Loading...
HomeMy WebLinkAboutSUB201600196 Review Comments Road Plan and Comps. 2017-07-27COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22761 Charles A. Kilpatrick, P.E. Commissioner July 17, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Matthew Wentland, P.E. Re: North Pointe — Route 29 Improvement Plan (Lewis & Clark Drive) SUB-2016-00196 Review #2 Dear Mr. Wentland: The Department of Transportation, Charlottesville Residency Transportation and Land Use and Traffic Engineering Sections, have reviewed the above referenced plan as submitted by Collins Engineering, revised 19 April 2017, and offers the following comments: Land Use 1. Provide weave analysis showing that the U-turn spacings are adequate for all existing and proposed conditions. 2. Provide merge/queueing analysis for U-turn movements demonstrating acceptable levels of service and appropriate storage lengths. 3. Provide Auto -turn diagrams for a WB-67 for all movements of the RCUT. 4. Is the additional right -turn lane onto Route 29 SB necessary? This may complicate the merge and weave for NB traffic from Lewis & Clark Drive. 5. Show more detail regarding the right turn lane and entrances on the west side of Route 29 south of Lewis & Clark Drive, including further detail of existing pavement widths in this area. 6. The proposed U-turns do not appear to sufficiently restrict traffic to one direction. 7. The proposed CMP pipe exiting through the retaining wall at Structure R4 should be RCP, not CMP. 8. Note #1 on Sheet 3 references signal warrant analysis; what is the timing and/or trigger in performing that analysis? 9. Prove time of concentration calculations; this can be provided separately. 10. Intersection sight distances, including profiles, must be shown for all movements at each RCUT intersection junction. 11. Provide detailed dimensions showing that the splitter-island at the proposed new subdivision entrance meets Appendix F design criteria; it should be offset from the future through lane. 12. CG-7 or CG-3 should extend to at least the edge of the clear zone at entrances along Route 29. VirginiaDOT.org WE KEEP VIRGINIA MOVING July 17, 2017 Matthew Wentland, F.E. Page 2 13. Please check all pavement marking and sign labels. All left -turn lane arrows are labeled "right -turn". I4. As noted in our 5 December 2016 email correspondence with Collins Engineering, design plans, including geotechnical report, for the proposed retaining wall along Route 29 must be approved by our Structure & Bridge Department; we have not received these plans to date. 15. The plan must show conformance with the VDOT Road Design Manual, as well as any other applicable standards, regulations or other requirements. Comments herein may not be exhaustive, particularly due to the amount and scale of requested revisions. Traffic 16. The splitter island should be narrowed so as to not encroach on the future thru lane while extending north far enough to block left turns out of the development. This could be accomplished by offsetting the SB left turn lane from the future SB thru lane and extending the splitter island further north. 17. Add note to the MOT plans stating that "All existing pavement markings shall be eradicated per TTC-55.1. Temporary pavement markings shall follow TTC-60.0 L" 18. MOT Plan Traffic Control note # 3 should state "current edition" vs. "May 2005" 19. MOT plan "NOTES" should include a note stating that "Contractor shall notify VDOT Northwest Regional Operations TOC 72 hours prior to any work at 540-332-9500". 20. Remove all guardrail or provide guardrail warrants per current VDOT standards. The current plans show guardrail in Iocations that are not warranted (example: at the removal of the signal pole at station 466+85). The use of guardrail increases hazards to the traveling public. All other efforts should made before the installation of guardrail to remove hazards or reduce slopes. Cross Sections, including additional shoulder width for guardrail installation, should be provided to review the guardrail warrants and constructability of the lanes. PIease provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, IV, - A4aZA­-- Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VcrginiaDOT_org WE KEEP VIRGINIA MOVING