Loading...
HomeMy WebLinkAboutSUB201700101 Review Comments Final Site Plan and Comps. 2017-07-31COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Wintergreen Farm - Road Plan Amendment Project file number: SUB201700101 Plan preparer: Scott Collins, Collins Engineering [Scot@Collins-engineering.com] Owner or rep.: Riverbend Development Company [Alan@riverbenddev.com] Date Received: June 21, 2017 Date of comments: July 31, 2017 Mr. Collins, We have reviewed the plans and have the following comments: Engineering 1. WPO Plan amendment will be required prior to Road Plan approval. Must demonstrate increased impervious area conforms to water quality and quantity requirements. Planning — Rachel Falkenstein 1. The density bonus will require Planning Commission approval (per section 13.4.3). Please provide a written justification for the proposed bonus for staff to provide to the Planning Commission for consideration. Include information such as whether the easement will be for public use, who will maintain the path, what, if any transportation and/or planning documents recommend a path in this location (Comp Plan, Master Plans, LRTP, etc.) 2. It is difficult to determine from the road plans if the easement will cross any previously approved lots. An easement plat will be required over areas already platted. For future phases, the easement can be reviewed with final plat. Fire and Rescue — Shawn Maddox 1. No Objection VDOT — Adam Moore 1. The Maintenance of Traffic plan should include both the notes and standards, as well as the figure, from the Virginia Work Area Protection Manual. ACSA — Alexander Morrison 1. No Objection Sincerely, Bobby Jocz Civil Engineer I