Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900030 Bond Estimates Stormwater Management Plan 2010-02-12
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Charlottesville First Church of the Nazarene PROJECT NUMBER: WPO- 2009 -00030 DATE OF ESTIMATE: 02/12/10 ESTIMATE BY: PBC BASED ON: Drawing signed 2/11/2010 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 6.8 1500 10200 SILT FENCE LF 680 5 3400 SAFETY FENCE LF 560 3 1680 TREE PROTECTION FENCE LF 1600 3 4800 DIVERSION DIKE LF 1220 3 3660 SEDIMENT TRAP 1 ACRES 0.96 1000 960 SEDIMENT TRAP 2 ACRES 2.8 1000 2800 SEDIMENT BASIN 1 ACRES 4.43 1000 4430 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 19 200 3800 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 150 10 1500 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 40330.00 project management 6049.50 subtotal 46379.50 CONTINGENCY LS 10% 4637.95 TOTAL 51017.45 BOND AMOUNT REQUIRED 51100.00