HomeMy WebLinkAboutARB201700036 Checklist 2017-04-28COUNTY-WIDE CERTIFICATE OF APPROPRIATENESS
New
or rglacernent,rooftop o ground-mo
equipment
CRITERIA
_2L&!22Lj:p12y1ted
-DESIGN
Size, scale, location
.
Replacement equipment (new its replacing
of units in the same location) shall not be
more visible than the existie uiprnept.
New equipment shall not be visible from the
OK: Not visible from EC
EC.
Roof form
Rooftop equipment on new buildings shall be
screened by appropriately scaled parapets,
the roof, or other appropriately scaled
architectural elements that are fully
coordinated with the building design.
Location
Buildings orstructures shall be used to
N/A
screen ground-mounted equipment from the
EC. In situations where no structure is
available for screening, equipment shall be
located as distant from the EC as possible to
minimize visibility, with screening devices
added to elimivate visiili...
Colors
Replacement equipment that remains visible
N/A
from the EC must be colored to reduce
visibility — either coordinated with the
bu�ildin or to blend with the background.
Screening devices
Walls, fences and other architectural features
N/A
may be considered for screening mechanical
equipment. Such features must be
coordinated in material, color, and scale with
the building. Durability and maintenance
shall be considered when reviewing proposed
screem 1Z materiak
Planting
Planting may be required in conjunction with
N/A
walls or fencing to provide a design that is
coordinated and compatible with the building
and site.
Screening consisting solely of planting may
N/A
be considered based on: size of the area to be
screened, proximity to the EC, density of
planting, and ability of the planting to
i ediate sc
NOTE
All equi2ment guidelines ap�.