WPO file number: WP0201500078
Erosion and Sediment Control Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
(installed)
stablization (PS, TS)
$5,000.00
$60,000.00
silt fence (SF)
Eacres
ft
$5.00
$19,800.00
safety fence (SAF)
ft
$5.00
$4,300.00
diversion (DD, FD, RWD)
ft
$13.00
$16,510.00
temporary slope drain (TSD)
pipe length
-ft
pipe diameter -in
$0.00
$0.00
earthwork for trap
height of dam at toeft
ft
cut at high sideoft
height of fill at faceoft
ft
cut at face ft
length of damft
length of cutft
top width
width of cut
(area above transition)
0 sf
(area below transition) 203 sf
(total width of dam)
0 ft
(total width of cut) 59 ft
(height below transition)
0 ft
(depth below transitior 8 ft
(area below transition)
0 sf
(area above transition, 172 sf
(total fill volume)
0.0 cy
(total fill volume) 1388.9 cy
length of spillway
_ft
(TOAL CY estimate) 1389 cy
$13.00
$18,057.00
width of spillway
ft
(spillway stone tons) 3.6 tons
$50.00
$180.00
structures for basin
riser heightft
riser diameterMin
in
(riser unit price) $0.00
$0.00
barrel lengthft
base plate or fdn
$200.00
$0
barrel diameter
(barrel unit price) $0.00
$0.00
barrel collars
Mft
$200.00
$0
baffle length
$50.00
$0
earthwork for basin
height of dam at toeft
ft
cut at high sideoft
height of fill at faceoft
ft
cut at face ft
length of damft
length of cutft
top width
width of cut
(area above transition)
24 sf
(area below transition) 483 sf
(total width of dam)
14 ft
(total width of cut) 141 ft
(height below transition)
5 ft
(depth below transitior 29 ft
(area below transition)
10 sf
(area above transition', 1203.5 sf
(total fill volume)
403.0 cy
(total fill volume) 22486.7 cy
length of spillway
2ft
(TOAL CY estimate) 22621 cy
$13.00
$294,073.00
width of spillway
3 ft
(spillway stone tons) 34.5 tons
$50.00
$1,725.00
structures for basin
riser height
4 ft
riser diameter
48 in
(riser unit price) $150.00
$600.00
barrel length
41 ift
base plate or fdn
$200.00
$200
barrel diameter
24 in
(barrel unit price) $50.00
$2,050.00
barrel collars
Mft
$200.00
$600
baffle length
$50.00
$0
silt fence inlet protection (IP)
$100.00
$0.00
stone inlet protection (IP)
$200.00
$8,600.00
5/11/2017
North Pointe Middle Entrance and Rt. 29 Improvements
WPO file number: WP0201500078
Erosion and Sediment Control Bond Estimate
Item Item
No. Unit
Unit Cost
Cost
Number
(installed)
outlet protection (OP)
length
ft
width
ft
$0.00
$0.00
channel (SCC, matted)
length
ft
width
ft
IWO
$0.00
check dam
depth in channeloft
channel width
ft
0
$0.00
$0.00
construction entrance (CE)
0
$2,500.00
$0.00
wash rack
$2,000.00
$0.00
paved construction entrance
$3,500.00
$10,500.00
rip -rap, placed
depth
ft
length
�ft
width
(tons)
0 tons
$60.00
$0.00
survey and layout (price per 0.1 mi.)
acres
traps and basins
$9,500.00
mobilization
$2,500.00
stream crossing (computed independently)
$0.00
cost sum
$449,195.00
contingency
$44,919.50
Total
$494,120
5/11/2017
North Pointe Middle Entrance and Rt. 29 Improvements
WPO file number: WP0201500078
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48")
aggregate base or drainage stone
earthwork for trap/basin
Basin in ESC portion
structures for basin
trees
in d ES -1,2
0 EC -1
shrubs
in d
ftL
M.0ftW
height of dam at toeft
basins
cut at high sideoft
ft
height of fill at faceWit
ft
cut at face
ft
length of damft
$450.00
length of cutft
maintenance access road (LF)
top width
$0.00
width of cut
(area above transition)
0 sf
(area below transition,
0 sf
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transitior
0 ft
(depth below transitioi 0 ft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
_ft
(TOAL CY estimate)
0 cy
width of spillway
ft
(spillway stone tons)
0 tons
riser heightft
riser diameterMin
in
(riser unit price)
$0.00
barrel lengthft
base plate or Win
-
barrel diameter
(barrel unit price)
$0.00
barrel collars
Mft
baffle length
trees
35.0 ft
(tons)
shrubs
length
19.0 ft
seedlings
85.5
basins
underdrain (LF)
$500.00
$0.00
biofilter soil mix (CY)
$3,500.00
$0.00
trash rack/ anti vortex devices
$450.00
$0.00
maintenance access road (LF)
$0.00
$0.00
rip -rap, placed
depth
2 ft
width
20.0
rip -rap, placed
depth
2 ft
width
30.0
survey and layout (price per 0.1 mi.)
acres
17
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
length
35.0 ft
(tons)
105
length
19.0 ft
(tons)
85.5
basins
1
No. Unit
Unit Cost
Cost
0 ea
installed
$0.00
momm9ft
$13.00
$0.00
0 ea
$500.00
$0.00
0 ea
$3,500.00
$0.00
0 ft
$450.00
$0.00
0.0 ft
$0.00
$0.00
0.0 ton
$35.00
$0.00
$13.00 $0.00
$50.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 ea
$275.00
$0.00
0 ea
$50.00
$0.00
0 ea
$5.00
$0.00
0 ft
$5.00
$0.00
0 cy
$45.00
$0.00
1 ft
$1,500.00
$1,500.00
400 ft
$50.00
$20,000.00
$60.00 $6,300.00
5/11/2017
$60.00
$5,130.00
$9,000.00
$2,500.00
$2,000.00
$2,000.00
Mea
ea
$2,000.00
$2,000.00
ea
$3,000.00
$3,000.00
$0.00
5/11/2017
North Pointe Middle Entrance and Rt. 29 Improvements
WPO file number: WPO201500078
Stormwater Management Plan Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
(installed)
cost sum $51,430.00
contingency $5,143.00
Total $56,580
5/11/2017