August 4, 2017
Paty Satemye
Albemarle County Community Development
401 Mcl nti re Road
Charlottesville, VA 22902
Regarding: Feld School of Virginia Phase 1 Initial Site Development Plan
SDP 201700025
Please find attached four full-size copy of the Feld School Phase 1 Initial Site Development Plan with revisions.
We've addressed your comments from the July 20 me= as follows:
1. Revise the "Proposed Use" statement to state "Private school ballfield (67 YD x 107 YD) as per
SP201500024. For Feld School of Charlottesville sporting event use only."
The proposed use statement is revised accordingly. Please note the actual 'ballfield" dimension
accommodated with the grading is a U 12 soccer field of 60 YD x 100 YD.
2. Revise the ITE Trip Generation note to include at the beginning the following sentence: "The ball fields are
for Feld School of Charlottesville private school sporting events use only, as authorized by Special Use
Permit SP201500024.
This sentence is added at the beginning of the ITE Trip Generation note.
3. In order to ensure that no Phase I uses or improvements will impact the future drainfield locations, and to
allow the Vrginia Department of Health to review the proposed drainfield location, the primary and reserve
drainfrelds for Phase I I (full buildout) of the project must be shown on the Phase I initial site plan.
The primary and reserve drainfield locations are shown on sheets 4, 5, and 6 of the Phase 1 initial site plan.
4. SP Condition #5 states that "No construction for the use shall begin without written approval of the
proposed septic facilities from the Vrginia Department of Health." Neither the approved Special Use Pemit
nor the County's Zoning Ordinance address or anticipate septic systems other than those served by
subsurface drainfrelds. Therefore, only bathrooms served by a subsurface drainfield will be allowed by the
County. Provide a note on the initial site plan that states, "If bathrooms fadlities are provided they must be
serviced by subsurface drainfrelds."
The requested note is provided.
5. Revise Sheet C5 of the initial site plan so that the labels, notes and hatching for all of the required buffer
and landscaping requirements specified in SP2015-24 are shown to be provided in Phase I or provide a
new initial site plan sheet to do so.
Sheet C5 is revised to include. the variable width tree buffer area `A" and a portion of the 50' tree buffer `B ,
the proposed drainfield areas for the future sdxool carrjous, the area delineation for the future school carrpus
along with the ballfield area, and critical slopes for the site. Sheet C6 has been added to the initial site plan to
include all of these same elements from sheet C5 along with the 25' tree buffer area "c" and the areas where
critical slopes disturbances were approved with SP201500024.
If you have any questions or concerns, please feel free to e-mail or call me at (434) 981-6029.
Best Regards,
J. x.duy strG�
Kelly Strickland
Shimp Engineering, P.C.