RE: SDP2017-36 Rivanna Village Phase 1B (Blocks C, D, and F) - Initial Site Plan
Mr. Franklin:
The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer
submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in
section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of
the final site plan.
The final site plan will not be considered to have been officially submitted until the following items are received:
1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code.
2. Afee of$1,613.
Please submit 10 copies of the final plans to the Community Development Department. The assigned Lead
Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the
final site plan, please work with each reviewer individually to satisfy their requirements.
The Department of Community Development shall not accept submittal of the final site plan for signature until
tentative approvals for the attached conditions from the following agencies/reviewers have been obtained:
SRC Members:
Albemarle County Planning Services (Planner) - 3 copies [Christopher Perez ext. 3443]
Albemarle County Engineering Services (Engineer) - 1 copy [Robert Jocz ext. 3283]
Virginia Department of Transportation - 1 copy [Adam Moore 434-422-9866]
Albemarle County Department of Fire Rescue - 1 copy [Shawn Maddox 434-296-5833]
Albemarle County Information Services (E911) - 1 copy [Elise Kiewra ext. 3030]
Albemarle County Building Inspections - 1 copy [Mike Dellinger (434)-296-5832 ext. 3228]
Albemarle County Architecture (ARB) — 1 copy [Margaret Maliszewski ext. 3276]
Albemarle County Service Authority (ACSA) - 1 copy [Alex Morrison 434-977-4511 ext. 116]
If you have any questions about these conditions or the submittal requirements please feel free to contact me at
Extension 3443, cperez@albemarle.org.
Sincerely,
Christopher P. Perez
Senior Planner
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902
Phone (434) 296-5832
Revised August 4, 2017
Alan Franklin
427 Cranberry Lane
Crozet VA 22932
RE: SDP2017-36 Rivanna Village Phase 1B (Blocks C, D, and F) - Initial Site Plan
Dear Sir:
Department of Community Development has reviewed the above referenced site plan (dated 6-5-17) against applicable
Code of Development, Proffers, Application Plan, and other codes and ordinances. Comments are provided below;
however, additional comments or conditions may be added or eliminated based on further review.): [Each comment is
preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [35.11 L'ee.. The public notif4eatio , fee o f $21 5 . not p .. aid F t.. the SRG meeting Please y the fee
to any aurthe...eyie.,.laotion oftheplan Applicant intends to pay the fee on 8-4-17, discussed via phone call.
2. [ZMA201300012 Proffer 5] Construction of Steamer Drive Improvements. Provide the necessary and
required sidewalk and landscape strip along Steamer Drive adjacent to the Fire Station in Block C. It is
understood that the road plan (SUB2015-119) for this segment of road was already approved without the
sidewalk and only provided street trees; however, it appears this aspect of the plan was approved in error and
these improvements are required by proffer #5. Furthermore, fourteen (14) onstreet guest parking spaces are
proposed adjacent to this strip of land. These spaces shall be provided a sidewalk for safe movement of
pedestrians between the spaces and the use [Section 4.12.8(c)].
3. [4.12.5] Location of Parking Areas. All parking spaces shall be established on the same lot with the primary
use to which it is appurtenant, except as authorized by section 4.12.8. Assure each townhome lot is provided
the 2 required parking spaces on the lot it serves. A few of the lots are not provided 2 spaces, such as Lots C 16,
C 18, C20, C21, C22... etc. If parking spaces cannot be shuffled to accommodate two onsite spaces per lot, then
a parking easement shall be provided over the portion of the space not on the lot it serves. Additionally, an
instrument assuring continuation of off-site parking shall be required prior to final plat/final site plan approval.
4. 132.5.2(a), 32.5.2(1)] Alleys. On the plan provide a note that states no public agency, including VDOT, and the
County of Albemarle will be responsible for maintaining the alleys. Also, provide information on the plans that
the alleys shall be dedicated and maintained by the HOA.
5. [32.5.2(a), 32.5.2(i)] Existing or platted streets. Label all streets (public) and all alleys (private). Provide
directional arrows on each alley to signify one way or two way traffic. Also, provide the widths of all streets.
6. [14-303(e)] Alleys. On the final plat depict and dimension an alley easement and label it as " feet Alley
Easement to Benefit Lots ". Also, provide a maintenance agreement for review and approval by the
County Attorney's office.
7, [4.12.6] Parking Requirements. Dimension the guest spaces. Provide striping that preserves the dimensions of
these spaces. The minimum dimensions for parallel parking spaces is 9'x20'.
8. IZMA201300012 Proffer 9] Affordable Housing. On sheet 2 relabeled the "Running Total" column in the
affordable housing tabulations chart to `Affordable Units Provided". Additionally, change how this column
functions, so that you bold the number of affordable units provided on this site plan. For blocks/phases yet to
be submitted/approved `Affordable Units Provided" should be left blank until it is submitted. For
blocks/phases previously approved the "Affordable Units Provided" should list how many were approved and
on what SDP/SUB#.
Also, relabel the chart as: Affordable Unit Tabulations (governed by Proffer #9) "
Also, designate which lots are the affordable units.
Also, under the chart provide a statement that reads: "The owner shall contribute cash to the County in the
amount of Twenty -One Thousand, One Hundred Fifty Dollars ($21,150) instead of constructing each required
affordable unit. Such payment shall be made after completion of the final inspection and prior to issuance of
the certificate of occupancy for any such unit for which payment in lieu of constructing affordable housing is
made. "
9. [ZMA201300012 Proffer 3] Route 250 and Eastern Entrance Improvements. "The owner shall either
construct left and right turn lanes on Route 250 at the eastern entrance to the property or bond these
improvements prior to approval of the first site plan or subdivision plat for the development "
Per recent conversations with Ana Kilmer the roads for this development have not been bonded. The above
shall take place prior to final site plan approval.
10. [Code of Development Section 3.41 Building Height Regulations. Provide the height of each proposed
townhome building.
11. [Code of Development Section 4.21 Covenants to Provide Architectural Review Committee. Prior to final site
plan and/or final subdivision plat approval a Declaration of Covenants, Conditions and Restrictions for
Rivanna Village shall be reviewed/approved by the County Attorney's office in consultation with County
Planning staff. The above document shall be approved by the County and recorded by the developer prior to
final site plan and/or final subdivision plat approval. The DB page reference information of this recorded
document shall be noted on the final site plan and/or final subdivision plat.
12. 132.5.2(e), 32.7.9.4(c)] Existing landscape features. The landscape plan shall show the existing landscape
features on the site, which shall include: "(1) Wooded areas. All wooded areas, identi)�ing whether they are
composed of evergreen, deciduous, or a mix of type, and showing the location of the tree line; (2) Small
groups of trees and individual trees. Small groups of trees and individual trees of six (6) inch caliper or
greater, or ornamental trees of any size, identified by common name and approximate caliper and showing
their location; "
13. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site
plan.
14. [32.7.9.8] Tree Canopy. The tree canopy calculations for the site omit 4.565 acres of open space required
under section 4.7; however, these deductions cannot be duplicative in nature. Please label and depict which
areas the site contain the 4.565 acres of open space. The area being deducted and the area counted as tree
preservation area (2.344 acres) shall not be the same area, as this would be duplicative. If this is the case,
please revise the calculations to assure the site meets the required canopy calculations.
15. [32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in order to satisfy the
landscaping and screening requirements of section 32.7.9, subject to the agent's approval. Because you intend
to use existing trees to satisfy some of the landscape plan requirements, please include the following:
1. Areas and other features shown on landscape plan. The landscape plan shall show the trees to be
preserved, the limits of clearing, the location and type of protective fencing, grade changes
requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing.
2. Conservation checklist. The applicant shall sign a conservation checklist approved by the agent to
ensure that the specified trees will be protected during construction. Except as otherwise expressly
approved by the agent in a particular case, the checklist shall conform to the specifications in the
Virginia Erosion and Sediment Control Handbook, pages III -393 through III -413, and as hereafter
amended.
16. [32.7.9.6] Parking Lot landscaping for Each Parking Area Having 5 or More Parking Spaces. Parking lot
landscape calculations shall be revised to account for 69 parking spaces. This number is being generated by all
the required parking spaces needed to facilitate the townhome lots (excluding townhomes with garages),
including guest spaces.
17. [32.7.9.6] Parking Lot landscaping for Each Parking Area Having 5 or More Parking Spaces. On sheet 7,
assure the parking lot calculations of 24,400 SF includes paved parking and vehicular circulation areas (alleys
and public streets w/ required guest parking). Additionally, this calculation references 1,220 SF of Canopy;
however, this calculation is not for canopy but instead for "required parking lot landscape area" (i.e. the
planting islands). Revise.
18. [32.7.9.5] Street Trees. Provide street tree calculations on the final site plan for all streets fronting the town
homes. Merely referencing the approved road plan is not adequate for the final site plan unless you apply for
and are approved for a site plan variation & exception to this requirement. If you choose to make the request,
see Section 32.3.5(a) for submittal information.
19. [Code of Development - Attachment B - sheet 7] Open Space and Recreational Plan.
On this plan please track the Open Space Statistics for the development as page 7 of Attachment B did (see
below).
OPEN SPACE STATISTICS:
TOTALSITEAREA 94.76ACRES
INCLUDING BLOCK K (FIRE STATION)
COMMUNITYPARK 1&42ACRES*
PIW
LINEAR PARK W1 TRAILS 13.26ACRES*
AMENITY AREA 31.68 ACRES (35.7%)*
AMENITY AREA 31.68ACRES*
Ph*
OTHER OPEN SPACE 7.67 ACRES*
minor
IWERVIOUS AREAS 1.83 ACRES*
TOTAL OPEN SPACEIGREENSPACE AREA 37.82ACRES(42,3%)*
*EXCLUDES AREA IN BLOCK X (FIRE STATION)
BASKETBALL COURT
2 TENNIS COURTS
2PICNICSHELTERS
LARGE PLAYFIRLD
PLAYGROUND
b WFRESTROOMFACILTY
DOG PARK WITH PIER AT QUARRY
PONDWITHPIER
-WOODEDGROVE WITH QUARRY -SIDE PAVILION
.
;Go 8,6650 LF OF PAVED TRAILS
20. [32.5.2(n)] Proposed Improvements. Provide the maximum footprint for all proposed buildings.
21. [32.5.2(n)] Proposed improvements. How is daily household trash going to be disposed of for these units? If
each lot is going to have its own trash container for curbside pickup, where are these containers going to be
stored when not in use?
22. [32.7.4.2] Easements for stormwater management facilities. Provide access to the stormwater management
facility. Also, provide an easement over the facility and the access.
23. 132.8.2, 14-3111 Infrastructure improvement plans. Road plans and WPO application must be approved, all
required improvements to construct the units in Blocks C, D, and F shall be built or bonded, and all required
deeds and declarations must be reviewed and approved prior to final plat and /or final site plan approval.
24. [Code of Development Section 3.31 Lot Regulation/Setbacks. Any unit which has a road or alley at its side,
the minimum side yard setback is increased to 15 feet. The applicant has submitted a variation to these
requirements. Prior to final site plan/final subdivision plat approval the variation shall be acted on.
25. 132.5.2(p) & 32.7.9.71 Screening. Proposed SWM Facilities shall be screened from the adjacent residential
lots. Is "SWM/BMP BS3a" and underground facility? If so, screening is not required.
26. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as
required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the
site shall be required prior to final site plan and/or final plat approval.
27. [32.6.2(f)] Signature panel. Signature panel for signature by each member of the site review committee.
28. [Comment] Provide the dimensions of proposed easements and whether they are to be publicly or privately
maintained.
29. [32.6.2(d)] Water and sewer facilities. Provide profiles and cross sections of all water and sewer lines
including clearance where lines cross.
30. [32.6.2(d)] Water and sewer facilities. Provide the station on the plan to conform to the station shown on the
profile and indicate the top and invert elevation of each structure.
31. [32.6.2(d)] Water and sewer facilities. Provide all sewer appurtenances by type and number.
32. [32.6.2(e)] Drainage and grading plans. Provide profiles of all ditches and channels whether proposed or
existing.
33. [32.6.2(e)] Drainage and grading plans. Provide profiles of all storm sewer systems.
34. [32.6.2(e)] Public facilities and utilities. All water and sewer facilities to be dedicated to public use and the
easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the
Albemarle County Service Authority.
35. [Comment] The applicant has submitted and the County is reviewing 4 variation requests to ZMA2013-12.
Prior to final site plan approval variations shall be acted on and the plans revised accordingly.
36. [Comment] The final site plan shall not be approved until all SRC reviewers have approved the plan. Their
comments attached.
Please contact Christopher P. Perez in the Planning Division by using cperez e,albemarle.org or 434-296-5832 ext.
3443 for further information or if you have questions.
Review Comments for SDP201740036
Project Tame: Rivanna Village, Phase 16, Blks. C, D and F - Initial Site Plan
Date Completed: Friday, July 14, 2017
Reviewer: Bobby Jocz
Department/Division/Age
nODD EF °naineedna
1.[Cover Page] Tease include site plan number SDP201700036 in the space provided.
2. tCover page and title block] Revise title to exclude blocks B and E. it appears
Blocks C, D, and F are the only blocks included in the submitted site plan.
3.[Sheet 3] Provide extent of WPO stream buffer.
4. [Sheet 4] Please revise shading to represent only approvable blocks (C, 0, and F).
Blocks B and E. do not seem to be included in the submitted site plan.
5. (All) Provide bumper blocks for perpendicular parking spaces adjacent to sidewalks.
Bumper blocks are to be provided when parking abuts sidewalks less than 6 feet
in width where no planting strip is provided.
6.[AII] Provide extent of proposed/existing SWM easements.
7.[AII] Approval conditional on approval of submitted variances.
8.[General] Topography is to be field verified within the past year. Please update.
Charles A. Kilpatrick, P.E.
Commissioner
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
7601 Oranpe Road
CWpepev Vaglnia 22701
July 13, 2017
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Christopher Perez
Re: Rivanna Village Phase 1B Block C, D, & F — Initial Site Plan
SDP -2017-00036
Review #1
Dear Mr Perez:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Alan Franklin PE, LLC., dated
5 June 2017, and offers the following comment:
• The throat length at either end of Alley B should be at least 50 feet, see Appendix F page
F-108.
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Justin Deel at 434-422-9894.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
�,fi� G�LJ+✓
1
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments_ for SDP201708036
Project Name:.Rivanna Village, Phase 16, Blks. C, 0 and F - Initial Site Plan
Date Completed: Monday, July 17, 2017 Department/Division/Age
Reviewer: Shawn Maddox Fire Rescue
Fire Rescue has no objections to the plan as submitted.
Please remember to maintain hydrant spacing and any
changes to on street parking configuration could require
signage or increased travel lane widths.
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
U
PLAN REVIEW COMMENTS - E911
APPLICATION#: SDP201700036
TMP: 093A1-00-00-00300 and 093A1-00-00-00400
DATE: 6/22/2017
FROM: Elise Kiewra
ekiewra@albemarle.org
Geographic Data Services (GDS)
www.albemarle.org/gds
(434) 296-5832 ext. 3030
The following road names are will need to be changed:
EAST RIVANNA AVE
RIVANNA VILLAGE AVE
Per Part I, Section 4-e of the County's Road Naming and Property Numbering Manual (page 7 of
PDF).
"Compass points such as NORTH and EAST shall not be used in road names."
1. EASTBROOK DR and EASTERN AVENUE begin with a compass point.
Per Part I, Section 4-i of the County's Road Naming and Property Numbering Manual (page 7 of
PDF).
"No proposed road name shall be approved which begins with a word that appears as the first
word in five or more official road names."
2. RIVANNA is the first word in over 5 road names in the County.
We recommend providing three (3) candidate names for each road to our office for
review, in case your first choices are not acceptable.
A PDF version of the Ordinance and Manual can be found here:
https://www. aIbemarle.ora/upload/imaaes/Forms Center/Departments/Geographic Data Service
s/Forms/Road Naminq and Propertv Numberinq Ordinance_ and Manual.pdf
Please consult the County's Road Name Index to check your road names prior to submittal. The
Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapl2s/roads/
Parcel and mapping information can be found here: http://gisweb.albemarle.org/
If you should have any questions, please do not hesitate to contact our office
Review Comments for SDP201700036
Project Name: Rivanna Village, Phase 1 B, Blks. C, D and F - Initial Site 'Plan
Date Completed: Monday, June 19, 2017 Department/Division/Age
Reviewer: Michael Dellinger -- CDD Inspections
Review Comments for SDP201700036
Project Name: Rivanna Village, Phase 1 B, Blks. C, D and F - Initial Site :Plan
Date Completed: Tuesday, June 13, 2017
Reviewer: Margaret Maliszewski
Department/Division/Age
1-7� CDD ARB
The portions of this proposed development that fall within the EC aveday are either:
1. Single family detached dwellings, which do not require ARB review, or
2. Landscape buffer areas along Glenmore Way, which were reviewed with road plans, or
3. Wooded area with no proposed changes.
Consequently, no additional ARB review is required at this time.
Christopher Perez
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Thursday, July 27, 2017 11:51 AM
To: Christopher Perez
Subject: SDP201700036: Rivanna Village Phase 1B Blocks C,D & F - Initial
Chris,
I have reviewed the above referenced initial site plan. The water/sewer utilities shown match the approved utility plan
at the ACSA. I hereby recommend approval with no conditions.
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698