Loading...
HomeMy WebLinkAboutWPO201400041 Review Comments 2014-10-14Short Review Comments Report for: WPO201400041 SubApplication Type: Goodwill - Mill Creek Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:05/16/2014 Reviewer:Max Greene CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/16/2014 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:Existing Stormwater for Food Lion Shopping Center needs addional information prior to approval. Detention is accounted for, but the water quality needs addressing/conformation. Division: Date Completed:08/06/2014 Reviewer:Max Greene CDD Engineering Review Status:Pending Reviews Comments:Waiting for Stormwater Credit conformation from the State. Forwarded all e-mails from consultant to County Engineer for clarification on VSMP requirements. Division: Date Completed:09/03/2014 Reviewer:Max Greene CDD Engineering Review Status:Administrative Approval Reviews Comments: Division: Date Completed:10/14/2014 Reviewer:Max Greene CDD Engineering Review Status:No Objection Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:June 16, 2017 i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Goodwill — Mill Creek WP0201400041 Plan preparer: Balzer & Assoc. [dodonhue @blazer.com] Owner or rep.: GREENHALGH, BLAKELEY T OR JENNIFER PARHAM GREENHALGH Plan received date: 28 April 2014 Date of comments: 16 May 2014 Reviewer: Max Greene The Water Protection Plans (WP0201400041) submitted 28 April 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The following items will need to be adequately addressed prior to final plan approvals: 1. Storm Water management Plan: a. Please submit information regarding the purchase of SWM credits. The County of Albemarle has no SWM credit program. Water quality may be required on site. Further review of the existing SWM pond design and agreement may be required. 2. Erosion and Sediment Control Plan: a. The inlet protection is crucial to protecting the existing stormwater system. Any sediment entering the system will require the entire system being cleaned, and camera/video inspection of the system may be required to prove system is clean prior to release of the WPO bond. Please place a note on the plans to warn the contractor of the need to keep the soil from leaving the site. b. Please clarify /show the limits of disturbance on the plan. c. Please clarify /show the limits of pavement removal on the plan. d. Please show how silt fence will be installed on pavement. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mcreene @albemarle.orc to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEl_esc,swm_MRG_Goodwill -Mill Creek.doc