HomeMy WebLinkAboutWPO201200045 Application 2012-05-01 I''I€i' ' Albemarle eCisivnty Community Development Department
401 McIntire Road Charlottesville,VA 22902-4596
Plannin A lication Voice: (434)296-5832 Fax:(434)972-4126
9 pp
PARCEL / OWNER INFORMATION
TMP 055E0-01-00-000A1 Owner(s): •
Application # WPO201200045 MARCH MOUNTAIN PROPERTIES LLC
PROPERTY INFORMATION
Legal Description OLD TRAIL PARENT TRACT
Magisterial Dist. White Hall Land Use Primary Commercial
Current AFD Not in A/F District Current Zoning Primary Rural Areas
APPLICATION INFORMATION
Street Address Entered By
Todd Shifflett
Application Type Water Protection Ordinances 05/01/2012
Project Old Trail Village-Stockpile / Borrow Area
Received Date 04/30/12 Received Date Final Submittal Date Total Fees 300
Closing File Date Submittal Date Final Total Paid 300
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub Applicati Comment
Erasi t and!Sedinl nt Cc�ritrot Pian I
APPLICANT/ CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhoneCell
Owner/Applicant LIARCII NT
MOIJATN.PI:OPE r ILS P 0 BOX 370 C 0z A 22932 03
Primary Contact SCOTT COLLINS - COLLINS ENGINEERIN 200 GARRETT STREET,SUITE CHARLOTTESVILL 22902 4342933719
Plan Preparer COLLINS ENGINEERING
Signature of Contractor or Authorized Agent Date
Application for Review of f,
Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & 4 ,
Stream Buffer Mitigation Plan
[l(Erosion& Sediment Control Plan ❑ Stormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan
❑ E&S Plan Amendment ❑ SWM Plan Amendment
(Previous Plan# ) (Previous Plan# )
❑ E&S Plan with Variance ❑ Request for Exception
#of Variances ❑ SWM Plan Resubmittal
&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 copies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: c1/1 j nu l 1�itf G' cif"'
✓I�-f''u/ 7 rrow' Are&
per
Tax map and parcel: — Zoning: 1 Y/t(!
GVa 5
Amount of Land Disturbance: 41 Acres
Location of property(landmarks,intersections,or other): Ota e
Contact Person(Who should we call/write concerning this project?): See# Lv/fe''t..S' /11›,-S yyj�li
Address „:„Z6e) S t5 'f ie City eita-`'( 'iM+-PVik State I/4 Zip 02 2
Daytime Phone(4 54 'J7/1 Fax#( ) E-mail SCC ('��tYtS 1�rY(f'G'�Z CGw(
Owner of Record A4/1.4 /I Pelt,rr l'IG,e)t /-2 p r'+ Y .G ( Mit-toe `-- l.L ra / LL(
a:MLOW % tate 41.._ Zip 071-3-2
Day me P ne( / Fax#( ) E-mail
Contractor
Address City State Zip
Daytime Phoneof/A-,5
( ) Fax#( ) E-mail
Plan Preparer &/l hs, ri yAe /y
Address City State Zip
Daytime Phone( ) Fax#( ) E-mail
Owner/Applicant Must Read and Sign
By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
Management/BMP Plan,/1 d/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
development on the sub"••ct property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure
compliance with the •,rj"�roved plan.
+/ 4/3L 4. 01.
Signature of Owner, ontract Purchaser Date
SCO all arts X4/3.3 76
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO#
Y +Q B(i042- Ck# (Jw
Fee Amount$ �` � Date Paid � YV By who?�,�� �a���.�,�Receipt# By0�,�(at
'fig' ) Revised March 4,2010 Page 1 of 3
EROSION CONTROL PLAN: (SUBMIT 2 COPIES)
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review, Disturbed Area Less Than One Acre ...$151 r re
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees, Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review,Disturbed Area One Acre or Larger
g $300 per review )
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) .__
13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $760/per request
(TO BE PAID AT TIME OF APPLICATION)
18. SUBTOTAL EROSION CONTROL PLAN $ O
Revised March 4,2010 Page 2 of 3
STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan. $300/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22. Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23. Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $860
(TO BE PAID AT TIME OF APPLICATION)
25. SUBTOTAL SWM/BMP PLAN $
TOTAL APPLICATION FEE: (Add lines 18 and 25) $
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
Revised March 4,2010 Page 3 of 3