HomeMy WebLinkAboutSUB201600196 Review Comments Road Plan and Comps. 2017-07-28COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: North Pointe — Route 29 Improvement Plan Project file number: SUB201600196 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Neighborhood Investments NP, LLC [richard@neighborhoodprops.com] Date Received: 14 October 2016 (Rev. 1) Date of comments: (Rev. 1) 2 June 2017 22 December 2016 28 July 2017 Scott, We have reviewed the plans and have the following comments: Engineering 1. A VSMP plan will need to be submitted and approved for this area and the stream crossing before the road plans can be approved. The plan referenced for the stream crossing (WP0200900061) is no longer under review and has expired. A new application will need to be submitted and approved prior to approval of this plan, along with a mitigation plan and a floodplain development permit application. (Rev. 1) Response noted. 2. The changes proposed to Rt. 29 will require further discussion with VDOT and the owners of the properties on the western side of the intersection (who are currently looking over the plans). This may prompt additional comments from the County and VDOT. (Rev. 1) Response noted. 3. Engineered wall plans and calculations (signed and sealed) will need to be provided before the road plans are approved. (Rev. 1) Response noted. ACSA — Alex Morrison The plan is currently under review by RWSA (I have CC'ed Victoria). Once RWSA grants approval the applicant will need to submit 3 copies to the ACSA, Attn: Jeremy Lynn, PE, along with water/sewer data sheets. Once received, the ACSA will process an approval package and I will recommend approval to the county. Comments have not yet been received from Planning. Fire Rescue and ARB currently have no objection to the plans. VDOT comments were emailed on 7/17/17. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Engineering Review Comments Page 2 of 2 Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; ht!p://www.albemarle.or,-/deptforms.asp?department=cden,izwpo If you have any questions or concerns, please contact me either by email (mwentland@albemarle.orc) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer H File: SUB201600196 North Pointe Rt29 Improvements Road Plans review comments rev 07-28-17.doc