Loading...
HomeMy WebLinkAboutWPO201700035 Bond Estimates WPO VSMP 2017-08-15Dunlora Overlook VSMP Plan WPO file number: WPO -2017-00035 (Amendment to WPO -2016-00058) Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length -ft pipe diameter -in earthwork for trap/basin $135.00 $135.00 $1,008.00 $1,008.00 height of dam at toe 0 ft cut at high side 0 ft analysis perfo height of fill at face 0 ft cut at face 0 ft 3,052 cy cut; 25 cy fill length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition; 0 sf (total width of dam) 0 ft (total width of cut) 0 It (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) -cy width of spillway "t (spillway stone tons) 0 tons structures for basin riser height 8.67 ft riser diameter 48 in (riser unit price) $150.00 barrel length 75 ft base plate or fdn - barrel diameter in (barrel unit price) $35.00 barrel collars baffle length It silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length it width 9 ft outlet protection (OP) length ft width 6 ft outlet protection (OP) length ft width 16 ft channel (SCC, matted) length ft width 0 ft check dam depth in channel ft channel width _ 0 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth It length -ft width dM (tons) 27.37 tons survey and layout (price per 0.1 mi.) acres i traps and basins - mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed acres $5,000.00 $35,000.00 2351.0 ft $5.00 $11,755.00 445.0 ft $5.00 $2,225.00 1435 ft $13.00 $18,655.00 $0.00 $0.00 $13.00 $39,780.00 $50.00 $0.00 $1,300.50 $200.00 $200 $2,625.00 $200.00 $400 $50.00 $0 $100.00 $0.00 $200.00 $1,800.00 $324.00 $324.00 $135.00 $135.00 $1,008.00 $1,008.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $1,642.20 $4,500.00 $500.00 $0.00 cost sum $125,849.70 contingency $12,584.97 Total $138,440 7/18/2017 Dunlora Overlook VSMP Plan WPO file number: WPO -2017-00035 (Amendment to WPO -2016-00058) Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 7/18/2017