Loading...
HomeMy WebLinkAboutSUB201700088 Checklist - Project Closeout (Administrative) 2017-06-23 SUBDIVISION/SITE PLAN FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and status label. CDA will forward to the Imaging Center for digital closeout. SDP/SUB # 13 2_014 - VC PROJECT TITLE S Grk=r= 411� -- t✓A FULL NAME OF LEAD REVIEWER ?t All-f-E12 1---w- FINAL ACTION DATE: 6,/2-3/1--q. -------------- - ----------- ------------------ Co tyView— - ________-------------___-- -- fg Application,Page 2 Data Entered 0 Staff Report,Ground Water Assessment or other documents placed in"Docs&Pies" Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ❑ Engineering Folder Information/documentation ❑ Scan 0 Saved location N A [/Applicati (signature copy) Scan 0 Saved location ❑ Public Notification records/Abutting Owner correspondence ❑ Scan 0 Saved location kl A Applicant Correspondence(to/from, memos/emails) ❑ Scan (Saved location r M j [Compleette�et of printed Review Comments L1� Scan 0 Saved location 114( Approved lan/plat(signed,or stamped "Approved"with Planner/Engineer name) Scan 0 Saved location ❑ Action Letter(Administrative Approval) ❑ Scan ❑ Saved location 0 White Envelope-PC/BOS Meeting Package- Staff Report(include plan/plat presented,PC/BOS Action Letter ❑ Scan 0 Saved location A ) 0 Ground Water Assessments A ❑ Scan ❑ Saved location ❑ Other(Please explain-i.e. Studies) ❑ Scan ❑ Saved location [] Other(Please explain-i.e. Studies) ❑ Scan ❑ Saved location ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they shouldbe clearly marked as unapproved and contain a note clarifying why it was included. 0 Scan ❑ Saved location --___ Additional Information on this project: _____ _______________ ♦ Planning Commission Minutes-may be obtained(-train. w.. ..__.__ ,,.. -