Loading...
HomeMy WebLinkAboutSDP201700032 Action Letter 2017-07-21COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 5, 2017 Scott Collins 200 Garrett Street, Suite K. Charlottesville VA 22902 RE: SDP201700032 Dunlora Park Phase II- Initial Site Plan Mr. Collins: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services Virginia Department of Transportation (VDOT) Albemarle County Transportation Planner Albemarle County Department of Fire Rescue Albemarle County Information Services (E911) Albemarle County Service Authority (ACSA) Albemarle County Building Inspections Albemarle County Engineering Services [to be forwarded once received] Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee (SRC) has attempted to identify all issues that will be required to be resolved prior to final site plan approval. The lead reviewer will either approve with conditions or deny the initial site plan within 15 days of the site review meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. 2. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the site shall be required prior to final site plan and/or final plat approval. VDOT's comments are substantial and may cause the project to be disapproved if they cannot be rectified. Please continue working with VDOT to address their comments. 3. [4.6.4, 4.19, 32.5.2(a)] Rear Yards. The required 20 feet min rear setback shall be measured from the edge of the alley right-of-way or easement. Depict, label, and dimension this setback for all lots. 4. [14-303(e)] On the final plat depict and dimension an alley easement and label it as " feet Alley Easement to Benefit Lots 30-40 ". Also, provide a maintenance agreement for review and approval by the County Attorney's office. 5. [32.5.2(n), 4.12.15(8)] Curb and gutter in parking areas and along travelways. Curbs shall be established at the edges of parking areas or access aisles in all townhouse developments requiring eight (8) or more parking spaces. Gutters shall be required where necessary to control or direct stormwater runoff. Prior to final site plan approval revise appropriately. 6. [4.7(c)3] Open Space. A minimum of twenty five (25) percent of the site shall be open space. Not more than eighty (80) percent of the minimum required open space shall consist of the following: preserved slopes and land devoted to stormwater management facilities. The remaining open space provided does not appear to meet this requirement. Prior to final site plan and/or final subdivision plat approval provide a chart to verify the amount of open space. This information was provided on the road plans for phase I, please revise and update it for the entire development to include phase I and II. 7. [32.5.1(c), 4.12.61 Dimensions. Proposed driveways are 16 feet wide; however, the minimum width for a single parking space is 9 feet. Revise the driveways to be a minimum of 18 feet wide. Depict, label, and dimension the two required parking spaces per lot. 8. [4.12.17(c)(1)] Vehicle access aisle standards. The cutsheet for the two-way alley does meet minimum width of 20 feet for a two-way travelway. Revise. 9. [4.12.6] Guest spaces shall be marked. Provide signage. 10. [32.5.1(c), 4.19] Setbacks. Depict, label, and dimension the existing structures on TMP 61-165C to that of Lot 40 Memorandum To: Scott Collins From: Christopher P. Perez, Senior Planner Division: Planning Date: July 5, 2017 Subiect: SDP201700032 Dunlora Park Phase II- Initial Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. 2. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the site shall be required prior to final site plan and/or final plat approval. VDOT's comments are substantial and may cause the project to be disapproved if they cannot be rectified. Please continue working with VDOT to address their comments. 3. [4.6.4, 4.19, 32.5.2(a)] Rear Yards. The required 20 feet min rear setback shall be measured from the edge of the alley right-of-way or easement. Depict, label, and dimension this setback for all lots. 4. [14-303(e)] On the final plat depict and dimension an alley easement and label it as " feet Alley Easement to Benefit Lots 30-40 ". Also, provide a maintenance agreement for review and approval by the County Attorney's office. 5. [32.5.2(n), 4.12.15(8)] Curb and gutter in parking areas and along travelways. Curbs shall be established at the edges of parking areas or access aisles in all townhouse developments requiring eight (8) or more parking spaces. Gutters shall be required where necessary to control or direct stormwater runoff. Prior to final site plan approval revise appropriately. 6. [4.7(c)3] Open Space. A minimum of twenty five (25) percent of the site shall be open space. Not more than eighty (80) percent of the minimum required open space shall consist of the following: preserved slopes and land devoted to stormwater management facilities. The remaining open space provided does not appear to meet this requirement. Prior to final site plan and/or final subdivision plat approval provide a chart to verify the amount of open space. This information was provided on the road plans for phase I, please revise and update it for the entire development to include phase I and II. 7. [32.5.1(c), 4.12.61 Dimensions. Proposed driveways are 16 feet wide; however, the minimum width for a single parking space is 9 feet. Revise the driveways to be a minimum of 18 feet wide. Depict, label, and dimension the two required parking spaces per lot. 8. [4.12.17(c)(1)] Vehicle access aisle standards. The cutsheet for the two-way alley does meet minimum width of 20 feet for a two-way travelway. Revise. 9. [4.12.6] Guest spaces shall be marked. Provide signage. 10. [32.5.1(c), 4.19] Setbacks. Depict, label, and dimension the existing structures on TMP 61-165C to that of Lot 40 11. [Albemarle County Engineering Design Standards Manual] Retaining Walls. Safety provisions for vehicles and pedestrians is required for all walls over 2.5 feet tall. This requirement can be met w/ a guardrail or fencing. Due to the presence and proximity of residential units, it is strongly recommended that the applicant utilize both guardrail and fencing to prevent children from being injured. Label and dimension such improvements on the final site plan. 12. [32.5.1(c), 4.191 Setbacks. On sheet 1 under Setbacks, label it as `Non -Infill Setbacks". 13. [15.3] Density. On sheet 1 under Density, label the development as "Bonus Level Cluster Development" and provide a label "No minimum lot size". 14. [32.5.1(c)] An offsite sanitary sewer easement is required on TMP 62F -C owned by Robert Hauser Homes, Inc. to serve the development. Prior to final site plan and/or final subdivision plat approval the required offsite easement shall be platted. The DB page information of this action shall be provided on the final site plan. 15. [32.8.2] Infrastructure improvement plans. All infrastructure required to construct phase II shall be review, approved, and built or bonded before the final plat and/or final site plan approval. 16. [32.7.4.2] Easements for stormwater management facilities. Provide access to the stormwater management facility. Also provide an easement over the facility and the access. 17. [32.5.2(n), 32.5.1(c)] Dimensions. On the plan depict and dimension the buildings and the garages. 18. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site plan. 19. [32.5.1(c)] Dimensions. Depict, label, provide acreages, and proposed property lines for Open Space A and Open Space B. 20. [32.5.2] Phase lines. Provide proposed timing of phase II development. 21. [32.5.2(a)] General information. Provide the names of owners, the zoning, and present use of abutting parcels. 22. [Comment] Remove the proposed street tree and sidewalk that is located in the entrance of the alley. Additionally, provide ADA compliant sidewalk connections at the entrance to the alley. 23. [Comment] Continue the sidewalk fronting Rio to the property line. 24. [32.5.2(a)] General information. Revise the zoning to include Airport Impact Area (AIA). 25. [32.5.2(1)] Existing and proposed utilities. Depict and label the location of all existing and proposed utilities, including electric, telephone, gas, and cable. 26. [Comment] Adjacent Residential Neighborhood Concerns. Staff has received the attached petition and letter dated June 30, 2017 from concerned citizens of surrounding neighborhoods. The primary concerns identified in the letter relates to traffic (the existing traffic patterns and proposed entrance onto Dunlora Drive and how it will affect traffic). Additionally, the density and the type/size of units compared to that of other nearby development is of concern. This letter has also been provided to VDOT for consideration in the spacing exception request. Please contact Christopher P. Perez in the Planning Division by using cperezkalbemarle.org or 434-296-5832 ext. 3443 for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner June 23, 2017 Christopher Perez Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2017-00032- Dunlora Park — Phase II Townhouse- Initial Site Plan Review #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated May 22, 2017, and offer the following comments: 1. The proposed entrance on Dunlora Drive does not meet the 225 ft. corner clearance standard. An approved Access Management exception would be required. 2. The Department recommends providing access to these residences via proposed Varick St. as noted in the review letter for Phase I dated November 30, 2016. Additionally Phase I is not currently eligible for acceptance into the secondary street system as it does not meet SSAR connectivity requirements. If access is provided to Phase II via Varick St. Phase I will meet these requirements and become eligible. 3. Current design doesn't meet connectivity requirements; please see Road Design Manual appendices B (1), SSAR, page 14, section 30-92-60 for reference. The regulation requires that new developments provide connectivity between adjacent developments and undeveloped parcels. If the proposed lots are served by a connection to Varick St. this requirement will be satisfied as there is not enough property frontage to provide an additional entrance that meets the Access Management regulations. 4. Please show mill and overlay on plans in accordance with the WP -2 standard and place the standard on the plans. 5. The mill and overlay will require work to centerline, so flagging operation will be necessary. Please provide an MOT plan in accordance with the Virginia Work Area Protection Manual. 6. Commercial entrance design to serve a Private Subdivision Road/Street. Please see Road Design Manual appendix F -Access Management design standards for entrances and Intersections, figure 4-8 and F-123, for an Entrance for a Private Subdivision Street. The minimum entrance radius is 25 ft. and the shoulder should be extended to the right of way line. WE KEEP VIRGINIA MOVING June 23, 2017 Christopher Perez Page 2 Please note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, liV�a�LC� Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency WE KEEP VIRGINIA MOVING Review Comments for SDP201700032 Project Name; Dunlora Park - Phase II Townhomes - Initial Date Completed: Friday, June 30, 2017 Department/Division/Agenc Reviewer; Kevin McDermott � DDD Plannina I have reviewed the above referenced Initial Site Plan and am unable to recommend for or against the spacing exception required for the entrance of the proposed development. These intersections include Rio Road and Dunlora Drive, and Rio Road and John Warner Parkway. I recommend submittal of a traffic analysis of impacts at these locations to insure the spacing exception required to access Dunlora Drive will not further degrade safety or operations at these intersections. Sevin McDermott Principal Planner - Transportation Albemarle County Review Comments for SDP201700032 In Project Name; Dunlora Park - Phase II Townhomes - Initial Date Completed; Monday, June 1 , 2017 Reviewer; Robbie Gilmer Department/Division/Agency: Fire Fescue approval, please attach to final plans. on both sides. 11 County of Albemarle Department of Community Development`_ 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SDP201700032 TMP: 06100-00-00-16500 DATE: 6/2/2017 FROM: Elise Kiewra ekiewra@albemarle.orq Geographic Data Services (GDS) www.albemarle.org/qds (434) 296-5832 ext. 3030 The following road will need a name: ALLEY A Note: As this will be a main access even if the houses front Rio it will need a road name as emergency vehicles stopping on Rio Rd could cause a safety issue as it is a main road with lots of traffic. This site will require a one (1) new private road name. Per Sec. 7-200-B of the County's Road Naming and Property Numbering Ordinance (Page 2 of PDF). "It is intended by this article that all roads within the county which serve or are designed to serve three (3) or more dwelling units or business structures shall be named." Please review the procedures in the Road Naming and Property Numbering Manual to decide upon a road name for the road accessing Old Lynchburg Road. We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: httDs://www.albemarle.ora/upload/imaaes/Forms Center/Departments/Geographic Data Service s/Forms/Road Namina and Property Numberina Ordinance and Manual.Ddf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ If you should have any questions, please do not hesitate to contact our office. Review Comments for SDP201700032 Project Name; Dunlora Park - Phase II Townhomes - Initial Date Completed: Tuesday, June 13, 2017 Departrnent/Division/Agenc Reviewer; Alexander Morrison I have reviewed the above referenced initial site plan and hereby recommend approval of SDP201700032 with the following conditions: • Water and Sewer Construction Plan Review will be required at the final site plan stage. Submit 3 copies of the final site plan along with water and sewer data sheets to the AA,Attn: Jeremy Lynn, PE, to begin the review. • Modification to approved Dunlora Park water and sewer utilities may be required based on the new layout. This can be handled through field changes with the contractor once this plan is approved. Alexander J. Morrison, P.E. Civil Engineer Project Name; Dunlora Park - Phase II Townhomes - Initial Date Completed. Monday, June 12, 2017 Deparkment/Division/Agenc Reviewer. Michael Dellinger �] DDD Insnections County of Albemarle Department of Community Development Memorandum To: Christopher Perez From: Emily Cox Date: 05 Jul 2017 Subject: Dunlora Park — Phase II Townhomes - ISP (SDP201700032) The initial site plan for Dunlora Park — Phase II Townhomes has been reviewed by Engineering. The following comments need to be addressed: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. WPO Plan 201600058 used forest and open space to meet water quality requirements. If this plan removes some of that forest & open space, the water quality for that site needs to be addressed. 3. VDOT entrance permit required for alley entrance on Dunlora Drive. 4. Label the type of proposed entrance on Dunlora Drive and provide detail. Radius appears too small to meet VDOT standards. 5. Driveways should be 18' wide, not 16' since the cover sheet states that two parking spaces are provided for each dwelling. (County Code section 18-4.12.16) 6. Proposed slopes steeper than 3:1 must specify low maintenance ground cover (not grass). (Design Standards Manual, Section 8) 7. Provide notes for critical slopes that reference the exhibit by Roudabush, Gale & Associates. 8. Retaining wall designs must be provided for engineering review.(Design Standards Manual, Section 8) 9. Provide profile of road. 10. Show pavement markings. 11. Show all street signs (speed limit, no parking, etc). Stop sign was shown. 12. Ensure there is a sufficient turn -around at the end of the road. 30 June, 2017 Attn: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Re: Dunlora Park Phase II — Initial Site Development Plan SDP201700032 Attachment: Daily Progress article dated 18 June 2017 citing growth and traffic along Rio rd. Dear Sirs, We, the undersigned, have received your notification regarding the Site Review of Dunlora Park Phase II. We feel as neighbors, and those most affected by the new development that our comments are relevant and will hopefully receive consideration in your review. Our opposition to the Phase II proposal falls in to two categories: 1. DENSITY. The proposed eleven unit afterthought is compacted into an area that in the phase one proposal only included two units. An example of this density is not found anywhere in the area and especially not fronting a busy thoroughfare such as Rio Rd. The nearest example might be the duplexes on Hydraulic Rd, but they are built on a separate access road. We do not believe that this plan is in keeping with the surrounding housing and development. 2. TRAFFIC CONCERNS. A. Exit from Dunlora Dr. onto East Rio rd is already difficult. The traffic line that builds up from the light at John Warner pkwy blocks the intersection to Dunlora Dr. despite signage that warns against blocking the intersection. This intersection serves as the southern exit point for nearly 400 residences in Dunlora, 20 from Shepard's Ridge, and because of the difficulty in making a left turn out of Belvedere, many of the 700 residents opt to drive through Dunlora to access east Rio Rd at this intersection. B. The proposed access to the row homes is an alley that will be very close to the Rio Rd. intersection and Varick St. (the main entrance to phase one). School buses, trash trucks, UPS trucks and the like will need to access this alley and likely back up the traffic to Rio Rd. Will emergency service vehicles be able to access this alley? C. There is already a visibility problem at the intersection of Rio Rd. due to the hill that blocks the view of coming traffic. This row of homes, pushed forward on the lot to create room for the alley behind it, will further impede visibility and compromise safety. The attached article highlights many of the ongoing and future developments along our portion of Rio rd., as we are sure you are well aware. The development of this intersection, as proposed, will limit the County's and VDOT's ability to further improve this intersection and traffic problems from this growth. We ask for disapproval of this plan and hope that any future plans will address our concerns with the Rio/ Dunlora intersection. Respectfully, Aams It Address Signage , J V�� -� �C-s9,,r, Cr 2n� � y Ste !-E�F�S W 'C� l.�'� `z�� C��1 �S Jit V►"� L4,dsol- I3zCA4*`" C 1, k ht/V4 ..... �IJC— S r i Y) CbL :b�] J , US c� � w G✓GG�ILC�[8� �� C �� Y� c� �^ GG2.0 V�� -� 930 C114tj�X OWS a� Rio Road traffic concerns persist as more growth planned BY ALLISON WRABEL • Jun 18, 2017 "Residents in the Rio Road area of Albemarle County are concerned about traffic, and more development is expected to come online in the near future. Along East Rio Road, more than 700 new housing units have been approved or are in the process of seeking approval. There are commerciai developments that also have been proposed, including the new Senior Center Inc project, the Center at Belvedere, as well as a Soccer Organization Charlottesville Area complex and a new hotel. Last week, Supervisor Brad Sheffield held a community meeting, attended by about 20 people, to discuss concerns related to the developments and how the county is working to solve traffic issues. Sheffield said he wanted to hold the meeting to get ahead on some issues, as well as to document more concerns for the correct entities. Representatives from the county's community development department, the Albemarle County Police Department and the Virginia Department of Transportation were present to answer questions and take notes on concerns. "Sometimes, the answer is just that there's nothing we can do, but at least you know that we're aware of the problem," he said. "Sometimes, it's as simple as we don't have enough resources." Residents asked about the area where John W. Warner Parkway and Dunlora Drive connect to Rio Road, and expressed concerns about the short left turning lanes with the expected additional traffic. Sheffield said he wished that the intersection had been designed differently with the expectations of the by right growth in that area. "I don't think we have a clear understanding OT now we can mitigate that area with the growth that is coming," he said. "[We] discussed a corridor study for that area, but it's only in its infancy. Hopefully, we'll get that going and try to get a better understanding of how we can handle the traffic." wo intersections along Rio Road where traffic signals have been repeatedly sought by residents, Putt Putt Place and Belvedere Boulevard, were mentioned at the meeting. Along Putt Putt Place, a developer is seeking permits to build a hotel and an apartment building near the current Arden Place apartments. "They're working on Arden Place II up front," said Kevin McDermott, Albemarle's principal planner for transportation. "We are seeing what the application says is a potential hotel and residential units. The hotel will be maybe around 120 rooms, and an apartment building of around 150 units, all right there at the Putt Putt Place." That intersection previously has not met VDOT's warrants to install a traffic signal. "That developer is working on a traffic study right now, so we don't yet know exactly what the configuration of that intersection's going to need to be to handle the additional traffic that will be produced by that development," VDOT spokesman Lou Hatter said. Hatter said they are also continuing to look at the Belvedere Boulevard and Rio Road intersection due to new developments. "It's very possible in the near future that we're going to have to look at some different type of traffic alternatives at that intersection," he said. "I'm not going to say `signal'; a signal may not be the best answer, but there may be a need to make some change." Another area of concern mentioned was the difficulty in getting to the Rio Hill Shopping Center after turning right onto U.S. 29 North from the Albemarle Square shopping center or Rio Road. Residents at the meeting said it is hard to cross traffic coming from underneath the Rio Road intersection to get to the left turning lane to enter Rio Hill, and many people are using Woodbrook Shopping Center as a cut - through. Hatter said another way to get to the shopping center is to continue on Rio Road over U.S. 29, tum right onto Berkmar Drive and then turn right onto Woodbrook Drive. "To a certain extent, part of this is redistributing the traffic based on new road options," he said. `That's what we tried to do. We did not have carte blanche to build a new roadway. We worked within the limitations of what we had available, and we tried to craft a solution that moved the regional traffic, as well as the local traffic." Speeding and increased traffic on Huntington Road, which had been used as a cut -through during the construction of the Rio Road grade -separated intersection, was discussed. "We can do another study on Huntington that will not only give us the amount or the number of cars that are more than 10 miles per hour over the speed limit, it will also give us the volume of traffic, which we can go back and compare to the volume study we did, preconstruction," Albemarle Police Lt. Miller Stoddard said." Allison Wrabel is a reporter for The Daily Progress. Contact her at (434) 978- 7261, awrabel@dailyprogress.com or @craftypanda on Twitter.