Loading...
HomeMy WebLinkAboutSUB201500123 Bond Reduction 2017-06-02 (3)�RGICn4' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Subdivision Bond Inspection Bond Title: Old Trail Village Block 27 File Number: SUB2015-000123 Date of inspection: June 2, 2017 Reviewer: Emily Cox Original Bond Amount: $483,880 [20%=$96,776] Phone: (434) 296-5832 Current Bond Amount: $483,880 Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Approved Y N Y N N/A VDOT ■ ❑ Completed inspection request and fee ■ ❑ ❑ ❑ ■ ❑ As -built plan, updated, sealed to current date, per As -built policy ❑ ■ ❑ ❑ ■ ❑ Copies of recorded plats for right-of-way, easements ■ ❑ ❑ ❑ ■ ❑ VDOT approval AM-4.3, or partial completion via punchlist ❑ ❑ ❑ ■ ■ ❑ Letter from P.E. certifying improvements are built to plan ■ ❑ ❑ ❑ ❑ ■ Current certification form completed by owner/developer ❑ ■ ❑ ❑ ■ ❑ CBR test reports for each road ❑ ■ ❑ ❑ ■ ❑ Stone depth and material inspection reports (or core tests) ❑ ■ ❑ ❑ ■ ❑ Pavement depth and material inspection reports (or core tests) ■ ❑ ❑ ❑ ■ ❑ Compaction test reports for fill areas under road ■ ❑ ❑ ❑ ❑ ■ Pipe trench inspection reports ❑ ❑ ■ ❑ ■ ❑ Pipe interior inspections reports and video ❑ ■ ❑ ❑ ■ ❑ Concrete test reports for structural concrete, curbing, aprons, etc. ■ ❑ ❑ ❑ ❑ ■ Structural inspection reports for any bridges or box culverts ❑ ❑ ■ ❑ ❑ ■ county road name signs and posts, or a sign agreement for alt. posts ❑ ❑ ❑ Updated bond amount based on completed work: $107,300.00 (See attached Bond Estimate form for breakdown of bond amount and remaining items.) Notes: As -built Plan: • Please provide as -built landscaping sheet. • Please show all pavement markings. • Please show the final pavement design. Field Visit: • Several signposts were not vertical. Please ensure they are all installed correctly. • Please install the no parking signs as shown on the approved plan. • Please install landscaping as shown on the approved plan. It appears to be about 50% complete. • One CG-12 had several severe cracks. It appeared to already be marked with orange paint, but please ensure these cracks are fixed. Other: • CBR testing results were not provided for all roads. • Provide stone depth for all roads. • Provide certification of completion. • Complete all items on VDOT punchlist. • Pipe video: several pipes appear to have debris in them, please flush/clean the pipes. • Provide stone depth reports Please refer to on-line content at http://www.albemarle.org/deptfonns.asp?department=cdengw�o for checklists and procedures.