HomeMy WebLinkAboutARB201700070 Checklist 2017-07-26HNM
7/26/17
F. Additional material
1 ® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision,
and contact information for the firm preparing the drawings in the title block on all drawings.
2 ® Provide labeled, color 8-'/i' x 11" photos of the site as seen from both directions on the Entrance
Corridor.
3 ❑ Any additional material that will make the review more productive. Clarification of topography,
visibility, utilities, landscaping, or other unique or unusual conditions are welcome.
Application is complete
Revised 6/10/10 — 1
Completeness Check
COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS
Building Permits where the change is 50% or less of the altered elevation
Project name: ARB2017-70 Ashley Furniture fagade renovation
1 ®
Submittal packages must contain 2 collated & folded copies of all info unless otherwise stated.
A. Written description of the proposal
10
Provide a general description of all proposed work.
2 b1
Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
— Commented [HM1]: Not provided, but the renovation is
consistent with previously approved renovations on other storefronts
B. Site plan/Sketch plan showing the following (drawn to the scale of 1"=20', clearly legible):
within the shopping center
1 ®
Location of all proposed changes in relation to the Entrance Corridor street.
2 F❑1
If mechanical equipment or accessory structures are altered or added then identify those
__- Commented [HM2]: N/A
features, their locations, and screening that will eliminate visibility from the Entrance Corridor.
0. Landscape plan showing the following (drawn to the scale of 1"=20' clearly legible):
— Commented [HM3]: N/A
1 ❑
Existing landscaping to be removed. Include the location, size, and species.
2 ❑
Proposed landscaping.
3 ❑
Landscape schedule indicating plant species with common and botanical names, plant quantity,
size at planting, and symbol used.
D. If new lighting is proposed or existing lighting will be modified, provide a lighting plan showing
the following (drawn to the scale of 1 "=20' and clearly legible):
1 ®
Location of all proposed building and site lighting.
20
Manufacturer's cut sheets with a diagram of the proposed fixture(s) sufficient to determine if it is a
full cutoff fixture. Include cut sheets as a separate sheet of the site plan set.
3 ®
Lighting schedule identifying all proposed light fixtures, poles and brackets. Identify illumination
type, intensity, style, shielding, color, finish, and installation height.
4 ®
Photometric plan addressing all fixtures and indicating that lighting meets the requirements of
section 4.17 of the Zoning Ordinance. ILLF must equal 1.0.1
Commented [HM4]: Not given
E. Appearance of the proposed building(s)
1 ®
Architectural elevations of the proposed building(s). Elevations must be drawn to the scale of at
least 1/8"=1'-0". Include existing condition and proposed changes. Include a building materials
schedule and key.
2 ❑1
One set of all building material samples and colors.
Commented [HMS]: Not provided, but materials schedule and
3 ®
A floor plan adequate to show exterior walls, windows and doors.
key on the architectural elevations suffice.
F. Additional material
1 ® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision,
and contact information for the firm preparing the drawings in the title block on all drawings.
2 ® Provide labeled, color 8-'/i' x 11" photos of the site as seen from both directions on the Entrance
Corridor.
3 ❑ Any additional material that will make the review more productive. Clarification of topography,
visibility, utilities, landscaping, or other unique or unusual conditions are welcome.
Application is complete
Revised 6/10/10 — 1
ARB2017-70: Ashley Furniture facade renovation
HNM
7/26/17
LIGHTING PLAN REVIEW CHECKLIST
CHECKLIST
ITEM
NOTES
Cut sheets
Lumen level (3000 or more must be full cutoff)
OK: lumens = 1596
Bulb/lamp location (must be totally within house
to be full cutoff)
OK: Holophane flat glass model = full cutoff
Luminaire schedule
❑
Catalog # coordinated with cut sheets
OK
Fixture quantity/types coordinated with
quantity/types on lighting plan
Quantity not given on lighting schedule but 15 shown
on lighting plan
Pole height/mounting height (ARB)
N/A: recessed lights
Colors/finishes (ARB)
OK: white casing will not be seen from EC
Tilt (must be 0 for full cutoff)
N/A: recessed lights
Fixture locations
Location conflicts with trees, utilities, etc.
N/A: recessed lights
❑
Coordination with other site plan sheets
N/A: recessed lights
❑
Shielding issues (freestanding signs, wall fixtures,
etc.)
N/A: recessed lights in ceiling of arcade
Photometric plan
❑
Adjacent zoning
N/A
❑
Property lines
Footcandle (fc) value = 1.5 at the storefronts'
boundaries
❑
Excessive spillover
OK
❑
Excessive lighting levels (ARB)
OK: highest value is 6 fc
Maintenance factor = 1.0
Not given, but highest fc value = 6, well below ARB
maximum of 20 fc
❑
Standard lighting notes: Each outdoor luminaire
equipped with a lamp that emits 3,000 or more initial
lumens shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away from
adjoining residential districts and away from adjacent
roads. The spillover of lighting from luminaires onto
public roads and property in residential or rural areas
zoning districts shall not exceed one-halffootcandle.
N/A: light emittance under 3,000 lumens
ARB2017-70: Ashley Furniture fagade renovation
HNM
7/26/17
COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS
Building pen -nits in which the proposed change occupies 50% or less of the altered elevation
DESIGN
CRITERIA
Proportion
Alteration must be in proportion with the existing
OK: alterations are consistent with previously approved and
elevation.
recently completed fagade renovations to other storefronts
Roof form
Roof form must be consistent with the existing patterns
OK: the change from a pitched roof broken by a pediment to a flat
of scale and proportion of the roof form of the existing
roof with a parapet is consistent with previously approved and
building.
recently completed facade renovations to other storefronts
Materials
Materials must be consistent with the existing patterns
OK: all proposed materials will match existing; no vinyl proposed
of scale and proportion of the existing materials. No
new vinyl.
Colors
Colors must be coordinated with existing colors.
OK: all proposed colors will match existing
Planting
Trees and shrubs may be required to integrate the
N/A
alteration into the building and site.