HomeMy WebLinkAboutARB201600126 Plan - Other (not approved) 2017-08-17Audi
T, �M
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
RECEIVED
COMMUNITY
DEVELOPMENT
Flow Audi of Charlottesville currently occupies a small section of an
existing building shared with both the Porsche and Volkswagen dealer-
ships. As sales in the area have grown over the last years Flow Audi is
planning a new 8 auto showroom and sales office on their existing site
along the south side of US 250 on Pantops Mountain. This site falls within
the US 250 Pantops Entrance Corridor and will require a Certificate of
Appropriateness from the Architectural Review Board. The new show
room is planned as an independent one story building along the west
side of the property in the location of an existing parking lot used for
display of new automobiles. The existing grade falls away to the south
allowing for a lower level service pick-up and drop off area which will
face away from US 250 and the Entrance Corridor.
In developing a new building for this site Audi of America has created
a building that responds to the guidelines for the Entrance Corridor
while using modern design and materials to accomplish those goals.
The Entrance Corridor along US 250 east of Charlottesville at Pantops
has developed over the last 15 years into one of the more cohesive
architectural environments of any of the Entrance Corridors around
Charlottesville. This has been accomplished along this corridor with
buildings which represent a healthy diversity of architectural approach-
es to design and scale. The a majority of the buildings developed in this
area since the establishment of the Entrance Corridor Overlay District
have utilized the traditional palette of red brick, gable or hipped roofs
and a building scale consistent with the historic character of the region.
Among these are the Social Security Building, a number of restaurants,
and modestly scaled commercial and office buildings. The larger, more
institutional buildings have been set back from fronting on the Street
edge allowing for the development of a compatible range of build-
ings and street landscaping in much of the corridor. The developing
success of this portion of the corridor is reinforced by the inclusion of a
number of buildings using different materials and a variety of architec-
tural styles. The Union Bank and UVA Credit Union buildings use painted
white brick, the Montessori school and new Chick Fil A are both more
contemporary designs which use scale, material and texture to ac-
complish their appropriateness within the district. Even Toyota has used
modern materials to modify its trademark building to break down the
scale of the building down into section that reflect the historic scale of
much more traditional buildings of the region.
6 R W A R C H 1 T E C T S
FLOW Audi of Charlottesville is developing a design which, while using
modern design and modern materials, takes its cues from the scale,
texture and detail of the surrounding Entrance Corridor and the histor-
ic precedents of the larger community. While doing this, they also will
associate the new building with the corporate identity Audi of America
has developed throughout its nationwide network of dealers.
PROJECT NARRATIVE
ll2 fourth str@nt NE
6hdrlotteKville virgl&la 22h07.
414.n; l.7ts0
www, brw-a rchiteOsxom CDR
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
Scde: 1 " = 40"
B R W A R C H , T E C T S
112 fourth street NE
Charlottesville virginla 22902
434.97 I.T 160
www.4rw-arch1-tecMcoyn CDR
PROPOSED AUDI EXPANSION
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
LEGEND
j marrtrE
T QERVICEREG,FIgtt
= A==KK Et
KEY
NEw GAR sHowHoom
CUSTOMER ZONE
First floor plan
Scale: 1/32" = 1 r-0"
9 R W A R C H I T E C T S
I h street NE
112 fu "',
'ha rlulLeWile virg,nla 22902
434.97 1 7 1 ^.()
CDR
ww,*.brw architects.com
Lower floor plan
Scale: 1/32" = 1 -0"
-C%y=cffhww,
GEPJNG L
Z-.-1 —i'Lcawic'.
EAST ELEVATION
PUWar 77777
mum L
*u
CEUM
SOUTH ELEVATION
CELM
WEST ELEVATION
rl
I lil jl i�l� i i �` .I �� � �AI I
RECEPTpN
MEW.,
OE NMIEPuiE
Al1RNNGUM
AIE'rAL; RNSH M1
iiT
NORTH ELEVATION
4=9C,
P
F-r-
Scale: 1/32" = V
ML +—t -41L
uatdmvtAmm
GEILWG
PROPOSED AUDI EXPANSION
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
r r I I l i ---------------- ------------
---------------
Compatibility with Significant Historic Sties
The basic question to answer for any new building in an Entrance Cor-
ridor is; "How does this building connect itself to this location and this
region?" This is particuiarly important when using modern materials and
design strategies associated with a nationally branded corporation.
For this location we have developed a building organized by the classi-
cist roots of the region. The building sits on a plinth of white brick, has a
'piano nobile' with columns and 'solid' wall surfaces, and meets the sky
with a proportioned cornice. The white brick is a commonly found ver-
nacular material used on both residential and commercial buildings in
the region. Specifically in this district it is found at both Union Bank and
the University Credit Union located at the corner of State Farm Bou-
levard and US 250. For Audi we have modified their typical concrete
base to a white brick plinth. The building itself will use clear glass and
anodized aluminum for the frame with an aluminum mesh rain screen
cladding running over portions of the building skin. We have reduced
the scale of the typical Audi showroom to correspond to the human
scale of significant historic precedents in the area using a four foot grid
to organize the facade. The lower ceiling, exposed inside the glass wall
will create the 'cornice' of the building in a proper proportion to the
overall composition. This creates an appropriate way to link the design
elements desired by Audi of America for their dealerships to the tradi-
tions specific to this area. Rather than emphasizing elements intended
to evoke images of adventurous driving on open roads the materials
and composition take their inspiration from regional precedents.
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
9 R W A R C M[ T E C T
U2 fourth street NE FLOW AUDI AUTOMOTIVE EXPANSION
Aarlottesvllle virglnia 22902 ARB Submittal
434. 971.7160
www.brw.arohitects.aum CDR September 27, 2016
Light
Building
Heavy Base
Monticello
Order
9 R W A R C H I T E C T 5
112 fourth street NE
nrwflollesville vnia irgIr 22902
434 97 t.7 I &I
CD
R
%,ww.brw- a rch itec ts. co m
X.41k
white brick
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2076
Mountaintop Montessori
ir 61 # � '4
Luxor Building
9 R W A k C H T E C T S
1.12 fourth street NE
aharluttesville Virginia 22902
4
34.971.7160
www.brw-arch itects,rem CDR
Brown Toyota
Proposed FLOW Audi Expansion
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 27, 201 b
AKII
BMW of Charlottesville
B R W A R C H T E C T 5
112 Puurth street YE
charlullesvllle vfrgirta 22902
d94.971.71CO
CDR
www. hrw-a rsh llects.cn m
-t
Compatibility with the Character of the Entrance Corridor
The size and scale of this building compares appropriately with the size
and scale of buildings on both sides of the Entrance Corridor. It would
fall into the small to moderate range in comparison to other buildings in
the area. This building will be smaller than the Car Max, the new Mon-
tessori School, and any of the three buildings at the Social Security site.
In terms of style its compatibility will relate more to the recently modern-
ized Toyota dealer and the Montessori School. This building is 71 ' wide
facing the Entrance Corridor, 108' deep and 20' tall.
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 27, 2016
Buildings should relate to their site and surrounding context
The proposed building will front on the north side of US 250 with the
street fagade aligning with the Volkswagen Dealership to the east. This
will be consistent with the range of buildings to the east and the west
and their general relationship to the street. The overall height of the
building at 20 feet is consistent with the other dealerships along this sec-
tion of the highway. The location of the building on the site will reduce
the amount of parking immediately visible from the entrance corridor
by limiting parking in front of the building to a single drive lane and a
single row of parking. This reinforces the County's desire to limit front
yard parking and depend primarily on relegated parking for this deal-
ership. Existing street landscaping will be preserved with new understory
landscaping. This site configuration should improve the 'street edge'
along this section of the Entrance Corridor.
r
4
005
I9
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
9 II W A R C N T E C T S
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
112 fourth street NE
charluttesville virginia 22902
CDR
434.9TS.7160
www. brw-Rrchitonts.com
Audi Charlottesville
H4
1
,•r; ,
.s�
i
I
I
3 NORTH ELEVATION
%tale: 118 " =1'-O"
VMZALPZV0RATM
CCOULI"TED MAL. MWSNEW-1
B R W A R C H I T E C T S
Jitf
EASTELEVATION
[7 7.
j
SOUTH ELEVATION "�"` i i. -.. NORTH ELEVATION
WEST ELEVATION
Scale: 1 " = 50'
Monticello
1_40+
— .1=_1P
b
Buildings should have a human scale
While establishing the primary height of the building at 20 feet there
are a number of components of the proposed design which reinforce
the human scale of the building. The basic module of the curtain wall
facade is four feet. Additionally, immediately behind the 20 foot clear
glass facade, the interior ceiling soffit drops to 15 feet and is easily
visible from the exterior. These two components with the white brick
site walls will provide the human scale of the building. Reinforcing this
will be the selection of the anodized aluminum mesh rain screen system
as the other primary exterior finish material. The texture of this material
will provide an appropriate appearance from the highway to unify the
building as well as reinforce its human scale, particularly as one ap-
proaches the building.
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
112 tuurth street NF
th,3000e5Ville vw9owl 22902
434.971 71.60
wwwbr w- a rch i tee ts.c om CDR
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
16
0 R W A R C Fi [ T E C T S
112 fourth street NE
chaeottesviile vlrglnla 22902
CDR
686.971.7160
www Arm -a rch Iteamea m
Form, Shape, Scale, and Material Creating a Cohesive Whole
The overall design of this building clearly communicates the overall
facility as a cohesive composition. The simple modern rectangular form
breaks itself down in a number of ways. Compositionally the relation-
ship between the areas clad with the aluminum mesh and the glazing
system provide a secondary scale to the overall composition. To break
the scale down further, while reinforcing the overall composition are
the repetitive 4 foot sections of glass and anodized aluminum frames.
All of this will be cleanly set on the white brick plinth.
�..otm.RR
-�. EAST ELEVATION
+tom"-i2a� in.ra
------ IT M-1
ELEVATiOH °'"'"' �--�,, HORTH ELEVATICH
•• •l=tea... �s.re
�'�Jilf JIl AYE Su �..V W;u
�hYORmtun. _
a
�mVowMwY
-.TEST ELEVAT10N
Scale: 1 " = 50'
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
'71- _ �t
P
rfi" °Illi°+�+vllr,
.. I`ll
GGGGG hlI
I A r f
I
I I I �
I,
p E
p11 iE
B R W A R C H I T= C T S
112 fourth street NE
charlottesvllle vlrglma 22902
d3A9T1J ten
C
rvww.brp arcdlteots.con,DR
The Appearance of Blankness Should be relieved using details or
vegetation
The areas of the building clad with the aluminum mesh create visual
anchors for each of the facades in contrast to the transparent glazing
system surrounding the showroom floor. However, at the northwest cor-
ner of the showroom the glazing system slips behind the large area of
mesh facade creating a `translucent' corner that shows both systems
overlaid with each other. Additionally the largest areas of mesh clad-
ding run in front of windows to the service area, allowing for the light
from the interior windows to break up the uninterrupted areas of the
facade.
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
Trademark buildings should be modified to meet the requirements of
the Guidelines
As mentioned above, this building is a significant departure from the
Audi of America typical branded dealership building. As mentioned in
the guidelines a number of times:
"The Guideline's standard of compatibility can be met through building
scare, materials, and forms which may be embodied in architecture
which is contemporary as well as traditional." This building uses the
trademark materials in a modern design, consistent with Audi's corpo-
rate image, while modifying their composition to respond to the local
architectural heritage of the region.
6 R W A R C H 1 T C C T S
112 fourth street NE CDR
charintlesvil le virgi n!a 22902
434.979.7160
www.brw-architects.com
Is
From left:
Top: Orlando, FL, San Diego, CA
Middle: Arlington, VA, Greenville,
SC, Denver, CO
Bottom: Chantilly, VA, Hampton,
VA
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
I
Am
8 R W C R C H f T E C T
112 rourth treed NE
ghaflotlesolle mrpnia 22902
434 471.71.60
CDR
www.brw arcl lecd9.com
Materials and Modifications
Modification of building form to smaller scale
Focus on human scale
White brick base to capture local material preference
Reduced building volume
Reduced building height
Creative application of building materials
row ji
EAST ELEVATION
.... . Th" I
SOUTH ELEVATION T NORTH ELEVATION
WEST ELEVATION
'ex:maW. Nr.,w
Scale: 1 " = 50'
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016
Unifying groups of buildings within a development
This new building sits on the opposite side of the main access drive to
the interior of the site. This makes it functionally difficult to conntect the
buildings with each other. In this case the scale of the building is more
appropriate as an individual building that if would be if connected to
other buildings.
Window Glass
All window glass will be clear.
Site Plan and Landscaping
A site plan meeting the requirements of the Entrance Corridor and
County Engineering will be submitted
Lighting
All exterior site lighting and landscape lighting will meet Entrance Corri-
dor and County Engineering requirements.
Landscape and Plant Design
The Site Elan will include all landscape and plant materials to meet the
requirements of the Entrance Corridor and the County's site develop-
ment requirements.
R R W A R C li l T E C T S
1.12 fourth street NE
rharlottesvihe vir®inla 22902
434.971.7160
www. brw- arch itects.com
C DR
OPERATIONAL INFO
eROp er
1t�lenR
eNneimu
aa:aaR
sexN.�rtc4rna
�mo�F-
aervM'EORME
Yr¢aeGP
ea aw�uac
ea®eoF
emZ
�•-..„r�r.
aea
coa.r
ae1�,�a
r&.O
NdYCNe NMEN1d1Y
'6 1_
CJV rMFh
r
-araL.anueom a�
� ..
Scale: 1 " = 64'
ELEMENTS OF ENTRY CORRIDOR GUIDELINES
FLOW AUDI AUTOMOTIVE EXPANSION
ARB Submittal
September 26, 2016