t 999-2000 Construction
Allocations and Six-Year Improvement
Prograxm
City/Town Mayors/Managers
County Board of Supervisors
County Libraries
Planning District Commissions
Transit Agencies
Transportation District Commissions
Concerned Citizens
A copy of the tentative 1999-2000 allocations for the Interstate, Primary, and Urban
Highway systems, as well as Public Transit, Ports, and Airports, including the updated Six-Year
Improvement Program through 2004-005, was submitted to you by my letter of May 24, 1999.
The Commonwealth Transportation Board, on June 17th, gave final approval to the
enclosed 1999-2000 allocations and updated Six-Year Improvement Program.
Very truly yours,
David R. Gehr
Commissioner
enclosures
cc: The Honorable Shirley J. Ybarra
WE KEEP VIRGINIA MOVING
Common wealth Y(ansp orta t/on Bo
i$ cai year
Volume Two
Virginia Department of Y~anspo(tation and the
Viy~inia Department of Rail and Pub/lc Y~anspo~tation
I ! ! ! ! i ! ! I i I ! I I I I ! I i
FISCAL YEARS 1999- 2000 THRU 2004- 2005
SIX YEAR
IMPROVEMENT PROGRAM
Interstate, Primary, Urban and Secondary Highway Systems
Public Transit, Ports and Airports
Copyright 1999, Commonwealth of Virginia
I ! i ! ! I I ! I I I I I I I i ! I _1
Congestion Mitigation & Air Quality
TABLE OF CONTENTS
VOLUME 2
Safety i }rovement
U. S. Route 58 Corridor
Development (
Rail and Public TransPortatiOn
' ! "! -'1 i ...... 1 ! 1 .1 -1 ' '1 w~.j '~! -I .... ! ! ..... 1 ,' .... I ' ..... }
Commonwealth T(ansportation Board
~"~ ~ (CongestiOn
h#~at~n & Air
/~pro vement Program)
I I I ! I I I I I ! I
CONGESTION MITIGA TION AND AIR QUALITY IMPRO VEMENT
The Transportation Equity Act for the 21st Century or "TEA-21", signed by the President on June 9, 1998 provided for the
continuation of the Congestion Mitigation and Air Quality Improvement Program (CMAQ). This program provides funds for projects to
reduce pollution in Clean Air Act non-attainment and maintenance areas.
This new federal-aid legislation established federal authorizations through 2003, thus providing better planning for future revenues.
Projects for 'the Congestion Mitigation Program are not limited to highways. Eligibility is extended to other modes where the
project can be shown to reduce congestion within the area.
federal dollars.
Local officials, acting through the Transportation
Required matching funds will be provided from the system or mode using the
Planning Board in Northern Virginia and the Metropolitan Plamfing
Organizations within the other areas of the state and in cooperation with the Department, are responsible for recommending projects
for Congestion Mitigation and Air Quality funding, except for $4 million in funds that shall be designated for projects in Virginia's
non-attainment and maintenance areas by the Commonwealth Transportation Board, with first priority for this funding granted to
approved Transportation Emissions Reduction Measures which are designed to mitigate emission impacts and that are not facility,
locality, or mode specific. These projects must be included in the regional Transportation Improvement Programs for each area and
are subject to individual eligibility determinations by the Federal Highway and Federal Transit Administrations.
CONGESTION MITIGATION AND AIR
QUALITY IMPROVEMENT PROGRAM
(In Thousands of Dollars)
1998-1999 through 2003-2004
FEDERAL FUND ALLOCATIONS
FREDERICKSBURG
REGION
NORTHERN VIRGINIA
REGION
344 477 487 499 499 499 2,805
8,563 11,852 12,411 12,411
12,411 69,755
HAMPTON ROADS
REGION
5,120 7,087 7,240 7,422 7,422 41,713
RIcHMoND
2,770 3,834 3,917 4,015 4,015 4,015 22,566
CTB DISTRII~UTED 4,000 4,000 4,000 4,564 5,139 25,703
I I I ! I I ! I I I t ! I It I I I
Stafford 1.8 Mile East PE .
~Brooke Route 1 - RW
ICommuter Rail Intersection CN ~:~,~ ~
) Additional CMAQ Funds 15459 CM ~
to be Distributed by
upon inclusion In TIP by MPO and specific project
, determlnalion by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY
FREDERICKSBURG REGION
tOn
PE
RW
CN
TO
13555
PE
RW
CO
TO
CM
52281
PE
Sidewalk/Other RW
Pedestrian CO
[mpmvemento TO
CM
52450
Old Dominion Dr. PE
Bike Trail RW
CN
TO
CM
16100
PE
Overpass at No~ RW
Carlin Springs Road CO
TO
CM
Provided In Pdmary Program
TIP by MPO and specific project
determination by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
I I I I I r I i I I I I I I I
Highway Signalization
HOV Access Ramp at
Seminap/Rd
PE
RW
CN
TO
CM
14862
PE
RW
CN
TO
CM
13464
PE
RW
CN
TO
CM
16O99
.andmark Mall
Gateway
Highway Trail
RW
CN
TO
5O431
PE
RW
CO
TO
52472
PE
RW
CO
TO
CM
CM
CM
* Includes $500 STP Regional Funding R'0vlded in Urban System Program ' ' '
Construction Unden~ay :Plans and Contract J ~dministration by City
by MPO and specitic project
determination by FHWAFTA.
NORTHERN VIRGINIA REGION
CONGESTION MITIGATION AND AIR QUALITY
5
Faidax
C~y of
Fairfax
~of
Columbia Pike
Trail
PE
RW
CO
~rO
CM
52469
PE
RW
CN
TO
CM
12879
PE
RW
CN
TO
CM
13466
PE
lhellers RW
CN
TO
CM
14863
Tysons Comer RW
(Weslpark Site) CN
TO
CM
Bus Shelters
16181
PE
RW
CN
TO
CM
16182
In TIP by UPO and specific project
determination by FHWNFTA,
CONGESTION MITIGATION AND AIR QUALITY
IConstruC~ion Complete ......... Plans aid Contract ,dministrat!,o,,n, by City
lUnder Construction , illllll, .............. ~la"s and, Contract A(JministralJon by Cty ,, ~;~l; , ,
iI *l InclUdes Funds Transferred from Previous AllocatiOns ............
[COnstmctipn coml~ieL[,~ i .... planS,~ild Contra~t AiJ~inistmtton by Co~i)~ ~
6
NORTHERN VIRGINIA REGION
· t
! · I
Seven Comefl;
Transit Transfer
Center
PE
RW
CN
TO
CM
Central Computerized PE
Traffic Signal RW
System and Control ON
Monitoring TO
OM
2380 / 12821 t 13453
PE
RW
Thru and CO
Lanes) TO
CM
52291
Sidewalks/Trails PE
at Metro Facilities RW
CO
TO
CM
52288
PE
Parkway - 500 Space RW
Commuter Parking Lot CO ~
TO
CM
52285
Gmat Falls Street Trail PE
RW ~
CO
TO
CM
$1,345 Required Federal Demo Match ~
(1) ' STP Statewide in Vol. I
(t)
by MPO and specific project
determination by FHWA/FTA,
NORTHERN VIRGINIA REGION
CONGESTION MITIGATION AND AIR QUALITY
7
PE
RW
CN
TO
CM
Hemdon
,of
PE
RW
CO
TO
PE
RW
CN
TO
3467
PE
RW
CN
TO
Purcellville- PE
RW
Parking Lot CO
TO
522g0
RW
CN
TO
13465
CM
CM
CM
CM
CM
(NFO)~00-253-111 PE101, C~01 ................. ,i', ....
in TIP by MPO and specific project
elegibility determinalion by FHWNFTA.
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
8
I I ! i ! I ! ' ! ! ! i I
tma
Program
PE
RW
CN
TO
CM
Bicycle Racks at
Selected Locations
I'CM-70A
RW
CN
TO
17641
PE
RW
CN
TO
5OOO9
CM
Pilot Program
PE
RW
CN
TO
t MPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
9
Rosslyn
RW
CO
TO
CM
RW
CN
TO
CM
PE
RW
CN
TO
CM
Assistance Program
(Commuter Stores
and Services)
PE
RW
CO
TO
CM
Station Safety/Station
Improvements
PE
RW
CO
TO
CM
Program
PE
RW
CN
TO
CM
' FHWNFTA.
project
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
10
I If I 11 I I I ' I I ! I :1 t t I i I ! I
Public Education PE
Campaign RW
CN
TO
Re(jional Rideshadng PE
Progarm RW
CN
TO
CM
Ride, sham PE
Program RW
Expanded CN
TCM-47 TO
CM
O~
TCM-47C RW
Guaranteed CO
Ride Home TO
CM
Support
Implementatio~ RW
Telecommuting CN
TCM-92 TO
CM~
Falls Church PE
Ele~ic Bus Service. RW
Neighborhoods To CN
Metrorail Stations TO
Cl~
TIP by MPO and spedflc project
determination by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY 11 NORTHERN VIRGINIA REGION
Transportation
Program
Enhancements
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
PE
RW
CO
TO
~i~ llnclud~"$450 STP Regional
inia
~ Commuter
Station -
Second Passenger
Platform
PE
RW
CN
TO
PE
RW
CN
TO
* Includes Funds Transferred From Previous Allocations
by MPO and spedfic project
determination by FHWNFTA,
CONGESTION MITIGATION AND AIR QUALITY
12
NORTHERN VIRGINIA REGION
Replacement Buses
Feeder Bus to
Vienna Melrorail
Station
Rail Car
Replacement
Provide Free Bus
Rides on Code Red
Days
PE
RW
CN
TO
CM
12878
PE
RW
CO
TO
CM
PE
RW
CO
TO ~;:;
CM ~i~
PE
RW
CN
TO
CM
Endzone PE
Regional Public RW
Education CO
Campaign TO
CM
Commuter Connections PE
Operation Center RW
CO
TO
CM
MPO and spedlic pro~ect
determination by FHWA/FTA,
STP Funds
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
13
Bus She{te~
Programs -
Fairfax, PRTC,
, and
Measures (TERMS)
)Funds
PE
RW
CO
TO
CM
RW
CN
TO CM
~Y MPO and specific= project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY NORTHERN VIRGINIA REGION
14
RW ~
10 ~
,- Reglonwide
M-92 Metropolitan
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
CM
.- Regionwlde
M-47C Regional
Guaranteed Ride
Home Program
PE
RW
CN
TO
CM~
CM
M-70B Employer
O~treach for
Bicycling
PE
RW
CN
TO
CM
CM
- Reglonwlde M-70A Bicycle
PE
RW
CN
TO
CM
CMAQ - TERM'S NORTHERN VIRGINIA REGION
15
Regionwide
-- Reglonwide
M-77B Vanpool
Incentives - Capital
PE
RW
CN
TO
CM
HOV Marketing
PE
RW
CN
TO
CM
Marketing Campaign
PE
RW
CO
TO
CM
PE
RW
CN
TO
CM
M
C
CMAQ - TERM'S
1
16
NORTHERN VIRGINIA REGION
PROJECTS TOBE ADMiNiStERED:BY VDOT
....... :
I
104 - Improve Great BF~lge PE
City ofBoulevard RW
Chesapeake Intersection CN
BoulevardDominion Geometric and Signal improvements TO CM
I Construction Complete ' ' Plans~Right of Way and Contract Administration by C ty
[VDOT) 12965 M110104-131-V05~ PE101~ C501 ,, ,
168 - Improve Great Bridge PE
City of Boulevard RW
Chesapeake
Intersection
CN
Boulevard CM nstructio, n Co,mplete Plans and Contract Adminisffation by City '
[VDOT) 12966 M 168-131-V10~ PE101~ C5,01 ,
City of Upgrade Traffic PE
Chesapeake Signal System with RW
Interconnect CN
IVDOT) 12964 M~ ' ....
3ity of Greenbrier Parkway - PE
3hesapeake Route 64 RW
Interconnect
[VDOT) 1~168 M
icity of Various Locations PE
IChesapeake RW
I(VDOTI 16108 · ~ .....
~ indusion in TIP by MPC and specific project
determination by FHWNFTA.
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
17
IChesapeal<e JEW I I I i I
ISlgnal I CN I I I ,,r, I
I I I i IPlans and Contra~ ~ dministrafi~ by Ci~ ' '
i(VOOT) 116109 I
IChesapeake Systems i RW
I I I I IPlans and ConE~ Admtnts~a~on by City '
I~VDOTI , ~5~10
lChesapeake Jolliff Rd I RW
iBikeway I CN I I I
cB~:?~ ...... I '
IIVDOT) J~6110 ~ I J CM I(NFO)U00043~-I~SPE101, C501 ....
ICi~ of At Gr~nbrier/ I PE F~:~OI ' I I
IChesapeake Eden Way I Mall I RW
llnters~ion I CO ~/ / I
I
I
/
/
/
I(VDOT) ........ 17637 CM i{NFO{ )U000-131- ....129 PE10i~ AW201 C501
IChesapeake ~lake Drive / RW ~ ?~ ~/ / I
I1~ Ramp - / co :~/~ / / I
IChesapeake lCedar Ro~ / RW
IExtend R~te ~ ! / CO
I(VDOT) I 152359 l: / l~NF°) UO0043~-~4t PEt01 RW201, C501 .........
IConUngent upon indusi~ in TIP by MPO and sp~fic proj~
el~ibili~ determinaUon by FHW~TA.
CONGESTION MITIGATION AND AIR QUALITY 18 HAMPTON ROADS REGION
I I ) I I I I I I I i ~ [
I I I I I i !
of Mount Pleasant Road at
Great Bridge Bypass
'urn Lane
PE
RW
CO
TO
CM
, of
Gilmerton Road:
Route 17 -
Signals, VMS Signs
and Video Monitoring
Site
Provide Satellite
Parking near
Street and
West Pembroke Ave.
System Upgrade
Integrate with
COMPARE
Armistead Avenue
PE
RW
CO
TO
CM
RW
CO
TO
CM
52352
RW
CN
TO
CM
13477
PE
RW
CN
TO
CM
16102
PE
RW
CO
TO
CM
19026
i * Includes Funds Transferred Frem Previous Nlocations '
d, eestruction Complete Plans and Contract Administration by City
* Includes $2,000 STP Regional and $350'Urban'AIIocat~or{~ ~ '"
inclusion in TIPby MPO and specific project
,determination by FHWAFTA.
HAMPTON ROADS REGION
CONGESTION MITIGATION AND AIR QUALITY
19
Landing Road
Michaels Woods
! TMSI
PE
RW
CO
TO
17825
RW
CO
TO
19027
Center - RW
VDOT Smart Travel CO
TO
, of Boulevard/
S~'eet
IntersecUons
52380
RW
CO
TO
52362
RW
CO
TO
52363
Hardy Cash Drive/ RW
Enterprise Parkway CO
TO
52387
CM
CM
CM
CM
CM
CM
~y MPO and specific project
determination by FHWAETA.
CONGESTION MITIGATION AND AIR QUALITY
HAMPTON ROADS REGION
20
City of IAt Fox Hill Road and I PE I i I I
Hampton IWoodland Road I RW I I I I
Intersection J ! CO I I I I
I I 152364 ! I CM IU000~114-135, PEI01
ICity of IJ. Clyde Morris [ PE ~1%~61 I I ....
INewport News IBoulevard Corridor I RW
IB~keway Int Route 64- I CN ?;~i!~.~,,i I I
IPhasel IJeffersonAvenue I TO : ! ::.~/183~,.,!,. ~t~'.~1 ":~"~
~'~'~i~;I ~ I o struc' Complete
LVDO~) I .... 112~69 ............... I I CM IUOOO-121-V14 P[~101
T - I I :(~,~ I I 'Cn tion
ICi~ o~ IJ. Clyde Morris I PE ~:~ ~] J I '
INewport News IBou evard Corridor I RW ; i~!i~!~;!OI I I
IB,keway l Jefferson Avenue- I CN ~;~i~al ! I------
IPhase II IManners Museum
I I I CM
I I I I I nder Cons uction
I(WOT) I 11~78 .......... I ! Ca IUOOOq2~.W4, PE102~
ICi~ of IJ. Qyde Mot[is I PE
INewp~ N~ IB~levard Cor~dor I RW I I /
IBikeway IThimble Shale Bird,- I CN I I /
I !
I(VmT) I I1,~25 ....... I I CM I00~7-~2~-V0S, PE101,
ICI~ of JRivermont Bike
INewp°" News ITrail ! aw I I /
IBike Trail I I CO
(VDOT) 52~3 CM 141~ PE101,
I~J~ of IJ. Clyde MoEis I PE I I
INewpo~ Ne~ IB~levard C~ridor ! ~ ~ I I /
IBik~ay IM dd ~r~nd Blvd -
IPhase IV IJeffemon Ave. i TO
I land ~ster Point Rd.) ! I I /
I(VP~T} I .............
IContingent u~n indusi~ in TIP by MPO and spe~fic pmj~
l~ibili~ detamina~on by FHW~TA,
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
21
and Right
Oyster Point Rd.
Intersection
PE
RW
CN
TO
~lewport News
Pat~lck Henry
Commerce Center
I
lPa~'ick Henry
Center
12970
RW
CN
TO
13470
RW
CN
TO
Coordinate 70
Signals
RW
CN
TO
16104
Lane-
RW
CN
TO
~ewpo~News
Intersection
Warwick Boulevard
and Oyster Point Road
16105
RW
CO
TO
9021
TIP by MPO and specific project
:determination by FHWNFTA.
cml
CUi
CMi
CM
CM
420 Additional CMAQ Funds Allocated From Reserve Account
CONGESTION MITIGATION AND AIR QUALITY
22
HAMPTON ROADS REGION
! I I ! I ! I I I I I I
I
I I
, of PE
Newport News and Thimble Shoals RW
Intersection CO
Improvement TO
19023
PE
Newport News Boulevard end RW
Intersection CO
Improvement TO
9O22
Traffic Operations PE
Center- RW
1.64 at JeffersOn Avenue CO
TO
r of Hall.
1-664
52346
PE
RW
CO
TO
CM
CM
CM
CM
~ of
Intersections
Phases VI - XI
Mercury Boulevard:
Hampton -
Newport News
PE
RW
CO
TO
CM
52348
RW
CO
TO
CM
52389
, MPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY
23
HAMPTON ROADS REGION
C~ty of
Pedesbian Trail
Upgrade
~of
~of
~of
Park PE
RW
CO
TO
System Upgrade
(225 Intersections)
52349
PE
RW
CO
TO
CM
CM
1-64 Newport News -
Route 105 York County
Upgrade 75
Intersections
Computerized Signal
System Expansion -
Phase I
PE
RW
CO
TO
CM
PE
RW
CN
TO
50011
RW
CN
TO
CM
12971
Computerized Signal PE
System Expansion RW
Phase II CN
TO
CM
' MPO and specific project
determination by FHWNFTA.
CONGESTION MITIGATION AND AIR QUALITY
24
0 !,, ,0~ 0
0 :0
O: :iO 0.'; 0 0 0
0
HAMPTON ROADS REGION
Non,4ew Avenue/ PE
Garden Road * RW
Relocate Eastbound CO
and Norlhbound Left TO ~
CM
§23§5
Norfolk STC - PE
VDOT STC RW
CO
TO
CM
~of
STC Operations
City of
Norfolk
Signal
Optimization
Citywide STC
; Avenue -
Boulevard
Beach Boulevard/
: Boulevard -
PE
RW
CO
TO
CM
PE
RW
CO
TO
CM
52367
PE
RW
CO
TO
OM
52368
~ of PE
Portsmouth Signal System RW
CN
TO
CM
16196
?7,0 O~ : :0'
Plans and Contract
:Iminislration by City
Contingent upon Inclusion in TIP by MPO and specific projec{
r determination by FHW/VFTA.
CONGESTION MITIGATION AND AIR QUALITY 25 HAMPTON ROADS REGION
¸of
~ane$
Constance Road
Intersection
Improvement
PE
RW
CN
TO
CM
12973
RW
CN
TO
CM
DoWntOwn Signal
AW
CN
TO
cM
Downtown
!7531
PE
RW
CN
TO
CM
50012
RW
CO
TO
CM
ECL -
19011
PE
RW
CO
TO
O~ O/;~:i!!', .0! O: :0
52370
inclusion in TiP by MPO and spectflc project
determination by FHWNFTA,
*'l~clud~s'Transfers of $34 from 17923, $43 from 12974 and $196 from MPO Reserve Account
'iC(~hstruction,,~......^.Underway...~..... .... plains and Contract J ,dmi~iSl!ration by City ,,
Pla, ps and C(~ntra'~:{'Adminislration by Cty
CONGESTION MITIGATION AND AIR QUALITY
HAMPTON ROADS REGION
26
! I I I I ! I 1 I I I ! I ] I I I i I
RW
Route 101
:loute 460 -
4ings Fork ROad
~CL -
Fork Road
PE
RW
CO
TO
RW
CO
TO
CM
SCL -
Turlington Road
Route 337/
ECL-
Portsmouth Blvd.
Va, Beach Blvd.
RW
CO
TO ~
CM~;~
PE
RW
CO
TO
CM
52382
PE
RW
CO
TO
CM
19013
TIP by MPO and specific project
t determination by FHWAET^.
CONGESTION MITIGATION AND AIR QUALITY
27
HAMPTON ROADS REGION
,of
and Lynnhaven
Parkway
and Witchduck
Neck Rd.
RW
CO
TO
19015
RW
CO
TO
RW
CO
TO
1~012
PE
RW
CO
TO
19005
Route 264 (44) RW
CO
TO
18970
RW
CN
TO
CM
CM
CM
CM
CM~
CM
~252~
determination by FHW/VFTA,
pecil~c project
CONGESTION MITIGATION AND AIR QUALITY
28
HAMPTON ROADS REGION
Interconnect and
Southbound Turn Lane
at Viking Drive
Locations and
Phase II
PE
RW
CN
TO
CM
12976
RW
CN
TO
CM
PE
RW
CN
TO
CM
STP
PE
RW
CO
TO
52355
RW
CN
TO
City/State Fiber
PE
RW
CO
TO
52354
CM
Jconstmctio~n:,Cemplete 'Plans and Con(ract Administration by City
lCons~ction Complete , , Plans andContract Administration by City
by MPO and specific project
determination by FHWAETA,
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
29
P of
Beach
Bikeway
Message Signs
(ITS)
Event Signals
Improvement]
Road
Cente~ville Rd
PE
RW
CN
TO
16107
RW
CN
TO
50014
RW
CO
TO
52378
PE
RW
CO
TO
19016
RW
CO
TO
PE
RW
CN
TO
16462
CM
CM
CM
GM
CM
CM
I
/
inclusion in TIP by MPO and specific project
determinalion by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY
30
HAMPTON ROADS REGION
]James City ]Longhilt Road/
]612. IOIde Town Road-
Multi Uso Trail Centerville Road
and
City
Lane
13719
Route 199/ PE
Route 5- RW
CO
TO
18975
CM
Regional Bikeway PE ional Nlocalions and $70 MPO Reserve Account
Network RW
CN
135O0
Regional Bikeway PE
Signege RW
CN
TO
16463
Lakeside Drive PE
Intersection RW
CN
TO
12962
PE
RW
CN
TO
GraflonDdve
CM
CM
CM
CM
~PO and spedflc project
determination by FHW/VFTA,
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
31
Emissions Inspection RW
Stations CN
TO ~0 ~0 0 0 :~:~:~:0~
151~1
Information System RW I
CO ,
!
TO * ~0 0 ~:~ ~ .0'
CM
52324
/IPO Reserve Account
0 O~?i ~
PROJECTS TO BE
City of ' Operation of Ferry PE
Hampton Between Hampton RW
Fast Ferry and Norfolk CN
(Downtown TO
...................................... ~:.3~317:- f:%~:ii0:.~? ~,~':::'~:?0'~ ~',::: :.":<, !0:i- .~ .
Partnership) CM " ............
Peninsula Purchase 2 - 40 fl PE
Transportatien Buses RW
Bislricl CN
~, ~}!}~ ,, ' ..... , .,.~, .~.~.~
.........
;~eninsula Pumhase";i Ne~ Buses PE ' ~%0 '
fransportation RW
:ommissien 1'0 ~.,.,. ~ ........................... ......
DR T)
I ' '""
TIP by IMPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY
32
HAMPTON ROADS REGION
i I I I I ! ]1 !
Purchase 5 New Buses PE
RW
CH
Peninsula ;o~vice PE
Transporlation RW
Disb'ict CN
TO
RW
CN
TO
CM
PE
RW
CN
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
:'-?0' ";~[ 0 0 0" 0 0 :0
upon indusion in TIP by MPO and specific project
determinalJon by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY
HAMPTON ROADS REGION
33
District
Transportation
District
Shuttle
PE
RW
CN
TO
CM
Oyster Point
Shuttle Service
PE
RW
CN
TO
CM
Transit
PE
RW
CN
TO
CM
Transit Service
RW
CO
TO
CM
HOV Express
Bus Service/ RW
1-64 Corridor From CO
To TO
GM
PE
Magruder Boulevard RW
Corridor Route Service CO
TO
CM
by MPO and specific project
t determinalion by FHWNFTA.
*
STP Regional Allocation
' i"'cludes $487 ST'P Regional AllocalJon I
CONGESTION MITIGATION AND AIR QUALITY
34
HAMPTON ROADS REGION
Tmnspoffa~on
Deviation/
Service
PE
RW
CO
TO
CM
Kempsvitle Road
New Transit Service
PE
RW
CN
TO
CM
Deep Creek New
Transit Service
PE
RW
CN
TO
-CM
Chesapeake Express
Transit Sen'ice
RW
CN
TO
CM
'/'.0
~0
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
inclusion in TIP by MPO and specific project
determination by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
35
Purchase 8 Buses for
New Service
PE
RW
CN
TO
CM
Purchase 20 Transit
Coaches for new HOV
Express Bus Service
Ridesharing and
RW
CN
TO
GM
PE
RW
CN
TO
'~62~
0 0 ~0
Tunnel;
From Churchland,
and other Park and
12
River Road)
PE
RW
CN
TO
PE
RW
CN
TO
Route No. 15
PE
RW
CN
TO
CM
125
* Inctude'~ $250 STP Regional Allocations
0 J ~0;.?!;.=
0
determination by FHWNFTA.
proj~
CONGESTION MITIGATION AND AIR QUALITY
36
HAMPTON ROADS REGION
I I I
! 'i ! I ] ! I } I I t I ! I I ! !
Tidewater HOV Express Bus PE
Service to Norfolk RW
Naval Base From CN
TO i120 :0~, :0'~ '0~ ~:0 50: O~:i
CM
Express Bus Service
PE
RW
CO
TO
CM
O~
Tidewater
District
Indian River HOV
Express Bus Service
Si vedeaf HOV
Express Bus Service
PE
RW
CO
TO
CM
PE
RW
CO
TO
CM
~0
~8
39
Park and Sail
Shuttle Sewice
RW
CO
TO
CM
0
Regional PE
Commuter Service RW
CN
TO
CM
inclusion in TIP by MPO and specific project
determination by FHWNFTA,
CONGESTION MITIGATION AND AIR QUALITY HAMPTON ROADS REGION
37
Richmond Rd
Tourist Shuttle
PE
RW
CN
TO
CM
iRecjional Allocation
Shopping
Circulator
RW
CO
TO
CM
PE
RW
CN
TO
CM
100,
Buses, Bus Shelters RW
and Other Facilities CO
TO
Equipment
CM
O~
PE
Downtown RW
Electric CO
TO
CM
0~
to be 0istributed by
Local MPO
by MPO and specific project
by FHWAETA
CONGESTION MITIGATION AND AIR QUALITY
38
HAMPTON ROADS REGION
I
upon inclusion in TIFby MPO and specific project
determinalion by FHWAFTA,
CONGESTION MITIGATION AND AIR QUALITY
39
HAMPTON ROADS REGION
RW
CN
TO
CM
50651
CMAQ - TERM'S
40
HAMPTON ROADS REGION
1/54 - Town of Reduce Single PE ~ I // ......................
~,shland Occupant Vehicle RW~1~1 /
CN
Install Tiips Bel~een High ~i ........ ~ '~ ' .......... ~ .... ~;~ '
Prior.Sidewalks 1 Ama in and Density Commerdal Residential Areas TO CM~1
3f Master Plan Plans and Contract Adminisb'ation b Town
Town of Intersmion '
Ashland Route 1 and RW
/ ~ Contract Adminis~a~on b~ '.
l'owniV'DO'T) of .... Route 1 and Junclion 13463PE ~l / CM 10001-166-V06, PE 01, RW20,, M501 ~. 1
~,hland Drive & Route 54 andCN RW ~ i~T~i~;~! ~
~edesldan Cottage Drive CN
SIgna Heads,
~ctivators, CM
~ave. Ma~ings Plans and own ,
'VDOT) 1:~62 ! M501
rown of Along and Adjacent PE
~shland to Route 1 and RW
nslall Route 54
,urn
rVDOT) 13461 / CM
15Cl;adesCity AtRoutel06 RwPE ~ ~
ILett
Lanes CM~I -- ~'
I(VDOT) 12951 .................... !.. CM I~'V~'PEIO!f M501~ M502 ...............
TIP by MPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
41
55-
10-
t0-
Lelt Turn Lane
155 PE
RW
CN
TO
12952
PE
RW
CN ~
TO
16477
PE
RW
CN
TO
16095
PE
RW
CN
TO
CM
16098
PE
RW
CN
TO
CM~
16096
PE
RW
CN
TO
CM
5OO16
(t)
Includes $194 STP Regional Allocation
inclusion in TIP by MPO and specific project
determination by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY
42
RICHMOND REGION
i I I
10-
Road
~0017
PE
RW
CN
TO
PE
RW
CN
TO
H742
PE
RW
CO
TO
52427
At Cloverleaf Mall PE
Bus Puli-Out and RW
Operating Funds for CN
Extension of GRTC TO
Savice
14744
PE
Walton Park Rd/ RW
Woolridge Road CN
Extension TO
17432
CM
CM
CM
CM
CM
CM
(NFO} 0060-020-123 ~ PE101~ RW201~ C501 , , ,
ol
O~
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
43
left Turn
0,2 Mile North Route
1451144-
0.2 Mile South Route
145It44
PE
RW
CN
TO
CM
11921
RW
CN
TO
CM
12931
RW
CN
TO
CM
Chlppenham Pkwy
RW
7370
PE
RW
CN
TO
CM
16338
RW
CN
TO
17147
ent upon Inclusion in TIP by MPO and specific project
, determination by FHWA/FTA
(~)
CONGESTION MITIGATION AND AIR QUALITY
Co~isbuction Comp!!,;e , ,=,~;,'" ' ' .....
~ '~-~ Tmnsfen'~ From Previous Allocations
Conslruclion Undenvay Plan and Contract A(minis'~'ation by County ..........
Regional Allocation
44
RICHMOND REGION
I
(Holridge St)
At Elkhardt Road
PE
RW
CN
TO
17148
RW
CN
TO
CM
13552
PE
RW
CN
TO
CM
50O26
Windsor
PE
RW
CO
TO
19064
RW
CO
TO
CM
CM
Westover
PE
RW
CO
TO
52433
CM
by MPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY
45
RICHMOND REGION
, of
Traffic
Hanover
Right Turn
Turn
Wright Avenue
At Route 643
PE
RW
TO OM ~
12953
RW
CN
TO
13551
RW
CN
TO
16O97
RW
CN
TO
PE
RW
CN
TO
16925
RW
CN
TO
CM
CM
CM
16926
CM
and Funds Transferred From Previous Projects
IPtans by County '
~y MPO and specific project
determination by FHWAETA
CONGESTION MITIGATION AND AIR QUALITY
46
RICHMOND REGION
I
I ] I
Rampand
156 -
At Cold Harbor Road
PE
RW
CN
1'O
16924
CM
At Interstate
Route 64
PE
RW
CN
TO
CM
50020
PE
RW
CN
TO
CM
5~021
PE
RW
CN
TO
CM
12936
PE
RW
CN
1'O
CM
12935
PE
RW
CN
TO
CM
12937
inclusion In TiP by MPO and specific project
, determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
47
Lane
PE
RW
CN
'ro
Henrico
Reconstruct
Intersection,
Provide
Signal
Right Turn
12941
Richmond Corporate
Limits -
:).~1 Mile East
~leals Street
and Modify Signal
RW
CN
TO
50022
RW
CN
1'0
RW
CN
TO
12939
AtAusfinAvenue
PE
RW
CN
TO
12940
RW
CN
TO
12942
CM
CM
CM~,~
CM~
I
IPlans and Contract l dminislration by County
determination by FHWA/FT^.
project
CONGESTION MITIGATION AND AIR QUALITY
48
RICHMOND REGION
I
Hen~co
Signalization
Improvement
Henrico
$ignalizaUon
Improvement
Signal Control
PE
RW
CN
TO
12~3
PE
RW
CN
TO
12944
RW
CN
TO
12945
PE
RW
CN
TO
13553
PE
RW
CN
TO
CM
CM
CM
CM
CM
PE
RW
CO
TO
CM
[Plans and Contract t dministration ~)~, County '
Transferred From Project 0010-116.V08, PE101, M501
I
I
I
I
inclusion in TIP by MPO and specific project
determination by FHWA/FTA.
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
49
10-
City of
Hopewell
Signals
Median
Lett
nalization
Road PE
RW
CN
TO
CM
12955
PE
RW
CN
TO
CM
Broad Street
RW
CN
TO
CM
13458
Corridor
RW
CN
TO
CM
Commerce Road
RW
CN
TO
CM
5OO23
Transpmtation RW
Plan CN
TO
CM
17371
ly MPO and specific project
, determination by FHWNFTA.
Transferred From Project 0036-116-105, PE
Previous Balance
CONGESTION MITIGATION AND AIR QUALITY
5O
RICHMOND REGION
I
I I ! I I I I
~E ~
Intermodal Study RW ~
CE ~
, TO CM~
Compatibility Wilh
VDOT's AVl Electronic
RW
CN
TO ~ ~!i~202 x?~
CM
5O025
City of Feasibility and PE .... I ' '
IRichmond Design Study for RW
IMaln Street Regional CN I .
Phasel Center CM
LDrPtl 1~94s I / cM
Icity of ~enovation a.d PE I / ~ .....
IRichmond ~ehabilllation of
[Main Street vlulli.Modal Center cN I /
I¢orPt}
ICity of Implemenl Sl~egles PE I ! ~ "
IRi~mond ~mended in ~e RW
IComprehensive Comprehensive CN
ITfens~t Transit Plan TO ?:,~-~.
ffDRPII -- / C ~ .....
in TIP by MPO and specific project
determination by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
51
of
Richmond
Bus Shelters
Benches
GRTC Service Area
PE
RW
CN
TO
CM
One Year Operating
Funds
operations
Off Low Floor Buses
PE
RW
CN
TO
RW
CN
TO
PE
RW
CN
TO
CM
CM
PE
RW
CO
TO
GM
*Includes $450 STP
~ion~l Funding Provided In Primary Sys~[em Program
RW
CO
TO
CM
MPO and specific project
determinalion by FHWA/FTA,
CONGESTION MITIGATION AND AIR QUALITY
52
RICHMOND REGION
PE
RW
CN
TO
CM
PE
RW
CO
1'0
CM
PE
RW
CN
TO
CM
Automate
and
PE
RW
CN
TO
CM
Elec~c
PE
RW
CN
TO
CM
RW
CO
TO
MPO and specific project
determination by FHWNFTA.
CM
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
53
Richmond
Transit Service Area:
fade Older
Engine Relrofit
tl
III
Van Shuttle: Phase I,
II and Iit
Information System
Upgrade
Tmnsi! Service Area:
Smart Card System:
determination by FHWNFTA.
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
RW
CN
TO
CM
RW
CN
TO
CM
RW
CN
TO
CM
PE
RW
CO
TO
CM
~0
CONGESTION MITIGATION AND AIR QUALITY
54
RICHMOND REGION
Regional Public PE
Transportation Study RW
CO
TO
CM
Trolley Vehicle
Replacement
Purchase of Clean
Fueled Buses
Reglonwide
Air Pollution
Reduotion Program
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
RW
CN
TO
CM
PE
RW
CN
TO
CM
PE
RW
CN
TO
CM
* Includes $50 STP Regional Allocation
determination by FHWA/FTA.
project
CONGESTION MITIGATION AND AIR QUALITY RICHMOND REGION
55
Additional CMAQ Funds
to be Distributed by
Local MPO- Tri-Cities
to be Distributed by
determination by FHWA/FTA.
pedticpr~ect
CONGESTION MITIGATION AND AIR QUALITY
I I I I I ~
56
RICHMOND REGION
RW
CN
TO
CM
5O65O
,,i
CMAQ - TERM'S RICHMOND REGION
57
f i~ ca/ y~ar
6
Yransportab~n
£nhanc~m~nt
Pm~ram
I ! I I I I I I ! ~ ~ J I ] I J I I i
TRANSPOR Tel TION ENHelNCEMENTS
This program provides a means of financing activities that go beyond the normal elements of a transportation
improvement project. The Transportation Equity Act for the 21st Century or "TEA-21", signed by the President on June 9,
1998 provided for the continuation of the Transportation Enhancement Program.
This federal-aid legislation established federal authorizations through 2003, thus providing better planning for future
revenues.
With the enactment of TEA-21, additional funding was made available for the Transportation Enhancement Program.
Transportation enhancement activities can be a stand-alone project or can be implemented as part of an on-
going project. In either case it must relate to the intennodal transportation system in function, proximity, or impact.
Transportation enhancement activities are activities which increase the value or worth of a project or make it more
aesthetically pleasing. It should provide a "quality-of-life" benefit. A project is enhanced by doing something that is
not common practice.
Eligible transportation enhancement activities must fall into one or more of the following categories:
1. Provision of facilities for bicycles and pedestrians;
2. Acquisition of scenic easements and scenic or historic sites;
58
3. Scenic or historic programs;
4. Landscaping and other scenic beautification;
5. Historic preservation;
6. Rehabilitation and operation of historic transportation buildings, structures, or facilities including
historic railroad facilities and canals;
7. Preservation of abandoned railway corridors including the conversion and use thereof for pedestrian and
bicycle trails;
8. Control and removal of outdoor advertising;
9. Archaeological planning and research; and,
10. Mitigation of pollution due to highway run-off;
11. Transportation Museums
This year 214 applications were received totalling $84.6 million.
for approval amounting to $18.5 million.
A total of 98 applications are recommended
The Commonwealth Transportation Board allocates funds to specific projects on a statewide, competitive basis.
Project Proposals are examined by a VDOT Enhancement Selection Panel. Based upon the recommendations of the
Panel and a review by the Commonwealth Transportation Board's Environmental Committee, projects are selected for
implementation.
59
and restoration of the bridge~ and tmsttes on the Virginia creeper
National Recrealion Trail.
Trail Restomlion
# Railroad Depot and
Trail
17564
C501
lhe Historic Appalachia Train Depot and construction of a trail through
historic portions of Town.
EN99-164-102~PE101~PE102~RW201~CS01
Town of Big Stone Gap
Greenbelt Trail &
Walking Tour
City of Bdstol
Mendota Trail
iCreate a greenbelt frail and complete an histodc walking tour.
17563 [NFO)ENO7-101'102?E 101,PE102,RW201,CS01
Construction of a mil-trail facility along the Mendota Rail Bed in the City of Bristol,
~/ashington and Scott Counties.
town of Cedar Bluff
Cedar Bluff Trail
& Ovedook
r°wh of Chilhowie
5197[
~isitofs Center and
rmil
town ofc°ebum
187~
tom's Creek Bddges
51980
51981
EN~'!O.2;103?E.101?E.102,CS01 .
Construction of overlook, public facilities and interpretive displays.
(NFO)EN98,184-103~PE 101~..PE..102 RW20t.C501
Establish a Visitor Information Center and develop a pedestrian/bicycle trail along
the Middle Fork of the Holston River.
EN99-189-104?E101~PE 102~RW201~C501
Pedestrian bridge repbcements and new bddge construction across Tom's Creek
including landscaping and associated walkways.
EN99-198-105,PE101.PE102,C501
ENHANCEMENT PROGRAM
PE
RW
CO
CO
10
CO
10
PE
RW
CO
TO
IPE
RW
CO
TO
I
CO
10
60 BRISTOL DISTRICT
Town of Damascus
Rail-Trail at Beaverdam
Creek
the Virginia-Carolina Railway milroed bed and spur lines into a
multi-use paved trail.
Dtcken. son County
John Fiannagan
Lake Overlook
Dickenson County
]'own of Clin~oed
Pedestrian Facilities
!town of Gate City
Downtown Sidewalk
Revitalization
[own of Gate City
Downtown Sidewalk
:~evitalizalion
rown of Grundy
3Id Kentucky Turnpike
31cycle and
3edesMan Trail
rewn of Jonesvitla
;umberland Bowl
~edesMan Access
51977
5O102
51983
15219
51982
1522O
1879~
E,N99'2OS-lO1,PElOl PE102,,C501 .............
Coi~s~uction of scenic overlook.
EN98-O25-137?E101,PE102~CS01
Construction of several trails that will allow for safe pedestrian passage throughout the
Downtown and Cranes Nest pa~ of the Town.
EN99-025-10Z?E101,PEI02.CS01
Central Business DisMct streets(ape alongtoWn's main thoroughfare would include
planting trees, installing antique.styled lighting to provide a more aesthetic
design in order to at. act new business establishments and retain those already
located there.
EN94-221*V43,PE101,PE102~CSOl CONSTRUCTION UNDER WAY
Construction of 21/2 blocks of sidewalk in downtown Gate City.
EN99'221-106.PE101~PE102,C501
Construction of a 3.5 mile trail between the Royal City area of Grundy and the
downtown area.
EN94-229-V44~PE101~PE102~RW201~CS01
Cons~ction of 1850 linear feet of paved trail from Main Street to the
Cumberland Bowl Park.
(NFO)EN98-O52-105,PE101 .PE102.C50t
ENHANCEMENT PROGRAM
61
I
BRISTOL DISTRICT
tie all the components of the park
13824 CONSTRUCTION UNDER WAY
Continuation of the Wilde~ Road Trail project consisting of an 8 mile segment
ir mm Caylor to Rose Hill.
16606](NFO)EN96-052-101 ,PEIOI,PEI02,CS01
lDevelopment and conslmction of a Visitors Center with the States of Tennessee and
~(entucky
Lee County
5198
Wilderness Road
Project
Phase II
Lee County
Daniel Boone Tri-State
~/isitofs Center
18792
rown of Marion
Vlarion Histoff Walk
18791
town of
=ennington Gap
.eeman Field
Bike Trail
Russell County
Trip Through the
Heart of Appalachia
Town of Saltvilie
Trail System
16065
~=N99-961-109,PE101,PE102,RW201,C501 .........
Pedes[d=. facility that will also serve as an educational and tourist attmctien
for the town.
qFO)EN98'119-107,PE101,.P..E102~C501 .
Construction of 5000 feet of paved Bicycle/PedesOan Trail throughout the Leemah
Field Park including rest areas and bike rocks.
(NFO)EN98.052-106~PE101~PE 102~C501
Construction of kiosks with regional maps which have local informalion about ama.
At k~ks them will be bicycle rocks and all areas will be landscaped with trees,
flowers and shrubs conducive to that envimm~nL
NF.O)EN95-083-103,PE 1017.E. 1~2. ,C501
Construction of trails that will provide access to the histo~ sites of Salt~ille
51984 EN99-295-108,PE101,PE102,CS01
ENHANCEMENT PROGRAM
IPE
RW
CO
TO
RW
CO
TO
JPE
RW
CO
TO
62 BRISTOL DISTRICT
Portal
Smyth County
town of Marion
3rassroots
;onsen/ancy
'Rive~walk"
~my~h County
-lungry Mother
~reek Trail
Nashington County
Nhitatop Station
:)ark
Nise COunty
Conductor House
~.ailmad Museum
Nise County
;linch River Ranger
;)istfict
5198(
15218
13823
1878~
1878S
Wise County 51987
HandsAcmss the Mountain 51989
Scenic Vistas and Overlook
Construction of a bOardwalk trail to an overlook above Stock Creek Gorge and a
Imit between the amphitheater and the Cove Ridge Educational Center.
E. N99-084:.! !..0,P~E. ~0! ,PE!02,C50!
Develop a 3.2 mile greenbelt walking/bicycle path along the Middle Fork of the
Hoiston River.
EN94-086~V19,PE101,PE102,RW201,C501 UNDER CONSTRUCTION
The trail will provide a scenic facility for pedestrians and bicyclists and will
follow Hungry Mother Park Eom the entrance to Hungry Mother Park to the Middle Fork
of the Hoiston River, a distance of approximately five miles,
EN93-086-V26iPE101~PE102~RW2..0.1,CS01
Cons~ction of a park on the site of the former Whitatop railroad depot which will
also provide facilities for users of the Virginia Creeper Trail.
(NFO)EN98-095-101?E101~PE I02~C501
Renovation of the oldest building In the Town of Saint Paul, the old Norfolk &
Western Conductor's House.
{NFO)EN98.O97-104,PE101~PE102~C50!
Provide hardened surface for the Guest River Trail, benches and bike racks,
EN99~097-111~PE101 PE102~C501 .
Construction of an overlook at Black Mountain on Route 160 and creation of a park
on Route 23 Business.
EN99-0cJ7-113~PE101~PE102~RW2.0.1,CS01
ENHANCEMENT PROGRAM
63
PE
RW
CO
TO
CO
TO
¢O
TO
PE
RW
CO
TO
BRISTOL DISTRICT
I
! ! I I ! I I i I ~ I , / I ~ ~ ' I I 1 I
roan of Wylheville
Nelcome to Historic
Nytlleville
18787
ENHANCEMENT PROGRAM
benches and improving the interpretive materials currently
public for lhe Welmme to Historic Wy~eville Project
EN98-139-102~PEt01~PEI02~C501 ,
DISTRICT SUMMARY
64 BRISTOL DISTRICT
Thomas Jefferson
Ntemorial Foundation
Thomas Jefferson
Parkway
Albemarle County I
Thomas Jefferson
Memorial Foundation
Thomas Jefferson
Parkway
Albema~ County /
Thomas Jefferson
Memorial Foundation
Thomas Jefferson
Parkway
Albemarle County I
Thomas Jeffemon
Memorial Foundation
Thomas Jeffemon
Parkway
Cityof
Chariot~esville
Union Station
City of
Charlottesville
University of Virginia
Rugby Road
City of Charlottesville/
Albemarle County
Rivanna Greenbelt
Extension
13772
15152
1653~
52020
13775
15153~ 16085
17567
Phase I - financing to develop traffic conldor as a true parkway, this will include
scenic and safety enhancement of roadside landscaping, a bike-hiking trail
connecting visitors center to Monticello, a native plant arboretum, scenic
overlooks and pond and foot trails.
EN93-002-V05,PE101~PE102,RW201,CS01 UNDER CONSTRUCTION
Phase II - including safety and aesthetic improvements, pedestrian and bicycle
access to Monticello and Park/Arboretum deveWpment.
EN94-002-V09~PE101,PE102~RW201~CS01 .............
Stone bridge and tunnel crossings of Route 53 to provide access
[or pedestrians, vehicles and cyclists. Includes Imils, plantings and overlook.
INFO)EN96-002-t19 PEt01 PE102,C§01
Site improvements to provide aocose from Monticello to the Monticello Visito['s
Center
EN99-002-143rPE101~PE102~RW201,CS01
Restoration of the seriously deteriorated historic train station building and supporting
infras~cture.
EN93-104-V02~PE101~PE102~RW201~C501
Widening of Rugby Road ~m University Avenue to Wayside Place, so that designated
bicycle lanes can be incorporated into the roadway. A sidewalk is proposed for the
east side oftbe road.
EN94-104-V05,..C501; (NFO) EN95.104-121 ,PE. t.01 ,PEJ02,RW201 ,C501
Pedesl~ian, bicycle and ADA accessible frail connecting Rivanna Greenbelt to Pen Park
and Darden Town Park.
(NFO) EN97.104.106~PE101~PE102,RW201,CSO~I ....
ENHANCEMENT PROGRAM
65
CO
TO
CO
TO
TO
co ~
TO
EN
CULPEPER DISTRICT
City of
Gateway landscaped bland at a major intersection and entrance into downtown
Charlottesville
EN98-104*125rPE.1.01,PE102,RW201,CS01
and censlrudlon of bicycle lanes and sidewalks
PE
RW
CO
TO
Airport Road Corridor
City of
Charlottesville
Histo~c Court Square
50103 EN98.104-1381.PE.101,PE102,C501
ri;Hcai~t historic elements of Charloltesville's Court Square
C)istdc{.
Culpeper County
Route 620 Corridor
5201{
EN99'104-142,PE10~,P. E102,C501
Safety improvements, pull-off areas and Irail slgnage
rown of Culpeper
;)epet Rehabilitation
Fauguier County
Mosby Heritage Area
Slgnage
Fluvanna County
Fluvanna Heritage Trail
15154
1880~
1879
Renovation and rehabilitation of depot building into a useable transportation facility.
beautification of surrounding area and addition of Amtrak waiting room.
EN94-204-V11~PE101~PE 102~RW201~C501 UNDER CONSTRUCTION
Designed to enhance the series of self-guided automobile tours through installation of
signs which will designate boundary lines of the area, historic towns and villages and
spedr~c stops of interesL
EN98~.30;1.28,PE101,PE102~C501
Pha~-d development of pedestrian/bicycle trails, preservation and access to historic
lock, canals and covered bridge site.
'."N98-032-127,PE101,PE 102~RW201,C501
ENHANCEMENT PROGRAM
j. EN [
PE
RW
CO
~ EN
66 CULPEPER DISTRICT
town of Gordonsville Renovate historic depot and upgrade pedestrian facilities PE
3ordonsville Depot CO
52021 EN99.225.144 PE101~PEI02~RW201~C501 ~!?~ EN
,o[~isa County Esi~l~ii~i~ment of a se i-guid~i ten stop auto-tour wilh appropriata pa~i~ areas and "PE
historic markers. RW
rrevilian Station CO
3attlefield Auto.Tour TO
18689 EN98-054-124 .... PEI01 PEIO2~RW201 C501 ~,~:,,~;~:~',:~;f~':~'~ EN,
.oulsa County Acquisition of battlefield and construction of walking trails with interpretive ma~ers. PE
Converston of old train station into a Visitor's Center. RW
rravilians Historic Park CO ~¥~:?,~-".~'?:i
I
50104EN98-054-139,PE101~PE102,RW201 i:i~ '!~i:i EN
ILoulsaCounty Acquisition of baUlefield and cons~ction of walking trails with interprelive marke'~. '
Conversion of old ffain station into a Visitor's Center. RW
ITrevilians Historic Park
J(ConstructionOnly) TO
50104 EN98-054-139,C501 i~ :i~ EN
16540 (NFO)EN96~056-120,PE101,PE102,RW201,C501 ~?!:~:~ EN
;)range Counly Establ'ist~ent of Visitor's Center, new ~ntrance and a bail that will wind t~mugh the ........ PE
historic sitos on the property. RW
3ermana Colonies Visitor CO
;enter on Route 3 TO
!
16083 (NFO) EN95~068-119)PE101,PE102,C501 ,, ~?~ EN
:)range County Restoration of historic train station and improve~ll~nts to the Visitor Center Complex. PE
52022 EN99'068'14§,PE101,PE102,RW201,C501 ........................................
ENHANCEMENT PROGRAM
67
CULPEPER DISTRICT
Spenyville Gateway - Phase I
52023
town of Scottsvitle
3anal Basin Square
18691
rown of Wa~nton
Narmnton Spur Greenway
13774
Streetscaping and pedeslrian facilities along Main Slmet and a footbridge over the
Thornton River,
EN99:078-t46 PEt01,PE10,2,RW201~CS01 .
Develop a h;s~.of;c ~,-a~$porlatlon ~a~k to celebrate the town's unique history and
increase tourism,
EN98-298.126~PE101~PE102,RW201~CS01
Convemlon of abandoned rail line to trail, beginning at Franklin and Lee Streets in downtown
Warrenton and traveming through town and into the country across Route 29.
EN93.156-V21,PE101~PE102~RW201~C501 , UNDER CONSTRUCTION
DISTRICT SUMMARY
ENHANCEMENT PROGRAM
68 CULPEPER DISTRICT
I Green
Street Enhancement
17573
CaroiineCounty
Vist~rCentar
52010
TownofCobnlal
Beach
Bike/Pedestrian
Pathway
13788
Town of Colonial Beach
Boardwalk Improvements
5201
Town of Colonial Beach
Landscaping and Sidewalks
52012
City of Fredericksburg
Market Square
18716
Gloucester County
Colonial Courthouse
Village
16554
ENHANCEMENT PROGRAM
broken sidewalks with new brick sidewalks, landscaping, decorative streetiighta and
street furniture.
[NFO)EN97-O16.110,PE101,PE102,RW201,CS01
Conslruction of a Caroline County VisitOrs Center at the tntamtate 951Routa 207
Interchange
EN99-016-133,PE101?E102,RW201~CS01
2,400 foot long 8' to 10' wide bike/pedeStrian path parallel to Euclid Avenue from
Ihe Bluff Point neighborhood to the Classic Shores neighborhood.
EN93-199-V09,PE101 PE102,0501
Revitalization improvements to the Boardwalk and adjacent areas including bike lanes.
EN99*199*134~PEt01?,,E102,C501
Landscaping and pedestrian facilities along Irving and Hawthorne Streets in the
downtown area,
EN99-199-135~PE101~PE102~CS01
Revitalization and renovation of the historic Market Square.
Landscaping and pedestrian facility improvements from the Histo~ Court Circle
down Main Street.
* includes $77,000 of Regional STP funds.
69
PE
RW
CO
TO
PE
RW
CO
TO
PE
RW
CO
TO
RW
CO
10
RW
¢0
TO
FREDERICKSBURG DISTRICT
I I I i I I
3ioucester County
~olonlal Courthouse
/illage - Phase 11
5201:
rown of Iwlngton
Steamboat Era Museum
52O13
town of Kilmamock
:)ewntown Revitalization
3base I
5201~
<lng and Queen County
-leritage Gateway and
rmils 2000
5201
.ancaster County
the Lancaster Trail
1871~
~athews County
#illlams Wharf Landing -
Phase I
15113
Vlathews County
Nilliams Wharf Landing -
3hase II
17572
Continuation of project to provide historic stmetscaping, sidewalks, landscaping
and lighting
;.N99-036-138 PE101,PE102~RW201,CS01
Create a transportation museum dedicated to the era o! the steamboat and ~
impodance to the Nodhem Neck and Tidewater areas.
5N99-242-136,PE101,PE102,RW201,CS01
Streetscaplng, signage and pa~king along Main Street.
,EN99-249-137,PE101 ,PE102,,R ,W201 ,C, 50!,
Gateway signage, tourism focus areas, public access landings and water/land trails,
~N99'049'139~PE1.01~PE102~RW201~CS01.. .
Construction of a blcyde/pedesMan trail along Route 200 from White Stone to
Kilmamock,
.(NFO)EN98.051-121,PE1010PE101,C501
Acquisition of pmpe~ to preserve significant historic features of this local landmark
whiio creating a contem~ra,/use for the public.
EN94~57-V06?..E..!.01?E102,RW201,CS01
Development of a regional small craft/handling fa~i~ providing a unique, historic and
scenic site that will present a clear concept of small craft use, marine shipping and
water b'anspo~t
(NFO)EN97-057-t09~PE101~PE102 RW201~C501
ENHANCEMENT PROGRAM
7O
FREDERICKSBURG DISTRICT
Northumberland County
Rice's Hotel /
Hughlett's Tavern
16074
Spotsylvania Counly
Central Railways Trail
1378[
(NFO)EN95- .~. 6-107,PE101~PE102,C501
Phase I of a bicyde/pedestrlan fadlity that will provide access from residential areas
to commercial and recreational facllttles.
EN93-088-V32,PE101,PE102,MS...0.!.. UNDER.CONSTRUCTION
Stafford County
17570
Belmont/Fern/Farm Trail
52017
StaffordCounty
Fen'yFam~His~ricSffe
50106
Stafford County
Norlh Stafford Bicycle/
Pedestrian Trail
Frederickstiunj/Stafford
Pan~ Authority
15112
Hiking/Biking Trail
Town of Wamaw
Main Street Beautification
Construction of a bicycle/pedestrian trail and sidewalk improvements.
(NFO)EN97'O89-107~PE101~PE 102~RW201~C501
Study to restore historic fern/service, archaeological evaluation of fem] landing and
colonial era Toll Keepers house, removal of outdoor edvertlsin9 and landscaping
along King's Highway.
EN99.O89-140.PE101,PE102,RW201,CS01
Construction of asphalt bicycle/pedestrian trail and concrete sidewalk.
EN98-089-141~PE1011PE102~RW201 C501
Paved trail on the north side of the Rappahannock River from U.S. Route 1 to Slate
Route 3.
EN94.089.V33 PE,!01~P,,E, 102~C501 UNDER CONSTRUCTION
Construclion of off. street parking, sidewalks, landscaping and pedestrian/bicycle trails.
52009 EN99-321-132~PE101 PE102~RW201~C501
ENHANCEMENT PROGRAM
71
PE
RW
CO
TO
PE
RW
CO
TO
PE
RW
CO
TO
FREDERICKSBURG DISTRICT
I ~ I
I I ! I I I ! ! ! ! I ! _ ~J I I I I I
Town of West Point
Bike Trail and River Park
Town of West Point
Downtown Streetscape
Town of Urbanna
Old Tobacco Warehouse
VisiloCs Center
52011
1511
1871!
16555
ENHANCEMENT PROGRAM
F~o~ improvements including a safe pull-off, small parking area and installation of
interpretive signs.
EN99~ ,96-141~PE101?E102~CS01
Roadside bike trail from local school complex 1o riverside park areas and downtown
historic locations.
EN94-325-Vt6~PE101tPE.102,RW.201,CS01 UNDER CONSTRUCT ON
Central business d;~ic[ sffeetscaping along the town's main thoroughfare and
downtown histo~ district walking tours.
(NFO) EN98-325-122,PE101~PE102tRW201~CS01
Rehabilitation of the Old Tobacco Warehouse as a visitors center.
[NFO) EN96-316-117 PE101?E102~RW201~CS01
'-: :" DISTRICT SUMMARY
23!)
72 FREDERICKSBURG DISTRICT
Amherst Depot
Renovation and
Relocation
~0wn 0fAmherst .......
Downtown Improvements
t75951(NFO)EN97-163-130,PE101,PE102,RW201.CS01
lStreetscaplng, sidewalks, landSCaping, signage and improvements to the traffic circle.
51995
Amherst and
Nelson Counties
Virginia Blue Ridge
~ailway Trail
51997
I'own of Appomattox
Vlain Street
Enhancement
;harlette County
31d Dominion
;{esource Conssn/ation
~outhem Virginia
Rail - Trail
Halifax County and
Charlotte County
16611
1381
Battlefleid(90Acres)
16O70
City of Danville
Rail Passenger
Station Complex
Rehabilitation - Phase II
15226
EN99-~6.3-118 PE101,PE102,C501
Development of a 7 mile bicycle; wa king, cross county skiing and horseback riding
trail. Also, preservation and access to the historic Piney River railroad station.
EN99-6O5-120,PE101 PE102,RW201,CS01
Relocate utility iinos, instal pe~ iighting, define bike trail and install
landscaping at downtown Appomattox Virginia Depot located on Main Street. Bike path
follows the Joel Sweeoey foot race route around downtown.
{NFO)EN96-165-107,PE.101,PEI02,RW201,CS01
Rail to trail convemlon to connect a significant civil war site and towns; provide
bicycle/pedestrian tadltties, preserve and rehabilitate historic site.
EN93-019-V31,PEI01,PE102.RW201.B601 ,CONSTRUCTION UNDER WAY
Phase II of Southern Vi~linia Rail.Trail project. Project includes pumhase and
restoration of historic railroad depot to be utilized as visitor center, exhibits
historic markers, restoration and preservation of earthwonks, cannons and
batteries.
(NF0}EN95-983.111,RW201,..C501
Purchase addi~nal prope~/from N&S Railway, provide off street parking for Amtrak
and Danville Science Center;, purchase, rehabilita~n and enhancement of historic
Southern Railway Freight Depot for Farmer's Market and convert inactive historic
Train Trestle into pedestrian/bicycle bridge and straetscapo improvements on
Craighead Street.
EN94-108.V02,PE101,PE102,RW201,CS01 CONSTRUCTION UNDER WAY
ENHANCEMENT PROGRAM
73
RW
CO
TO
PE
RW
CO
TO
I
RW
CO
TO
PE
RW
CO
TO
RW
CO
10
CO
10
CO
10
LYNCHBURG DISTRICT
I t I
I I i I I I ! ! i ! I ! ! ! ~ I __ 1 ~ I I
Danville
a trail system to scenic and River.
Development of now pedestrian and bicydin9 paths connectJn9 the Danville Train
Station Complex and Auctionee(s Park to the Dan Daniel Memorial Park and Civil War
historic siteS.
Phase IV
Halifax County
~ Restora~n
City of Lynchburg &
Amherst County
Cenlml Virginia PDC
Conversion of
Rails to Trails
City of LynchbUrg
Riverfmnt
Revitalization
access walkways to trail, protective bah'let
in unsafe areas and improvements to Auctioneers Park.
a caboose into a museum/visitors center.
the convemion
g grasS,
trees and shrubs. Also censtmcting a small concrete apron and installing
~enches and antique railroad station lantams. This project will
enhance the aesthetics of downtown Gretna and Main Street (Route 29).
UNDER CONSTRUCTION
Restoration of a century old
13821
15227
9,PE101,PE102,CS01 ..
A major component of the downtown rive~front revitalization plan including connecting
a natural recreation trail to downtown and providing a connecting link to a proposed
ENg3-118-V23,PE101,PE102,RW201~CS01
This phase of development will build on the previously approved ISTEA projects by
acquiring and beginning development of approximately 7.5 acres of land; The land
currently contains extensive open space; an 1885 depot building and a portion of
1840 James River and Kanawha Canal.
EN94-118-V26,PE101?E 102,RW20t,C50!
PE
CO
TO
EN
ENHANCEMENT PROGRAM 74 LYNCHBURG DISTRICT
Oity of Lynchburg
Point of Honor
~ccess Improvement
City of Lynchburg
Kemper Street
Amlmk Slation
Town of Pamplin City
Town of Pamplin City
Depot Renovation
ilmpmve vehicular access to Point of Honor, provide a direct pedestrian connectbn
to Point of Honor from downtown Lynchburg, from the redeveloping rivertmnt ama and
TP~ilrd,,val's Island Recreation Trail and from the Blackwater Creek Natural Area
16614
Acquisition and rehabilitation of the Kemper Street Station, construclion of a
bike/hike trail and acquisition and development of land adjacent to the stalion
into a park area I~duding street front landscaping,
17576
the historic Pamplin Depot from the Norfolk-Southern Railroad Corporation
and restoring the futility to its original form.
CO
TO
PE
RW
CO
TO
RW
CO
TO
Pittsylvania County
Richmond and
Danville Trail
Phase I
Prince Edward County
Sandy River Reservoir
Pedestrian and Bike
Trail
17597
town of South Boston
The Prize~y": A
Community, Fine Arts
[ Welcome Center
..... 17594~ 1871(
Pmpese to acquire land and structure, create multi-purpose trail for
restore a historic depot into a visitor center, landscape,
PE
RW
CO
TO
To construct a pedestrian and bike trail along the Sandy River Reservoir.
NFO)EN97-O73-132~PE101~PE102~RW201~C501
Plan to restore a historic warehouse "The Prizery" into a community, fine arts, and
welcome center in downtown South Boston.
RW
CO
TO
PE
RW
EN97-130-129,PE101,PE102,RW201,CS01
ENgS-130-113?E10%PE102~RW20%C501
CO
TO
~50
ENHANCEMENT PROGRAM
75
I
LYNCHBURG DISTRICT
I i I I I I ! J ~_ 1 ! Z II _ l- I ! !
Columbia Pike.
Pentagon Trail
13776
Arlington County
Four Mile Run Trail
1515t
Adington County
Transit Program
Protective Canopy for
Clarendon IVietmrail
Station Escalatom
16635
Town of Clifton
Main S~eet
Pedes~an/aicycie
Plaza and Pathways
Phase I
15161
Town of Clifton
Main Skeet
Pedestrian/Bicycle
Plaza and Pathways
Fal~fax County
Groat Falls
Street Trail
Faidax County
Bus Passenger
Wail~ng Shelters
1663L
15157
176~
utilizing off-mad trails, side
roads and both sides of Columbia Pike to provide a safer and more convenient
alternative for commuters.
EN93-000-V06~PE10.1?E102~CS01
This projecl will unde~ke the sun,eying, engineering, final planning, permit
preparation and ~ht of way acquisition required for the development of a 0.5 mile
~ong bicyde/pedestdan trail with a grade separated crossing of Shirley Highway
[I-395).
Additional Funds provided in Primary System Program.
EN94.-000-V25-PE101?E102~RW201
Design for canopy over existing escalators.
(NFO)EN96-000-131~PE101~PE102,CS01
Project will provide a pedeslrian/bicyde walkway, sitting area and landscaped
obsewation platform. Also, facilitates improved pedestrian access to railroad
calxx)sa which is being restored as a railroad museum.
EN94-194-V35,PE101~PE102~CS01 UNDER CONSTRUCTION
Pedestrien/blke path to circulate from the center of the town (Phase I) to the
adjacent peas and to the nearby Clifton Elementary School. Conslmction of a grass
sop and landscaping fora pedestrian/bike path to run acmse the five acre parcel
recently purchased by the Clifton Bel~erment Association (CBA).
(NFO)EN96-194-130,PE101,PE102,C501
This 990' trail wilt be installed along the east side of Great Falls Street from the
intersection of Crotchfleld Street to the intersection of Hutchison Street, The
trail will facilitate pedes~an access to lhe West Falls Church Metro Station.
EN94~029-V29,PE 1.01,PE102,RW201,C501
Constmclion of 30 bus sheltem at highly utilized bus stops In Falffax County.
JFO)EN97-O29-138~PE101?E102~RW201~CS01
PE
RW
CO
TO
I
RW
CO
TO
RW
CO
10
CO
10
I
CO
10
I
RW
CO
10
ENHANCEMENT PROGRAM 76 NORTHERN VIRGINIA DISTRICT
Fair[ax County
Improve Public Access
to Fair[ax Stalion
Railroad Museum
Fair[ax County
Columbia Pike Trail -
Holmes Run Segment
Fair[ax County
Columbia Pike
Fair[ax County
Chain Bridge Road
Fairfax County
Mason Neck Trail
Fai~fax County
Roberts Road
Fairfax County
Georgetown Pike Trail
1608~
5010E
50t0~
5011C
Proposes paving parking lot, constructing cement walk to caboose and extending
elecl~icity to caboose.
Construction of a bicycle/pedesldan trail.
EN98-029-142rPE101rPE102,RW201,C501
Landscaping, lighting and sidewalk construction,
EN98-029-143~PE101~PE102~C501
Landscaping and planning for pedesMan friendly improvements at vadous locations.
EN98-02g-144~PE101~PE102,C501
3 mile ~'ail from Route t to the fi~st entrance of Pohick Bay park,
50111 EN98-029-145~PE101~PE102~RW201~CS01
Landscaping and scenic beautification
50148
EN98-029,155,PE10,1 ?E102 C501
Cons~ctlon of a 4.5 mile trail from Innsbmck Road to River Bend Road and
Applewood Lane to Seneca Road.
EN99-029-164~PE101~PE102,RW201~CS01
52O41
ENHANCEMENT PROGRAM
77
I
NORTHERN VIRGINIA DISTRICT
I I i I I I ! I I i.~ !__ !_ ! I_ ~ ~_ I j I
Fairfax County
Waker Road Trail
ora natural surface Nil from Columbine Street to Colvln Run Road and
a stone dust trail from the G.F. School to Beach Milt Road.
52042
City of Falrfax
Accolink Gateway
Conneclor Trail
160~
Town of Haymarket
Prince William County
Haymarket
Streetscaplng
16637
Town of Leesburg
The George C.
Marshall
Intema§onal Center
Loudoun County
18784
Pumeliville
TrainSiation
15158
LoudounCoun~
Mount Zion Church
Stabilization
LoudounCounty
1608;
Snickersville
Turnpike Restoration
and Beautification
1607
EN99--029-173,PE101,PE102,RW201,CS01
Facility for bikes and pedestrians, beaulir~ation, landscaping and
historic preservation. Project will link trails located in the City to those in the
County,
NFO)EN95-151-134,PEI01,PEI02,CS01 EN95-029-126,PE101,PE102,CS01
nstallaUon of five.foot wide brick sidewalks, storm drainage system, colonial
style streetlighls, street trees and planter boxes, street furniture, designated
bicycle lanes and bike acks.
{NFO)EN96-233:128.,PE101,PE102~CS01. ,
Construction of parking facilities and pedestrian access.
EN98-253-1347..E..!0.1, .PE102, .C. 50t .
Restoration of this station will be a slgnir~nt element in the planning of the
future development of Western Loudoun Counly.
EN~4-053-V39,PE101,PE 102tRW. 201pC,501
Project will plan, design and stabilize historic structure. Church was a landmark
for both Federal and Confederate troops during Civil War.
(NFO)EN95-053.124,PE101,PE 102,RW;~01,C501 ........
Proje~ will enable the restoration of the site back to a more aesthetically pleasing
sight. The CMl War Monument will be cleaned and pull-off ames cleared and filled
with grovel. Signs relating to historic slte tdenlificalion will be Installed.
(NFO)EN95.~53-113 PE101 PE102,C501
I
RW
CO
TO
PE
RW
CO
TO
PE
RW
CO
TO
i
RW
CO
TO
I
RW
ENHANCEMENT PROGRAM NORTHERN VIRGINIA DISTRICT
78
L°udoun County
Board of Supervisors
Aldie Mill Site
Improvement Project
Loudoun County
E.E. Lake General
Store Stabilization
Loudoun County
Buq the Wires and
Tame the Traffic
Loudoun County
Harper House
Stabilization
Town of Lovettsville
Lovettsville
Pedes~an/Sike Path
Network
City of Manassas
Old Town Manassas
City Square, Walkways
and Crosswalks
Icity of Manassas
IH°pklns Candy Fact°~Y
Rehabilitation of mill headrace and trailmce to proVide water as a source of power
to the mill, landscaping along new pedestrian bails, construction of interpretive
signs and archaeological evaluation.
16638
17602i (NFO)EN97-053-137~PE101?E102rCS01
i Scenic Improvements within the Village of Waterford.
18781 (NFO)EN98-O53-131,PE 101,PEt02,RW201,CS01
Stabilization of an historic stone house located at Harper Park.
18783 {NFO)EN98-053-t33 PEIO1,PE102~CS01 .......
Project will design and construct a 6.mile netwo[k of sidewalks and hike paths to
link community, social, and business centers together.
17601 (NFO)EN97-255-136,PEI01,PE102,RW201,CS01
Construction of pedes~an facilities including crosswalks and walkway from the
Old Town Pavilion at West Street to Battle Street.
18782 (NFO)EN98;155;132,PE101,PE102,RW201 C501
Renovate historic factor,/in historic dtstd~t, landscaping and pedestrian access.
52039 :N99-155-162~PE101,PE 102~C501
(NFO)EN96-O53-129,PE101~PE102~C501
This project will provide site improvements and stabilization to the E. E. Lake
General Store in Bluemont Site improvements will include: handrails, handicap
accessibility, concrete and step upgrades as welt as interpretive signs, landscaping
and bicycle parking.
EN
EN
EN
EN
ENHANCEMENT PROGRAM NORTHERN VIRGINIA DISTRICT
79
=rince William County
3rentsville Historic
~entre
=rince William County
3everiy Mill Stabilization
~nd Interpretation
::'dnce William County
3uan'dco Natlonat
;emete~/Entrance
]eautir~tien
rewn of Quantico
~uantico Potomac
rransportation
:adlity
rewn of Vienna
Streelscapa
3onnecf~n
rewn of Vienna
~us Sheltem
5204(
1878~
52O43
52O44
1760(
17598
Instal~f, on of scenic overlook, stone retaining wall, parking Ict/tum around, sidewalks,
lighling, signs, bike racks and landscaping.
EN99-272-163,PE1.01~PE102~RW201~CS01 .......
Restoration of Historic Bmntsvllie Courthouse and related butidiogs to create a
distinctive rural 'village" designed to Incerpomta a broad spectrum of
kansportation-mieted linkages,
(NFO)EN98-076.135,PE101,PE102,RW201,CS01
Preservation and restoration of the stone walls and environs of Bevedy Mill.
ENgg-076-165~PE101~PE102~R...W.2.01~CS01
Landscaping of Joplin Road at the entrance to Quantico National Cemetery.
EN99-076-166?E!01 PE102~RW201tCS01
Construct a separate bicyde/pedestfen transportation trait starting al the
AMTRAKNRE Station, cons~ctien of a paved panking lot, paved and graveled
wal~ays, and timber deck lrail/aqualic marine ~er study area.
(NFO)EN97-287-!35 PE10!,PE102 RW201,C501
Street improvemenls along 3 separate s~eels that connect 2 parallel renovated
streetscapos; includes new brick sidewalks, crosswalks and plantem.
(NFO)EN97-153-133,PE101,PE102,CS01
Constmctien of 9 bus shelters.
EN98-153-154.,PE101,PE102~CS01 .
EN
PE"
RW
CO
TO
~200
ENHANCEMENT PROGI::U~M NORTHERN VIRGINIA DISTRICT
80
ENHANCEMENT PROGRAM 81 NORTHERN VIRGINIA DISTRICT
mi
0
n,
Chesterfield County
Smoketree Bike Lane
The planned bike lane will involve widening the pavement on Smoketree Drive by paving
four feet of the extsting six foot shoulders from 0.1 mile west of Courlhouse Road
to Gordon School Road, a dlstance of 1.7 miles.
1761~
Chesterfield County
Chester Village
Streelscape
Beaulilicatlon
18794
Chesterfield County
VSU~ttrick
Riverfront Trail
18795
Cheste~eldCounty
Route360
5011:
Chesterfield County
Halloway Avenue
50113
Chesterfield County
Route 60
50115
Chesterfield County
Walton Park Sidewalk
5200:
Piaoement of Virginia Power 'Acorn* style street lights within the Village of
Chester,
(NFO)EN98-020-116,PE101~PE102~RW201~CS01
Construction of a lwo mile trail along the Appomattox River.
NFO)EN98-020:117,PE101,PE102~CS01
Landscaping from Turner Road to Courthouse Road.
EN98-O20-146,PE101,pE102,CS01
Construction of sidewalk in the area of Matoaca High School, Matoaca Middle School
and Matoaca Park.
(NFO)EN98*O20-147,..P..E! 0t,PE.102,C501
Landscaping and construction of sidewalk.
EN98-020-149~PE101~PE102~C501
Const~cUon oa a safe and accessible facility for pedes~ans along Walton Park Road
in the area of the Walton Park Community Recreational faciliUes.
EN99-020-! 25,,PE 101,PE,!,02~RW201,C,501
ENHANCEMENT PROGRAM
83
PE
RW
CO
TO
~ EN
PE ~ !~
PE
RW
CO
.~ EN
RICHMOND DISTRICT
I I I I
Tow~ of Colonial Heights
Boulevard (Route 301tl)
Revitalization
landscaping and lighting Improvements between ~he no~ city limits
and the south city limits.
Nottoway County
Cmwe. Burkeville
Chamber of Commerce
Hagberg Park Walking Path
Dinwtddie County
^PCWS
White Oak Battlefield
Site Interpretation
Hanover County
The Campaign to
Pmsmve Hanover
tavern
Henrtco County
Community Development
From the Park to the
3arden: The Lakeside
Avenue Enhancement
~lenrlco County
9mastwork Park I
~,viation Museum
~ccess Road
31ty of Hopawell
;ity Point's
Rails and Waterways
Historywalk
13793
15110
16079
16617
50114
176~
2,640 foot long 6-foot wide path thmngh and around Hagberg Park.
EN93-203-V10,PE 101,PE1.02.~C501
Establish interpretation and landscape management program, including land and
~iewshed protection measures, site maintenance, visitor safety measures, and trail
:onstmctlon.
EN94-026-V4 .I.~..P...E !...0..1 ,.PE102,C501
Proposes to rehabilitate tavern by making it handicapped accessible, adding new
kitchen, reworking eleclrical/mechanical systems, landscaping and expanding
existing parking lot.
:N, FO)EN95-042-114~PE101~PE102~C501
Landscaping and streetscaplag of Lakeside Avenue from the Richmond City line at Bryan
Park to Club Lane and the entrance to Lewis Ginter Botanical Garden.
(NFO)EN~43-110,pE10J ?E102,C501
Landscaping and construction of a cart path,
EN98-043-148,PE101,PEI02,R. Wr2r rr0!,CS0!
Project is envisioned as a continuous pedestrian trail extending along the streets
in the City Point National Histo~ Did]icl in Hopewell. Project is intended to
improve pedest~an circula~n and deter vehicular usage in the historic district.
NFO)EN97-116-139,PE101,PE102,RW201,CS01
ENHANCEMENT PROGRAM
PE
RW
CO
TO
PE
RW
CO
TO
PE
RW
CO
TO
PE
RW
CO
TO
I
Rw
EN
9§~:~
RICHMOND DISTRICT
84
Town of Lawranceville
Dream Lawrenseville
2000 - Phase I
Mecklenburg County
Boyd Tavern
Foundation
Restoration
New Kent County
New Kent County
Government Complex
Pedes~an Plan
City of Petersburg
Appomattox River
Heritage Trail
City of Petersburg
Blandford Cemetary
Wall Restoration and
Crater Road Co~idor Plan
Cily of Petersburg
Grove Avenue
Streetscapo
Enhancement
City of Petersburg
Historic Foundation
Grove Avenue
Streetscape
Enhancement. Phase II
1760~
16618
1761
13789
15105
16082
16619
Landsceplng, streelscaping, scentcbeaut~cationandprovistonoffadlitiesfor
)edestrians.
NFO)EN97-251-141,PEIQl~,PE102,RW201.,CS01
Rehabilitation of Inn for use as a hotel, conference center and museum.
(NFO)EN96-058-113tPE1,01tPE102~CS01
Repair and Improve sidewalk in and around the County Government Complex.
(NFO)EN97-063-144~PE101~PE102,RW2.01,C~1
RenovalJon of historic passenger train station and planning land acquisition and at
least pa~lal construction of approximately two miles of pedestrian/bicycle trail
along the Appomattox River.
EN93-123-V20,PE101tPE102,RW201,C501 C502 C503 UNDER CONSTRUCTION
This project includes rebuilding and restoring the historic cemetery walls that line
Crater Road and Rochelle Lane along the Westem bounda~/of the cemetery.
EN94.123-V48,PE101,PE102~C501 UNDER CONSTRUCTION
The proposed project, will implement the addition of curbs and curb culs, new street
surfaces and crosswalks, crosswalks across alleys, utilities, street lighting and
pubtic signs.
[NFO)EN95-123-118~PEI01~PE102~RW201~CS01 UNDER CONSTRUCTION
Introduclion of histeficelly compatible street lighting, consolidation of
utility lines and introduction of appropriate slmet signage.
[NFO)EN96-123-111?E 1017E102~RW201~C501 UNDER CONSTRUCT:ION
ENHANCEMENT PROGRAM
85
PE
RW
CO
TO
I
RICHMOND DISTRICT
t
Powhatan County
Courthouse Square
Reconstruction of sidewalks, storm water drainage control and adding lighting
fixtures.
Powhatan County
Courthouse Square
City of Richmond
Central Business
Distdct Steel
Rail Trolley
Clly of Richmond
Entrance to City of
Richmond
City of Richmond
James River and
Kanawha Canal
City of Richmond
Hull Street Passenger
Station
City of Richmond
rredegar Visitor Center
18793
151{
13791
13792
520OO
5199~
(NFO)EN98-072-t15,P.E.!0...1,.PE102,C501
Reconstruction of sidewalks, storm water drainage control and adding lighting
fixtures.
Preliminap/engineering and design of a Historic Eleclric Streetcar System for
Downtown Richmond.
EN94-127-V36,pE101,PE102
Complete landscape/stmelscape ffeatment to improve the aesthetics of the entryway
comidor on 1-64 west from Nine Mile Road through 1-64/I-95 Interchange and Betvidere
Interchange down to Canal Street. Phase funding.
EN93-127-V36~PE101,PE102~C501
Partial funding for the Richmond Riveffront Development Program and the James River
and Kanawha Canal/Triple Cress Connector project which will link two major sections
~f canal and urban greenway. Restoration and reconstruction of James River and
Kanawha Canal; fabrication of canal gate, walkways, landscaping, lighUng,
interpretNe signs and exhibits.
~..N....93. 427.-V13,PE101,PE102,RW201~CS01
Rehabilitation of the Hull Street station and surrounding area for a museum.
EN99-127-123,PE 101,PE102,RW201, .C501
Provide a slate of the art interactive map at Richmond's Civil War Center creating a
single view of Virginia's Civil War Heritage.
EN99-!27-122?E101,PE102,CS01
ENHANCEMENT PROGRAM
80~
RICHMOND DISTRICT
86
town of Victoria
¢ictoria Railroad
Roundhouse Museum
~nd Park
52003
Constmctioa a Railroad Roundhouse Museum to resemble original roundhouse.
Other amenities include a bus stop for the new public t~ansit system, park and ride lot
and railroad histo~ walking path.
EN99-317-126~PE101~PE102~RW201,CS01
ENHANCEMENT PROGRAM
I I I
87
RICHMOND DISTRICT
I
signage, path construction, landscaping and bike racks.
City of Blacksburg
Unlvemily City
Boulevard
Craig County
Town of New Castle
Streetscapa
Improvements
City of Galax
~alax Trail
~lenry County
Virginia Avenue
mprovements
,;~ of Mmlinsville
;ommunity Development
Jptown Rail Trail
Montgomery County
Huckleben'y Trail
Rails to Trails
15223
5O116
18776
17579
18774
16609
13817
EN94-141NI4tPE101~PE102rC501
Construction of pedestrian facilities and landscaping.
EN98-150:~!51,PEI01,PE102,RW201,C501
Landscaping, enW signs, lighting, crosswalks, sidewalks, park & ride lot and
~¥cle facilities along sectk)es of Routes 311,42 and 615.
iNFO)EN98-022-1127E1 Ol ?.EI, 02,c5o 1
Extension of the New River Trail into the City of Galax to connect businesses,
residential and public areas.
EN97-113-116,PE101,PE102~RW201~CS01
Straetscaping and signage improvements.
(NFO)EN98-044-110, ,PEI,01,PE 102,RW20!,C501
Existing vegetation will be cleared to creale an approximate 30-40 foot wide
trailway and paved pedes~an/bike path. Rail spur will be restored and landscaped
and steep embankment to the south will be manicured with safety fence installed.
NFO)EN96-120-105,PE101,PE102,RW201~ ,C501
A proposed six-mile project that will be built on the abandoned Huckleber~ Railroad
Line between Blacksburg and Chdstiansburg. The trail originates in downtown
Blacksburg, passes through VPI and ends at the New River Valley Mall,
EN93-O60-V28,PE101 PEI02,RW201 C~01tC502 UNDER CONSTRUCTION
PE
RW
CO
TO
ENHANCEMENT PROGRAM SALEM DISTRICT
88
Town of Narrows
Route 61 Improvements
and Train Exhibit
P~i~-k County
Economic Bevelopment
Pride 2020 Gateway
Project
Pulaski County
New River Trail
Safety/Access
Pulaski County
Draper Mountain
Overlook and
~Vayside
¥own of Pulaski
New River
trail Extension
town of Pulaski
Ratcliff Memorial Museum
5xfenslon
0ity of Radferd
Radford Pathways Network
16607
13827
16608
1606~
51990
51991
Development of gateway signege, native landscaping and informational kiosks.
[NFO)EN96-070-104?E101~PE102~RW201,CS01....
Safety improvements to the New River Trail at intersections with Route 693 and public
parking areas at Allisonia and Hiwassee.
EN93-0~?N!.~,PE101,PE102,RW201 ,C501
Stabilize and repair picnic shelters, upgrade restroom facilities, upgrade trail
system, implement vegetation management practices, define parking ares and upgrade
lookout sites and sealing areas.
;NFO)EN96-077-103, .P~t01 ,PE102,C501
Location from terminus of New River Trail [near Route 99) to downtown Pulaski.
Proposes to connect trail to town, ending at Pulaski Train Depot. Extension
includes acquisition of approximately 1.2 miles of dght of way adjacent to active
Norfolk Soulhem rail and Peak Creek.
(NFO)EN95-125-106,PE101?E 102,RW201,C501
Acquisit~on of property, design and initial development of the properly.
EN99-125-114 PE101 PE102 RW201~C501
Create a ne~ork of bikeways, walkways and trails.
ZN99-126-115,PE101~PE102~RW201~CS01
ENHANCEMENT PROGRAM
89
PE
RW
CO
TO
I
SALEM DISTRICT
I
City of Roanoke .
Railside Linear Park
City of Roanoke
virginia Museum of
Transportation
City of Roanoke
Planning and
Community Development
The Mill Mountain
Prospect Greenway
City of Roanoke
Lick Run Gmenway
Roanoke County
The Hanging Rock
Battlefield Tail
Phase I
Roanoke County
I'he Hanging Rock
BatfJefield Trail -
Phase II
town of Rocky Mount
~ailway Station
3base I & II
t607
18772
16610
1877~
16067
17578
13820
Improvements to the exlsling raiiside yard of the museum's main facility.
EN98-128-108?E101,PE102,C601
Conslmction of a trail for pedesMans and bicydisls, hlstodc interpretation signage and
landscape improvements,
EN96-128-102~PE101~PEI02~RW201
Bicycle/podestrian trail, landscaping and interpretation impmvemenls to a
historic resource.
EN98-128-10cj PE101 PE102fRW201~CS01
Trails. landmark preservation and stormwater control. The 4.76 mile walking I biking trail
#ill link the City of Salem with the Hanging Rock Batllefield site.
EN95-080.1.04~PE101?E 102<C501 UNDER CONSTRUCTION
Frails for walking and biking; pedeslfian and bike bridges; pmsewa~n of historic
sites and structure.
;N.F~),E. ,N97-080-115,PE101,PE102,RW201,CS01 UNDE..Ri.C..ON..STRUCTION
The acquisition, renovation and expansion of the Rocky Mount Railway Station to
become a Welcome Center/Area Museum. Landscaping and pedestrian/bike facilities are
included.
EN93-157.V30~PE101~PE102~RW201~C501 UNDER CONSTRUCTION
ENHANCEMENT PROGRAM
RW
CO
TO
3OO
SALEM DISTRICT
90
ENHANCEMENT PROGRAM
91
I
SALEM DISTRICT
I
~,lleghany County
;ailing Spdng
3verlook Project
parking lot to ovedook by bridge and sidewalk.
Link
Allaghany County
~fiato~ca! Sodety
1608~
Oakland Presbyterian
Church Cemetery
16542
Augusta County
Fort Defiance
Depot Restoration
17582
Bath C~unty
Hot Springs
Streetscape
Revitalization
18777
Route 340
Sidewalk Extension
1511{
1'own of B~gewater
WB~ Springs
Turnpike Park
16545
I' own of Broadway
PedesLdan Facility
1654{
[NFO)EN95q)03-117~PE101,PE102,RW201,C501
~onstruction of a wetland on prope~ west of the Church to slow down and treat lhe
,f, ow of ston'n runoff and highway drainage before it reaches the Jackson River,
[NFO)EN964)03-122~PE101~PE102~RW201~C501
Project is designed to restore the Fo~t Defiance railroad station built In the late
191h century to its original condition.
[NFO)EN97.007:.l19,PE101,PE102,CS01
Constmcllon of brick sidewalks, historic styled light fixtures, improved
3n-street parking and pedestrian accommodations,
[NFO)EN98-008-129,PEH01,PE102,C501
Proposed 550' sidewalk eXtension is located in the northern section of the town along
Route 34Q Thls wouid connect new sidewalks in a developing section of town.
EN94-168-V42~PE 101,PE t02~RW201~C501 ...........
Development of park. street beauliflcation, and pedestrian/bikeway on North Main
'Street in the Town of Bridgewater.
[NFO)EN96-176~!.2~5,pE!QI,P. E. !g2,RW201,CS01 UNDER CONSTRUCTION
Conslruclion of a pedestrian facility to link residential, commercial and
recrealJonal areas of the town.
{FO)EN96-177-126,PE101~PE102~RW201~C50,1, ..........
ENHANCEMENT PROGRAM STAUNTON DISTRICT
92
Restore railroad passenger and freight terminal building into museum.
Restoration
3tarke County
BurwelI.Morgan Mill
Site Improvements
~,larke County
,lighway Markers
3ity of Covington
3SX Depot Restoration
town of Edlnburg
the Edinburg Mill
town of Elkton
:limination of
transportation and
~treelscepo
mprovements. Phase I
16089
13781
17587
50117
52024
52O31
1654
INFO) .EN95-021-126,PE101~PE!02,RW201.,CS01
Approximately one acre of landscaping at the intersection of Route 7 Bypass and Route
? Business. This will serve as a Gateway project for the Town of Bem/ville and
Clarke County.
EN93-O21-V07~L801
Improvements COnsist of landscaping, mitigation of pollution due to highway runoff,
bu,/electrical/telephone cables, recons~ct mill headrace/lailrace and construct
~offet facilities.
[NFO)EN97-021-122,PE101~PE102,CS01
Installation of histo~c highway markers at various locations.
EN98-O21-153~PE101~PE102~C501
Restoration of two historic railway depots for public use with landscaping, sidewalks
~nd parking facilities.
~Ng.9:.1.Q .7-147,PE101,PE102,RW201.CS01
Acquisition and rehabilitation of mill to serve as a visitor's center and museum.
EN99-215-154,PE101,PE102,RW201,CS01
Removal of lranspo~tation obstacles and creation of visual enhancements.
NFO)EN96-216-121 PEI01,PE10.2.~RW201,CS01 UNDER CONSTRUCTION
ENHANCEMENT PROGRAM
93
PE
RW
CO
TO
i
STAUNTON DISTRICT
I I I
Frederick County
Sherando Area
Pedes~an and
Bicyae Fac~
Town o! Middletown
Cedar Creek and
Belle Grove
13784
5203(
Town of Front Royal
Happy Creek Trail
16547
Town of Front Royal
Billboard Removal and
Gateway Landscaping
52025
City of Harrisonburg
Harrisonburg Visitor
Center and Railmedl
Agricultural Heritage
Museum
16080
City of Hanisonburg
Port Republic Road
and Pedestrian
Facility
18771
Highland County
McDowell Battlefield/
Staunton to
Parkemburg Pike
1758O
pedestrian facility will provide a network connection between
~arious high density residential subdivisions along the Route 277 corridor.
5N93-034-V257 .E.101?E10.2,RW201~CS01
Trail impmvementa, landscaping, install information kiosk, interpretative signs and
and lntomtate 81 directional signage.
EN99-260-159~.P...E 1.01~PE 102,C501
Doslgnand construclionofwalking/biking lreiL Off road, parallel to Commerce
Avenue and Happy Creek,
[NFO)EN96.11~127 PEIO1,PE1020RW201,C501
Acquisition of off-premise outdoor advertising signs along Route 522 and landscaping
of two gateway sites.
EN99'112'148,PE101,PE102~RW201~CS01 . .
Project is located at old Chesapeake Wes(am Railway Train Station and Freight
Depo[ The museum will be utilized as a multi-functional facility serving tourists
and area residents with historical linkages between agriculture and tmnspodation.
[NFO)EN95.115-116,PE101,PE102,RW201,C501
Conslmction of bicycle lanes, sidewalk and landscaping.
[NFO)EN98-115-130,PE101,PE102,RW201,CS01
Scenic conservation easement acquisition, lrall construction and planning, and
~lriving tour co.stmctJon,
INFO) .E.N.9,7-045.! 17,PE101 ,PEI02,RW201 ,C5.01
CO
TO
, EN
ENHANCEMENT PROGRAM 94 STAUNTON DISTRICT
s Tmilhead
Town of Luray
First Skeet Sidewalk
Town of Monterey
Entryways and Access
Improvements
Town of Mount Crawford
Enl~n~ays and Access
Improvements
Town of Mount Sidney
Augusta County
Pathway to the Past
52037
16064
1758
5203~
5203;
52033
16543
Renovalion of the Locust Springs Adirondack Shelter, trail improvements, water/
sanitary upgrades and parking lot improvements.
ENgg-o45-160?E101~PE 102~C501
Purpose is to construct Iow water concrete pedestrian bridge linking Lexington
terminus to mst of trail. Also connect Woods Creek Trail to Chessie Nature Trail.
(NFO)EN95-117-t20~PE101 ?Et02, .C501
Construct a pedestrtan/bloycle kelt and enhance the aesthetic value of Lee Highway
lhat connects the City of Lexington wilh Rockbridge County.
(NFO)EN97-I17-1187E101~PE102tRW201 ~C501 ,,
Install sidewalks on the north side of First Avenue between Resewoir Road and
Lumy Avenue.
EN99-159-153,PE101,PElO2~RW201~CS01 ....
Landscaping and enffyway signage at two locations and miscellaneous signage
improvements.
EN99-262-155~PE101~PE102~CS01 ......
Construction of sidewalks, improved signage and enl~vay landscaping.
EN99.264-156,PE101,PE102~CS01 .......
Conslmction of pedest~n/bikeway to link the residential, commercial and
recreational areas to the village.
(NFO)EN96-007-123~PE101,PE102,CS01
ENHANCEMENT PROGRAM
95
PE
RW
CO
TO
EN
STAUNTON DISTRICT
I I I
! I I I ! I / I I I t ....I ~ I i I '! i !
The
Town
~ Tmflhead
17590
Installation of exhibils in the River room of the Port Republic Museum and
contemporary wayside exhibits in the village to Interpret the history of this early
barge*town as a major lransportation center,
landscaping and sanitary facilities at Crystal Springs located
Shenandoah County
Shenandoah Rail
Initiative
Town of Shenandoah
Front Street and
riverfronl Improvements
Ot{y of Slaunton/
~ugusta County
.andscape Screening
Scenic Enhancement
3ity of Staunton
-'nh3~ays
City of Staunton
History and Arts Center
52038
52034
17589
52026
52027
EN99-081-161 ~PE101 ,P,E 102~C50,1,
The presewatlen and mair~im[a,ce of ex~ih~j mil c~ddom by implementing altemata
considerations for use by supporting new opportunities in Intermodal Transpo~tion
which will preserve resources while supporting a regional effort to promote heritage
tourism.
(NFO)ENO?-O85-120~PE1q1,,,P,,E,102,C501
Landscaping and gateway improvements.
EN99-299-157~PE101~PE10,2,CS,0,1'
Land.ping along Intars{ai=s 81 and 64 at the Frontier Culture Museum to preserve
I~isto~,al interpretation.
iNFO)EN97-132-124,PE101,PE 102,C50t
Implementation of a s;~age program for entryways and historic districts.
EN99-132-149~PE101,PE1.0.2, .C5ql
Development of a ~glenal ads and hi~to~y center in the histodc Eakfeton Hotel.
EN99-132-150?E101?E102,RW201~ .C..501
ENHANCEMENT PROGF~J~M
96
RW
CO
TO
STAUNTON DISTRICT
Frederick County
Stephens City
Main Street
Historic District
Too. of st~i~a~ c~/
Sidewalk Extension
Town of Timbe~ville
Routes 42 and 800
East Sidewalk Project
City of Waynesboro
Doontown Revitalization and
Bicycle/Pedestrian Access
City of Winchester
Frederick County
Civil War
Battiefield Tour- Phase I
C~ of Winchester
Planning Department
B&O Rail Station and
Envimes
Rehabilitation
City of Winchester
B&O Rail Station and
Environs
Rehabilitation - Phase II
52035
15115
52028
15122
16544
17586
Improvement of Main St[est business area and historic district by (~mpleting and
upgrading the pedestrian sidewalks, designating a bicycle area and landscaping the
designated historic area.
EN93-304-V15~PE!01~PE102~CS01 CONSTRUCTION UNDER WAY
Extension of sidewalks from previous project,
EN99-304-158~PE101~PEI02~RW201~C501
Install 1,800 feet of sidewalk on Route 42 and Route 800 in the Town of Timberville
EN94-312-V46,PE101~PE102,RW201,NS01 CONSTRUCTION UNDER WAY
Approximately 6 miles of bicycle/pedestrian greenway along the South River and access
improvements within the cent[al business district.
ENg9-136-151?E101~PE102~C501
Part of larger muitlphase project to establish Civil War Battlefield Tour Network in
Winchester/Frederick County and is ~tical to full implementation of Shenandoah
Valley Civil War National Battlefield Park. Phase I is to acquire Grim Farm site.
which represents cent[al portion of Kerstewn Battlefield.
EN94-034-V31~PE101~PE102~RW201
Rehabilitation and opomlion of historic transportation buildings, structures or
[acilities including historic railroad tacilities.
(NFO)ENg..6..-.!..38-124,PE10.1,pEt02,RW201,CS01
Rehabilitation and operation of histo~ B&O transportation building.
(NFO)EN97-138-t21,PEt01,PEI02,RW201,CS01
ENHANCEMENT PROGRAM
I I I
97
I
CO
TO
~J'~ EN
I
STAUNTON DISTRICT
i I I
I ! ! ! I --~1 ! I I I - I I I ! ~ "1 I I '
ENHANCEMENTPROGRAM
:.,=DISTRICT SUMMARY
98
STAUNTON DISTRICT
purchase and improve an existing commercial docking facility and develop a recreational
T
angier/Harborton boat ramp and parking in the Town of Harborton.
17593 (NFO)EN97-001-12S PE101~PE102,RW201,CS01 I i: ~ EN J I
~,ccomack County Acquisition, design and construction of a visitor center and museum. '
Town of Tangier I RW ~i!:..:;~i:;{ I I
Tangier Island Visitor's
[TO
Center and Museum
I
52004 EN99-001-127~PE101?E102,RW201,CS01 I . .;i!.!;~,;!~ , EN I I
3i'{y of Chesapeake Construct 5' paved bike lanes with stripe on each side of Dock Landing I~(~ 'from
Porlsmouth Boulevard to near Devon Drive (approximately 1.8 miles). Also construct
Bikeway Loop - Phase I 5' paved bike lanes with stripe on each side of Joliff Road from the intersection of
David's Mill Drive to Portsmouth Boulevard (1.9 miles) and east along both sides of TO
Portsmouth Boulevard (0.6 mile). I i
15148 EN94-131-V27,PE101,PE102,RW201~CS01 . I
;ity of Chesapeake Construction of a 1.4 mi. multi-use trail in the Western Branch Borough of Chesapeake.
Sum Road I co ~i~??i!~ ii I i
52005 EN99-131-128~PEt01?EI02~RW201~CS01
3ity of Emporia To acquire and complete renovation of the interior of the CSX de~t according to I PE
Deparlment of the Interior standards for historic preservation and current ADA
Train Depot requirements.
13768 I i ' '?~!'::~:~;~;~ EN I
i So~,th Mai. Streat .... Constru~o. of pedes~,a.[ac,lt es and ~a,dscaping. I PE ,~ i ~:~0;;~?~i I .... I
City of Emporia EN93-109-V24,PE101PE 102~RW201~C501 UNDER CONSTRUCTION
II co :~ I !
50118 EN98-109-150,PE101?E102~,RW201~C501 I ,,
City of Hampton IPrl)ject Involves decorative lights, pedestrian signage, appropriate landscape
lbo[leT, attractive signage, street fumlture, etc., lining Ix)Ih sides of Settlers I RW
StreetscapelSettiers Landing Road ILanding Road from Eaton Street to Bridge Street and Kings Way from Sealers Landing
137891EN93-114-V04,PE101,PE 102,C501 UNDER CONSTRUCTION ,,
ENHANCEMENT PROGRAM SUFFOLK DISTRICT
99
Project invokes landscaping the median of the Hampton Roads Center Parkway between
Intestate 64 and Magmder Boulevard and high visibility areas at the respective
UNDER CONSTRUCTION
Complete renovation of the slructure in order to provide for a tourist center, a
museum annex and public use areas.
Preservation
17592
City of Newport News
Wan~ick Boulevard
50119
City of No~folk
~tlucks Historic
Pedeslrian Walkway
17591
qorthampton County
-teritage Trail
15144
rownofOnancock
~ameel D, Outlaw
)lacksmith Shop and
Museum
16537
Town of Parksley
Diner 8011
Restoration - Eastem
Shore Railway Museum
1871
(NFO)EN97-046-127~PE101~PE102~C501
Construction of pedestrian Improvemenls, parking facilities and landscaping.
EN98-121-t52?E101?E102 RW201~C501
Pedestrian walkway along Church Slreet, Hemy Street, Virginia Beach Boulevard,
and Princess Anne Road.
[NFO)EN97-122-126~PE 101~PE102~C501
Scenic and histo~ co~dor which travels length of County along designated Virginia
Byways, coastal routes and rural highways. Project will include trail center.
historic EasNitle Inn renovation and mill restoration which will be used as an
'ndust~al museum.
EN94-065-V13 PE101 PE10,.2~C501
:{estoralion of historic blacksmith shop and development of blacksmith shop museum.
;NF .O.)E.N96-273-1157E. 101,PE102,RW201,CS..0.1'
Purchase and restoration of Blner 8011, restroom cons~ction, siding repair,
conslmctlon of bus shelter and bike rack.
(NFO}EN98-O01-120,PE101 ,PE102,C501
RW ~
CO
TO
....... .~Z31~, ,, EN
PE
RW
CO
TO
275 iO0~
5804
7O
ENHANCEMENT PROGRAM SUFFOLK DISTRICT
100
Southamp~nCounty
A Colonnadeonthe
sreen-Southamp~n
Cou[thouse
18712
City of Suffolk
Downtown Suffolk
Association
CSX Main St. Railroad
Station Restoration
16538
City of Suffolk
Downtown Initiatives
52OO6
City of
Virginia Beach
Arts Center/Oceanfront
onnector Trail
1515{~
City of
Virginia Beach
Cape Henry
Lighthouse Restoration
1514
Cityof
Virginia Beach
Pungo - Park
Connector Trail
Facility Phase I
13771
Oily of Williamsburg,
James City I York
Counties
Bikeways and
Bike Lockers
- 13765, 13766
Planning, design and construction of a pedestrian colonnade approximately 115' in
length between the primary facility entrance and the courthouse parking lot.
{NFO)ENg~87-11.9,PE!01,PE102,C501
Restoration of a historically signir~nt railroad station for contemporary use as a
museum and visitor information center.
PE
RW
CO
TO
{NFO)EN96-133-116?EI01 PE102,RW201 C501
Downtown Suffolk Initiatives
EN99-133-129,PE101~PE102tC501
This project would plan, design and cons~ct a one-mile pedestdanlbicycle trail
along the existing salt-marsh environment.
EN94-134N22~PEI01?E102~C501
Restoration would include repair and maintenance of the structure as welt as
improvements necessary to make the lighthouse more accessible to the public.
EN94-134-V21~PE101~PE102~C501
6.2 mile long 10-foot wide asphalt surfaced pedestrian/bicycle trail on abandoned
Norfolk/Soulhem Railroad right of way. Trail to include two rest stops,
appropriate landscaping, interpretive signage and a bridge over West Neck Creek.
RW
'CO
TO
PE
RW
CO
TO
EN93-134-V12,PE101,PE102,CS01
Phase t financing for 10.0 miles of bikeways which are both separate facilities or
)aved shoulder bnes.
EN93-965-V11 PE10t,PE102,RW201 N501 NS02~N504
ENHANCEMENT PROGRAM
101
I
SUFFOLK DISTRICT
! I I ! I I ! ! 1 i '1 ! I I I ! I i
City of Williamsburg
W I iamsburg Transportation
Center
York County
Yorktown Water
Street Rive~alk
York County
Yorktown Wharf and
Waterfront
52007
15145
52OO8
train station and property for use as a
~nsportation center,
EN99-137-130,PE1.0!~PE1,02,RW201,C501
Pedestrian linkage between v~;{o~ attractions including streetscape improvements and
Rive~valk along the York River.
E~ N9,4-09,9-V08~PE101?E102fRW20,1~C501
Restoration of wharf/warehouse/ferry terminal and access to wateFfront transpodation
and existing Riverwalk,
EN99-099-131~PE 1q1.PE102~CS01
~': : +~,:;,DISTRICT,,SUMMARY
550
ENHANCEMENT PROGRAM SUFFOLK DISTRICT
102
15107
CouNties
~latural Bridge
iTC -,lames River
;oot Bridge
15295
-lighway Marker
~eplacement Program
~'a, Department of
-listoric Resources
16621
=auquierand Loudoun
3oose Creek Historic
3ridge Site Improvement
17566
;ily of Richmond
in fiscal year 1999-00,
preparation services for approved
EN99.069d66?E101?E102
Bocumentation and interpretation of Civil War sites statewide, Includes facilities
for bicycles and pedestrians, landscaping at sites requiring such and
)lacement of historical signs.
EN94*969-V30~PE101?E102~C501 CONSTRUCTION UNDERWAY
Rehabilitate piers and abutments of brldge over James River. Piers have been
abandoned and unused since 1954. Project will provide facilities for pedestrians
c~osslng Appalachian Trail that are presently using Route 501 bridge. This would
~rovide a safer crossing,
.~N94-969-V49 PE101 PE102~C501
Conduct reseerch and draft new Htstoric Marker texls. Replace erroneous andlor
missing markers.
(NFO)EN96-969-133,PE101,PE 102~C501
Construction of a scenic overlook, the installation of historic markers, the cmaticn
of historic markem, the creation of a native plants and wetlands walk, and
stabilization of the bridge.
',NFO)EN97-969-105~PE101~PE 102~RW201~0501
Restomtien of the Steam Plant Building and the restoration of Track
~,daptive Reuse of
~istorical
rransporlation Site
18797
Science Museum of
Virginia
historic streetcar loop and the complete restoration of a vintage
Elisebeth S. Bocock
Trolley Loop
52046 EN99-969-168
ENHANCEMENT PROGRAM
103
PE
RW
CO
TO
CO
TO
CO
PIE !~
Rw
co
TO
I
EN
EN
STATEWIDE
I
Science Museum of
Virginia
Interactive Transportation
System Exhibit
Old Dominion Resource
Consewation and
Development Council. Inc,
Wilson. Kautz Campaign
Driving Tour
Old Dominion Resource
Conservation and
Development Coundl, Inc.
Civil Rights in Education
Heritage Trail Initiative
~/Irginia Museum of
Transportalion Site
Site Improvements
52O49
52048
52045
52047
of an educational interactive exhibit and rehabilitation of historic RF&P
Railroad Car One.
EN99-969-171~PE101~PE102~CS01
Ddving tour of lhe mute taken by Union forces during a Civil War campaign of 1864
EN99-969-170, PEIOI~PE102,CS01
Historic preservation and interpretation of sites tn 13 jurisdi~ons focusing on civil
rights in educalion,
EN99-969-167~PE101~PEI02,R ,W2,01~C501
Restoration of the museum roof and extension of the canopy over the station's
railside dock.
EN.9,.9;969-169~PE101,PEt02~CS01
;DISTRICTSUMMARY
ENHANCEMENTPROGRAM
PE
RW
CO
TO
~8
STATEWIDE
104
TOTAL-1999~2000 ENHANCEMENT ALLOCATIONS
ENHANCEMENTPROGRAM
105
STATEWIDE
~ommonwealth Transportation ~oard
fiscal year
'! - ! ' -'1 .....
6
TransportatiOn
Safety lmpro vement
Program
I I I I I I I I I I I ! !
SAt;ETY IMPROI/~EMENJ~S
The Transportation Equity Act for the 21st Century or "TEA-21", signed by the President on June 9, 1998 provided for the
continuation of the Safety Improvement Program.
This federal-aid legislation established federal authorizations through 2003, thus providing better planning for future revenues.
With the enactment of TEA-21 additional funding was made available for the Safety Improvement Program.
This will provide the Board an opportunity to continue the program begun by ISTEA. Rather than charging the full cost of an
improvement to a locality's construction allocation, the locality will be able to use the state matching share from its construction
allocation to leverage the federal funding available for the proposed improvement.
The improvements identified in this program were selected from a statewide priority list for hazard elimination improvements
and rail-highway grade crossings to provide for the safety and convenience of the travelling public.
106
SAFETY IMPROVEMENT PROGRAM
(In Thousands of Dollars)
1998-1999 through 2003-2004
FEDERAL, FUND ALLOCAT!,ONS
SAFETY IMPROVEMENTS
18,424 18,424 18,424 18,424 18,398 18,783
INCENTIVE 0 0 0 0 0 0 0
RAILROAD
AUTHORITY GRANT
778 636 331 331 314 0 0
107
I
I t I I I I ! ! I I I i I i I ! I -I I
~oute 801803
RW
CN
TO
STP
Guardrail &
Remove Fixed
Objects
1.57 Miles
Install Guardrail,
Update Guardrail,
Shoulders
Route 72 -
Route 719
Route 742
Scott 688
Install Guerdrail,
Shoulders
4.3 km East
Route 639
Intersection
PE
RW
CN
TO
STP
16465
PE
RW
CN
TO
STP
524~2
RW
CN
TO
STP
52493
RW
CN
TO
STP
14815
RW
CN
TO STp~
17528
I
i
I
I
) 0071-084-!0~' PE101,NS01
System Allocations
CTBtSTP Statewide Allocations
High Priority Funds
(4) STP Regional NlocaUons
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM BRISTOL DISTRICT
108
14-
and
645-
Washington
Reconstruction
Route 71
PE
RW
CN
t'O
STP
;655
PE
RW
CN
TO
STP
' - East PE
RW
Widen Pavement CN
TO
STP
16,1 km 14812
CTBISTP Statewide Allocations
) TEA-21 High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) CooperatiVe Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
109
BRISTOL DISTRICT
Route 726
Intersection
Route 250
1 Lan~
Route 15/29 (North
of Remington)-
Prince William
County Line
Intersection
Route 666
RW
CN
TO
STP
PE
RW
CN
TO
STP
18902
RW
CN
TO
17977
PE
RW
CN
TO
STP
189O3
PE
Route 663 RW
CN
TO
Flashing SIP
Signal
189O4
PE
Route 607 RW
CN
Lane TO
STP
CTBISTP Statewide Allocations
High Priodty Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
CULPEPER DISTRICT
110
WidenRappahannock & Pave INCL Woodville RW CN ~;<s~'~ ~':~ *"~'~ ~'~ ~? ;?~
STP ....
52495
§12 - At ;iiie~section PE ! [
Route 610 RW
Improve Sight CN
STP
Shoulders
Route 768 - PE
Charlottesville RW
Corporate Limits CN
TO
17903
Route 29 - PE
Route 1455 RW
CN
TO
STP
STPi
(t) National Highway System Allocations
(2) CTB/STP Statewide Allocations
(3) TEA.21 High Prioqty Funds
Funding/MiSCellaneous Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
111
CULPEPER DISTRICT
I I ! ! I I I I I ! I i I I ! ! I I I
Route 17 - RW
0.3 km South CN
Route 95 SB TO
17529
IStafford Route 606 RW
Cut Slope and CN
Improve Grade TO
14739
218- PE
Stafford Route 1161- RW
Two* CN
,Leff*Tum 116t TO
13847
PE
RW
CN
TO
Intemection PE
Route 1336 RW
CN
TO
STP
STP
STP
STP
STP
DISTRI(~T SUMMARY
(1) National Highway System Allocations
(2) CTB/STP Statewlde Allocations
TEA-21 High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Olher System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
(6)
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
FREDERICKSBURG DISTRICT
112
Arm
hals with
on
Route 501 Bus,
:Langhome Road)
Route 501 Bus,
Street
Interchange -
Route 501 Intemhange
2.3 Mi.
At Intersection Old Mt,
Nelson Avenue
Intersection
Danville
Install
Traffic
Signals
(1) National Highway System Allocations
(2) CTBtSTP Statewide Allocations
(3) TEA-21 High Priority Funds
RW
CN
TO
STPi
15817
PE
RW
CN
TO
17520
PE
RW
CN
TO
STP
17834
PE
RW
CN
TO
PE
RW
CN
TO
STP
15816
PE
RW
CN
TO
STP
19008
FuhdlngtMis~ellaneOus FoOtnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMROVEMENT PROGRAM LYNCHBURG DISTRICT
113
I i I I ! ! ! I ! I '1 ]1 i 'l I I I I I
0,35 km
Signals with
Backplates
Route 602
Inte~secUon
Piney Forest
Road
Intersection
Route 626
Intersection
Route 783
;nteisection
Murrell Road
Rt. 29/501
Interchange -
Bus. 460 Interchange
PE
RW
CN
TO
16431
RW
CN
TO
19O07
PE
RW
CN
TO
1879
RW
CN
TO
16429
PE
RW
CN
TO
15841
PE
RW
CN
TO
17833
STP~
STP
STP
STP
STP
~0
56~ i0 ~0 0 ~,0 .0'~ 0 it).
[1) National Highway System Nlooations
CTB/STP 8tatewide Nlocations
Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HAZARD ELIMINATION SAFETY IMROVEMENT PROGRAM LYNCHBURG DISTRICT
114
2.6 Mi.
1.6 km
2.14 Mi.
Rt. 460 Bus.
Rt. 221
Mile East
Route 609-
D.90 Mile East
Route 609
Route 681.
~).3 km East of
Route 682
Route t303 -
Route 360
PE
RW
CN
TO
t7832
PE
RW
CN
TO
18650
PE
RW
CN
TO
15818
RW
CN
TO
f?g04
STP
STP
STP
STP
I(NFO)0501-118-10E.PmE..tm~!,M§Q1'
~.0!?!:~::
(6)
'1
1) National Highway System Allocations
i CTBISTP Statewide Nlooations
~ TEA-21 High PriOry Funds
(4) STP Regional AllOCations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HAZARD ELIMINATION SAFETY IMROVEMENT PROGRAM
115
I
LYNCHBURG DISTRICT
I
William Line - RW >:,
Manassas CN
Lanes TO !680~ 680 ~:/680 i~880~';.~:': ;~;:~!680:~,~: 680 :0,:~'~ ~;./i0i~~
0,8 km
Rte 50&
649
120-
123-
Intersection
Route 609
17984
RW
CN
1899O
PE
Route 27 - RW
CN
Street TO
STP
At Intersection
24th Road South
Route 1813
leside Avenue)
9195
PE
RW
CN
TO
STP
17524
RW
CN
TO
STP
~2497
PE
RW
CN
TO
STP
<0 ~0
y System NlocaUons
CTB/STP Statewide Allocations
Funds
(4) STP Regional Allocation~
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/In{erest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
NORTHERN VIRGINIA DISTRICT
116
Road & Nethercliffe
Hall Road
North
Signal
South Veitch Street-
South Courthouse Rd
)- Route 828 (Wiehle Ave.)
Route 620 (Braddock
Curve
0.6 Mile North
Hundred Drive
Road)- Route 620 (Braddock
Road)
PE
RW
CN
TO
STP
52503
RW
CN
TO
STP
14695
PE
RW
CN
TO
STP
RW
CN
TO
STP
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
[1) National Highway System Allocations
CTB/STP Statewide Allocations
Funds
(4) STP Regional Allocati°ns
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project wl~h Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM NORTHERN VIRGINIA DISTRICT
117
11-
0.3 Mi,
h~nCuwe
Rte 3180
Improve Horizontal &
Shoulders
PE
RW
CN
TO
17836
STP~
Bethleham Rd.
Construct Turn Lanes
Approaches
Realign, & Add
Shoulders & Pavement
PE
RW
CN
TO
17837
STP
Road)-
Route 5436 (Oflay
Road)
Route 19,54
Trowbridge Drive
PE
RW
CN
TO
STP
CN
50142
STP
!680 1.680
88O
Highway System Nlonations
CTB/STP Statewide Nlonations
High Pdority Funds
F.Unding/Mis~llaneous Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
118
NORTHERN VIRGINIA DISTRICT
Park Lee Place
Pavement and
Improve
Sight Distance
0,5 km
I~l;nover
Intersections Route
RW
CN
TO
STP
13843
PE
RW
CN
TO
STP
Intersection
30
t925114743
RW
CN
TO
STP
18994
PE
Street RW
CN
TO
STP
'of
15852
Leigh Street-
Spring Skeet RW
(Spot Locations) CN
TO
14734
of
;~ichmond
Install Positive
RW
CN
TO
0 0
(1) National Highway System Allocations
(2) CTB/STP Statewide Allocations
(3) TEA-21 High Pdodly FUndS
Eunding!Mi~d~!laneous FOotnOtes
(4) STP Regt~al Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
119
RICHMOND DISTRICT
I
I I I I ! ! I I ~ I ! I I I i I I ! ] I
Road
Left.
1.4kin
1(3L3e~gh St) Leigh StreeffAdams
Street- 4th Street
At Intersection
Laburnum Avenue
Iht Cmtchfield
Street
Boulevard
Route 634
PE
RW
CN
TO
STP
13844
PE
RW
CN
TO
STP
1585O
PE
RW ;~
CN
TO
STP.
50505
RW
CN
TO STP ~i i
1753O
CN
TO
19002
PE
RW
CN
TO
STP ~
0 0
0 0
CTB/STP Statewide Nlocalions
TEA.21 High Pdority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperalive Project with Other Localities
(8} Funded on a Previous Project
(91 Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
RICHMOND DISTRICT
120
144 -
0,5 km
145 -
km North
Route 1520 (Curtis
st,)-
03 km South
Route t520 (Cu~s
St.)
At ;~e~ection
Route 632
Eighth Street
147.
of
Pedestrian
Laurel Street
' of (Spot Locations)
Ninth 'Street
PE
RW
CN
TO
1765O
STP
147 - Intersection
Cherry Street
PE
RW
CN
TO
51242
PE
RW
CN
TO
15849
STP
STP
New
I(1) National Highway' System Allocations
i(2) C'I*B/STP Statewide Allocations
(3) TEA-21 High Priority Funds
PE
RW
CN
TO
t6435
PE
RW
CN
TO
15848
PE
RW
CN
TO
15847
STP
0 ?~!:'0 0 0 0
Fbndihg!Misceltaneous Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
~ I t I I
121
RICHMOND DISTRICT
! I I I i ! I i I i I I ! I I ! I ! ~
~6 - Int. Route 1155
PE
RW
CN
TO
157 -
Left
0.4 km
0.04 Mile South
Mile North
Boardman Lane
South
Oid House Bridge-
Quioccasin Road
0.Tkm
Intersection
) Bells Road
New
Intersection
Route 64
(1 ) National Highway System Nlocations
(2) CTB/STP Statewide Allocations
(3) TEA-21 High Priory Funds
STP
PE
RW
CN
TO
STP
PE
RW
CN
1`O
STP
50427
RW
CN
1'O
STP
16432
PE
RW
CN
TO
STP
181O5
PE
RW
CN
TO
STP
50428
(NFO) 0157,,*p4,3'1:1~i ,PE101,RW201,MS01
Fu nding/MiscellarieoiJs Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8] Funded on a Previous Project
(9) Bonds/Interest
(6)
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
RICHMOND DISTRICT
122
hal
1.6 km
~lickory
Road).
Chesterfield
Intersection
~MV Drive
km West
~oute 730 (Baldwin
~reek Road)-
Route 4700 (Deer
Run Road)
iRamp to 1.64 -
Springdale Road
Intersection
3erwent Road and Hey
~oad
PE
RW
CN
TO
STP
15846
PE
RW
CN
TO
STP
16433
PE
RW
CN
TO
STP
17526
PE
RW
CN
TO
STP
15845
~oute 630 -
Mile East
PE
RW
CN
TO
18997
Route 812 -
RW
CN
TO
STP
STP
J(1) National Highway System Nlocatlons
(2) CTB/STP Statewide Allocations
................
* Maximum HES Funds
(7)
(4) STP Regional Allocations
(5) Federal Dernons~ation Funds
(6) Cooperative Project with Other System
(7) Cooperative Project wilh Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
123
RICHMOND DISTRICT
I
! '1 I i I ! i I I ! I i ! I I I ! I I
Improve Horizontal
Structure
PE
RW
CN
TO
17184
STP
Route 622
PE
RW
CN
1'O
17853
STP
Mill PE
Road) - RW
600' South Route 1708 CN
(Groundhog Road) TO
STP ~
Inl. e~ueCtion
Bliley Road
New
RW
CN
TO
15851
Homeview Road RW
CN
Lane & TO
STP
52507
PE
f of Belmont Road RW
CN
TO
14735
(1) National Highway System Allocations
CTBISTP Statewide Allocations
High Pdodty Funds
STP
O :01 ~0 (6)
~68~
-:0
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
lai~abOS FbOtnOtes
(7) Cooperative Project with Other LocaliUes
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
RICHMOND DISTRICT
124
At Intersection
of Grace Street
of Marshall Street
of Franklin Street
of
Pedestrian
Clay Street-
Franklin Street
St-
of Bank Slreet
PE
RW
CN
TO
RW
CN
TO
52509
PE
RW
CN
TO
nal
RW
CN
TO
PE
RW
CN
TO
STP
STP ~:~
STP ~;;~
STP!
STP
(t) National Highway System Allocations
(2) CTBtSTP 8tatewHe Nlocations
(3) TEA-21 High Pdorily Funds
_
Funding/MiScellaneous FoOtnotes
(4) STP Regional Allocations
(5) Federal Bemonsffation Funds
(6) Cooperative Project with Other System
i1~111~ iiii i i i
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
RICHMOND DISTRICT
125
Route 669 RW
CN
Lanes TO
Left-Turn
Remove
Turn Lane
North Carolina
State Line -
1.3 Miles North
North Carolina
State Line
Route 609 (2.6 km
East Route 220)
Route 9201 -
Route 683
Route 779
17842
STP
RW
CN
TO
STP
18982
PE
RW
CN
TO
HESISTP
11938
PE
RW
CN
TO
STP
17523
RW
CN
TO
STP
8983
Intersection PE
of Galax Club/ RW
Larkspur CN
TO
STP
18984
I CTB/STP Statewide Nlocations
Funds
(4) STP Regional Allocations
(5] Federal Demonsfl'ation Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
SALEM DISTRICT
126
114 -
nstall Signal
0.3 Mile
Ch[isfiansburg.
Christiansburg
PE
RW
CN
TO
52514
Route 116 PE
RW
CN
TO
52515
Route 902 -
Route 902
Route 669-
D.4 Mile South
Route 669
Route 611-
9.8 km South
Route 611 (South of
Big Island)
RW
CN
TO
17257
PE
RW
CN
TO
525t6
RW
CN
TO
15756
Route 10t9
PE
RW
CN
TO
STP
STP
STP
STP
System Nlecations
~ CTB/STP S~ewide Nlocatiofls
~ Funds
(4) STP Regional Nlocations
(5) Federal Oemonstralion Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
127
SALEM DISTRICT
~ of Roanoke
Widen
Pavement
and Improve
tess Street
Intersection
Nelms Lane
Intersection
Berkley Road
PE
RW
CN
TO
PE
RW
CN
3'0
14558
PE
RW
CN
TO
14829
STP
STP
0
~:,~:,:8701:~ 0 0 O'
CTB/STP Statewide Allocations
f Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project wilh Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM SALEM DISTRICT
128
Route 704
nstall
hals
Route 739 -
Route 760
nment
0,8 km
Intersection
.~henandoah Route 682
Intersection
~henandoah Route 703
in
Install
nstall Guardrail
1.6 km East
Steeles Tavern -
Nelson County Line
Horseshoe Bend
Ramsey's Draft
(Augusta County)
1) National Highway System Allocations
CTBtSTP Statewide Allocations
r Funds
RW
CN
TO
STP
18985
PE
RW
CN
TO
STP
15855
RW
CN
TO
STP
18986
PE
RW
CN
TO ~:~
STP ~
52519
PE
RW
CN
TO
STP
13807
PE
RW
CN
TO
52568
52567
~60;1
'(NFO) 0042-085-10f ,PE101,RW201,M501 J
~73
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
129
STAUNTON DISTRICT
I
Intersection
Route 636
PE
RW
CN
TO
STP
usta
Install
Traffic
Route
Center
RW
CN
TO
1644O
PE
RW
CN
TO
16441
PE
RW
TO
17643
522 - Intersection PE
Frederick 37 NB RW
Widen Ramp to CN
2 Lanes, TO
16439
0.6 Milo North PE
Route 643 - RW
CN
Route 643 TO
STP
STP
STP
STP
STP
CTB/STP Statewide Allocations
High Pdodty Funds
(4) STP Regional Allocations
5) Federal DemonStration Funds
6) Cooperative Project with O{her System
0;~
222 Accounts Receivable
~?i::~ ~0::~!!;~ {
0~'~ r 0
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM STAUNTON DISTRICT
130
PE
RW
CN
TO
STP
Lane
ntersection
~oute 276
PE
RW
CN
TO
STP
Mile
Replace Existing
Harrisonbu~g
Install Traffic
0.3 Mile
Street
Install Overheight
Detection
Equipment &
Road.
~ of
Intersection
Papermill Road
i(~)
National Highway System Allocations
CTB/STP Statewide Allocations
TEA-21 High Priority Funds
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
17846
RW
CN
1'0
STP
52518
PE
RW
CN
TO
STP
18988
of Hardsonburg
Fu~ndi~g/Mi~llan~Ous~FoOtnOtes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
131
h
STAUNTON DISTRICT
i
DISTRIC~ SUMMARY
(1) National Highway System Allocations
CTB/STP Statewide Allocallons
Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
STAUNTON DISTRICT
132
Bird,)
Intersection
Fort Story West Gate
Shore 83rd Street
RW
CN
1'O
STP
15821
PE
RW
CN
TO
17519
Removalof
134-
Island
PE
RW
CN
1'O
19O08
PE
RW
CN
TO
13978
RW
CN
TO
STP
17518
Freeman Ddve
PE
RW
CN
TO
Allocations
STP
(I) National HighWay System Allocations
(2) CTBISTP Statewlde Nlocations
(3) TEA-21 High Priority Funds
(4) STP Regional Altocatio~
(5) Federal Demonstratie~ Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
133
SUFFOLK DISTRICT
PE
e Road F-137 RW
Warning CN
Left Turn Lane STP
143 - Intersection
Lanes
143 -
News
Lanes
143 -
and
Road
Denbigh Boulevard to
Fort EusUs Boulevm'd
and Intersection
Realignment at
Industrial Park Drive
Ave) DresdenDdve
St. Thomas Ddve
(1) National Highway System Allocations
CTBISTP Statewlde Allocations
High Priority Funds
RW
CN
TO
STP
15822
RW
CN
TO
STP
15823
PE
RW
CN
TO
STP
13979
RW
CN
TO
STP
PE
RW
CN
TO
STP~
52524
i280~
HES Funds
0 J 0;~
Fundihg/Miscellatlebus Footnotes
(4) STP Regional Nlocations
(5) Federal Bemoustratiou Funds
(6) Cooperative Project wilh Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interesl
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM 1 34 SUFFOLK DISTRICT
Suppl.
Install Traffic
Intersection
Tyler Avenue
At 1-564/I-64
Intersection
PE
RW
CN
TO
STP
13980
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
': 5- 1-V 3~: -"_01~--'5--, . ....... lUlilities and Conkac['Tkdministration by Cit
/
PE
Fox Hill Road & RW
Chem/Acres Drive CN
TO
PE
of Riverside Regional RW
CN
Traffic TO
STP
52528
Intersection PE
LaSalle Avenue RW
CN
TO
Modify STP
19OO9
I(1) National Highway System Allocations
(2) CTB/STP Statewide AIIocallons
~Funding/Mi~iian,~6u{ Fo6tnote~
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Coopemlive Project with Other Localities
(8) Funded on a Previous Project
{9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
135
SUFFOLK DISTRICT
I
InlersecUon PE
Granby Street and RW
Norfolk CN
Install Boulevard TO .!0 i~O ;~ :0
Lanes STP
Von Schilling Brive
15824
PE
RW
CN
TO
STP
16436
RW
CN
TO
STP
Hill Road -
Fox Hill Road
RW
CN
TO ~::~
STP ~
52529
Blvd.- PE
Middle Ground RW
Boulevard CN
STP
19010
Boxley Boulevard - PE
Boulevard RW
CN
TO
Standards STP
14722
0~
National Highway System Nlooations
CTBISTP Statewide Allocations
, Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) CoopemUve Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
{9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM SUFFOLK DISTRICT
136
Shitt Alignment to
Improve Sight
nal w/Mast Arm
and
PE
RW
CN
TO
STP
17522
RW
CN
TO
STP
(1) National Highway System Nlocatlons
CTBISTP Statewide Allocations
) TEA-21 High Priority Funds
L
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) CooperafJve Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HAZARD ELIMINATION SAFETY IMPROVEMENT PROGRAM
137
SUFFOLK DISTRICT
t
Elimination-
Highway System Allocations
Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Projecl
(9) Bonds/Interest
HES SUMMARY
STATEWIDE
138
Russell
Realign
InterseclJon
& Add Lett
Turn Lanes
Routes 65/683
RW
CN
TO
17-
Fauquier
Lane
Route 724
RW
CN
TO
50546
Install Traffic
G~ass
Median witl~
Furniture
Route 654 ·
Route 783
PE
RW
CN
TO
RW
CN
TO
5O547
15-
Spinks Ferry Road -
Merryville Farm Lane
PE
RW
CN
TO
15-
PE
RW
CN
TO
(7)
National Highway System Allocations
CTB/STP Statewide Allocations
TEA-21 High Priority Funds
(4) STP Regional Allocations
(5) Federal I:)emonstralion Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
SAFETY INCENTIVE PROGRAM
139
STATEWIDE
I
15- Road PE
RW ~
CN
Embankment TO
STP
157 -
Intersection
Improvement &
Modify Signal
Three Chopt Road
Franklin
~.t Intersection
Island) -
Plaza
PE
RW
CN
TO
~543
PE
RW
CN
TO
RW
CN
TO
PE
RW
CN
TO
'- PE
Route 171 RW
CN
TO
(1) National Highway System Allocalions
CTBISTP Statewide Nlocatfons
Priodfy Funds
(4) STP Regional Nlocationa
(5) Federal Demonstration Funds
(6) Cooperative Project with Olher System
(?] Cooperative Project with Other Localities
(8} Funded on a Previous Project
(9] Bonds/interest
SAFETY INCENTIVE PROGRAM STATEWIDE
140
:1) National Highway System Allocations
: CTB/STP Statewide Nlocations
High P[iority Funds
(4) STP Regional Allocations
(5) Federal Oemonslration Funds
(6) Cooperative Project wi~h Other System
~: Footnotes' ~..:,
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
SAFETY INCENTIVE PROGRAM
141
STATEWIDE
RW
CN
Surface TO ~261 ~0~~: ~0 ~!i~iO~i :~:~2~0
Improvement STP
Rt, 23
Install Flashing
15704
RW
CN
TO
STP
714916L)
17789
23
RW
Add Gates & Upgrade CN
Flashing Lights TO
STP
18232
RW
CN
Install Flashing TO
Lights and Gates STP
0
lpgrade
Ipgrade
Ugh~
PE
RW
CN
'ro
PE
RW
CN
TO
STP
STP
CTB/STP Statewide NlecaUons
High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
Footnotes
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(g) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION '!30
BRISTOL DISTRICT
142
Mi, S, Rte. 675
~.dd Gates & Upgrade
Flashing Lights
Install Cantilever
Flashing Lights and
Gates
Mi, SW Rte. 623
install FlaShing
Lights
Rte, 620
Flashing Lights & Bell
Fleshing Lights
Upgrade Flashing
Lights
I(1) National Highway System Allocations
(2) CTB/STP Statewlde Nlocablons
(3) TEA.21 High Priority Funds
PE
RW
CN
TO
STP
18473
PE
RW
CN
TO
STP
10276
PE
RW
CN
TO
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP~
PE
RW
CN
TO
STPi
O~
~Eunding/Mi~llanebus Footnbtes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(91 Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
143
BRISTOL DISTRICT
PE
RW
CN
t'O
Rushing Ughts & Bell
STP
638 - S, Rt. 11
Smyth
Smyth
Flashing Lights
N. Ri, 11
Rushing
and Add Gates
Lights and Gates
Widen Surface &
Install Flashing
Lights
RW
CN
TO
STP
18468
RW
CN
TO
STP
17790
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
18481
Install Flashing
Ughts & Gates
DOT fi 469713G)
PE
RW
CN
TO
5O689
STP
0
O~
.0
System Allocations
CTBISTP Statewlde Nlocations
High Pdoriiy Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
{9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
BRISTOL DISTRICT
144
Buchanan
Rt. 616 PE
RW
CN
Ipgrade FI TO
STP
#4697t6C)
16993
N. Rte. PE
RW
CN
TO
STP
18470
Rt. 1t PE
RW
CN
Gates and Upgrade TO
g Lights STP
17791
S. PE
RW
CN
Bell, TO
STP
Rte. 609
RW
Gates & Improve CN
ht Distance TO
50694
Rte. 609 PE
RW
CN
TO
STP ~
17261
I(1) National Highway' System Allocations
(2) CTBISTP Statewide Nlocations
(3) TEA-21 High Prio[ity Funds ......................
'~ Eunding!Miseellaneous FOOtnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
145
BRISTOL DISTRICT
Mi. S. Rte, ~ pi:
RW
Install Flashing CN
Jghls and Gates TO
:DOT 904261Y) STP
18467
PE
RW
CN
Install Flashing Ughts TO
Widen Crossing STP
O~
RW
CN
TO
STP
18471
RW
Install Flashing CN
Lights and Gates TO
STP
PE
RW
Install Flashing CN
Lights and Gates or TO
Closure STP
17792
3- PE
RW
Upgrade Flashing CN
Lights, Add Gates TO
STP
(2) CTB/STP Statewide Allocations
(3) TEA-21 High Pdority Funds
17793
Fu nding/MiSdellai'i~bUS Footnotes
(4) STP Regional Ntocalions
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
146 BRISTOL DISTRICT
0.01 Mi, N. Rte. 460E PE
RW
CN
Flashing Ughts & TO
Improve Approaches
STP
1201 -
' of Norton
0.04 Mi. N.
RW
CN
Flashing Lights & TO
Improve Sight STP
Distance
18668
0.06 Mi. N. Chilhowie PE
RW
Install Flashing Ughts, CN
Bell & Gates w/CWT TO
Predictors or Close STP
Crossing
0.01 Mi, NW RL 637 PE
RW
Install FlaShing CN
Lights and Gates, TO
Interconnect w/Advance STP
Flashers on Rte. 637
17285
0.11 Mi. SE Rte 58 PE
RW
Install Flashing CN
Lights and Gates TO
0.01 Mi. S; Railroad
17652
STP
RW
CN
Lights and Gates or TO
Closure STP
I(1) National Highway System AtlocaUons
[(2) CTBISTP Statawide Allocations
1(3) TEA-2J High PdmitY Funds
17882
O~
0 O~
'FuM~iing/Miscellanebus FootnOtes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE ~ SECTION 130
147
BRISTOL DISTRICT
PE
RW
CN
TO
Lights and Gates STP
17284
DISTRICT SUMMARY
Highway System Allocations
CTSISTP Slatewide Allocations
High Pdority Funds
(4) STP Regional Allocations'
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project wilh Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 131) 148 BRISTOL DISTRICT
install Cantilever
Flashing Lights, Bell
& Gates
RW
CN
TO
STP!
Install Flashing
Lights and Gates
DOT # 714709S)
RW
CN
TO
18498
0.12 MI. N. Rte. 20
Flashing Lights, Install
CWT Predictors
DOT # 7t4744F)
PE
RW
CN
TO
17
1004-
Install Flashing
Lights and Gates
DOT # 714394R)
1002
Flashing Ughts & Gates
PE
RW
CN
TO
18496
RW
CN
TO
10t2- 15
Flashing Lights
I(1) National Highway SyStem Allocations
(2) CTBISTP Statewlde Allocations
(3) TEA'21 High Pdority Funds
PE
RW
CN
TO
18499
STP
STP
STP
Fundihg/MiSbelia~eo~iS:Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7)Coopera§veProjectwithOtherLocaliaes
(8)FundedonaPreviousPr~ect
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION '130
149
CULPEPER DISTRICT
]015 - i.S. Rte. 15 PE
3~ange RW
CN
Add Gates & Upgrade TO
1019- 15
3range
Install Flashing
Lights and Gates
St-
185OO
STP
PE
RW
CN
TO
STP
18497
PE
RW
CN
Upgrade Flashing TO
Lights, Add Galas STP
17366
RW
Upgrade Flashing CN
Lights, Add Gates TO
STP
17361
PE
RW
Interconnect R,R, CN
Signals w/Traftic TO
Signals, Install CWT STP
Predictors
52551
PE
Mill Road RW
CN
Add Gates & Upgrade TO
Flashing Lights STP i
System Nlecations
Funds
t8832
o o O~
:Fonclir
(4) STP Regional Nlocalions
(5) Federal Demonstration Funds
(6) Cooperative Project witil Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION '130 CULPEPER DISTRICT
150
National Highway System Allocations
CTB/STP Statewide Nlocations
TEA-21 High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with O~er Localities
(8) Funded on a Previous Project
(9) Bondsllntemst
HIGHWAY/RAIL GRADE - SECTION 130
151
1
CULPEPER DISTRICT
Interconnect Warning STP
Signals
D.05 MI. N. Rt, 3 I
RW
CN
Flashing Lights TO
STP
16270
(1) Nalional Highway System Allocations
CTB/STP Statewide Allocations
rEA.21 High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) C~x)perative Roject with O~her System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAYIFUUL GPJ~DE - SECTION 130 FREDERICKSBURG DISTRICT
152
Install Cantilever
Flashing Lights with
Short Arm Gates
RW
CN
TO
STP
17129
E. Rte, 613 PE
RW
CN
Gates TO
STP
S~reat
Upgrade Flashing
Cantilever Lights
and Add Gates
PE
RW
CN
TO
STP
Improve Approach
17731
PE
RW
CN
TO
STP
Mi. W. Rte. 501
t Lights,
Bell & Gates
18480
PE
RW
CN
TO
STP!
, W. Rt, 683 PE
RW
CN
Separation TO
S~P
17302
National Highway System Nlocations
CTBtSTP Statewide Nlocations
TEA-21 High Priority Funds
Matching Funds Provided by Norfolk Southern RR Company
(6)
(4) STP Regional Nlocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Boeds/laterest
HIGHWAY/RAIL GRADE - SECTION 130
153
LYNCHBURG DISTRICT
0,93 Mi. E. Rte. 15/360 PE
151360 RW
CN ~
Lights & Bell, Grade TO
STP
E. Rte.
Install Flashing
Gates & Beti,
1848t
PE
RW
CN
TO
STP
385~
PE
RW
CN
TO
STP
0 0 0
0
718 -
RW
CN
Install Rashin9 TO
STP
S. Rte. 360 PE
RW
CN
Install Flashing TO
and Bell STP
50692
RW
CN
TO
15212
Install Flashing
Lights & Bell
714039C)
STP~
0 ~
CTBtSTP Statewide Nlocations
TEA-21 High Pdortty Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other LocaliUes
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130 LYNCHBURG DISTRICT
154
t11t-
S. Rte. 131 PE
RW
CN
Improve South TO
18479
Mi. W. Rte. 501 PE
Relocate Rte. 635 RW
Crossing & Close Rte. CN
761 Crossing, Install TO
Flashing Lights & Gates
Lights and Gates
Interconnect RR SignaLs
Motion Detectors
PE
RW
CN
TO
STP
16319
PE
RW
CN
TO
STP
100% Federal Funds
Matching Funds
O~
National Highway System Nlocations
CTB/STP Statewide Nlocations
TEA-21 High Priority Funds
(4) STP Regional Nlocations
(5) Federal Demonslmtion Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Projecl
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130 LYNCHBURG DISTRICT
155
15-
Install Cantilever
Flashers w/Gates &
Interconnect wilh
RW
CN
TO ~19' ~:!0 !i 0~;; 0 0 ~0~ ~:~!;; i,':'~b~
STP
{Old Rte,
Rt, 653
GradeSeparation
(DOT#714337C)
Flashing Lights & Bell
16874
PE
RW
CN ~
TO ~"
STP
15132
PE
RW
CN
TO
STP
Install Flashing
PE
RW
CN
TO
STP
Light and Gates
17676
PE
RW
CN
TO
STP
e¸.
Manassas Nokesville Road
17677
PE
RW
CN ;~
TO ~
STP
18751
Highway System Allocations
CTBISTP Statewide Nlocations
Funds
Funds Provided by Norfolk Southem RR
)~;~!ii!:0; !! '~0
~mpany
Matching Funds Provided by Norfolk Southern RR Company
Matching Funds0 Provided. i by No[folk oS°Uthern RR CompanYo.
(4) STP Regional Nlocations
(5) Federal Demonstration Funds
(6) Cooperallve Project with Other System
(7) Cooperative Project with O~her Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
NORTHERN VIRGINIA DISTRICT
156
Center Street
Install CWT Predictor
Prince William County
Install CWT Predictor
Install CWT Predictor
)
PE
RW
CN
TO
18752
PE
RW
CN
TO
~750
PE
RW
CN
TO
18753
& RW
CN
[Includes Engineering TO
[or Wellington Road)
1.2 km 17689
STP
STP
STP'
Matching Funds Provided by Norfolk Southern RR Company
Funds Provided by Norfolk Southern RR Company
ol
Norfolk Southern RR Company
National Highway System Nlocations
CTBISTP Statewide Allocations
TEA-21 High Priority Funds
Fuilding!MiS¢~!lan~us FOOtnotes
(4) STP Regional Allocaltons (7) Cooperative Project with Other Localities
(5) Federal Demonslrafion Funds (8) Funded on a Previous Project
(6) Cooperative Project with Other System (9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
I I I I
157
NORTHERN VIRGINIA DISTRICT
RW
CN
Surface TO
Improvement STP
Hanover
15689
PE
RW
CN
Lights & Gates & TO
Raise Approaches STP
Mi, N. Rte.
Crossing Condition
N. Rte, 606
Install Flashing
& Gates
18482
PE
RW
CN
TO
STP
18484
PE
RW
CN
TO
STP
t8486
RW
Add Gates & Upgrade CN
Flashing Lights TO
STP
~0697
PE
RW
CN
Flashing Lights & TO
Improve Horizontal STP
18485
Matching Funds Provided by Norfolk Southern RR Company
I
0 J · ~0
I
0 0
0
(1) National Highway System Allocations
CTB/STP Statewide Allocations
TEA-21 High Pdority Funds
(4) STP Regional AIIccations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) CooperaUve Project with Other Localities
(8) Funded on a Previous Proje~
(9) Bonds/Interest
HIGHWAY/RAIL GRADE ~ SECTION '130
1 58 RICHMOND DISTRICT
1101-
0.10 Mi, S, Rte. 750
Install Flashing
Lights and Bell
DOT 464408E)
Install Flashing
Lights and Gates
DOT 715105R)
Install Flashing
Lights and Gates w/
Motion Detectors
Pkwy
Interconnect with
Iraftic Signal
Interconnect Signals
PE
RW
CN
TO
18487
RW
CN
TO
STP
PE
RW
CN
TO
STP
17653
PE
RW
CN ............
TO
STP
16346
PE
RW
CN
TO STP ~
17281
PE
Interconn,Signals wi RW
Pm. Emp.,Add Add'l, CN ~
Gate EB,CWT Predictor TO
& Motion Detector STP
at Route 161
I(1) National Highway System Allocations
(2) CTB/STP Statewide Allocations
(3) TEA-21 High Priority Funds
17278
Matching Funds Provided by Norfolk Southern Corporation
Matching Funds Provided by Norfolk Southern Corporation
!
~01 0 · 0 ~?~?0 4 0~<
~b~hldih~/Mi~%liati~b'US: FOotnote~
(4) STP Regional Allocations
(Si Federal Demonstration Funds
{6) CooPerative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
I I I ~ I
159
1
RICHMOND DISTRICT
} i I
Street
PE
RW
CN
wt Pre-Emption at TO ~!~6j:~:i:i~ ,~:~0 ~i~,~ :0:~? 0~:~"~i ~ 0 ~.~':.",:~:~0~
Dock Street STP
17280
[1) National Highway System Allocations
CTBISTP Statewide Nlocations
High Priority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Conpemtive Project with Olher Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION t30 RICHMOND DISTRICT
160
Route 701
Add Gates & Upgrade
Flashing Lights &
Cantilevers
Intersection
Route 756 (Bassett)
Install 138' Removable
Median Barrier for
Each Approach
Add Gates & Bell,
Upgrade Flashing
Ughts
Rte. 641
Add Gates & Bell,
E. Rte. 603
Upgrade
RW
CN
TO
STP
18870
PE
RW
CN
TO
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
J
Matching Funds Provided by
O!
NE Rt 622N PE
RW
thsiati Flashing CN
TO
STP
National Highway System Nlocations
CTB/STP Statewide Nlecations
TEA-21 High Priority Funds
{4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
161
1
SALEM DISTRICT
t I I
Install Flashing
Gates
Upgrade Flashing
Lights
0.04 Mi. N. Rte. 798
& Bell,
Upgrade Flashing
Lights
S. Rte.
Bell,
Upgrade Flashing
Lights
Gates
PE
RW
CN
TO
STP
17839
RW
CN
TO
STP;
PE
RW
CN
TO
STP
RW
CN
TO
STP
RW
CN
TO
STP
Mi. S. Rte. 640 PE
RW
CN
Install Flashing Lights, TO
STP
O! :0
National Highway System Allocations
CTB/STP Statewlde Allocations
TEA.21 High Pdo~ity Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperalive Project with Other System
IlaneouS Footnotes
(7) Cooperative Project with Other LocaliUes
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
SALEM DISTRICT
162
0.02 Mi. NE, Rte. 220 PE
RW
& Upgrade CN
Flashing Lights TO
(DOT # 468044V) STP
, of Roanoke
17934
0.06 Mi. SE. 18th St. PE
RW
Install Flashing CN
Lights and Gates TO
STP
, of Roanoke
18th Street-
, of Roanoke
18869
PE
RW
& Bell, CN
Motion Detectors, TO
Upgrade Flashing STP
,of
),03 Mile South PE
Campbell Avenue RW
CN
Install Flashing TO
Lights and Gates STP
18868
PE
RW
Install Flashing CN
Ughts and Gates, TO
ImProve ' STP
Horizontal Alignment
17283
~0
0 0
1) National Highway System Allocations
CTB/STP StatewHe Allocations
TEA-21 High Priority Fonds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(8) Cooperative Project with ~er System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
163
I
SALEM DISTRICT
I I I
Rw
Upgrade Flashing CN
Lights, Add gates TO
E. Rte. 11 PE
RW
CN
8ell, TO
STP
STP
Page
Interconnect
Rubberized
Surface
0.22 Mi. S. Rte. 811
RW
CN
TO
18871
RW
CN
TO
STP
Upgrade Flashing STP ~
Lights
PE
RW
CN
Install Flashing TO
Bell STP
Int. Rt, 619
RW
CN
TO
Lights, Add gates STP
17841
(NF,O) 0275-132-101
.... ~(%:'~0,'??:
(2) CTB/STP Statewide Allocations
(3) TEA-21 High Pdodty Funds
(4) STP Regional Nlocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130 STAUNTON DISTRICT
164
Upgrade Flashing
Ughts
0.30 Mi, E. Rte. 33
Install Flashing
Lights and Gates
PE
RW
CN
TO
STP
PE
RW
CN
TO
18478
STP
Flashing Lights
to Cantilever
Flashing Lights
0.12 Mi. N. Rt, 608
Add Gates
PE
RW
CN
TO
STP
17293
RW
CN
TO
STP
18477
PE
RW
CN
TO
STP
17842
0.40 Mi, SE Rte. 611 PE
RW
CN
Add Gates & Bell, TO
STP
1) National Highway System Allocations
CTBtSTP Statewide AllocatiOns
t TEAo21 High Priority Funds
Matching Funds Provided by Norfolk Southern RR Company
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HIGHWAY/RAIL GRADE - SECTION 130
165
STAUNTON DISTRICT
t I I
1.0 Mi. E. ~e. 11
Lights
Mi. N. Rte. 687
Install Flashing
Lights & Bell
Install Flashing Lights,
Bell & Gates
PE
RW
CN
TO
STP
PE
TO ~
RRP ~
STP
13282
RW
CN
TO
STP
PE
RW
CN
TO
STP
CWT Predictors
PE
RW
CN
TO
STP
Matching Funds Provided by CSX Transportation
ii!);,?: ~:'i '~0
Mi. W, Rte, 617
Install Flashing
Lights and Bell
714568K)
System Nlocations
CTB/STP Statewide Nlocations
~(3) TEA-21 High Priority Funds
I'"
PE
RW
CN
TO
STP
18475
EbhdinglMisb~lianeous.'Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9} Bonds/interest
HIGHWAY/RAIL GRADE- SECTION t30 166 STAUNTON DISTRICT
),05 MI. E. Rte, 616
rnsta~l Flashing
iUghts and Bell
usla
1301-
InstallCantilever
~lashlngUghts&
MLE. Liberty
FlashingUghts&
Lights, Install
Rubberized Crossing
Surface
Cantilever Flashing
Lights and Gates
l(1) National Highway sYStem Allocations
(2) CTB/STP Statewlde Allecetio~s
(3) TEA-21 High Priority Funds
PE
RW
CN
TO
PE
RW
CN
TO
STP
Matching Funds Provided by Norfolk Southern
RW
CN
TO
STP
17292
PE
RW
CN
TO
14981
PE
RW
CN
TO STP i
16340
RW
CN
TO
STP
16339
Matching Funds Provided by Norfolk Southern Corporation
O~
O~
FUnding/MisCellaneOus Footnotes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project wi[~ Other Localities
{8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
167
STAUNTON DISTRICT
I
Harrisonburg
Street -
street -
Ltbe[ty St,
Install Flashing
Lights
Interconnect w!
Lights and Gates &
Interconnect wi
Pre-Empt at Liberty
Install Flashing
Lights and Gates &
Interconnect wi
Pre-Empt at Liberty
Roosevelt Street
Flashing
and Gat~
PE
RW
CN
TO
STP
16341
RW
CN
TO
STP
17362
PE
RW
CN
TO
STP
17675
PE
RW
CN
TO
STP
17316
PE
RW
CN
TO
STP !i'~
18873
PE
Street RW
CN
Surface & TO
18872
STP ~
1 ) National Highway System Allocations
CTB/STP Stateside Allocalions
High Priority Funds
(4) STP Regional Nlocations
(5} Federal Demonslration Funds
(6] Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
STAUNTON DISTRICT
168
D,02 Mi. E. Chesapeake
Install Dual Flashing
Lights & Gates for
Way System &
Interconnect
9.04 Mi. W, Main Street
Install Flashing Lights &
Gates, Interconnect RR
Signals w/Traffic Signal
9.02 Mi. W. Kent Sffeet
Install Flashing Lights,
Bell & C.~tes w/Motion
Detectors
DOT # 139446V)
PE
RW
CN
TO
STP
52554
RW
TO
STP
52555
PE I
RW
CN
TO
(1) National Highway System Allocations
(2) CTB/STP Statawide Allocations
(3) TEA-21 High Priority Funds
.
FundiSg!Mi~bellaneous FoOtnOtes
(4) STP Regional Allocations
(5) Federal Demonstration Funds
{6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
169
I
STAUNTON DISTRICT
i I I I I
Route 648 RW I
CN
!
~pgrade TO ~: ~:~! ~';:~0~ ~
Ughts STP
(DOT 532156T)
18707
PE
RW
CN
Signal Interconnect TO
STP
60-
Co. Line
Cantilever Flashing
Lights (Both
Directions)
460
(DOT 467423S)
18821
PE
RW
CN
TO
17365
PE
RW
CN
TO
18822
Rtl3
Install Flashing RW
Lights and CN
Interconnect Signal TO
STF
STP
STP
17291
PE
RW
Improve Approach CN
Grade to Eliminate TO
Hump Crossing STP
Condition
17857
System Nlocations
CTB/STP Statewlde Allocations
Priority Funds
!0 '2 ,0 0
FUndihgtM
(4) STP Regional Allocations
(,5) Federal Demonsb'ation Funds
(8) Coeperative Project with Other System
(7) CooperaUve Project with Olher Localilies
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAI L GRADE - SECTION 130 170 SUFFOLK DISTRICT
r',lansemond
0,15 Mile East
Route 605 North
Install Flashing
Lights and Gates
Install Flashing Lights,
Bell & Gates
(DOT # 464171H)
0,03 Mi, S,
Add Gates
SW Rte.
616 -
Hump Crossing
Condition
S. Rte. 1603
Gates & Upgrade
517-
E. RL 13
CTBISTP Statawlde AtlocaHons
High Pdodty Funds
PE
RW
CN
TO
STP
18491
RW
CN
TO
STP
RW
CN
TO
STP
17901
PE
RW
CN
TO
STP
PE
RW
CN
TO
STP
50698
PE
RW
CN
TO
STP
173tl
(4) STP Regional AIIocaUoas
($) Federal Demonstration Funds
($) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interesl
HIGHWAY/RAIL GRADE - SECTION '130
171
SUFFOLK DISTRICT
I ] I I I
01 Mile West
Impr. Approach Grade
Eliminate Hump
Crossing Condition
Route 13 S,
Add Gales & UPgrade
his
Route 13 N.
Flashing Lights
Mile South
Route 611
Install Flashing
Lights & Gates
PE
RW
CN
TO
18495
PE
RW
CN
'tO
18488
PE
RW
TO
18490
RW
CN
1'0
18492
Route 1602
Lights
STP
stP
STP
PE
RW
CN
TO
STP~
PE
RW
CN
Install Flashing Lights TO
& Bell STP
) National Highway System Allocations
CTB/STP Statewide Nlocations
Funds
~;i gii:~i;i'~]*~ IMatching Funds~?0 ~s~:JPr°vided by Eastern Shore RR company
Eastern Shore RR Company
O~
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6} Cooperative Project with Other System
(1) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HIGHWAY/RAIL GRADE - SECTION t 30 SUFFOLK DISTRICT
172
0,02 Mi, SW Rte, 740
;I Lights,
Bell & Gates
PE
RW
CN
TO
STP
0~ 0 FO
662 -
Greensville
Route 301
Install Intersect, &
Adv. Waming Flashers,
Interconn.w/RR Signal
Rt, 58B
Route 13
Flashing
W. Rte. 13
Install Flashing Lights
0.80 Mi. NE; Rte. 58
PE
RW
CN
TO
STP
18493
RW
CN
TO
STP.,
17899
PE
RW
CN
TO
STP
18489
RW
CN
TO
PE'
RW
CN
TO
STP
O~ O: O~ 0
National Highway System Allocations
CTBISTP Statewide Nlocations
TEA-21 High Pdority Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperalive Project with Other System
(7) Cooperative Project with Other LocaliUes
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION t30
173
I
SUFFOLK DISTRICT
I
1603-
PE
RW
CN
~ CWT TO ~0~ ~.:~ 0~!~ ~0~i O~,~i~ 0
Add 8e~l
MI. S. Seaboard PE
RW
CN
I~ubbedzed Crossing TO
~urfece Improvement
Blvd.
PE
RW
CN
TO
)Creek
Install Rubberized
Surface
Dr
Crossing Surface
52858
PE
RW
CN
TO
18825
PE
RW
CN
TO
17354
Mile Southwest PE
Military Highway RW
CN
TO
STP
STP
STPi
grossing Surface STP
System Allocations
CTBISTP Statewide Nlocations
High Priodty Funds
ff
~0
Funds Provided
(4) STP Regional Allocations
(5) Federal Demonsb'ation Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/interest
HIGHWAY/RAIL GRADE - SECTION 130 SUFFOLK DISTRICT
174
News
PE
Pughsville Road RW
CN
Install Flashing TO
Lights and Gates
18823
STP
0.34 Mile West
Pembroke Ave. RW
CN
Flashing Lights, TO STP
with Pre-empt
18826
S{reet PE
RW
Gates, Upgrade CN
TO
Rubberized Crossing STP
Surface Improvement
0.01 Mile South PE
Industrial Avenue RW
Add Gates, Upgrade CN
to Canlilever FI. & TO
Install Rubberized STP
Crossing Surface
18827
PE
RW
CN
TO
14952
Add Cantilever
Flashing Lights
. E, Chestnut PE
RW
Gates & Bell, CN
TO
I Lights, Install
Rubberized Crossing ;
52560
National Highway System Allocations
STP
STP
O?
~0:
EunclinglMisCella~eous FOOtnotes
(4) STP Regional Nlocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
175
SUFFOLK DISTRICT
I
Road -
Norfolk
Upgrade Cantilever
PE
RW
CN
TO STP~
18403
PE
RW
CN ~
Install Flashing TO
Lights STP
17733
PE
Henry RW
CN
Install Flashing TO
Lights and Gates STP
Norfolk
17360
Little PE
Creek RW
Interconnect Signal CN ~
ttat TO
1.64 Ramp STP
Bell
17279
RW
CN
TO
Inglaslde Road RW
CN
Add Gates & Upgrade TO
Flashing Lights STP
CTB/STP Statawide AIIooa~tons
Funds
18828
O~
Norfolk Southern RR Company
0
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) CooperaUve Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interesl
HIGHWAY/RAIL GRADE ~ SECTION 130 SUFFOLK DISTRICT
176
Lights,
PE
RW
CN
TO
Bell & Gates STP ~
0,03 Mi, E, Virginia PE
RW
CN
Install Flashing Lights, TO
Bell & Gates STP
Mile Southwest PE
Route 642 RW
CN
TO
Flashing Lights STP
0.08 Mi. E. County St RW
CN
Flashing Lights & TO
Gates STP
164O5
0.04 MI. S. Knight
RW
Install Flashing CN
Lights and Gates TO
STP
17730
PE
0.10 Mi. E. County St RW
CN
Flashing Lights & TO
Gates STP ~
I(1) National Highway SYStem Allocations
(2) CTBISTP Statewide AtiocaUons
(3) TEA-21 High Priority Funds
Matching Funds Provided by NOrfolk Southern Corporation
(4) STP Regional Allocations (7) Cooperative Project with Other Localities
(5) Federal Demonstration Funds (8) Funded on a Previous Project
(6) Cooperative Project with Other System (9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130
177
SUFFOLK DISTRICT
I
Beach
Kentucky Ave,-
0.08 Mile North PE
RW
CN
Interconnect Signals TO
Cantilever Flashing
:lashing Lights
$,Southem
Road
Install Flashing
Lights & Interconn.
with Pre-emption
18830
PE
RW
CN
TO
14961
PE
RW
CN
TO
15705
RW
CN
TO
PE
RW
CN
TO
18831
STP
STP
STP
O' '0
STP :68 ~,~'0 ~J 0
0 0,=;~'i 0 =0
DISTRICT SUMMARY
CTBtSTP Statewide Allocations
~ Funds
(4) STP Regional Allocations
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Coopemtlve Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGHWAY/RAIL GRADE - SECTION 130 178 SUFFOLK DISTRICT
GRADE CROSSING
PROGRAM
1) National Highway System Allocations
CTB/STP Statewide Allocations
t Funds
(4) STP Regional Allocations
(5) Federal Demonslration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9} Bondstlntemst
HIGHWAY/RAIL GRADE - SECTION 130
179
STATEWIDE
I
0.1 Milo West of
Route 628
(860.534P)
Predictors
(12" Lens)
(Se0-SSTW)
RW
CN
TO
13918
PE
RW
CN
TO
13919
STP
Predictors
(12" Lens)
(8s9-545c)
Constant Warning
Predictors
(12" Lens)
RW
CN
TO STP
13913
PE
RW
CN
TO STP
............ i00% P~deral Funds'" ! .........................
'Constmcti~ 'C°mpl~te ...... ',,' ..................... ", .........
100% Federal Funds ' ~ I' "
..................... :~!-: ~:~0~:~: ..........
C,onstmctlon ComplEte , ' "'
100% Federal Funds
(12" Lens)
13914
PE
RW
CN
TO
STP
100% Federal Funds
::)ISTRI~T:SUMMARY:
13916
564 ~3
(I) National Highway System Allocations
CTB/STP Statewide Nlocalions
TEA*21 High Priority Funds
(5) Federal Demonslratton Funds
(6) Cooperative Project with O~her System
(7) CooperaHve Project with Olhet Localities
(8) Funded on a Previous. Project
(9) Bonds/Interest
HIGH SPEED RAIL - SECTION 130 FREDERICKSBURG DISTRICT
180
~rince William
Grade Separation
RW
CO
TO
STP
National Highway System Nlocations
CTB/STP Statewide Nlocations
TEA-21 High Prio~ Funds
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL - SECTION 130
181
NORTHERN VIRGINIA DISTRICT
' of Richmond
Street RWco I
Install 150' Median TO ~:~;0~iii!:~i
Bar~ier for Ea~ STP
DISTRICT SUMMARY
CTBISTP Stateaide Allocations
Funds
(5) Federal
(6) Cooperative Project with Other System
(7] Cooperative Project with Other Localities
(8} Funded on a Previous Project
(9} Bonds/Interest
HIGH SPEED RAIL -SECTION '130 RICHMOND DISTRICT
182
Gates/CWT Predictors
Fleshing Lights and
Mile West of
and
RW
CN
TO HSR
15180
PE
RW
CN
TO
15178
PE
RW
CN
TO
HSR
13918
PE
RW
CN
TO HSR
PE
RW
CN
TO HSR
13890
[1) National Highway System Allocations
CTB/STP Statewide AIIocaUons
t TEA.21 High Priority Funds
(5) Federal Demonstration Funds
(6) Cooperative P¢oject with Other System
(7) Cooperative Project wilh Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL -SECTION 1010
183
FREDERICKSBURG DISTRICT
'. William
[DOT # 860526C) RW
CN
TO
15172
DISTRIOT SUMMARY
0 ~0
National Highway System Allocations
CTBISTP Slatewlde Allocations
Funds
(5) Federal
(6) Cooperative Project with Other System
[7) Cooperative Project with Ofher Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL -SECTION 1010 1 84 NORTHERN VIRGINIA DISTRICT
Upgrade Light Signals
Add CWT Predictors
0.12 Mi, W, Rte 145
Upgrade Flashing Lights
and Gates & Add
CWT Predictors
Quadrant
860-438M)
Petersburg
RW
CN
TO HSR
16816
PE
RW
CN ~
TO HSR ~
16819
PE
RW
CN
TO
16186
Halifax PE
RW
CN
& Gates 3'0 HSR
Event Recorders
16821
1) National Highway System Allocations
CTB/STP Statewlde Allocations
TEA.21 High Priodty Funds
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL - SECTION t0t0
185
RICHMOND DISTRICT
I
I ') ! I i I ! I I I ' I I ! I ! J I I !
Industrial Park
Street
Access
RW
CN
TO HSR ~:~ ~O~ ~:':0~/~ .... ~0
18709
PE
RW
CN
Install CWl' Predictors TO HSR i~'O~ ~
Mi. NE Rte. 60
Event Recorder
Mile West
Ingleside Road
~redictors & include
Recorder
18685
RW
CN
TO HSR
18705
RW
CN
TO HSR~
18703
Reservoir RW
Upgrade Flashing CN
Lights & Gates wlCWT TO HSR
187O4
Lafayette RW
Upgrade Flashing CN
Lights & Gates wlCWT TO HSR ~0~ ;ii,0~:
Predictors & include
Event Recorder
18706
National Highway System Allocations
CTBISTP Statewide Allocations
Pdority Funds
(5) Federal Demonstration Funds
(6) CooperaUve Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL - SECTION 10t0
SUFFOLK DISTRICT
186
Nalional Highway System Nlecations
CTB/STP Statewide Allocations
TEA-21 High Priority Funds
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL - SECTION t0'10
187
SUFFOLK DISTRICT
I
at30 RW
Crossings within CN
TO
16820
HSR
*
CTB/STP Statewide Nlocations
) TEA-21 High Priority Funds
Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HIGH SPEED RAIL- SECTION 1010 188 STATEWIDE
Safety Improvement
[SeCtion t52)
Crossing Safety
Improvement Program
[Section 130)
High Speed Rail
Corridor
t010)
Federal Railroad
~Gmnt)
IMPROVEMENT PROGRAM
RAILROAD AUTHORITY
SAFETY INCENTIVE
PROGRAM
National Highway System Allocations
CTB/STP Statewide Nlocations
TEA.21 High Priority Funds
(5) Federal Demonstration Funds
(6) Cooperative Project with Other System
(7) Cooperative Project with Other Localities
(8) Funded on a Previous Project
(9) Bonds/Interest
HES RAIL SUMMARY
I
189
I 1 ! ...... !
~omm on w~alth Yran~p orta Hon
cai y~ar
6
Corr?dor
D~w/opm~n!
Pro. qram
I ! I I I I
U.S. ROUTE 58 CORRIDOR DEVELOPMENT PROGRAM
The Virginia General Assembly, through the enactment of House Bill 1836 in the 1989 session, created the U.S. Route 58
Corridor Development Fund for the purpose of providing an adequate, modem, safe, and efficient highway system along the southern
boundary of the Commonwealth. The U.S. Route 58 Corridor Development Fund of the Transportation Trust Fund is supported from
an appropriation of $43.85 million from state real estate recordation tax receipts.
In the April 1989 Special Session of the General Assembly, legislation was enacted which authorized the issuance of $600
million in Commonwealth of Virginia Transportation Revenue Bonds under the provisions of Article 10, Section 9(d) of the
Constitution of Virginia for the development of the U.S. Route 58 Corridor. The 1999 General Assembly increased that amotmt to
$704.3 million.
The 1999 General Assembly authorized an additional $5.35 million in appropriation' to the fund f~om the State's Highway
Maintenance and Operating Fund beginning in Fiscal Year 2000.
The Commonwealth Transportation Board is charged with the responsibility of defining the U.S. Route 58 Corridor and
administering the program. The Board has considered needed improvements of this corridor when allocating funds for highway
improvements.
Toward this end, the Commonwealth Transportation Board is actively pursuing the objectives of this legislation. To date, the
Board has sold $397.0 million in bonds. Future bond issues are plam~ed over the next several years to meet thc project development
190
schedules. At the current time, preliminary engineering, right-of-way acquisition and construction are being carried out on various
segments of the program. While some sections are further advanced than others, some preliminary engineering has been accomplished
throughout the entire corridor.
In this update, the program is shown in its entirety. It shows those projects that have been completed, under way, or proposed,
as well as those projects that have or are anticipated to receive bond funds. Also, included are those projects that are beyond m~y
current funding program.
The solid time line identifies those projects that are funded or anticipated to be funded from existing sources of revenue which
include bond funding, highway construction allocations, etc. Broken lines identify those projects proposed to be financed with future
bond funds to be sold within the $704.3 million bond authorization approved by the General Assembly. Those projects identified as
needs, but with no ftmds anticipated within the current funding program, are shown in the far right-hand column as amounts in the
"Balance to Complete" column. To date, $616.1 million in bond funds and highway construction allocations have been dedicated to
the .corridor. Projects to use these monies are identified as being completed, underway, or with a solid time line showing
implementation in the near future. Another $307.3 million has been identified with the dashed time line as being funded from future
bond issues. An additional $852.8 million has been identified in the "Balance to Complete" coltunn with no funds programmed.
The increase in the total cost of the Route 58 Corridor program is due mainly to the inclusion of the right-of-way and
construction on the corridor between Damascus and Volney, and the section of Route 16 between Route 81 and Volney as approved by
the Commonwealth Transportation Board. The remaining increase in cost includes the addition of a large number of bridges and other
191
sections throughout the corridor where right-of-way and construction were added.
The Board is continuing to place all possible emphasis toward completing the Route 58 corridor improvements within the
program guidelines established by the General Assembly.
192
7$.TMiles
~/ashington,
Scott and Lee
tPE Only)
Miles
Lee
IRW On~y)
58-
Lee
Parallel
Lane
[RW On~y)
2,!.Miles
58-
Lee
Parallel
Lane
t.3 Miles
~8-
Lee
Parallel
Lane
.8 Miles
Uric.
Abln§don
Corridor
Study
Abingdon-
Jonesville
Corridor
Study
Shawnee(AtTennessee
StateLine)-
Hagans
o:'i Mile East
Route 25 East at
Cumberland Gap -
2,2 Miles East
Route 25 East at
:umberland Gap
Z2 Miles East
Route 25 East at
Cumberland Gap-
0.4 Mile West
L & N Railroad
at Gibson Station
PE
RW
CN
TO
10068
PE
RW
CN
TO
~865
PE
RW
CN
TO
11916
PE
RW
CN
TO
0.4 Mile West
L & N Railroad
at Gibson StaUon -
1,0 Mile West
Route 689 at
Etydale School
:)0~8.961:E0~;I~Ei00
10058-052-E22~RW2!I
IAcqulAt!ioq C~ 9mp!~t~
I i
IPreliminary Engineering 8, Construction B
10058-0§2-E22,RW201
National Park Service
RW
CN
TO
ConstructionCorn lete ..... -,,~~
193
ROUTE 58 CORRIDOR PROGRAM BRISTOL DISTRICT
Lane & 4-Lane
Relocation
~,5 Miles
~8-
Lee
4-Lane
~,elocatiou
1,1 Miles
~8-
.ee
Parallel
.a~.e
Miles
NewLocaUon
.1 km
~689at
Elydale School
Mile East
Route 698 at
Cowan Mill
Mile East
~ 698 at
Cowan Mill -
I).1 Mile East
Route 8?9 Near
Walker School
[~.1 Mile East
Route 8?9 Near
Walker School-
~).1 Mile Wast
Route 667 at
Rose Hill
0.1 ~li~ West
Route 667 at
Rose Hill -
0,1 Mite West
Route 621 al
Hardy Creek
30 km W Route 621 -
iN, InL Route 899
PE
RW
CN
TO
PE
RW
CN
TO
}892
PE
RW
CN
TO
9891
PE
RW
CN
TO
PE
RW
CN
TO
13379
Route 899 -
km East Route 758
[near Bt7 Creek)
PE
RW
CN
TO
194
ROUTE 58 CORRIDOR PROGRAM BRISTOL DISTRICT
58-
Lee
Parallel
Lane
1.6 km
6.1 kml
3.8 Miles
58 Alt. -
Lee
=arallel
.ane
Z.9 kin/
1.8 Miles
58 Alt. -
qew Location
[PE & RW Only)
5.3 kml
Alt,-
km/
Nt,-
0.1 km East Route 758
(near Dff Creek)-
0.5 km W, West
Route 647
(West End Proposed
Jonasviile Bypass)
JONESVILLE BYPASS:
1.6 kmll,0 Mile West
West Corporate Umits
Jonesville -
3.3 kin/0.2 Mile West
Route 647
~1.8 kml3,0 Miles East
North Corporate
Limits Jonesville
[Ben Hu~)-
9.8 kin/0,5 Mile West
WCL Pennington Gap
PENNtNGTON GAP
BYPASS:
9,8 km West WCL
Pennington Gap*
0.7 km East ECL
Pennington Gap
1,6 kin/0.9 Mile East
Route 421 -
Route 752
of Bp/den)
PE
RW
CN
TO
13381
PE
RW
ON
TO
15166
PE
RW
CN
TO
13382
PE
RW
CN
TO
15163
PE
RW
CN
TO
13387
Route 752 (E. of
Dryden)-
1.5 kmt0.9 Mile East
Route 620 (Near
Oiinger)
PE
RW
CN
TO
6058-052-E31.PE101,RW201,C501
195
ROUTE 58 CORRIDOR PROGRAM BRISTOL DISTRICT
~ ~ I I ~ I
PE
Route 620 (Near RW
CN
r Line TO
1.3 Miles
i8-
Wise
New Location
(PE Only)
Improve to
5 Lanes
r Line -
3.8 Mile West
Big Stone Gap
[West End Big Stone
Sap Bypass)
BIG STONE GAP BYPASS:
:).8 Mile West
~/est Corporate Limits
Big Stone Gap-
Route 23
(Duffield) -
13389
RW
CN
TO
6058-097-E 17, ,pEI01,RW201,CS0'~t
PE ~:'i
I RW
I CN
15164
RW
CN
TO
54i215.:
1.0 Mile
Lanes on
0.2 Mile West
Route 421 (Dot) -
0.1 Mile South
Route 702
(stlcl<leyvltle)
Flyover
Intersection
Route 23~58 and
Business Route 23t58
11917/15426
PE
RW
CN
TO
57O
PE
RW
CN
TO
13724
196
ROUTE 58 CORRIDOR PROGRAM BRISTOL DISTRICT
Scott
Con$~ct
Interchange
(PE Only)
58-
Scott and
Washington
Develop to
4 Lanes
21.5 Miles
58-
Scott
Improve Curve
1.2 Mile
58-
Washington
Develop to
4 Lanes
0.4 Mile
58-
Washington
Parallel Lane
(PE & RW O~ly)
1.8 km
58.
Washington
Parallel Lane
Vidnity of
Moccasin Gap
~ou'i~' ~3 at' Weber
city-
Route 81 at Bristol
5.1 Miles West
Washington County
Line -
4,9 Miles West
Washington County
Line
0.4 Mile East
Route 11 -
0.1 Mile West
Route 11
0.2kin East Route 11
(Abingdon) -
0.3 km East
Route 638 East
0.3 km East
Route 638 West
0.2 km West
Route 712 West
PE
RW
CN
TO
17747
RW
CN
TO
PE
RW
CN
TO
9830
PE
RW
CN
TO
11440
PE
RW
CN
TO
16384
PE
RW
CN
TO
16383
IProject Closed- To Be Improved With ultimate Route 58 ImPm
......... 10058-084-E09,pE!01,MS01
9merit
I¢oastm~on ¢omplote
bb~:09,,5:iP81PE, i03 RW203 C503,D609
ROUTE 58 CORRIDOR PROGRAM
'1
197
RRISTOI
rtlISTR~T I
Oely)
Srayson
Develop to
4 Lanes
[PE only)
3.5 Miles
58-
3rayson
~lew Lo.lion
?E Only)
5.6 km
3rayson
~arallel
.ane
L? Miles
Gray-son
4 Lanes on
New Location
(PE Only)
PE
RW
CN
TO
16382
of Independence)-
2.0 Miles West
Independence
(Route 703)
INDEPENDENCE BYPASS:
0.2 km West
Roule 703 -
1.3 km West
Route 274
PE
RW
CN
TO
8376
PE
RW
CN
TO
1.9 Miles East
East Co[porate
Umits Independence.
9.1 Mile East
Route 631 (East of
New River)
3.1 Mile East
Route 631 (East of
~ew River) -
2.1 Miles West
15165
RW
CN
TO
13383
PE
RW
CN
TO
13345
WashingtontGrayson
County Line-
0.1 Mile East of
Route 754
RW
CN
TO
18009
O058-095-10~,,PE101,RW201,CS01
;!5~750
ROUTE 58 CORRIDOR PROGRAM 198
BRISTOL DISTRICT
i(PE ~1¥) ........
~a~hlngton
Recousbuction
(PE Only)
~),4 Miles
8.
Washington
Reconsffuclion
[PE Only)
6.0 Miles
10-
~rayson
Reconstruction
IPE On¥)
).7 Miles
16-
Smyth
Reconsffuction
Mile
0.1 Mile East of
Route 754 -
Iht Route 16/58
(At Volney)
Int. Route 58/91
(East of Damascus}-
0.2 Mile West of
Route 603
).2MileWestof
Route 603 *
WashingtonlGrayson
County Line
Int. Route i6/58
(At Volney) -
8myth/Grayson
County Line
Smyth/Grayson
County Line *
0,2 Mile North of
Route 650
16-
PE
RW
CN
TO
18010
PE
RW
CN
TO
180O7
PE
RW
CN
TO
18OO8
PE
RW
CN
TO
18011
RW
10
180t2
Route 650 -
1-81 (Exit 43)
PE
RW
CN
TO
18013
0058"038-E 15,PE 10. i,RW20t,CS01
OO58'095'E 12,PEt0i,R .W2..O. !.,C. 501
D058-OOS-E13~PE10i RW201~.C. 501
~016-038-E01 PE101~RW201tC501
I
L
ROUTE 58 CORRIDOR PROGRAM
199
BRISTOL DISTRICT
I
I ~! I t I ~ I i ! '1 ! i ' t ! ! ! ]1 _'i I I
[PE Only)
~03 -
Sm) ih
Reconsb'uction
[PE Only)
~,5 km
?25 -
~ashington
Reconstruction
PE only)
,,0 km
Int. Route 603~58 -
Washington/Smyth RW
County Une CN
TO
Washington/Smyth
County Line-
Iht, Route 603/600
Route 726
(Taylors Valley)-
Route 91/725 (State
of Tennessee)
19031
PE
RW
CN
TO
~30
RW
10
12501
0603-095-E~'4~PE101
0603-086-E45,PE10't'
* Partial Constructio[ Financed with Latest Bonds
D725-ogs-E75~PE10')
5;~2
ROUTE 58 CORRIDOR PROGRAM 200
BRISTOL DISTRICT
Carroll
Widening with
Curb and
Gu~ter
0.3 Mile
TOWN OF HILLSVILLE:
Route 52 -
Route 221
Route 703 West of
PE
RW
CN
TO
656
Carroll, Floyd,
and Pa~ck
Final Location
Studies O~ly
36.2 Miles
58-
Ca~roll
Develop to
4 Lanes
(PE S RW O~ly)
8.5 km
58#
Ca,roll
Develop to
¢ Lanes
(PE & RW Only)
Hiltsville -
Iht Route 703 (West
of Htllsville) -
Route 669 (East of
Hillsville)
Route 669 (East of
Hillsville) -
Big Reed Island
Creek (East of
Route 844)
Reed
Island Creek.
) to 0.4 km East
Lanes Route 632 (Mapleshede
S RW Only) Road)
RW
CN
TO
13386
PE
RW
CN
TO
17535
PE
RW
CN
TO
17534
PE
RW
CN
TO
~7533
· 10058-017:EI3,PE101,RW20t,C501 B611.B6'18,D620
L I I
ROUTE 58 CORRIDOR PROGRAM
' l ( '/ I
201
SALEM DISTRICT
I
Floyd, Route 632 (Mapleshade
Road) -
~ to Route 795 (East of
Meadows of Dan
RW only) School)
.5 Miles
8-
'affick
Bridge and
Approaches
),2 Miles
Patrick
Route 8 (Crazes
Store)-
Route 640
NORTH FOR MAYO RIVER:
[0.5 Mile West
of Stuart)
Route 795 (East of
Meadows of Dan
PE
RW
CN
TO
~7538
PE
RW
CN
TO
4328
PE
RW
CN
TO
4327
PE
RW
CN
TO
Develop to 4
Lanes
(PE & RW Only)
6.4 km
58-
Patrick
Develop to 4
Lanes
(PE & RW Only)
0.8 km East
Route 610
:).5 Mile East
~{oute 610-
:).7 Mile North
~lorlh Corporate
Limits Stuart
17537
PE
RW
CN
3'O
km North
North Corporate
Limits Stuart-
17536
PE
RW
CN
TO
Route835(Eastof
13392
3058-962-E02~PE10i~RW201~CS0'I,B601
~mject Closed - New Location Determinec
~058-070-1117E101
0058-070-E19~PE101~RW201~CS01,B627,B628
202
ROUTE 58 CORRIDOR PROGRAM SALEM DISTRICT
~'alrick
)to4
Miles
Develop to 4
Lanes
2.4 Miles
Henry
)to4
Lanes
Route 835 (East of
St~a~t) -
West Route 625
West Route 625 -
Mile West
Route 653 (West of
!Nettleridge)
Mile West
Mile West
Route 831
~Nettteridge)
Mile West
Route 831
(Nettleridge).
0.1 Mile East
Route 697
0.1 Mile East
IRoute 697.
Hen;y County Line
Patrick County
Line.
Route 695
PE
RW
CN
TO
RW
CN
TO
3385
PE
RW
CN
TO
PE
RW
CN
TO
PE
RW
CN
TO
9872
RW
CN
TO
I
I6058-070-E18,PEI(~
~t~!~1 "
I
!
I
~B626
9873
203
ROUTE, 58 CORRIDORi PRI O(~RAMI ~ALF"~ r~ISTP'~?I
lto4
5.9 Miles West PE
Route 220 - RW
2.7 Miles West CN
Route 220 Bypass TO
2.7 Miles West
Route 220 Bypass
1.4 Miles West
Route 220 Bypass
Miles
~to4
West
Route 220 Bypass-
Route 220 Bypass
Mile
-tenry
=arallel Lane
9.6 Mile East
Route 220 Soulh -
Route 650
~.6 Miles
~enry
~nes on
l-L~ne R/W
Signs
MARTINSVILLE BYPASS:
Route 650-
Route 58 East of
Martinsville
5,9 Miles West
Pittsylvania County
RW
CN
TO
9874
RW
CN
TO
69O
RW
CN
TO
9888 ~'"' '~2 ~
CN
11705
RW
CN
TO
~889
IiC ,504tB, 603,B606
204
ROUTE 58 CORRIDOR PROGRAM SALEM DISTRICT
Grayson County Line - PE
Route 220 West of RW
CN
TO
L8 km
Route 100
[at Route 221)-
Route 58
RW
CN
TO
18107
ROUTE 58 CORRIDOR PROGRAM
t I t
205
SALEM DISTRICT
Route 26 South
4 Lanes on Route 58 West
58-
Pittsylvania
4 Lanes on
New Location
[PE & RW Only)
58-
Pittsylvania
1 Lanes on New
Location
,.12 km
58-
~i~sylvania
! LanesonNew
~oca~ofl
~ocaaon
5.08 km
=ittsylvania
Lanes on New
.ocation
.~.71 km
BYPASS:
Route 58 -
Route 29/265
Int. Existing Route 58 -
4.t2 km South Int.
Existing Route 58
PPMS No.
4.12 km South Int.
Existing Route 58-
2,71 km West Int,
Exisling Route 29t265
PPMS No,
2.71 km West Int.
Existing Route 29/265 -
InL Existing Route 29/265
PPMS No.
RW
CN
TO
9885
PE
RW
CN
TO
17372
PE
RW
CO
TO
50750
PE
RW
CO
TO
RW
CO
TO
50752
DANVILLE BYPASS:
Route 86 South -
Route 58 East
PE
RW
CN
TO
9946
6058-071-E15tC5811B608- 8611 .
6058-071-E15~C503~B606~B607~B613
ROUTE 58 CORRIDOR PROGRAM 206
LYNCHBURG DISTRICT
581265 *
Cityof
Danville
Consffuct
Interchange
58-
C~tyof
Danville
Construct
Interchange
0,5 Mile
58-
PittsyIvania
Improve
Alignment
,3 Mile
lalifax
Improve
Existing Road
PE Only)
.).6 Miles
58-
Halifax
Add Fifth
Lane
Lanes
Memorial Parkway
in Danville
At Danville
Expressway (East
of Danville)
0.2 iVlJl~ East
Route 62 -
0.1 Mile West
Route 62
RIVERDALE:
1.9 Miles West
Route 501 -
Off Mile West
Route 501
Route 501 -
0.2 Mile East
Route 501
0,3 km N~h
Route 34.
Route 58
PE
RW
CN
TO
13725
PE
RW
CN
TO
9945
PE
RW
CN
TO
9886
PE
RW
CN
TO
11918
PE
RW
CN
TO
9846
PE
RW
CN
TO
~1,RW20!,C501
Construction ComplJte
9058-041-E10~N501
207
ROUTE 58 CORRIDOR PROGRAM LYNCHBURG DISTRICT
Soulh
Boslon
RW
CN
TO
RW
Preliminary CN
TO
9485
208
ROUTE §8 CORRIDOR PROGRAM LYNCHBURG DISTRICT
Lane
Mecklenburg
4 Lan~ on
New Locntion
Mecklenburg
Parallel Lane
Route 58 in
;larksville
CLARKSVILLE BYPASS:
3,1 Miles East
Route 15 North -
2,7 Miles West
Route 15 South
RW
CO
TO
15538
PE
RW
CO
TO
9878
13835
Route 15 -
3,7 Miles East
Route 15
PE
RW
CO
TO
D015.058.E07~PE101
Mecklenburg
Parallel Lane
Mecklenburg
Parallel Lane
Route 15 -
Mite West West
Corporate Limits
Boydto~
0.1 Mile West
WCL Boydton
0.? Mite East
Route 92
PE
RW
CO
TO
5O434
9880
PE
RW
CO
TO
0.7 Mile East
Route 92 -
t.9 Miles East
Route 92
PE
RW
CO
TO
11635
209
ROUTE 68 CORRIDOR PROGRAM RICHMOND r)ISTRICT
3,4 Miles 9882 ~'.~
58 - 0,5 Mile West PE
~lecklenburg Route 4 - RW -
Parallel Lane 0.6 Mile West
CN
Route t TO
(at Big Fork) 50435IlConsffucUon Under, ray
~.2 Miles 9883
5~J .' 0.? Mile East ...... PE ~~~ · .............
Vlecklenburg Route 92 - RW
Rehabilitate 1.9 Miles East CN
& Reconstruct Route 92 TO
EB Lane
IConstruclJouUndem/ay .
1.2 Miles t6093 ~6058~058-E30,PE101~W201~C501 fDiC'31 ......
58- 0,6 Mile West PE ~ ..........
RW
Vlecklenburg Route 1 (At Big
:)evelop to Fork) - CN
t Lanes 9.9 Miles South South TO
(PE & RW O~ly) Corporate Limits
South Hill
3.5 Miles 11314 ~,., 16058.058.E28~PE101 fRW201~ .C501
58- SOUTH HILL BYPASS: I~
Mecklenburg 1.9 Miles South South
4 Lanes on ~orporate Limits CN
New Location ~oulh Hill - TO
(Preliminary 3.4 Mile East~ '
Engineering) ~oute 85 9884 IConstruction Unde~ay
5.2. Miles 10t78~ 13734 16058-058-E23?E100,~W201~CS01~B634 B635~B636
58- Distdc[wide '~SE' ~ ' "' '
Dis~ctwide RW
Preliminary CN
Studies TO
lSludias Complete
9486 10058-964-EO1~PElO0 '
I
210
ROUTE 58 CORRIDOR PROGRAM RICHMOND DISTRICT
PE
175 M East Rte. 15 N - RW
558 M East Rte 15 N CN
TO
ROUTE 58 CORRIDOR PROGRAM
211
RICHMOND DISTRICT
RW
CN
TO
Greensville
Under Drains
123OO
RW
Route 301 - CN
1.3 Miles East TO
Route 301
Line
9876
PE
RW
CN
TO
10037
PE
Line. RW
2.7 Miles East CN
Greensville County TO
Line
'Jne
RW
CN
TO
PE
Greensville County RW
Une * CN
TO
,r
1989
212
ROUTE 58 CORRIDOR PROGRAM SUFFOLK DISTRICT
2.6 Miles
58-
Southampton
Parallel Lane
~,.!..Nlilas
58 ~
Southampton
Parallel Lane
Miles
58-
Southampton
Construct
Interchange
..7 Mile
i58 -
Southampton
~arallet Lane
6.5 Miles East
Greensville County
Line -
6.9 Miles West
East Corporate
Umits Capro~
6.9 Milos West
East Corporate
Limits Capmn -
4.8 Miles West
East Corporate
Jmits Caprou
1.8 Miles West
East Corporate
Limits Capron -
2.5 Miles West
East Corporate
Limits Capron
I).4 Mile East
Route 35 -
~).3 Mite West
Route 35
PE
RW
CN
TO
1971
PE
RW
CN
TO
1964
PE
RW
CN
TO
1963
PE
RW
CN
TO
J!.3958
ICOURTLAND BYPASS: I PE
0.7 Mile West RW
Route 35 - ON
1.3 Miles West TO
Nottoway River
1.3 Miles West
Nottoway River
1.5 Miles East
Nottoway River
9877
PE
RW
CN
TO
111RW201~C501~B635
I
ROUTE 58 CORRIDOR PROGRAM
213
SUFFOLK DISTRICT
~ntefchange
1.5 km
Southampton
Pamll~ Lane
&0Miles
58-
Suffolk &
Southampton
Parallel
Bridge and
Approaches
0.3 Mile
Suffolk
Parallel Lane
& Interchange
at Route 260
2 Lanes on
R/Won
~ Business
East End
Bypass)
BYPASS:
Route 258 *
~.1 Mile West
Route 258
3,1 Mile West
Route 258-
:~,9 Miles East
Route 258
:RANKLIN BYPASS:
~.9 Miles East
Route 258-
3,2 Miles East
Route 258
FRANKLIN BYPASS:
3.2 Miles East
Route 258 -
5.6 Miles East
Route 258
Route 58 -
InL Route 58 & 258
PE
RW
CN
TO
17728
PE
RW
CN
TO
PE
RW
CN
TO
PE
RW
CN
TO
9868
PE
RW
CN
TO
9870
PE
RW
CN
TO
li~RW2,06~C506,B610f
I
Construction Complete
§058*087-EO3,PE10 ~C50518613
214
ROUTE 58 CORRIDOR PROGRAM SUFFOLK DISTRICT
58- Route '189- I PE I ! I | |
Suffolk Isle of W'~ht I RW I I I I
2 Lanes on County Line I CN
4-Lane Right I TO I ! I I
of Way J ~ [ _
t
I_ 198~6
ILSs~.ictwide Pre m nary Slud es I RPEw :.~Ji~ i~1 / .....
i IStudies C0mple, te I ' '
l ~ ' ' 19487'
.......... F~ti ,~li~ ..... : ~ nes "
215
ROUTE,58 CORRIDOR PROGRAM I SU iFFOLK DISTRICT
6
~ommonw~alth Yranapo(tation ~oa(d
cai ~
Ra//andPubk~
TransportatiOn
Pro. ram
I I ! i I I I .! ! 1! I ! I I ! ! I I
FY 2000 Public Transportation Improvement Program
Commonwealth Transportation Board
Introduction
The first table in the Public Transportation Improvement Program provides a list of all of the federal and state funds that are anticipated to be made available in
FY 2000. This includes all federal and state sources, This table also shows the anticipated funding levels for certain federal and state funding programs during
the next six years. These programs receive federal and state appropriations by formula and can be estimated for future years. Other federal appropriations for
transit are made one year at a time and cannot be predicted, Included in the FY 2000 column are several federal appropriations that were made in the FY 1999
federal appropriations act.
The second table in the Public Transportation Improvement Program lists the federal and state funding programs for public transportation in Virginia that are
distributed at the approval of the Commonwealth Transportation Board. All of these funds are programmed or awarded as grants in the FY 2000 Public
Transportation Improvement Program.
Starting with the third table, the Public Transportation Improvement Program provides a detailed list of public transportation projects for FY2000 in each of
Virginia's Construction Districts. Information is provided for each project including a project description and its total cost, the amounts and sources of federal,
state and local funds for the project. Operating revenue estimates also are provided along with information regarding federal, state and local operating
assistance. Unlike highway projects, most public transportation projects are funded in a single year. This is due to the nature of the federal and state funding
programs for public transportation and to the large role that local govemments play in funding public transportation projects. Therefore the Public
Transportation Improvement Program contains projects only for the upcoming fiscal year -- FY 2000.
Information is provided regarding each of the subprograms of state financial assistance to public transportation. Tables are included showing the statewide
distributions of formula assistance funds, capital assistance funds, and special projects funds. Each grant is shown for the special projects funds including the
Transportation Efficiency Improvement Fund (TEIF) program. These grants also appear in the Construction Districts tables.
Tables also are included that show the distribution for FY 2000 of the Commonwealth Transit Capital Fund (a new funding program created during the 1999
session of the Virginia General Assembly), and the Oil Overcharge Program Grant anticipated for FY 2000. Noted with the Commonwealth Transit Capital
Fund is a special allocation of $1 .gM to the Light Rail Project of the Tidewater Transportation District Commission that also was appropriated during the 1999
General Assembly session. In addition, a table is included that shows the statewide distribution of a special allocation of federal financial assistance
programmed for Virginia in the FY 1999 federal appropriations act. These federal funds were provided to support bus capital projects in Virginia. The projects
and amounts shown in italics were programmed by Congress and the remaining projects and amounts are programmed by the CTB.
Each of the Federal Transit Administration programs administered by the Department of Rail and Public Transportation is included in the program as a
statewide table showing the amounts and recipients of the FY 2000 grants. Separate tables are provided for the FTA Sections 5303, 5307, 5310, 5311, and
5313(b) programs.
PUBLIC TRANSPORTATION
INTRODUCTION
216
Six Year Projection of Federal and
(Dollars in 1,000's)
Federal Transit Act Appropriations
Virginia Shara of WMATA Metrorail Conslruction Funds (FY99)*:
Virginia Share of WMATA Section 5307 Funds:
Virginia Share of WMATA Section 5309 Fixed Guldeway Modernization Funds:
Hampton Roads Sectlon 5307 Funds:
Hampton Roads Section 5309 Fixed Guideway Modernizatlon Funds:
Richmond Section 5307 Funds:
Governor's Allocation of FTA Section 5307 Funds:
Governor's Allocation of FTA Section 5311 Funds:
Governor's Allocation of FTA Rural Technical Asslstance (RTAP) Funds:
Governor's Allocation of FTA Metropolitan Planning (Section 5303) Funds:
Governor's Allocation of FTA Planning and Research (Section 5313b) Funds:
Governor's Allocation of FTA Section 5310 Funds:
Section 5309 Fixed Guideway Appropriations (FY99):
Section 5309 Bus & Bus Facility Appropriations (FY99):
Subtotal:
TEA-21 Flexible Funds
Title I High Priority Transit Projects in TEA-21:
Congestion Mitigation & Air Quality Funds Used for Transit:
Regional Surface Transportation Program Funds Used for Transit:
Statewide Surface Transportation Program Funds Used for Transit:
Subtotal:
State Funds
Virginia State Aid To Public Transportation:
Transportation Efficiency Improvement Program:
Commonwealth Transit Capital Fund:
Oil Overcharge Funds:
State Highway Funds Used for Transit:
Dulles Toll Road Revenues Available for Transit:
Northern Virginia Transportation District Bonds:
Total State Funds:
Federal Transit Discretionary Programs - Nationwide
State Transit Funding in Virginia
Rail Discretionary Capital Grants - New Starts:
Bus Discretionary Grants:
Rural Transportation Accessibility Prog. (Intercity Bus Wheelchair Lifts):
Clean Fuels Buses:
Job Access and Reverse Commute:
FYO0 FY01
$13,500
$32,900 $35,563
$12,604 $13,585
$12,118 $13,099
$936 $1,142
$5,743 $6,208
$5,045 $5,453
$4,930 $5,329
$133 $139
$1,109 $1,165
$236 $248
$1,552 $1,680
$26,798
$13,846
$131,450 $83,611
$8,470 $3,465
$7,686
$7,545
~ $4,000
$19,231
$38 212
$14 561
$14 075
$1 249
$6 671
$5 860
$5 726
H48
$1,239
$264
$1,807
$40 886
$15 545
$15 059
$1 364
$7 138
$6 270
$6 127
$161
$1,350
$287
$1,935
FY04 EY05
$40,886 $40,886
$15,545 $15,545
$15,059 $15,059
$1,364 $1,364
$7,138 $7,138
$6,27O $6,27O
$6,127 $6,127
$161 $161
$1,350 $1,350
$287 $287
$1,935 $1,935
$89,812 $96,122 $96,122 $96,122
FY02 1~ FY04 FY05
$3,658 $3,658
FY(X) FY01
$96,190 $97,765
$1,900 $1,900
$5,000 $5,000
$800 $800
$3,521 $4,215
$4,150 $4,826
$33,9OO -
$145,461 $114,506
FY02 FY03 FY04 FY05
$101,969 $105,722 $110,121 $115,053
$1,900 $1,900 $i,900 $1,900
$5,000 $5,000 $5,000 $5,000
$800 $800 $800 $800
$3,515 $2,666 $2,826 $569
$3,807 $6,897 $8,919 $11,192
$116,991 $122,985 $129,566 $134,51~
Funding Levels
FYO0 FY01
$1,044 $1,122
$476 $515
$5 $7
$5O $5O
$100 $125
(VA share undetermined)
(Dollars in 1,000,000's)
~ FY03 EYJ~ FY05
$1,200 $1,200 $1,200 $1,200
$554 $554 $554 $554
$7 $7 $7 $7
$50 $50 $50 $50
$150 $150 $150 $150
PUBLIC TRANSPORTATION
217
SIX YEAR FUNDING PROJECTIONS
Il I ! 11 I ! ~ i '1 I Ii ! I I I ! J !
FY 2000 Public Transportation Improvement Program
commonwealth Transportation Board
FY00 Mass Transit Trust Fund Appropriation and
TTF Allocation of Revenue for Mass Transit Account:
TTF Allocation of Interest for Mass Transit Account:
Adjustment for Indirect Charges and Basis Points:
Net TTF Allocation:
Adjustment for Previous FY Revenue Surplus (Shortfall):
Adjustment for Unobligated Balance of Previous FY Appropriation:
Net Adjustments:
Total FY00 Mass Transit Trust Fund Allocation:
Distribution of State Aid Allocation to Subprograms:
Formula Allocations Subprogram (73.5%):
Ca pital Assistance Subprogram (25.0%):
S pecial Projects Subprogram (1.5%):
Adjustments
$93,429,500
$1,436,000
~$191.400'~
$94,674,100
$951,500
$564,700
$1,516,200
$96,190,300
$70,699,870
$24,047,575
$1,442,855
$96,190,300
Other Financial Assistance to
State Funds
Transportation Efficiency Improvement Fund (Including Carryover):
Capital Assistance for Paratransit Vehicles (Oil Overcharge):
Commonwealth Transit Capital Fund (Item 534.G):
Northern Virginia Transportation District Program Bonds:
Federal Funds
Federal Transit Act Section 5307 Program (Gov. Apport.) Appropriation (FY99):
Federal Transit Act Section 5309 Bus and Bus Facility Statewide Allocation (FY99):
Federal Transit Act Section 5310 Program Appropriation (FY99):
Federal Transit Act Section 531 l& RTAP Program Appropriation (FY99):
Federal Transit Act Section 5303 Program Appropriation (FY99):
Federal Transit Act Section 5313(b) Program Appropriation (FY99):
Transit Distributed by the Commonwealth Transportation Board
$1,924,896
$800,000
$5,000,000
$33,900,000
$5,003,907
$9,925,001
$1,426,963
$4,570,524
$980,769
$210,961
PUBLIC TRANSPORTATION FY2000 CTB FUNDING SUMMARY
218
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
BRISTOL DISTRICT
Bristol City Bus
Operating Expenses $380,263 $78,495 FTA Sect. 5307 FY99 $70,700 MTTF $28,500 Operating Revenues
$202,568 Local General Funds
Graham Transit -Town of Bluefield
Operating Expenses $122,950 $59,475 FTA Sect. 5311 FY99 $14,140 MTTF $4,000 Operating Revenues
$45,335 Local General Funds
District III Governmental Cooperative .........
Operating Expenses $654,386 $309,693 FTA Sect. 5311 FY99 $169,680 MTTF $35,000 Operating Revenues
Capital Expenses $140,013 Contract & Local Funds
Purchase 3 Replacement Body-On-Chassis Bus $130,500 $0 $123,975 Oil Overcharge $6,525 Local General Funds
Purchase 1 Sen/ice Vehicle $22,454 $17,963 FTA Sect. 5309 FY99 $1,932 MTTF $2,559 Local General Funds
Mtn. Empire Older'Ctzns. (Wise Co.) ...............
Operating Expenses $443,802 $206,901 FTA Sect. 5311 FY99 $113,120 MTTF $30,000 Operating Revenues
Capital Expenses $93,781 Contract & Local Funds
Purchase 1 Replacement Body-On,Chassis Bus $45,000 $0 $42,750 Oil Overcharge $2,250 Local General Funds
Purchase 1 Replacement Body. On-Chassis Bus $53,000 $0 $50,350 Oil Overcharge $2,650 Local General Funds
Buchanan County Transportation
Operating Expenses $348,572 $0 $49,490 MTTF $0 Operating Revenues
Capital Expenses $299,082 Local General Funds
Purchase 2 Replacement Vans $70,000 $0 $30,100 MTTF $39,900 Local General Funds
Dickenson County Transportation
Operating Expenses $36,873 $0 $7,070 MTTF $0 Operating Revenues
Capital Expenses $29,803 Local General Funds
Purchase 1 Replacement Bus $40,000 $0 $38,000 Oil Overcharge $2,000 Local General Funds
Russell County Transportation
Operating Expenses $144,000 $0 $28,280 MTTF $0 Operating Revenues
$115,720 Local General Funds
Tazewell County Transportation ' ,
Operating Expenses $41,475 $0 $11,175 MTTF $0 Operating Revenues
$30,300 Local General Funds
PUBLIC TRANSPORTATION
I
219
GRANTS BY CONSTRUCTION DISTRICT
!~ ! I I ! I I ! I ! !1 I I i I i I I, ~
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
BRISTOL DISTRICT (Continued)
Capital Ex_pens. es . - , I I i I $16,290 ILocal General Funds
~'urcnase z t~eplacement Body-On-ChassisI $80,000 I $0 I I $76,000 Oil Overcharge $4,000 [Local General Funds
IM[ I F = M~ss Transit Trust Fund; Demo. = Demonstration Program; TDM = Transporleflon Demend Manegement Program; Tech. = Te~hnicel Assist, Pro mm; TEIF ~ Tmns ~eflon E~len~ Improvement Fund; CTCF
Commo~ellh Tmnspofl~lon Capital Fund; DTR ~ DulleS ~oll R~d Revenues; ~F ~ Tmns~det on Trust Funds; H~ ~ Hlgh~ ~l~lenenee & 0~ratln~ Funds; TANF = Temp, Assisl N~ Famili~
PUBLIC TRANSPORTATION GRANTS BY CONSTRUCTION DISTRICT
220
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
CULPEPER DISTRICT
Charlottesville Transit Service
Operating Expenses $1,941,305 $489,033 FTA Sect. 5307 FYg9 $388,850 MTTF $351,000 Operating Revenues
Capital Expenses $712,422 Local General Funds
Replace 2 Transit Coaches $530,000 $424,000 FTA Sect. 5307 FY99 $45,580 MTTF $60,420 Local General Funds
Purchase 1 Expansion Body. On-Chassis Buses $53,125 $33,000 FTA Sect. 5307 FY99 $0 $20,125 Local General Funds
Service Expansion to pantops Area $81,000 $0 $76,950 MTTF - Demo. $4,050 Local General Funds
CTS Facility Study $67,500 $54,000 FTA Sect. 5313b FY99 $6,750 MTTF - Tach. $6,750 Local General Funds
CTS Transit Development Plan $72,000 $57,600 FTA Sect. 5313b FY99 $7,200 MTTF - Tach. $7,200 LOcal General Funds
Transit Intern $20,279 $0 $19,265 MTTF - Demo. $1,014 Local General Funds
J^u.'r: .............................
Operating Expenses $2,110,133 $484,081 FTA Sect. 5311 FY99 $402,990 MTTF $241,678 Operating Revenues
Capital Expenses $153,836 FTA Sect. 5307 FY99 $827,548 Contract & Local Funds
Purchase 10 Replacement Body-On-Chassis $505,000 $404,000 FTA Sect. 5309 FY99 $43,430 MTTF $57,570 Contract & Local Funds
Greene County Transit
Operating Expenses $278,150 $118,575 FTA Sect. 5311 FY99 $63,630 MTTF $41,000 Operating Revenues
Capital Expenses $54,945 Local General Funds
Purchase 2 Replacement Body-On. Chassis $81,500 $65,200 FTA Sect. 5311 FY99 $7,009 MTTF $9,291 Local General Funds
Saturday Service EXpansion $9,000 $0 $8,550 MTTF - Demo. $450 Local General Funds
Rappahannock Rapldan PDC
Rideshare Program Administration $97,565 $0 $78,052 TEIF $19,513 Local Funds
Thomas Jefferson PDC
Rideshare Program Administration $131,685 $0 $105,348 TEIF $26,337 Local Funds
~l~PER
DISTRICT
TO TALI~':~ i ;iiiiiii:.i:.!ii::~ 5i9~8i~'2
c.MTTF Mass Transit Trust Fund; Demo, - Demonstration Program; TDM ~ Transporlati0n Demand Management Program; T%h, = Technical Aesish Pi'ogram; TEIF = Transperlation Efficiency Improvement Fund; CTCF =
ommonwealth Transportation Capital Fund; DTR = Dulles Toll Road Revenues; TTF = TransBortation Trust Funds; HMO -- H!~h~wa~v__M?_inlenanc?_.& O~,0j~~ Funds; TANF = Temp, Assist, Needy Families
PUBLIC TRANSPORTATION
221
GRANTS BY CONSTRUCTION DISTRICT
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
FREDERICKSBURG DISTRICT
Fredericksburg (FRED)
Operating Expenses $719,694 $120,094 FTA Sect. 5307 FY99 $106,'050 MTTF $15,000 Operating Revenues
$478,550 Private & Local Funds
Bay Transit - Gloucester County
Operating Expenses $407,796 $185,398 FTA Sect. 5311 FY99 $42,420 MTTF $37,000 Operating Revenues
Capital Expenses $142,978 Contract & Local Funds
Purchase 3 Expansion Body-On-Chassis Buses $144,000 $0 $136,800 Oil Overcharge $7,200 Local Funds
Essex Bus Service $86,000 $0 $81,700 MTTF - Demo. $4,300 Local Funds
Middle Peninsula PDC
Rideshare Program Administration $61,864 $0 $49,491 TEIF $12,373 Local Funds
Northern Neck PDC
Rideshare Program Administration $45i000 $0 $36,000 TEIF $9,000 Local Funds
RADCO PDC
Rideshare Program Administration $248,994 $0 $199,195 TEIF $49,799 Local Funds
Springfield Interchange Assistant $23,354 $0 $18,683 MTTF- TDM $4,671 Local Funds
ICemmonwealth,Transporlallon Capital F,und; DTR = Dulles Tpll Road. R,e, venues; TTF = Transporlalion Trust Funds; HMO = Ht~hway Maintenance & Operating Funds; TANF = Temp. Assisl, Needy Families '
PUBLIC TRANSPORTATION
GRANTS BY CONSTRUCTION DISTRICT
222
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
LYNCHBURG DISTRICT
Greater Lynchburg Transit Company
Operating Expenses $2,772,169 $812,239 FTA Sect. 5307 FY99 $586,809 MTTF $957,067 Operating Revenues
Capital Expenses $416,054 Local General Funds
Replete 2 Paratrensit Buses $87,122 $69,698 FTA Sect. 5309 FY99 $7,493 MTTF $9,931 Local General Funds
Renovate Train Stafion (TEA-21) $1,875,000 $1,500,000 Title 1 High Prior'~ $161,250 MTTF $213,750 Local General Funds
Renovate Train Station $1;525,000 $1,220,000 Title 1 Enhancement $131,150 MTTF $173,850 Local General Funds
Danville Transit ....
Operating Expenses $760,035 $199,840 FTA Sect. 5307 FY99 $155,540 MTTF $233,790 Operating Revenues
Capital Expenses $170,865 Local General Funds
Replace 1 Body-On. Chassis Coaches $75,000 $60,000 FTA Sect. 5307 FY99 $6,450 MTTF $8,550 Local General Funds
CVT (CPAC) Cumberland Co.
Operating Expenses $258,000 $118,500 FTA Sect. 5311 FY99 $49,490 MTTF $22,000 Operating Revenues
$68,010 Contract & Local Funds
Farmville Area Bus
Operating Expenses $256,800 $89 900 FTA Sect. 5311 FY99 $56,560 MTTF $77,000 Operating Revenues
$33,340 Local General Funds
IMTTF = Mass Transtt Trust Fund; Demo. = Demonstration Program; TDM = Transpa~latton Demand Management Program; Tech. = Technical Assist. Program; TE1F -- Transportation Efficiency Improvement Fund CTCF =
~Commonwealth Transportation Capital Fund; DTR = Dulles 'l~oll Road Revenues; TTF = Transportation Trust Funds; HMO = Highway Maintenance & Operatln~l Funds; T^NF ~ Temp, Assist. Needy Families
PUBLIC TRANSPORTATION
223
GRANTS BY CONSTRUCTION DISTRICT
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
NORTHERN VIRGINIA DISTRICT
~orthem Virginia Transportation Commission
Operating Expenses for WMATA and Local Transit $211,234,598 $0 $45,785,236 MTTF $99,354,745 Operating Revenues
$808,000 TTF Fare Bydw $12,500,000 Regional Gas Tax
$48,936,617 Local General Funds
Electric Buses for Falls Church Project $496,250 $397,000 FTA Sect. 5309 FY99
Collection of Bus Rider,hip Information $63,158 $0 $60,000 MTTF - Demo. $3,158 Local General Funds
Planning Intern $23,000 $0 $21,850 MTTF - Demo. $1,150 Local General Funds
NVTC Capital (Sum of Grants Shown Below) $78,104,923 $45,288,096 $14,111,239 $8,782,383
Washington Metro. Area Transit Authority
Rail Debt Service $7,412,486 $0 $3,187,369 MTTF $4,225,117 Local General Funds
Adopted Regional Rail System $21,574,720 $13,484,200 Special Fed. Approp. $3,478,924 MTTF $0 NVTDPB Funds used
Metrorail Reliability Program $30,662,515 .$14,505,800 FTA Sect. 5307 FY00 $2,636,977 MTTF $0 NVTDPB Funds used
$8,367,944 FTA Sect. 5309 FGM
$2,228,000 CMAQ FY00
Metrorail Reliability Program Repairable Parts $725,000 $0 $311,750 MTTF $0 NVTDPB Funds used
Bus Purchases $4,542,450 $3,633,960 FTA Sect. 5307 FY00 $390,651 MTTF $0 NVTDPB Funds used
Other Bus Capital $4,549,905 $3,639,924 FTA Sect. 5307 FY00 $391,292 MTTF $0 NVTDPB Funds used
Bus Capital Repairable Parts $642,642 $1,830,000 CMAQ FY00 $276,337 MTTF $0 NVTDPB Funds used
Fair/ax Connector
Lease Purchase 45 Transit Coaches $1,347,904 $0 $579~599 MTTF $768,305 Local General Funds
Purchase 17 Transit Coaches $4,562,001 $0 $1,961,661 MTTF $2,600,340 Local General Funds
Purchase 17 Radio Units $15,300 $0 $6,579 MTTF $8,721 Local General Funds
Purchase Land for Bus Garage $405,000 $0 $174,150 MTTF $230,850 Local General Funds
Alexandria Transit (DASH)
Purchase 5 Replacement Buses $1,250,000 $0 $537,500 MTTF $712,500 Local General Funds
Purchase 5 Radio Units $15,000 $0 $6,450 MTTF $8,550 Local General Funds
Purchase 2 Supervisory Vehicles $28,000 $0 $12,040 MTTF $15,960 Local General Funds
Purchase Spare Parts & Misc. Equipment $62,000 $0 $26,660 MTTF $35,340 Local General Funds
install 5 Passenger Shelters $20,000 $0 $8,600 MTTF $11,400 Local General Funds
Rehabilitate 2 Buses $40,000 $0 $17,200 MTTF $22,800 Local General Funds
City of Fairfax CUE Bus
Lease Purchase 6 Transit Coaches $250,000 $0 $107,500 MTTF $142,500 Local General Funds
Northern Virginia Transpmla'ii;n I~i'strict Program BOnd, (NV'I'~B) ...........
Alexandria Metrorail Capital including King street Sra. $4,200,000
Metrorail Capital including new rail car purchases $17,365,602 $16,000,000
Dulles Corridor Phase 3 Bus Rapid Transit & Rail PE $6,000,000
PRTC Bus Replacement Program $1,500,000
Arlington Metrorail Capital including Ball, ton Station $500,000 $400,000 CMAQ FY00 $6,200,000
PUBLIC TRANSPORTATION GRANTS BY CONSTRUCTION DISTRICT
224
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
NORTHERN VIRGINIA DISTRICT (Continued)
Loudoun County
Loudoun County Transportation Association
Operating Expenses $852,850 $355,175 FTA Sect. 5311 FY99 $141,400 MTTF $142,500 Operating Revenues
Capital Expenses $213,775 Contract & Local Funds
Purchase 10 Replacement Vans $465,000 $372,000 FTA Sect. 5311 FY99 $39,990 MTTF $53,010 Local General Funds
Purchase 1 Expansion Trotleybus $170,000 $136,000 FTA Sect. 5309 FY99 $14,620 MTTF $19,380 Local General Funds
Warrenton/Berryville Transit Service $12i,174 $0 $115,115 MTTF Demo. $6,059 Local General Funds
Transit Facility Development Project $106,250 $85,000 FTA Sect. 5313b FY99 $10,625 MTTF - Tach. $10,625 Local General Funds
Loudoun County Dept, of Transportation
Commuter Bus Operating Expenses $1,128,960 $0 $169,680 MTTF $846,720 Operating Revenues
$112,560 Regional Gas Tax
Rideshare Program Administration $118,750 $0 $95,000 TEIF $23,750 Local General Funds
Falrfax County
Rideshare Program Administration $317,000 $0 $253,600 TEIF $63,400 Local General Funds
Fairfax CountylDR.pT ...... . $120,000 $0 $96,000 . TEIF $24,000 DRPT Funds
City of Fairfax
Fairfax City TDM Program $100,000 $0 $80,000 MTTF- TDM $20,000 Local General Funds
City of Alexandria
Rideshare Program Administration $170,000 $0 $136,000 TEIF $34,000 Local General Funds
Alexandria Transit (DASH) Intern $26,000 $0 $24,700 MTTF - Demo. $1,300 Local General Funds
Arlington County CAP
Rideshare Program Administration $496,680 $0 $397,344 TEIF $99,336 Local General Funds
CAP Program - Base $300,000 $300,000 CMAQ FY00 $0 $0
CAP Program - Enhanced $300,000 $240,000 Regional STP FY00 $60,000 TTF $0
Transp, Partners Employer Incentive Fund $280,000 $0 $224,000 MTTF - TDM $56,000 Local General Funds
Master Plan Transit Element $50,000 $0 $25,000 MTTF -Tech $25,000 Local General Funds
Dulles Area Transportation Association
Loudoun Co. Commuter's Choice Campaign $62,500 $0 $50,000 TEIF $12,500 Local Funds
Dulles 'Corridor Rapid Transit Program
Operating Expenses
Fairfax County Express Bus Service $3,850,000 $0 $3,850,000 DTR
HOV Marketing $300,000 $0 $300,000 DTR $0
Capital Expenses
Phase 2 Express Bus Vehicle Purchase $3,053,739 $2,442,991 FTA Sect. 5307 FY98 $610,748 CTCF $0
Phase 3 Bus Rapid Transit & Rail PE $21,091,750 $16,873,400 FTA 5309 NS FY99 $1,389,252 CTCF $0
$5OO,OOO HMO
$6,000,000 NVTDP Bonds $0
PUBLIC TRANSPORTATION
!
225
GRANTS BY CONSTRUCTION DISTRICT
I I
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
NORTHERN VIRGINIA DISTRICT (Continued)
Washington CoUncil of'oov~mments"(CoG} ................................................................................................................................................. ,,,
Commuter Connections Program $150,000 $150,000 CMAQ FY00 $0 $0
Endzone Public Education Campaign $108,000 $108,000 CMAQ FY00 $0 $0
Vlrglnla Railway Express (NVTClPRTC)
Operating Expenses $19,870,948 $4,000,000 Statewide STP FY00 $4,082,039 MTTF $8,863,707 Operating Revenues
Capital Expenses $2,925,202 Regional Gas Tax
Debt Service and Leases $9,030,783 $1,480,000 FTA Sect. 5307 FY00 $3,246,837 MTTF $4,303,946 Regional Gas Tax
RO-AF Projects $400,000 $320,000 FTA Sect. 5307 FY0( $34,400 MTTF $45,600 Regional Gas Tax
Fare Collection II $500,000 $400,000 FTA Sect. 5307 FY00 $43,000 MTTF $57,000 Regional Gas Tax
Rolling Stock Modifications $700,000 $560,000 FTA Sect. 5307 FY00 $60,200 MTTF $79,800 Regional Gas Tax
Rolling Stock Overhaul $200,000 $160,000 FTA Sect. 5307 FY00 $17,200 MTTF $22,800 Regional Gas Tax
Stations and Facilities Improvements $200,000 $160,000 FTA Sect. 5307 FY00 $17,200 MTTF $22,800 Regional Gas Tax
Franconia/Springfield Terminal Improvements' $290,000 $0 $124,700 MTTF $165,300 Regional Gas Tax .
Potomac Rappahannock Transp. Comm.
Operating Expenses $7,985,389 $858,000 FTA Sect. 5307 FY00 $1,421,068 MTTF $2,594,898 Operating Revenues
Ridesharing Expenses $300,000 $300,000 CMAQ FY00
Capital Expenses $3,111,423 Local General Funds
Office, Computer & Communications Equipment $89,501 $0 $38,486 MTTF $51,015 Local General Funds
Purchase 13 Transit Coaches & 21 Minibuses $2,942,500 $1,588,000 FTA Sect. 5309 FY99 $175,655 MTTF $0 NVTDPB Funds used
$946,000 CMAQ FY00 $1,500,000 NV"rDP Bonds
Lease Purchase 5 buses $273,000 $0 $117,390 MTTF $155,610 Local General Funds
Bus Rehabilitation $217,300 $116,000 FTA Sect. 5307 FY00 $43,559 MTTF $57,741 Local General Funds
Associated Capital Maintenance $312,500 $0 $134,375 MTTF $178,125 Local General Funds
Debt Service $1,371,253 $0 $589,639 MTTF $781,614 Local General Funds
Woodbridge & Alex. VRE Station Improvements $3,851,928 $3,081,542 FTA Sect. 5309 FY99 $331,266 MTTF $439,120 Local General Funds
Manassas Depot Parking Improvements $347,375 ' $277,900 FTA Sect. 5309 FY99 $29,875 MTTF $39,600 Local General Funds
Manassas Parking Capital Lease I $27,895 $0 $11,995 MTTF $15,900 Local General Funds
Proper~y Acquisition - Fredericksburg VRE $350,000 $0 $150,500 MTTF $199,500 Local General Funds
Getting to Basics Marketing Program $62,500 $0 $50,000 MTTF - TDM $12,500 Local General Funds
CMP Mixing Bowl Reconstruct. Enhncmnts $46,000 $0 $36,800 TEIF $9,200 Local General Funds
Transit Intern $20,000 $0 $19,000 MTTF- Demo. $1,000 Local General Funds
NORTHERN VIRGINIA DISTRICT TOTALS: ::ii~'3.~i(~i~):~1~i056 !!i!i$.871iiii395ii104 ii?:ii?:ii?;ii;i:!!!!i?:i:i".:i'.'.!?.i:!:i::?:iliiiii::iiiiii::::i:?;?:il $i!!i~!~[i~,~,ii583 iiii:~.~;i::iiii!iii;:i::?iii::.'i~!i~i:i:il;::ili;iiiii!ii?:' ii:.$~12'0i'666~27~: ~6t~ti~!R~e~::.~ i
MTTF Mass Transil Trusl Fund; Demo. = Demoii,;,a~ion Program; TDM = T[aii~po,alion Demand Managomenl Program; Tech. = Technical Assisl. Program; TEIF = Transpoltation Efficiency lmprJ;oTl~Jn~ ~;"d; ~'~'~'""
[C. ommonweallh Transporlation Capital Fund; DTR = Dulles Toll Road Revenues; TTF = Transporlalion Trust Funds; HMO = Highway Malnlenance & Operalln~l Funds; TANF = Temp. Assisl. Need~/Families
PUBLIC TRANSPORTATION GRANTS BY CONSTRUCTION DISTRICT
226
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
RICHMOND DISTRICT
Greater Richmond Transit Company
Operating Expenses $23,942,371 $234,515 FTA Sect. 5307 FY00 $5,175,231 MTTF $9,398,803 Operating Revenues
$1,000,000 $1,000,000 CMAQ FY00 $9,133,822 Local General Funds
Capital Expenses
Purchase 10 ReplacementTransit Coaches $2,600,000 $2,080,000 FTA Sect. 5307 FY00 $223,600 MTTF $296,400 Local General Funds
Associated Capital Maintenance $167,000 $133,600 FTA Sect. 5307 FY00 $14,362 MTTF $19,038 Local General Funds
Purchase ADP Hardware & Software $200,000 $160,000 FTA Sect. 5307 FY00 $17,200 MTTF $22,800 Local General Funds
Purchase Miscellaneous Equipment $5,000 $4,000 FTA Sect. 5307 FY00 $430 MTTF $570 _ocal General Funds
Purchase 40 Replacement Paratransit Vans $1,800,000 $1,440,000 FTA Sect. 5307 FY00 $154,800 MTTF $205,200 Local General Funds
Rehabilitate Transit Operations Facility $1,000,000 $800,000 FTA Sect. 5307 FY00 $86,000 MTTF $114,000 Local General Funds
Facility Maintenance Improvements $74,711 $59,769 FTA Sect. 5307 FY00 $6,426 MTTF $8,516 Local General Funds
Rehabilitate Transit Operations Facility (TEA-21) $843,750 $675,000 Title 1 High Priority FY00 $72,563 MTTF $96,187 Local General Funds
Rehabilitate Transit Operations Facility (RSTP) $401,000 $320,800 Regional STP FY00 $80,200 TTF $0
Purchase 7 Buses & 3 Vans for New Suburban Svcs. $2,515,200 $1,515,200 FTA Sect. 5309 FY99 $1,000,000 CTCF
Urban Funds Match to FYg9 CMAQ Project! $204,082 $200,000 TTF Urban $4,082 Local General Funds
Regional Transit Study $250,000 $200,000 CMAQ FY00 $0 $50,000 Planning District Comm.
Marketing Campaign $427,500 $342,000 CMAQ FY00 $0 $85,500 Local General Funds
Suburban Transit Expansion (Approps. Act) $1,300,000 $1,000,000 TANF $300,000 TEIF
Transit Planning Intern $20,000 $0 $19,000 MTTF- Demo. $1,000 Local General Funds
City of Richmond
Main Street Station Multimodal Center $27,756,864 $19,315,491 FTA 5309 FY96-99 $2,387,091 MTTF $1,729,282 Local Funds
$2,640,000 Tills 1 H Priority FY99-00 $500,000 CTCF
$250,000 Enhancement FY96 $935,000 TTF - Urban
Main Street Station Operations $242,500 $194,000 CMAQ FY00 $0 $48,500 Local General Funds
Petersburg Area Transit
Operating Expenses $1,272,587 $577,595 FTA Sect. 5307 FY99 $226,240 MTTF $397,000 Operating Revenues
Capital Expenses $71,752 iLocal General Funds
Purchase 1 Expansion Bus $260,000 $208,000 FTA Sect. 5307 FY99 $22,360 MTTF $29,640 Local General Funds
Purchase ADP Hardware & Software $5,000 $4,000 FTA Sect. 5307 FY99 $430 MTTF $570 Local General Funds
Purchase Communications Equipment $5,000 $4,000 FTA Sect. 5307 FY99 $430 MTTF $570 Local General Funds
Purchase Miscellaneous Equipment $15,000 $12,000 FTA Sect. 5307 FY99 $1,290 MTTF $1,710 Local General Funds
F~ichmond Rideflnders
Rideshare Program Administration $426,000 $317,000 CMAQ FY00 $24,000 TEIF $6,000 Local General Funds
Air Pollution Reduction Program $100,000 $100,000 CMAQ FY00 $79,000 TTF
cMoTTF = Mass Transil Trust Fund; Demo. = Demonstration Program; TDM = Transportation Demand Management Program; Tach. = Technical Assist. Program; TEIF = Transportation Efficiency Improvement Fund; CTCF =
mmonwealth Transperlafion Capital Fund; DTR = Dulles Toll Road Revenues; TTF = Transportation Trust Funds; HMO = Highway Mainlenance & Operating Funds; TANF = Temp. Assisl, Needy Families
PUBLIC TRANSPORTATION
227
!
GRANTS BY CONSTRUCTION DISTRICT
I ! I I I i i I I I I i I I ! i I 11 I
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
SALEM DISTRICT
Greater Roanoke Transit Company
Operating Expenses $4,337,625 $986,261 FT^ Sect. 5307 FY99 $876,679 MTTF $1,558,975 Operatin9 Revenues
Cap*~al Expenses $915,710 Local General Funds
Purchase 4 Replacement Buses $1,052,000 $841,500 FTA Sect. 5307 FY99 $90,515 MTTF $119,985 Local General Funds
Purchase 1 Replacement Bus $248,000 $198,500 FTA Sect. 5309 FY99 $21,285 MTTF $28,215 Local General Funds
Rideshare Program Administration $28,890 $0 $23,112 MTTF $5,778 Local General Funds
Blacksburg Transit
Operating Expense{ $2,609,930 $928,215 FTA Sect. 5311 FY99 $452,480 MTTF $753,500 Operating Revenues
Capital Expenses $475,735 VaTech & Local Funds
Purchase 5 Replacement Buses $1,350,000 $1,080,000 FTA Sect. 5309 FY99 $116,100 MTTF $153,900 VaTech & Local Funds
Purchase 2 Replacement Vans $100,000 $80,000 FTA Sect. 5309 FY99 $8,600 MTTF $11,400 VaTech & Local Funds
Blacksburg Transit Development Plan $157,000 $0 $149,150 MTTF $7,850 VaTech & Local Funds
ITS Intern $36,504 $0 $34,679 MTTF $1,825 VaTech & Local Funds
RADAR (UHSTS) Roanoke Co.
Operating Expenses $94,185 $43,968 FTA Sect. 5311 FY99 $21,210 MTTF $6,250 Operating Revenues
Capital Expenses $22,757 Local General Funds
Purchase 4 Replacement Body-On-Chassis $134,600 $0 $127,870 Oil Overcharge $6,730 Local General Funds
City of Martinsville
Martinsville-Henry Co. Transit Study $9,600 $7,680 FTA Sect. 5313b FY99 $960 MTTF $960 Local Funds
MT'I I- = Mass Transit Trusl Fund; Demo. = Demonstration Program; TDM = Transporlallon Demand Management Program; Tach, -- Technical Assisl. Program; TEIF = Transporlafion Efficiency Improvement Fund; CT~F =
ICommonwealth Transpodalion Capital Fund; DTR = Dulles Toll Road Revenues; TTF = Transpodalion Trust Funds; HMO = Highway Maintenance & Operating Funds; TANF = Tamp, ^sslsl. Needy Families
PUBLIC TRANSPORTATION
GRANTS BY CONSTRUCTION DISTRICT
228
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
STAUNTON DISTRICT
Harrlsonburg Bus Sen/Ice
Operating Expenses $1,672,500 $471,250 FTA Sect. 5311 FY99 $332,290 MTTF $730,000 Operating Revenues
Capital Expenses $138,960 JMU &Local Funds
Purchase 1 Replacement Bus $248,125 $198,500 FTA Sect. 5309 FY99 $21,339 MTTF $28,286 JMU &Local Funds
Purchase 4 Replacement Buses $626,875 $501,500 FTA Sect. 5309 FY99 $53,912 MTTF $71,463 JMU &Local Funds
Facility Improvements $350,000 $280,000 FTA Sect. 5309 FY99 $30,100 MTTF $39,900 JMU &Local Funds
Winchester Transit Service
Operating Expenses $461,600 $193,450 FTA Sect. 5311 FY99 $98,980 MTTF $74,700 Operating Revenues
Capital Expenses $94,470 Local General Funds
Purchase 4 Replacement Body-On-Chassis $200,000 $160,000 FTA Sect. 5311 FY99 $17,200 MTTF $22,800 Local General Funds
Staunton (CATS)
Operating Expenses $334,041 $60,584 FTA Sect. 5311 FY99 $41,677 MTTF $212,874 Contract/Op. Revenues
$18,906 Local Ger{eral Funds
Lord Falrfax PDC
Rideshare Program Administration $50,000 $0 $40,000 MTTF $10,000 Local Funds
Central Shenandoah Planning District Commission
GIS/Transportation Intern $15,000 $0 $14,250 MTTF $750 Local Funds
STAUNTON DISTRICT TOTALS: .:.i::i:?:i::?:ii!$.3~9~87!;~!:: Ii;i;?:~!.~'865~28~' :~:~ii::?~!:~:~:~;:~i~:~::~i~ii?~:~:::~ii~::::~:~!~:~i~i~iii~i~:~i~i~i~ii!iiii~i~;i~i~::!~i::~i~!!~ :::i!i~i::ii:;~;~i!;:.$6~9':,:748 ::::::?:::::::::::::::::::::::?:::?:::?:::::::::::?::?::::::::?:::::::::::: ;:~i::i?~!??:~:$~!::i~;~:i~!:09. :::::::::::::?:?::::::::?::::::::::::::::::::::::::::::::::?:??:::::::?:?::::::::::::::::::::::::::::::::::::::::::::::::?:::::
IMTTF='Mass Transil Trust Fund; Demo, = Demonstration Program; TDM = Transportation Demand Managemenl Program; Tach. = Technical Assist, Program; TEIF = Transportation Efficiency Improvement Fund; CTCF =
Commonweallh Transportation Capital Fund; DTR = Dulles Toll Road Revenues; TTF = Transportation Trust Funds; HMO = Hi~lhway Maintenance & Operating Funds; TANF =Ternp, Assisl, Needy Famtlies
GRANTS BY CONSTRUCTION DISTRICT
PUB LIC TRANSPORTATION 229
I I I I ! I I i I I I ! ! I I !_ i I I--
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
SUFFOLK DISTRICT
Tidewater Transp, District Coma,
Operating Expenses $27,795,086 $5,036,217 FTA Sect. 5307 FY00 $5,267,070 MTTF $9,176,823 Operating Revenues
$363,880 CMAQ FY00 $700,000 TTF- urban (NoG $7,251,096 Local General Funds
Ridesharing Expenses- TRAFFIX $1,100,000 $880,000 Regional STP FY00 $220,000 TTF
Capital Expenses
VA-gO-X182 Purch. 8 Expansion Buses & Lifts $2,470,000 $1,992,000 FTA Sect. 5307 FY00 $205,540 MTTF $272,460 Local General Funds
VA-90-X182 Purch. 30 Bus Shelters' $48,420 $38,736 FTA Sect. 5307 FY00 $4,165 MTTF $5,519 Local General Funds
VA-90-X182 Purch. 12 Support Vehicles, $360,000 $288,000 FTA Sect. 5307 FY00 $30,960 MTTF $41,040 Local General Funds
VA-gO-X182 Purch. Shop & Office Equipment' $100,000 $80,000 FTA Sect. 5307 FY00 $8,600 MTTF $11,400 Local General Funds
VA-O0 Lease of Bus Tires $250,000 $200,000 FTA Sect. 5307 FY00 $21,500 MTTF $28,500 Local General Funds
VA-O0 Purch. Shop & Office Equipment~ $100,000 $80,000 FTA Sect. 5307 FY00 $8,600 MTTF $11,400 Local General Funds
VA-O0 Purch. 20 Replacement Vans $880,000 $704,000 FTA Sect. 5307 FY00 $75,680 MTTF $100,320 Local General Funds
VA-O0 Purch. 20 Replacement Van Lifts i $100,000 $90,000 FTA Sect. 5307 FY00 $4,300 MTTF $5,700 Local General Funds
VA-O0 Purch. 10 Bus Shelters $40,000 $32,000 FTA Sect. 5307 FY00 $3,440 MTTF $4,560 Local General Funds
VA-O0 Lease Radio Equipment! $24,000 $19,200 FTA Sect. 5307 FY00 $2,064 MTTF $2,736 Local General Funds
VA-O0 Purchase Microwave Link Equipment $120,000 $96,000 FTA Sect. 5307 FY00 $10,320 MTTF $13,680 Local General Funds
VA-O0 Purchase Security Equipment $150,000 $120,000 FTA Sect. 5307 FY00 $12,900 MTTF · $17,100 Local General Funds
VA.O0 Purchase ADP Hardware & Software $255,000 $204,000 FTA Sect. 5307 FY00 $21,930 MTTF ~ $29,070 Local General Funds
Prelinimary Engineering for Light Rail $3,000,000 $2,400,000 Regional STP FY00 $600,000 TTF
Purchase 12 Buses $2,400,000 $1,920,000 Regional STP FY00 $480,000 TTF
Special State Appropriation for Light Rail PE $1,900,000 $1,900,000 HMO
Peninsula Transp. District Comm.
Operating Expenses $15,586,775 $2,174,680 FTA Sect. 5307 FY00 $3,139,075 MTTF $5,902,619 Operating Revenues
$280,000 CMAQ FY00 $3,770,401 Local General Funds
$320,000 FTA 5307 FY00 ADA
Capital Expenses
Replace 10 Vans & 7Automobiles $649,000 $519,200 FTA Sect. 5307 FY00 $55,814 MTTF $73,986 Local General Funds
Associated Capital Maintenance $595,000 $476,000 FTA Sect. 5307 FY00 $51,170 MTTF $67,830 Local General Funds
ADP Hardware/Software & Security Equipment $82,500 $66,000 FTA Sect. 5307 FY00 $7,095 MTTF $9,405 Local General Funds
Passenger Amenities $512,000 $409,600 FTA Sect. 5307 FY00 $44,032 MTTF $58,368 Local General Funds
Facility Improvements, Tools. Furniture & Equip. $432,700 $346,160 FTA Sect. 5307 FY00 $37,213 MTTF $49,327 Local General Funds
Planning Projects $155,000 $124,000 FTA Sect. 5307 FY00 $0 $31,000 Local General Funds
InstallAVL System (RSTP) $500,000 $400,000 Regional STP FY00 $100,000 TTF $0
Purchase 4 Expansion Transit Coaches $1,000,000 $800,000 Regional STP FY00 $200,000 TTF $0
Replace Radio System $600,000 $480,000 Regional STP FY00 $120,000 TTF $0
Hampton - Fast Ferry $237,500 $190,000 CMAQ FY00 $47,500 Local General Funds
PUBLIC TRANSPORTATION GRANTS BY CONSTRUCTION DISTRICT
230
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
SUFFOLK DISTRICT (Continued)
James City County Transit
Operating Expenses $956,310 $167,000 FTA Sect. 5307 FY00 $197,960 MTTF $142,000 Operating Revenues
$33,685 FTA Sect. 5311 FY99 $327,665 Local General Funds
$88,000 FTA 5303
Vehicles for Shopping Circulator $130,000 $104,000 Regional STP FY00 $26,000 TTF
Eastern Shore. Star Transit
Operating Expenses $300,777 $123,514 FTA Sect. 5311 FY99 $56,560 MTTF $53,750 Operating Revenues
Capital Expenses $66,953 Contract & Local Funds
Purchase 1 Replacement Body-On-Chassis Bus $45,100 $36,080 FTA Sect. 5311 FY99 $3,879 MTTF $5,141 Contract & Local Funds
Chesapeake Bay Connector $40,480 $0 $38,456 MTTF- Demo. $2,024 Contract & Local Funds
Facility Feasibility Study $20,000 $0 $19,000 MTTF - Demo. $1,000 Contract & Local Funds
Tidewater Transp. District Corem, TRAFFIX
Park & Sail Shuttle $44,200 $0 $41,990 MTTF - Demo. $2,210 Local General Funds
IMTTF= Mass Transit Trust Fund; Demo. = Demonstralion Program; TDM = Transportation Demand Management Program; Tech. = Technical Assist, Program; TEIF = Transportation Efficiency Improvement Fund; CTCF =
Commonweallh Transpml~fion Capilal Fund; DTR =, Dulles Toll Road Revenues; TTF = Transporlalion Trusl Funds; HMO = Hi~hwa]/Maintenance & Operating Funds; TANF = Temp, Assist, Need]/Families
PUBLIC TRANSPORTATION
231
I
GRANTS BY CONSTRUCTION DISTRICT
! I I I I I I I I I ! I I I ! I I J
FISCAL YEAR 2000 PUBLIC TRANSPORTATION IMPROVEMENT PROGRAM
STATEWIDE SUMMARY
BRISTOL DISTRICT TOTALS: $2,691,275 $710,027 All Soumes $847,972 All Sources $1,133,276 Revenues & All Sources
CULPEPER DISTRICT TOTALS: $5,978,242 $2,283,325 Ail Sources $1,253,604 Ail Sources $2,441,313 Revenues & Ail Sources
FREDERICKSBURG DISTRICT TOTALS: $1,736,702; $305,492 Ail Sources $670,340 All Sources $760,870 Revenues & All Sources
LYNCHBURG DISTRICT TOTALS:i $7,609,126 $4,070,177 Ail Sources $1,154,742 Ail Sources $2,384,207 Revenues & Ail Sources
NORTHERN VIRGINIA DISTRICT TOTALS $390,915,056 $81,395,104 All Sources $114,044,583' All Sources $195,475,368 Revenues & Ail Sources
RICHMOND DISTRICT TOTALS $66,833,565 $33,586,9701 Ail Sources $11,525,653 Ail Soumes $21,720,942 Revenues & Ail Sources
STAUNTON DISTRICT TOTALS: $3,958,141 $1,865,284 All Sources $649,748 All Sources $1,443,109 Revenues & All Sources
SUFFOLK DISTRICT TOTALS: $62,979,848 $21,681,952 All Sources $13,715,313 All Sources $27,582,583 Revenues & All Sources
State Funds Unobligated orAssigned to Statewide Projects: $4,488,018 ' $2,618,693 All Sources $1,625,500 All Soumes $243,825 Revenues & All Sources
PUBLIC TRANSPORTATION
232 GRANTS BY CONSTRUCTION DISTRICT
State Aid to Public Transportation
Formula Allocations Subprogram (73.5%): $70,699,870
Recipients of State Formula Assistance
Northern Virginia Transp. Comm.
Virginia Railway Express (NVTC/PRTC)
Potomac Rappahannock Transp. Comm.
Tidewater Transp. District Comm.
Greater Richmond Transit Company
Peninsula Transp. District Comm.
Greater Roanoke Transit Company
Greater Lynchburg Transit Company
Petersburg Area Transit
Bristol City Bus
Charlottesville Transit Service
Danville Transit
Fredericksburg (FRED)
Blacksburg Transit
CVT (CPAC) Cumberland Co.
Graham Transit - Town of Bluefield
District III Governmental Cooperative
Harrisonburg Bus Service
James City County Transit
JAUNT, Inc.
Mtn. Empire Older Ctzns. (Wise Co.)
Winchester Transit Service
Farmville Area Bus
Greene County Transit
RADAR (UHSTS) Roanoke Co.
Loudoun County Transportation Association
Staunton (CATS)
Buchanan County Transportation
Dickenson County Transportation
Russell County Transportation
Tazewell County Transportation
Eastern Shore - Star Transit
Bay Transit- Gloucester County
Loudoun County Dept. of Transportation
Four County Transit (AASC)
STATEWIDE TOTALS:
FY{X) Formula
Assistance
Allocation
$45,785,236
$4,082,039
$1,421,068
$5,967,070
$5,175,231
$3,139,075
$876 679
$586 809
$226 240
$70 700
$388 850
$155 540
$106 050
$452 480
$49 490
$14140
$169 680
$332 290
$197 960
$402 990
$113,120
$98,980
$56,560
$63,630
$21,210
$141,400
$41,677
$49,490
$7,070
$28,280
$11,175
$56,560
$42,420
$169,680
$21,210
$70,522,079
FY00 Formula Assistance Grants
FY99
Allocation
$43,443,352
$3,470,463
$1,445,171
$5,548,131
$4,928,096
$2,795,666
$863 918
$591 421
$223 866
$74 205
$386 387
$160 453
$70 267
$434 804
$55,721
$14,024
$159,061
$294,009
$119,546
$406,823
$105,182
$92,301
$59,837
$54,767
$15,289
$115,213
$28,232
$38,292
$7,538
$27,483
$10,992
$53,570
$19,172
$0
$66,130,335
Increase or
(Decrease)
from FY99 to
FYO0
$2,341,884
$611 576
-$24 103
$418 939
$247 135
$343 409
$12 761
-$4 612
$2 374
-$3 505
$2.463
-$4 913
$35 783
$17.676
-$6 231
~116
$10 619
$38 281
$78 414
-$3 833
$7,938
$6,679
33,277
$8,863
$5,921
$26,187
$13,445
$11,198
-$468
$797
$183
$2,990
$23,248
$169,680
$21,210
$4,391,744
FY98
Operating Percentof
Expenses StateTotal
$198,566,802 64.76%
$18,469,683 6.02%
$6,176,974 2.01%
$25,905,728 8.44%
$22,452,185 7.32%
$13,635,949 4.44%
$3,806,517 1.24%
$2,529,429 0.83%
$1,000,482 0.32%
$276,870 0.10%
$1,670,212 0.55%
$668,129 0.22%
$450,618 0.15%
$1,967,278 0.64%
$222,057 0.07%
$67,972 0.02%
$725,748 0.24%
$1,446,992 0.47%
$846,993 0.28%
$1,725,836 0.57%
$497,683 0.16%
$434,066 0.14%
$238,536 0.08%
$262,809 0.09%
$91,479 0.03%
$617,264 0.20%
$176,182 0.06%
$215,610 0.07%
$29,711 0.01%
$127,543 0.04%
$41,485 0.02%
$242,154 0.08%
$188,314 0.06%
$760,087 0.24%
$78,000 0.03%
$306,613,377 100.00%
FORMULA ASSISTANCE GRANTS
PUBLIC TRANSPORTATION
233
I I ! i I I ! I I I ! I I i I I I I !
State Aid to Public Transportation FY00 Capital Assistance Grants
Unobligated Formula Assistance:
Capital Assistance Subprogram (25%):
Total Funds Available for Capital:
Recipient
Washington Metro. Area Transit Authority
Fairfax Connector
Alexandria Transit (DASH)
City of Fairfax CUE Bus
Northern Virginia Transportation Commission
Virginia Railway Express (NVTC/PRTC)
Potomac Rappahannock Transp. Comm.
Tidewater Transp. District Comm.
Greater Richmond Transit Company
City of Richmond
Peninsula Transp. District Comm.
Greater Roanoke Transit Company
Greater Lynchburg Transit Company
Petersburg Area Transit
Charlottesville Transit Service
Danville Transit
Blacksburg Transit
District III Governmental Cooperative
Harrisonburg Bus Service
JAUNT, Inc.
Mtn. Empire Older Ctzns. (Wise Co.)
Winchester Transit Service
Greene County Transit
RADAR (UHSTs) Roanoke Co.
Loudoun County Transportation Association
Buchanan County Transportation
Dickenson County Transportation
Eastern Shore - Star Transit
Bay Transit - Gloucester County
Four County Transit (AASC)
Statewide Totals:
$177,802
$24,047,575
$24,225,377
Total Project
Cost
$70,109,718
$6,330,205
$1,415,000
$250,000
$78,104,923
$11,320,783
$9,783,252
$4,897,42O
$7,091,461
$27,756,864
$4,526,200
$1,300,000
$3,487,122
$285,OOO
$583,125
$75,000
$1,450,000
$152,954
$1,225,000
$505,000
$98 000
$200 000
$81 500
$134 800
$635 000
$7O 000
$4O 000
$45 100
$144,000
~80,000
$154,072,304
Total Federal
Funds
$45,288,096
$0
$0
$45,288,096
$3,080.00O
$6,009,442
$3,943,936
$5,673,169
$22,205,491
$3,620,960
$1 ,O40,000
$2,789,698
$228,00O
$457,000
$60,000
$1,160,000
$17,963
$98O,OOO
$4O4,O0O
$o
$160,000
$65,200
$o
$508,000
$0
$0
$36,080
$0
$97,727,O35
Non-Federal
Funds
$24,821,622
$6,330,205
$1,415,000
3250,000
$32,816,827
$8,240,783
$3,773,810
$953,484
$1,338,092
$5,551,373
$454,240
$260,OOO
$697,424
$57,OOO
$106,000
$15,000
$29O,OOO
$4,491
$245,000
$101,000
$0
$4o,ooo
$16,300
$0
$127,000
$7O,OOO
$o
$9,O2O
$0
$55,166,843
Matching Ratio:
State Funds
MTF
$10,673,300
$2,721,989
$608,450
$107,500
$14,111,239
$3,543,537
$1,622,740
$409,999
$575 381
$2,387 091
$195 324
$111 800
$299 893
$24 510
$45 580
$6 450
$124 700
$1 932
$t05 351
$43 430
$o
$17,200
$7,009
$0
$54,610
$30,100
$o
$3,879
$o
$23,721,755
43.00%
State Funds
Oil
Overcharge
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$o
$123,975
$o
$o
$93,100
$0
$0
$127,870
$o
$o
$38,000
$o
$136,800
$76,000
$595,745
PUBLIC TRANSPORTATION CAPITAL GRANTS SUMMARY
234
FY00 State Aid Special Projects Grants - TEIF Program and TDM Projects
Recipient
Fairfax County
City of Alexandria
Arlington County CAP
Greater Roanoke Transit Company
Loudoun County Dept. of Transportation
Lord Fairfax PDC
Middle Peninsula PDC
Northern Neck PDC
RADCO PDC
Rappahannock Rapidan PDC
Thomas Jefferson PDC
Project Description
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Rideshare Program Administration
Total
p. roiect Cost
$317 000
$170 000
$496 680
$28 890
$118 750
$50 000
$61 864
$45 000
$248 994
$97 565
$131 685
State TEIF
Funds
$253,600
$136 000
$397 344
$23 112
$95 000
$40 000
$49 491
$36 000
$199 195
$78 052
$105 348
State TDM
Funds
$
$
$
$
$
$
$
$
$
$
$
Arlington County CAP Transp. Partners Employer Incentive Fund $280 000 $ $224,000
City of Fairfax
Potomac Rappahannock Transp. Comm.
Potomac Rappahannock Transp. Comm.
Greater Richmond Transit Company
RADCO PDC
Fairfax County/DRPT
Dulles Area Transportation Association
Fairfax City TDM Program $100 000
Getting to Basics Marketing Program $62 500
CMP Mixing Bowl Reconstruct. Enhncmnts $46 000
Suburban Transit Expansion (Approps. Act) $375 000
Springfield Interchange Assistant $23 354
Franconia/Springfield Transit Store $120 000
Loudoun Co. Commuter's Choice Campaig $62,500
Statewide Total: $2,865,782
$ $80,000
$ $50,000
$36,800 $
$3OO,OOO $
$ $18,683
$96,000 $
$1,919,942 $372,683
FY00 State Aid Special Projects Grants - Demonstration Program Projects
Total State
Recipient
Northern Virginia Transp. Comm.
Tidewater Transp. District Comm. TRAFFIX
Charlottesville Transit Service
Greene County Transit
Loudoun County Transportation
Eastem Shore - Star Transit
Bay Transit - Gloucester County
Virginia Transit Association (VTA)
Department of Rail & Public Transportation
Blacksburg Transit
Eastern Shore - Star Transit
PUBLIC TRANSPORTATION
Proiect Description
Collection of Bus Ridership Information
Park & Sail Shuffle
Service Expansion to Pantops Area
Saturday Service Expansion
Warrenton/Berryville Transit Service
Chesapeake Bay Connector
Essex Bus Service
Transit Promotion, Education & Safety
Urban Training Program
Blacksburg Transit Development Plan
Facility Feasibility Study
Statewide Total:
235
!
Project Cost
$63,158
$44,200
$81,000
$9,000
$121,174
$40,480
$86,O00
$120,000
$80,000
$157,0OO
$20,000
$822,012
Funds
$60,000
$41,990
$76,950
$8,550
$115,115
$38,456
$81,7OO
$114,000
$76,000
$149,150
$19,000
$780,911
SPECIAL PROJECTS GRANTS
! i
FY00 State Aid Special Projects Grants - Technical Assistance Program
Recipient
Arlington County CAP
Charlottesville Transit Service
Charlottesville Transit Service
Loudoun County Transportation
City of Martinsville
Greater Roanoke Transit Company
Total
Proiect Description Funds
Master Plan Transit Element $ .
CTS Facility Study $54,000
CTS Transit Development Plan $57,600
Transit Facility Development Project $85,000
Martinsville-Henry Co. Transit Study $7,680
Transit Development Plan .~10,873 $
Statewide Total: $215,153
Federal
Proje~ Con
$50,000
$67,5O0
$72,OOO
$106,250
$9,600
$13,590
$318,940
State Funds
$25,000
$6,750
$7,200
$10,625
$960
$50,535
FYO0 State Aid Special Projects Grants - Transit Training & Internship Program
Total State
ProiectCost Funds
$26,000 $24,700
$23,000 $21,850
$20,000 $19,000
$20,000 $19,000
$20,279 $19,265
$36,504 $34,679
$15,000 $14,250
$160,783 $152,744
Recipient
Alexandria Transit (DASH)
Northem Virginia Transp. Comm.
Potomac Rappahannock Transp. Comm.
Greater Richmond Transit Company
Charlottesville Transit Service
Blacksburg Transit
Central Shenandoah Planning District Corn
Proiect Description
Alexandria Transit (DASH) Intern
Planning Intern
Transit Intern
Transit Planning Intern
Transit Intern
ITS Intern
GIS/Transportation Intern
Statewide Total:
PUBLIC TRANSPORTATION
236 SPECIAL PROJECTS GRANTS
Commonwealth Transit
Recipient
Northern Virginia (DRPT)
Greater Richmond Transit Company
Department of Rail and Public Transportation
City of Richmond
Tidewater Transportation District Commission
Capital Fund Program (Item 534.G)
State Funds
$2,000,000
$1,000,000
$1,500,000
$500,000
$5,000,000
$1,900,000
Prelect Description
Dulles Corridor Rapid Transit Project
ChesterfieldlHenfico County Suburban Transit
High Speed Rail in the 1-95 Corridor
Richmond Main Street Station Project
Preliminary Engineering for Light Rail (Item 534.J)
FTA Section 5309 Bus and Bus Facility Funds - FY99 Statewide Allocation for Virginia
Recipient
Northern Virginia Transportation Commission
Washington Metropolitan Area Transit Authority
Potomac & Rappahannock Transportation Corn
Potomac & Rappahannock Transportation Corn
City of Richmond
Fairfax County
Town of Warrenton
Greater Richmond Transit Company
District III Governmental Cooperative
Blacksburg Transit
Harrisonburg Transit
Loudoun County Transportation Association
JAUNT Inc.
Federal Funds
$397,000
$045,125
$277,900
$1,588,000
$1,985,000
$992,500
$24,813
$1,515,200
$17,963
$1,160,000
$781,5O0
$136,000
$404,000
$9,925,001
Oil Overcharge Program - Capital
Recipient
Mountain Empire Older Citizens, Inc.
UHSTS/RADAR - Roanoke County
District III Governmental Cooperative
Central Virginia AAA
Greater Richmond Chap. American Red Cross
Dickenson County
Bay Transit
Four County Transit
Rappahannock Area Agency on Aging
New River Valley Senior Sewices
Peninsula Area Agency on Aging
Sussex-Greeenville Adult Activity Services
State Funds
$93,100
$127,870
$123,975
$31,350
$35,150
$38,000
$136,800
$76,OO0
$25,650
$34,205
$35,150
$42,750
$800,0O0
PUBLIC TRANSPORTATION
project Description
Falls Church Electric Bus
Buses for; Franconia Springfield
Manassas Transit Depot
Buses
Main Street Station Transportation Center
Stringfellow Road/I-66 Park and Ride Lot
Warrenton Circuit Rider
Purchase 7 Buses & 3 Vans for New Suburban Svcs.
Purchase 1 Replacement Supervisory Vehicle
Purchase 5 Replacement Buses & 2 Vans
Purchase 4 Replacement Buses & Facility Improvements
Purchase 1 Expansion Trolleybus
Purchase 10 Replacement Body-On-Chassis
Assistance for Paratransit Service Vehicles
.Project Description
2 Vans with Lifts
4 Vans and Radios
3 Vans with Lifts
I Van
1 Raised Roof Van with Lift
I Body on Chassis
3 Vans with Lifts
2 Vans with Lifts
Radio System
I Raised Roof Van with Lift
1 Raised Roof Van with Lift
I Body on Chassis with Lift
237
SPECIAL CAPITAL GRANT PROGRAMS
I ] ! I I ! ! ! i I I I I i I ] ~ ! ~
FEDERAL TRANSIT ADMINISTRATION SECTION 5307 PROGRAM
FY00 PROGRAM OF PROJECTS FY99Appropriation: $4,645,393
Carry Over:. .~358,514
Total Funds Available: $5,003, g07
Section 5307 Section 5307 Section 6309 Total Capital Total Section 6307
Recipient Opera~infl Funds Cm)ital Funds Capital Funds FU..pds .Funds
Greater Roanoke Transit Company $986,261 $841,500 $198,500 $1,040,000 $1,827,761
Greater Lynchburg Transit Company $812,239 $0 $69,698 $69,698 $812,239
Petersburg Area Transit $577,595 $228,000 $0 $228,000 $805,595
Bdstol City Bus $78,495 $0 $0 $0 $78,495
Charlottesville Transit Service $489,033 $457,000 $0 $457,000 $946,033
Danville Trans'~ $199,840 $60,000 $0 $60,000 $259,840
Fredericksburg (FRED) $120,094 $0 $0 $0 $120,094
JAUNT, Inc. ~;153,836 $0 $0 $0 $153,836
$3,417,393 $1,586,500 $268,198 $1,854,698 $5,003,893
Section 5307 Unobligated Balance: $14
FEDERAL TRANSIT ADMINISTRATION SECTION 5311 PROGRAM
FY 00 PROGRAM OF PROJECTS FY99Appropdation:
Recipient
Blacksburg Transit
CVT (CPAC) Cumberland Co.
Graham Transit - Town of Bluefleld
Oistrict III Governmental Cooperative
Harrisonburg Bus Service
James City County Transit
JAUNT, Inc.
Mtn. Empire Older Ctzns. (Wise Co.)
Winchester Transit Service
Farmville Area Bus
Greene County Transit
RADAR (UHSTS) Roanoke Co.
Loudoun County Transportation Association
Staunton (CATS)
Eastern Shore - Star Transit
Bay Transit - Gloucester County
Four County Transit (AASC)
FY00 RTAP Projects
FYg9 RTAP Appropriation:
Deobligation:
Total Funds Available:
Section $311 Section 6311 Section 6309 Total Capital
Operatinq Funds ~ap~al Funds Capital Funds Funds
$928,215 $0 $1,160,000 $1,160,000
$118,500 $0 $0 $0
$59,475 $0 $0 $0
$309,693 $0 $17,963 $17,963
$471,250 $0 $781,500 $781,500
$33,685 $0 $0 $0
$484,081 $0 $404,000 $404,000
$206,901 $0 $0 $0
$193,450 $160,000 $0 $160,000
$89,900 $0 $0 $0
$118,575 $65,200 $0 $65,200
$43,968 $0 $0 $0
$355,175 $372,000 $136,000 $508,000
$60,584 $0 $0 $0
$123,514 $36,080 $0 $36,080
$185,398 $0 $0 $0
$37,500 $0 $0 $0
$3,819,864 $633,280 $2,499,463 $3,132,743
Section 5311 Unobligated Balance:
$4,434,146
$11~380
$~570,524
TotalSection 5311
Funds
$928,215
$118,500
$59,475
$309,693
$471,250
$33,685
$484,081
$206,901
$353 450
$89 900
$183 775
$43 968
$727 175
$6O 584
$159 594
$185 398
$37 500
9117,380
$4,570,524
$0
PUBLIC TRANSPORTATION FEDERAL SECTIONS 5307 AND 5311 PROGRAMS
238
FEDERAL TRANSIT ADMINISTRATION SECTION 5303 PROGRAM
FY00 PROGRAM OF PROJECTS FYgg Appropriation: $980,769
Reci01ent Agency
Bdstol TN/VA Area Metropolitan Planning Organization
Charlottesville Area Metropolitan Planning Organization
Danville Area Metropolitan Planning Organization
Fredericksburg Area Metropolitan Planning Organization
Hampton Roads Metropolitan Planning Organization
Kingsport TN/VA Area Metropolitan Planning Organization
Lynchburg Area Metropolitan Planning Organization
Washington, D.C. Area Metropolitan Planning Organization
Petersburg Area Metropolitan Planning Organization
Richmond Area Metropolitan Planning Organization
Roanoke Area Metropolitan Planning Organization
Total Section 5303 State Local
Funds Funds Funds Funds
$16,065 $12,852 $1,607 $1,606
$45,000 $36,000 $4,500 $4,500
$45,000 $36,000 $4,500 $4,500
$45,000 $36,000 $4,500 $4,500
$340,164 $272,130 $34,016 $34,018
$2,160 $1,728 $216 $216
$45,000 $36,000 $4,500 $4,500
$467,316 $373,853 $46,732 $46,731
$45,000 $36,000 $4,500 $4,500
$130,259 $104,206 $13,026 $13,027
$45,000 ~;36,000 $4,500 $4,500
$1,225,964 $980,769 $122,597 $122,598
$0
Section 5310 Unobligated Balance:
FEDERAL TRANSIT ADMINISTRATION SECTION 5313(b) PROGRAM
FY00 PROGRAM OF PROJECTS FYggAppropriation: $210,961
Reci.oient Agency
Greater Roanoke Transit Company - Complete TDP Funding
Charlottesville Transit Service - Transit Development Plan
Charlottesville Transit Service - Transit Facility Study
Loudoun Co. Transportation Assoc.- Transit Facility Study
Martinsville/Henry County - Transit Feasibility Study
Total Se~ion 5313b StYe Local
Funds Funds Funds Funds
$5,935 $5,935 $0 $0
$72,000 $57,600 $7,200 $7,200
$67,500 $54,000 $6,750 $6,750
$106,250 $85,000 $10,625 $10,625
$9,600 ~7,680 $96Q $960
$261,285 $210,215 $25,535 $25,535
$740
Section 5310 Unobligated Balance:
PUBLIC TRANSPORTATION
239
FEDERAL SECTIONS 5303 AND 5313(B) PROGRAMS
I I I I I ! I ! I ! I I ! ! ! ! _t ~~
FEDERAL TRANSIT ADMINISTRATION SECTION 5310 PROGRAM
FY00 PROGRAM OF PROJECTS (VA-16-0026)
FY99 Appropriation:
.Recipient Aqency
I Adult Care Services, Richmond
2 Appalachian Agency for Senior Citizens, Cedar Bluff
3 Association of Retarded Citizens, Prince William
4 CPAC, Cumberland
5 Central VA AAA, Lynchburg
6 Chesapeake Bay AAA, Urbanna
7 Chesterfield CSB, Chesterfield
8 District III Governmental Coop., Marion
9 Eastern Shore AAA/CAA, Onancock
10 Eastern Shore CSB, Nassawadox
11 Foster Grandparents, Petersburg
12 Goochland Fellowship & Family Services
13 Grafton School, Berryville
14 Greater Richmond Red Cross, Richmond
15 Lake Country AAA, South Hill
16 Mountain Empire Older Citizens, Big Stone Gap
17 Mountain Empire Services of the SW, Radford
18 New River Valley Senior Service, Pulaski
19 Northwestern Community Services, Front Royal
20 Peninsula AAA, Newport News
21 Rappahannock AAA, Fredericksburg
22 Rappahannock-Rapidan CSB, Culpeper
23 Senior Services of SE VA, Norfolk
24 Shenadoah AAA, Front Royal
25 Southern AAA, Martinsville
26 Southside CSB, South Boston
27 Sussex,Emporia, Greenville Adult Activity Svcs.
28 Valley Program for Senior Svcs, Waynesboro
Equipment Description
(1) 13 Pass Boc/Lift
(1) Raised Roof Van/Lift & (1) Center Aisle Van
(2) 13 Pass Boc/Lifts
(1) Center Aisle Van
(2) Center Aisle Vans
(1) 13 Pass Boc/Lift, (1) Center Aisle Van
(1) Center Aisle Van
(1) 20 Pass Boc/Lift
(1) Center Aisle Van
(1) 13 Pass Boc/Lift
(2) Center Aisle Vans & (1) Raised Roof Van/Lift
(1) Center Aisle Van
(1) Center Aisle Van
(1) Raised Roof Van/Lift
(1) Center Aisle Van, (1) 13 Pass BOC
(2) 13 Pass Boc/Lifts
(1) Center Aisle Van
(3) Center Aisle Vans
(1) Center Aisle Van
(1) Center Aisle Van, (1) Raised Roof Van/Lift
(2) Center Aisle Vans, (1) Raised Roof Van, (1) 13 Pass BOC
(1) Raised Roof Van/Lift
(1) 13 Pass Boc/Lift
(1) Center Aisle Van
(2) Center Aisle Vans, (1) 7 Pass RR Van, (1) 13 Pass BOC
(1) 13 Pass Boc/Lift
(1) 13 Pass Boc/Lift
(1) Center Aisle Van
Total Cost
$45 000
$71 000
$9O 000
$33.000
$66 000
$78 000
$33,000
$55 000
$33 000
$45 000
$103.000
$33 000
$33 000
$37 000
$78,0O0
$90,O00
$33,000
$99,000
$33,000
$70,000
$148,000
$33,000
$45,O00
$33,000
$145,000
$45,0O0
$45,000
$33,000
Totals: $1,685,000
Section5310Unobliga~dBa~nce:
Section 6310
Funds
$36,000
$56,800
$72,000
$26 400
$52 800
$624OO
$26 4OO
$44 000
$26 400
$29 728
$82 400
$26 400
$26400
$29 600
$62400
$72000
$26400
$79 200
$26 400
$56,000
$118,400
$26,4O0
$36,0O0
$26,400
$116,000
$36,O00
$36,000
$26,400
$1,341,728
$$~235
PUBLIC TRANSPORTATION FEDERAL SECTION 5310 PROGRAM
240
~"~ ~(Con. q~#~nA~qa~n ~A?r Qus~//mprov~m~ntPro. qram)
~an~porta~n £nh~nc~m~n! Pro. qram
~ansporta~n $a£ety /~pro vement Pro. qram
Route 58 CorridorDevelopment Pro. qram
R~?/andPub/ic