Loading...
HomeMy WebLinkAboutWPO201400054 Action Letter 2016-11-21 OAF PPG�P� 5 x`' : (O•• SE County of Albemarle 5 Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper,Water Resources Manager From: [click to select] £!&-; Division: Inspections—E&S Co trol Date: 11-21-16 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Grace Estates Winery TMP: 04pO0— ®ba 00-- 024, 230 SITE PLAN NUMBER: LOP° —424l --CO 5(t FACILITY DESCRIPTION Type(s) and number of BMPs 1 —biofilter (incl.non-structural) #— [click to select type] Description of Outfall 15" PVC from cast in place concrete box (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ® 1Oyr (l 2yr Any Additional Information Discharges into a Stream Buffer, with a level (incl.stream buffer mitigation) spreader 6-o?/—!'� A copy of the site plan and details oof the BMP(s) are attached. /;-`-> 5u) h6tc.ith1i; r 12 6c.4.) /c / 7- ,;)s /1c (:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc