HomeMy WebLinkAboutWPO200900030 Action Letter 2016-10-27 41t10
GVN
ag? l'fro*W'
10%"
County of Albemarle
Department of Community Development
Memorandum
To: Ana Kilmer, Management Analyst
Greg Harper, Water Resources Manager
From: Kenny Thacker
Division: Inspections— E&S Control
Date: 10/27/2016
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Charlottesville Church of the Nazarene
TMP: 07900-00-00-01000
SITE PLAN NUMBER: WPO-2009-00030
FACILITY DESCRIPTION
Type(s) and number of BMPs 2 - biofilter
(inci non-structural) — [click to select type]
Description of Outfall 36" CMP with 24" barrrel pipe and 6" orifice
(Ex: 24" RCP from 36" CMF' riser) VDOT DI-I with 6" barrel pipe
Water Quality Yes [1] No
Design Storm fl l 0yr 2yr
Any Additional Information Two biotilters on site
(Ind stream buffer mitigation)
6-77-r/
A copy of the site plan and details of the BMP(s) are/attached.,
,3 IA> 1"6/- /1
I OF t onum11111, clorm,n, oinn [Find , '11,vr,,tot)to pont,ment nn in 11.c \Psi S I do.