Loading...
HomeMy WebLinkAboutARB201700036 Checklist 2017-04-28COUNTY-WIDE CERTIFICATE OF APPROPRIATENESS New or rglacernent,rooftop o ground-mo equipment CRITERIA _2L&!22Lj:p12y1ted -DESIGN Size, scale, location . Replacement equipment (new its replacing of units in the same location) shall not be more visible than the existie uiprnept. New equipment shall not be visible from the OK: Not visible from EC EC. Roof form Rooftop equipment on new buildings shall be screened by appropriately scaled parapets, the roof, or other appropriately scaled architectural elements that are fully coordinated with the building design. Location Buildings orstructures shall be used to N/A screen ground-mounted equipment from the EC. In situations where no structure is available for screening, equipment shall be located as distant from the EC as possible to minimize visibility, with screening devices added to elimivate visiili... Colors Replacement equipment that remains visible N/A from the EC must be colored to reduce visibility — either coordinated with the bu�ildin or to blend with the background. Screening devices Walls, fences and other architectural features N/A may be considered for screening mechanical equipment. Such features must be coordinated in material, color, and scale with the building. Durability and maintenance shall be considered when reviewing proposed screem 1Z materiak Planting Planting may be required in conjunction with N/A walls or fencing to provide a design that is coordinated and compatible with the building and site. Screening consisting solely of planting may N/A be considered based on: size of the area to be screened, proximity to the EC, density of planting, and ability of the planting to i ediate sc NOTE All equi2ment guidelines ap�.