HomeMy WebLinkAboutARB201700068 Checklist 2017-07-21ARB2017-68 Three Roses Brewery
HNM 7/21/17
Architectural Review Board
COUNTY -WIDE Structures Located At Least 750' from EC
Completeness check
2 collated copies
A. Written description of the proposal
1 N Provide a description of the proposed work.
20 Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1 "=20', clearly legible and folded):
3 ® Location(s) of proposed building(s) on the site.
4 ® Location of proposed parking, travelways, walkways and other improvements.
5 IMechanical equipment, trash containers, loading and service areas, other similar features and Commented[HM1]:numpsterpad shown inparking area; no
improvements, and associated screening. mechanical equipment or loading/service areas shown
6 ® Existing and proposed topography drawn with contour intervals of 5-feet or less, and with
sufficient off -site topography to describe prominent and pertinent off -site features and physical
characteristics, but in no case less than 50-feet outside of the site.
70 Location and size of existing and proposed utilities and easements. Identify type of utility and
extent of easement.
8 N Stormwater management plan.
9 ❑ Location of retaining walls indicating top and bottom elevations, maximum wall height, and
proposed materials, with material and color samples. N/A
C. Landscape plan showing the following (drawn to the scale of 1 "=20' orlarger, clearly legible):
1 N Proposed landscaping that meets or exceeds the requirements outlined in the EC guidelines.
2 ❑ Existing landscaping to be removed. Include the location, size, and species. N/A
3 N Landscape schedule indicating plant species with common and botanical names, quantity, size at Commented [HM2]: Quantity inplantscheauleis noorreot
planting, and symbol used. when compared tosite plan
4 ❑ Location of existing and proposed tree lines and tree save areas. N/A
5 ❑ Location of existing natural features. N/A
6 ❑ Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated
by botanical name and caliper. N/A
7 N Location and height of above -ground utilities and associated easements, and location of below -
ground utilities and associated easements.
8 N Stormwater facilities.
9 ❑ A signed tree conservation checklist with all checklist items drawn on the landscape plans. N/A
10 ❑ Tree protection fencing and limits of work on the landscape, grading and E&S plans. N/A
D. Lighting plan showing the following (drawn to the scale of 1'=20' or larger and clearly legible):
10 Location of all proposed building and site lighting.
2 N Lighting schedule identifying all proposed light fixtures, poles and brackets, and information on
illumination type, intensity, style, shielding, color, finish, and installation height.
Architectural Review Board Final Site Plan Checklist — 1
ARB2017-68 Three Roses Brewery
HNM 7/21/17
3 ® Manufacturer's cut sheets illustrating proposed lighting fixtures. Include the cut sheets as a sheet
of the site plan set.
4 ® Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance. LLF must equal 1.0.
5 ® Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections):
10 Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to
the Scale of 1/8"=V-0". Include a building materials schedule and key on the elevation Commented[HM3]:Scale is3/16"=i
drawings.
2 ❑ Site sections that clarify proposed changes in topography and illustrate the visibility of the
proposed development from the Entrance Corridor. Site sections shall indicate the finish floor
elevation(s) and roof height(s) relative to the natural elevations along the Entrance Corridor. N/A
40 One set of all building materials / colors.
50 A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
1 ❑ Provide labeled, color 8%" x 11" photos of the site as seen from both directions on the EC.
2 ® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision,
and contact information for the firm preparing the drawings in the title block on all drawings. For
revised drawings, clearly identify revisions made.
3 ® Color perspective sketches that show the proposed development as seen from the EC.
4 ❑ Any additional material that will make the review more productive.
Signatures
Architectural Review Board Final Site Plan Checklist — 2