Loading...
HomeMy WebLinkAboutWPO200900030 Action Letter 2016-10-27 41t10 GVN ag? l'fro*W' 10%" County of Albemarle Department of Community Development Memorandum To: Ana Kilmer, Management Analyst Greg Harper, Water Resources Manager From: Kenny Thacker Division: Inspections— E&S Control Date: 10/27/2016 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Charlottesville Church of the Nazarene TMP: 07900-00-00-01000 SITE PLAN NUMBER: WPO-2009-00030 FACILITY DESCRIPTION Type(s) and number of BMPs 2 - biofilter (inci non-structural) — [click to select type] Description of Outfall 36" CMP with 24" barrrel pipe and 6" orifice (Ex: 24" RCP from 36" CMF' riser) VDOT DI-I with 6" barrel pipe Water Quality Yes [1] No Design Storm fl l 0yr 2yr Any Additional Information Two biotilters on site (Ind stream buffer mitigation) 6-77-r/ A copy of the site plan and details of the BMP(s) are/attached., ,3 IA> 1"6/- /1 I OF t onum11111, clorm,n, oinn [Find , '11,vr,,tot)to pont,ment nn in 11.c \Psi S I do.