Loading...
HomeMy WebLinkAboutZMA199500005 Action Letter -~ --. .2MÆ- QS - 05 -- . COUNTY OF ALBEMARLE DepL of Planning & Community Development 401 Mcintire Road Charlottesville, Virginia 22902-4596 (804) 296-5823 June 23, 1995 Wendell Wood W oodbriar Associates, P. O. Box 5548 Charlottesville, VA 22905 RE: ZMA-95-05 Woodbriar Associates Tax Map 320, Parcell, and Tax Map 320 Section 3 Parcels A and 83 , Dear Mr. Wood: The Albemarle County Board of Supervisors, at its meeting on June 14, 1995, approved as recommended by the Planning Commission (amended agreements are outlined below) , the above-noted requ~st for relief of Pr~.ffer 12 of ZMA -91-13, W oodbriar Associates, in order to allow relief of phasing requirement and clarification of phase completion, zoned PRD. Agreement #12: No more than two phases with signed site plans or subdivision plats shall be under simultaneous development. This phasing limitation shall not be interpreted as limiting the construction of infrastructure (ro~ds utilities, drainage, etc.). The development shall proceed in the following order: Phase 3A, 3B, 3C, the completion of Phase 7, lA, 6, 5 and 4. Phase IB may be developed following completion of Phase lA. Phase 8 shall not be subject to the phasing order. A phase shall be considered '. complete for purposes of satisfying phasing requirements when the following is complete: 1. All public roads shown in the phase have been given final inspection by the Virginia Department of Transportation (VDOT) Charlottesville Residency. A complete assembly package has been submitted to the residency. The maintenance fee has been paid and the one-year VDOT performance bond has been posted; . r; . ~- . r-. Page 2 June 23, 1995 2.. All private roads shown in the phase have been completed to the satisfaction of the County Engineer and all road bonds have been released; 3. All necessary water and sewer lines shall have been installed and dedicated with the exception of individual connections. , Agreement #8: Staff approval of recreational facilities to include: one tot lot with Phase 3C and one tot lot with Phase IB; the dedication of open space with the approval of Phases 4 and 5 for the passive recreational area which shall include construction of walking/jogging trails; and, the primary recreation area south of Camelot shall be built or bonded for its construction prior to final plat approval of Phase 4. This recreational area shall be built prior to completion of Phase 4 and shall consist of a basebalVrnulti-purpose field, two basketball courts, playgroup equipment and picnic facilities. All recreation facilities shall be installed by the developer. If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. , . VWC/jcw cc: Amelia McCulley Jo Higgins Lee Catlin