HomeMy WebLinkAboutWPO201400024 Action Letter 2017-05-10 pE
�$�4111
County of Albemarle
r Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper, Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 10 May 2017
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Out Of Bounds
TMP: 060000-00-00-06500
SITE PLAN NUMBER: 2014-02400
FACILITY DESCRIPTION
Type(s) and number of BMPs 2 —extended detention
(incl.non-structural) #— [click to select type]
Description of Outfall Drain to existing Storm system and existing stream
(Ex:24"RCP from 36"CMP riser) ; channel
Water Quality ® Yes n No
Design Storm ® 10yr ® 2yr
Any Additional Information Two underground infiltration systems
(incl.stream buffer mitigation)
Q
(PAVi i7
A copy of the site plan and details of the BMP(s) are attached. r> . ,- 4 k `
CJ' - °i 1(x�t "% F.ait�(,•,� /i J f J`.k I '.° ,..7 1.4.) '` c 'S 1f,1"7 L.l,.\)// L'
4s f( ,C l'po 12. 7,
p g.f. / (1.5, C.t� M r-, p,c< �� ' t`l �.
l-3OIC.)y 0 j-(o'C_)5
I:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc