HomeMy WebLinkAboutWPO201400054 Action Letter 2016-11-21 OAF
PPG�P� 5 x`' :
(O••
SE
County of Albemarle
5 Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper,Water Resources Manager
From: [click to select] £!&-;
Division: Inspections—E&S Co trol
Date: 11-21-16
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Grace Estates Winery
TMP: 04pO0— ®ba 00-- 024, 230
SITE PLAN NUMBER: LOP° —424l --CO 5(t
FACILITY DESCRIPTION
Type(s) and number of BMPs 1 —biofilter
(incl.non-structural) #— [click to select type]
Description of Outfall 15" PVC from cast in place concrete box
(Ex:24"RCP from 36"CMP riser)
Water Quality ® Yes ❑No
Design Storm ® 1Oyr (l 2yr
Any Additional Information Discharges into a Stream Buffer, with a level
(incl.stream buffer mitigation) spreader
6-o?/—!'�
A copy of the site plan and details oof the BMP(s) are attached.
/;-`-> 5u) h6tc.ith1i; r 12 6c.4.) /c / 7- ,;)s /1c
(:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc