Loading...
HomeMy WebLinkAboutSDP201700030 Review Comments Initial Site Plan 2017-07-06COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 6, 2017 Bill Ledbetter Roudabush Gale & Associates, Inc. 914 Monticello Road Charlottesville, VA 22902 BLedbetterna.roudabush.com RE: SDP201700030 Old Trail Village Block 7, Phase I — Initial Site Plan Dear Mr. Ledbetter: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) (attached) Albemarle County Information Services (E911) (attached) Albemarle County Building Inspections Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation (attached) Comments reflect information available at the time the proposal was reviewed and should not be considered final. However, the Site Review Committee has attempted to identify all issues that are required to be resolved prior to final approval. The applicant should work with each of the reviewers individually to address the comments provided. Once all of the comments have been addressed, the Lead Reviewer will request copies for final signature by each reviewer. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, J.T. Newberry Senior Planner CC: March Mountain Properties 800 East Jefferson Street Charlottesville, VA 22902 Albemarle County Planning Services (Planner) — J.T. Newberry, jnewbegy&albemarle.org— Requested changes. 1. Section 4.12.16/p.10 of COD — Please confirm that each driveway is a minimum of 18 feet wide. The driveway for Lots 5, 11, and 14 appear to be only 16 feet wide. 2. Section 32.5.2(a) — On Sheet 1, please remove the reference to critical slopes. Under Zoning, please note this site also lies with the Steep Slopes (Managed) and Entrance Corridor overlay districts. 3. Section 32.5.2(a) — On Sheet 1, please clarify the information shown for Project Area and Area Summaries. The area shown for Project Area is 0.78 acres and then the Total under Area Summary is 1.11 acres. Should these two numbers match? 4. Section 32.5.2(a) — On Sheet 1, please specify this site lies within the South Fork Rivanna Reservoir water supply watershed. 5. [General Comment] — On Sheet 6, the cross-section for Orion Lane shows a 6 foot parking lane. Please delineate these parking spaces on Sheet 3. 6. Section 32.5.2(p) — Sheet 5 shows 14 street trees in bold, but the planting schedule only shows 12 trees. Please only show the required trees in bold and confirm that the correct quantity of trees is included in the planting schedule. 7. [General Comment] — Other blocks proposing residential uses in Old Trail have used the same table to track the provision of affordable housing units over time. Please copy and update this table from the last approved site plan at the time of final site plan submission. As of right now, the latest table is from the final site plan for Blocks 10, 16, 17, and 18 (SDP201600006). Albemarle County Engineering Services (Engineer) — Emily Cox, ecoxgalbemarle.org — See attached. Albemarle County Department of Fire Rescue — Robbie Gilmer, rizilmergalbemarle.org — Requested changes. 1. Show no parking signs on one side of Orion Lane. 2. Increase radii to 25 feet at the intersection of Alley A and Alley B. Albemarle County Information Services (E911) — Elise Kiewra, ekiewra(i�,albemarle.org — See attached. Albemarle County Building Inspections, Michael Dellinger, mdellinger(ii,)albemarle.org — No objection. ACSA — Alex Morrison, amorrisonnserviceauthority.org — See recommendation. 1. Water and Sewer Construction Plan Review will be required at the final site plan stage. Submit 3 copies of the final site plan along with water and sewer data sheets to the ACSA, Attn: Jeremy Lynn, PE, to begin the review. 2. RWSA Wastewater Capacity Certification will be required at the final site plan stage. Virginia Department of Transportation — Adam Moore, Adam.Moorenvdot.vir ig nia.gov — See attached. VIRGlN1P County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 21 Jun 2017 Subject: Old Trail Block 7 Ph1 - ISP (SDP201700030) The initial site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. Road Plan must be submitted and approved before final site plan can be approved. 3. Please add the approved Master SWM Plan # to the note on the cover sheet (WPO20160009). 4. Ensure that all critical slopes are shown and labeled on the plan. 5. VDOT entrance permit will be required for Orion Lane. Please designate the type of entrances. County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 21 Jun 2017 Subject: Old Trail Block 7 Ph1 - ISP (SDP201700030) The initial site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. Road Plan must be submitted and approved before final site plan can be approved. 3. Please add the approved Master SWM Plan # to the note on the cover sheet (WPO20160009). 4. Ensure that all critical slopes are shown and labeled on the plan. 5. VDOT entrance permit will be required for Orion Lane. Please designate the type of entrances. County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SDP201700030 TMP: 055E0 -01-00-000A1 DATE: 6/19/2017 FROM: Elise Kiewra ekiewra@albemarle.org Geographic Data Services (GDS) www.albemarle.org/qds (434) 296-5832 ext. 3030 Comments for road names are below: 1. "Private Road A" will need to be a continuation of FENNEL RD 2. "Alley A" does not need a road name as it appears no houses will be addressed off of it 3. "Alley B" will also be FENNEL RD as it appears that the road will curve around and connect back to Orion Ln Please let me know if you have any questions. Thanks. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner June 16, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: J.T. Newberry Re: OId Trail Village Block 7 Phase 1 — Initial Site Plan SDP -2017-00030 Review #1 Dear Mr. Newberry: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, & Associates, dated S May 2017, and offers the following comments: 1. It is our understanding that Orion Lane will be a private street; please confirm this on the plans by labeling all streets public or private. If it is to be a public street, the entrances must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements, in which case comments can be provided. 2. Please demonstrate that existing drainage structures being tied -in to are adequate for the developed site. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Dee] at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Short Review Comments Report for: SDP201700030 SubApplication Type: Old Trail Village, Blk. 7, Ph.1 - Initial Initial Site Plan Date Completed:07/06/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/21/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/19/2017 Reviewer:Elise Kiewra CDD E911 Review Status:Requested Changes Reviews Comments:see uploaded letter for comments, per site plan dated 5/8/2017 Division: Date Completed:06/21/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:No Objection Reviews Comments:This portion of the Old Trail development is not expected to be visible from the EC; consequently, ARB review and approval are not required. Division: Date Completed:06/16/2017 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/13/2017 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments: Division: Date Completed:06/12/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments: Based on plans dated 5/9/17. 1. Show no parking signs on one side of Orion Lane. 2. Increase radii to 25' at the intersection of Alley A and Alley B. Division: Date Completed:06/12/2017 Reviewer:Michael Dellinger CDD Inspections Review Status:No Objection Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:July 24, 2018