HomeMy WebLinkAboutWPO201700020 Approval - County 2017-06-29COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: (Rev. 1) (Rev. 2) Date of comments: (Rev. 1) (Rev. 2) Reviewer: VSMP Permit Plan Review Foothill Crossing II WPO -2017-00020 Collins Engineering Foothill Crossing, Inc. 21 February 2017 12 April 2017 24 May 2017 31 March 2017 22 May 2017 29 June 2017 Matt Wentland County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. The existing SWPPP will need to be updated with the amendment. If area shown on the existing Registration Statement is being increased, a new statement will be needed. (Rev. 1) Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. The sheet emailed on 3/23 will need to be included in the next submittal. The layout on this sheet also conflicts with the layout shown on other sheets and a consistent layout will need to be shown. This may also require changes to the road plans. (Rev. 1) Comment addressed. Please note that since this is conventional zoning, a grading permit for the further disturbance will not be issued until the Glenbrook Initial Site Plan is approved. [18.32.4.2.8b] 2. Provide a maintenance schedule for the pond on the plans. (Rev. 1) Comment addressed. 3. The calculations/VRRM worksheet will need to be revised to match any additional areas shown on the recently submitted site plan for the area around the revised pond. (Graham's message on 3/21) (Rev. 1) Comment addressed. 4. Side slopes for the pond should have a gradient of 4:1 or 5:1 for easier maintenance and safety. (DEQ BMP Spec. 14, 6.6) (Rev. 1) Comment addressed. Engineering Review Comments Page 2 of 2 D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. See comment 1 above. (Rev. 1) Comment partially addressed. It appears additional measures may be required along lots 54-60 if they will be completed before the grading of Glenbrook is finished. All necessary measures from Phase II should also be shown on the Glenbrook ESC plan, such as the inlet protection. Show the drainage areas to the traps and basin on sheet 10A. (Rev. 2) Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; httD://www.albemarle.orL),/deDtforms.aSD?deDartment=cdenL)'WDO File: WP0201700020 Foothill Crossing II Amendment Rev2 06-29-17.doc