HomeMy WebLinkAboutWPO201300071 Action Letter 2017-04-06 0_
7
400,-
etott G�,PS County of Albemarle
Department of Community Development
t/° 5 Memorandum
.,: Ana Kilmer, Management Analyst
Greg Harper,Water Resources Manager
From: t] G i
Division: Inspections—E&S Control
Date: 4-6-17
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Collins Medical Center
TMP: 061W0-02-013-001A0
SITE PLAN NUMBER: WP0201300071
FACILITY DESCRIPTION
Type(s) and number of BMPs 2—manufactured BMP
(incl.non-structural) 1 —extended detention
Description of Outfall 15" HDPE from a 36"concrete riser for
(Ex: 24"RCP from 36" CMP riser) underground and Filteras
Water Quality Fl Yes (l No — —
Design Storm ® l0yr n2yr — —
Any Additional Information 2 Filteras and 1 Underground Retention
(incl. stream buffer mitigation)
I i
ICP
A copy of the elan and details of the BM (s),are attached.
.J� ��CLP.✓t
,7,f 14,..f_...a h d,sa..�ra,t0- 1.//&„t
I:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc