Loading...
HomeMy WebLinkAboutWPO201400024 Action Letter 2017-05-10 pE �$�4111 County of Albemarle r Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper, Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 10 May 2017 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Out Of Bounds TMP: 060000-00-00-06500 SITE PLAN NUMBER: 2014-02400 FACILITY DESCRIPTION Type(s) and number of BMPs 2 —extended detention (incl.non-structural) #— [click to select type] Description of Outfall Drain to existing Storm system and existing stream (Ex:24"RCP from 36"CMP riser) ; channel Water Quality ® Yes n No Design Storm ® 10yr ® 2yr Any Additional Information Two underground infiltration systems (incl.stream buffer mitigation) Q (PAVi i7 A copy of the site plan and details of the BMP(s) are attached. r> . ,- 4 k ` CJ' - °i 1(x�t "% F.ait�(,•,� /i J f J`.k I '.° ,..7 1.4.) '` c 'S 1f,1"7 L.l,.\)// L' 4s f( ,C l'po 12. 7, p g.f. / (1.5, C.t� M r-, p,c< �� ' t`l �. l-3OIC.)y 0 j-(o'C_)5 I:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc