HomeMy WebLinkAboutSUB201600206 Review Comments Appeal to BOS 2017-07-18COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Dunlora Park - Road Plans Project file number: SUB201600206 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Dunlora Investments LLC [alan@riverbenddev.com] Date Received: 24 October 2016 Rev. 1 Date Received: 19 Jan 2017 Rev. 2 Date Received: 22 Feb 2017 Rev. 3 Date Received: 10 Apr 2017 Rev 4 Date Received: 20 Jun 2017 Date of comments: 15 December 2016 Rev. 1 comments: 22 Feb 2017 Rev. 2 comments: 24 Mar 2017 Rev 3. Comments: 05 May 2017 Rev 4. Comments: 18 July 2017 Scott, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) Can't approve until WPO 201700035 is approved and VDOT is approval is received. 1. The typical road section on Sheet 6 does not appear to match the layout. The sidewalk and the planting strips are opposite between the layout plan and the detail. Please revise. Also, please show the slope of the road on the detail (1/4":1). Rev. 1 : Comment addressed. 2. The drainage divides are shown on Sheet 9, but they are not labeled. Please show DA labels within the divides. Rev. 1 : Comment addressed. 3. Storm structure 18 is shown as a DI -313 on the plans, but a DI -3C in the inlet calculations. Please clarify. Rev. 1 : Comment addressed. 4. Please label the type of entrances and provide details for the Varick Street entrance as well as the shared driveway entrances. Rev. 1 : Please provide details for these entrances. Rev. 2: Comment not addressed. Rev. 3 : Comment addressed. 5. Please provide pavement markings and speed limit signs. Rev. 1 : Comment addressed. 6. Please provide retaining wall details Rev. 1 : Comment addressed. 7. Please specify the type of concrete in the sidewalk detail on Sheet 6. (3000psi @ 28 days or stronger) Rev. 1 : Comment addressed. 8. Rev. 1: Please provide a signed and dated professional seal on the plans. Rev. 2: Comment not addressed Rev. 3 : Comment addressed. 9. Rev. 2: Please remove the sanitary sewer and laterals in the western end of the site that are not serving any lots. Rev. 3 : Comment addressed. 10. Rev.2 : Remove the note labeled, "area reserved for future development." This was not shown on Engineering Review Comments Page 2 of 3 the approved initial site plan or preliminary plat. Rev. 3 : Comment addressed. 11. Rev 2: The WPO plan must be revised to show the proposed storm drain on the western end of the site. Rev. 3 : Comment addressed. Planning (Chris Perez) 1. Comments attached at the end of this letter. Rev. 1 : Currently under review; comments pending. Rev. 2: Currently under review; comments pending. Rev. 3: See attached comment letter. Rev. 4: No ojections. VDOT (Adam Moore) 2. Comments provided by email on 12/6/16 from Willis Bedsaul. They are also attached at the end of this letter. Rev. 1 : Comments provided by email on 2/2/17 from Willis Bedsaul. They are also attached at the end of this letter. Rev. 2 : Comments provided by email on 3/17/17 from Willis Bedsaul. They are also attached at the end of this letter. Rev. 3: Approved. See attached letter. Rev.4 : See attached comment letter. Fire Rescue (Robbie Gilmer) 1. Fire flow test required before final approval. Please attach a copy to the final copy of plans. Rev. 1 : No objections. ACSA (Jeremy Lynn) 1. Currently under review by ACSA. Rev. 2: Approved. Rev. 3: Currently under review. Rev. 4: approved. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Engineering Review Comments Page 3 of 3 Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hiq2://www.albemarle.org/deptforyns.asl2?department--cdengno If you have any questions or concerns, please contact me either by email (ecox@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II File: SUB201600206 Dunlora Parl, Road Plans COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner July 06, 2017 Emily Cox County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2016-00206- Dunlora Park — Road & Utility Plan Review #4 Dear Ms. Cox: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, Dunlora Park Road and Utility dated October 24, 2016, and revised on May 30, 2017, and offers the following comment. Land use 1. Current design doesn't meet connectivity requirements; please see Road Design Manual appendices B (1), SSAR, page 14, section 30-92-60 for reference. The regulation requires that new developments provide connectivity between adjacent developments and undeveloped parcels. If the proposed lots are served by a connection to Varick St. this requirement will be satisfied as there is not enough property frontage to provide an additional entrance that meets the Access Management regulations. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis C. Bedsaul at (434) 422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, N4�m- . �ov Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency WE KEEP VIRGINIA MOVING