HomeMy WebLinkAboutWPO201600072 Bond Estimates 2017-06-28Woolen Mills Light Industrial WPO file number: WP0201600072 Erosion and Sediment Control Bond Estimate Item tem Number No. Unit Unit Cost Cost nstalled stablization (PS, TS) acres $5,000.00 $28,550.00 sill fence (SF) ff $5.00 $5,730.00 safety fence (SAF) R $5.00 $2,485.00 tree protection (TP) R $5.00 $22,570.00 diversion (Do' FD, RWD) oft $13,00 $14,625.00 temporary slope drain (TSD) pipe length -ft pipe diameter -in $0.00 $0.00 earthwork for basin (SS) hei ht of dam at toe ft cut at hi h side R 9 9 height of fill al face R cut at (ace It length of dam ft length of cut R top width R width of cut ft (area above t.n.il 0 sf (area below transition) 320 sf (total width of dam) 0 ft (total width of cut) 94 ft (height below transition) 0 ft (depth below transition) 19 ft (area below transition) 0 sf (area above lansition) 532 sf (total fill volume) 0.0 cy (total fill volume) 4985.8 cy length of spillway _ft (TOAL Cy estimate) 4986 cy $13.00 $64,818.00 width of spillway R (spillway stone tons) 0tons $50.00 $0.00 earthwork for trap (ST-1) hei ht of dam at toe R cut at high side R 9 9 height of fill al face R cut at face ft length of dam ft length of cut R top with R width of cut ft (area above transition) 2 sf (area below transition) 147 sf (total width of dam) 1 ft (total width of cut) 35 ft (height below transition) 0 ft (depth below transition) 0 ft (area below transition) 0 sf (area abovelansition) 0 sf (total fill volume) 5.6 cy (total fill volume) 435.6 cy length of spillway _ft (TOAL Cy estimate) 437' $13.00 $5,681.00 width of spillway ft (spillway stone tons) 0tons $50.00 $0.00 earthwork for trap (ST-2) height of dam at toe ft cut at high side 28.7 R height of fill at face ft cut efface 6.7ft length of dam R length of cut 57 it lop width It width of cut -...Aft (area above transition) 0 sf (area below transition) 129.98 sf (total width of dam) 0 ft (total width of cut) 76.8 ft (height below transition) 0 ft (depth below transition) 22 ft area below transition) 0 sf area above transition) 360.8 sf (total fill volume) 0A cy (total fill volume) 1036.1 cy length of spillway MR (TOAL Cy estimate) 1036 cy $13.00 $13,468.00 width of spillway ft (spillway stone tons) 0tons $50.00 $0.00 structures for basin riser height SR r diameter 4 in (riser unit price) $150.00 $750.00 barrel length ft base plate or fdn $200.00 $200 barrel diameter (barrel unit price) $35 00 $1,050.00 trash rack) anti vortex devices R $1,500.00 $3,000.00 barrel collars ■ $200.00 $0 baffle length R $50.00 $3,000 sill fence inlet protection (IP) $100.00 $0.00 stone inlet protection (IP) $200.00 $3,200.00 outlet protection (j Stri end (DP) length ft width R $1,fi13.00 $1,683.00 outlet protection 0 st, end (OP) length R witltlt ft $315.00 $315.00 channel ($CC' matted) length ft width R $0.00 check dam depth in channel R channel width R $90.00 $360.00 construction entrance (CE) $2,011.11 $0.00 wash rack $2,000.00 $4,000.00 paved construction entrance $3,500.00 $7,000.00 rip -rap, placed depth _ft length -ft width (tons) 0 tons $60.00 $0.00 rvey and layout (price per 0.1 mi.) acres traps and basins $4,355.00 mobilization $4,000.00 stream crossing (computed independently) $0.00 cost sum $190,840.00 contingency $19,084.00 Total $209,930 6/28/2017