HomeMy WebLinkAboutSDP201700016 Review Comments Final Site Plan and Comps. 2017-05-23 liere Christopher Perez From: Christopher Perez Sent: Tuesday, May 23, 2017 9:14 AM To: Mark Graham Cc: David Benish Subject: RE: FINAL SITE PLAN READY FOR APPROVAL - SDP2017-16 Timberland Park Apt - Final Site Plan Mark, RE: SDP2017-16 Timberland Park Apt- Final Site Plan I went ahead and discussed the situation w/Megan and she threw me Section 32.4.3.6, which gives the agent the authority to sign provided we made a good faith effort to identify all deficiencies, and lists other SRC reviewers as providing"recommendations", see ordinance section below. Do you want to get into this a bit further with Robbie or should I provide him the following section of the ordinance and explain my position a bit further. 32.4.3.6 REVIEW AND ACTION ON FINAL SITE PLAN BY AGENT The agent shall review and act on a final site plan as follows: a. Review. The agent shall review the final site plan for compliance with all requirements, and shall make a good faith effort to identify all deficiencies, if any, during review of the plan. The agent shall consider the recommendation of the site review committee as to whether the plan complies with all applicable requirements and any statement by the developer. The agent also may consider any other evidence pertaining to the plan's compliance with the requirements of this chapter as deemed necessary for a proper review of the plan. c. Action to approve and notice of approval. if the agent determines that the final site plan complies with all applicable requirements, he shall approve and sign the plan, and may issue a letter to the developer informing the developer of the approval. The agent shall mail the letter by first class mail, personally deliver it to the developer, or, if consented to by the developer in writing, deliver it by fax or email. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Tuesday, May 23,2017 8:54 AM To: Mark Graham<mgraham@albemarle.org> Cc: David Benish <DBENISH@albemarle.org> Subject: FW: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan Mark, RE: SDP2017-16 Timberland Park Apt- Final Site Plan Please see the email correspondence below from Fire and Rescue's Robbie Gilmer after he learned I signed on his behalf to approve the above ref plan set. He is livid about it and is going to his Chief. I am sure you will hear 1 about this soon. Notably, I did not sign his name; rather, I wrote his name out and then initialed it CPP. After receiving such an email from staff I am inclined not to respond further. Christopher P.Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Robbie Gilmer Sent:Tuesday, May 23, 2017 8:36 AM To:Christopher Perez<cperez@albemarle.org> Subject: RE: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan Chris, I never gave you permission to sign on my behalf, by doing that you have committed two felonies by state law(forgery and uttering).You had my no objections for my last review not my approval for final signature. Did you make sure the final plans hadn't changed based on my last review? I've had two sets of plans that when it came time for signatures had changed so I make sure I always do a quick review before signing any plans. I get it was a trying situation but that doesn't give you the right to forge someone's signature even if your boss says it's ok. I'm not pleased with the way this was handled and I'll be talking to my chiefs about this situation. THANK YOU, ROBERT GILMER, CFEI CAPT/ASSIST FIRE MARSHAL ALBEMARLE COUNTY FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA. 22902 OFFICE 434-296-5833 CELL 434-531-6606 From:Christopher Perez Sent:Tuesday, May 23,2017 8:28 AM To: Robbie Gilmer<rgilmer@albemarle.org> Subject: RE: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan Robbie, RE: SDP2017-16 Timberland Park Apt- Final Site Plan This was a trying situation in which the plans were ready to be approved and the applicant was about to lose funding from the bank for the project. In light of this I was directed by Mark Graham to approve the site plan. I had received your tentative approval/no objection, so I signed on your behalf. Christopher P.Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 2 *410104 ti+NI From: Robbie Gilmer Sent:Tuesday, May 23,2017 8:24 AM To:Christopher Perez<cperez@albemarle.org> Subject: RE: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan Chris, I stopped by this morning to sign plans and noticed this plan wasn't there. I'm not sure who signed it for Fire Rescue, since I was off work and didn't send anyone in my place. Could you tell me who signed on behalf of Fire Rescue? THANK YOU, ROBERT GILMER, CFEI CAPT/ASSIST FIRE MARSHAL ALBEMARLE COUNTY FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA. 22902 OFFICE 434-296-5833 CELL 434-531-6606 From:Christopher Perez Sent: Friday, May 19, 2017 12:36 PM To: Moore,Adam PE (VDOT)<Adam.Moore@vdot.virginia.gov>; Robbie Gilmer<rgilmer@albemarle.org> Cc: Emily Cox<ecox@albemarle.org> Subject: RE: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan Adam & Robbie, SDP2017-16 Timberland Park Apt- Final Site Plan The above ref site plan is ready for approval and the applicant is in a frenzy. VDOT & Fire and Rescue are the only ones left to sign the final site plan. Can I sign these plans on your behalf? If not, please explain why for my discussions with the applicant and Mark Graham. Or maybe you could come in today and get this done before 3:30pm? Please let me know your thoughts. Thanks Christopher P.Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Wednesday, May 17, 2017 3:29 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org>; Emily Cox<ecox@albemarle.org>; 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; 'Alexander Morrison' <amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep<KHUCKSTE@albemarle.org>; Michael Dellinger<mdellinger@albemarle.org> Cc:Judy Martin-BC/ZS<imartin4@albemarle.org>; David Benish<DBENISH@albemarle.org> Subject: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan 3 All, . SDP2017-16 Timberland Park Apt- Final Site Plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. FYI - These applicants are on a tight deadline for approval due to financing, so if you could come in and sign sooner than later that would be much appreciated. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 4 •wr Christopher Perez From: Christopher Perez Sent: Monday, May 22, 2017 12:34 PM To: 'Kent O'Donohue' Cc: Emily Cox; 'William Moore' Subject: SUB2017-66— Timberland Park Apt Easement Plat Kent, SUB2017-66—Timberland Park Apt Easement Plat The deed of dedication was signed by Doug today, then the plat was approved by the subdivision agent. Both documents are available for you to pickup at the front desk and then record them in the clerks office. Once both are recorded send Emily and I the recordation recipient of that action. Additionally the final site plan is also at the front desk awaiting pickup. thanks Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent: Friday, May 19, 2017 4:10 PM To: Christopher Perez<cperez@albemarle.org>;Jen Surber<jensurber@surberdev.com> Cc:<mmelton@gemmanagement.net><mmelton@gemmanagement.net>; Emily Cox<ecox@albemarle.org> Subject: Re: SDP2017-16 Timberland Park Apt- Final Site Plan Chris, Thank you very much. I really appreciate all the extra effort you all have taken to get this done under these special circumstances. Are you able to provide us a letter to provide the bank? Once the Plat and Deed is approved I will come down to record it and I will pick up our copy of the plans then. Thanks, Kent Sent from my Verizon, Samsung Galaxy smartphone Original message From: Christopher Perez <cperez@albemarle.org> Date: 5/19/17 3:21 PM (GMT-05:00) To: Kent O'Donohue<dodonohue@balzer.cc>, Jen Surber<jensurber@surberdev.com> 1 Christopher Perez From: Christopher Perez Sent: Friday, May 19, 2017 3:43 PM To: 'Kent O'Donohue' Cc: Emily Cox Subject: RE: SDP2017-16 Timberland Park Apt - Final Site Plan Kent, To follow-up on all this. The final site plan &WPO are approved but we are still pending Doug Walker's signature on the deed of dedication, then approval of the plat, and then you need to record both of those docs in the clerk's office. From:Christopher Perez Sent: Friday, May 19, 2017 3:22 PM To: 'Kent O'Donohue'<dodonohue@balzer.cc>;Jen Surber<jensurber@surberdev.com> Cc:<mmelton@gemmanagement.net><mmelton@gemmanagement.net>; Emily Cox<ecox@albemarle.org> Subject:SDP2017-16 Timberland Park Apt- Final Site Plan Kent, SDP2017-16 Timberland Park Apt- Final Site Plan The final site plan has been approved. Signature copies are available for you to pickup. Christopher P. Perez 1 Senior Planner Department of Community Development!County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext. 3443 1 s fir/ Christopher Perez From: Mark Graham Sent: Friday, May 19, 2017 2:15 PM To: Christopher Perez Cc: Emily Cox Subject: RE: Planning Application Review for WP0201700005 Timberland Park Apartments - DIGITAL. Please consider this my authorization, as Agent,to go ahead and approve the site plan. Thanks to you and Emily for all your good work! Mark B Graham, P.E. Director of Community Development Albemarle County,Virginia From:Christopher Perez Sent: Friday, May 19, 2017 12:26 PM To: Mark Graham <mgraham@albemarle.org> Subject: FW: Planning Application Review for WP0201700005 Timberland Park Apartments- DIGITAL. Mark, SDP2017-16 Timberland Park Apt- Final Site Plan I'm in a bit of a soft bind here w/the WPO plan being approved today. I'm looking for you to help make this decision on the final site plan approval. The final site plan is ready to be approved pending the approval and recordation of the Easement Plat associated with the site plan (right-of-way dedication, ACSA easements, and SWM easements) &deed of dedication being signed by Doug Walker. The item was just approved to form by the County Attorney's office and is being routed to Doug for signature. Once Doug signs the above legal doc the plat can be signed. Once the plat is signed the applicant needs to record all those items in the clerks office. Once that happens the final site plan can be approved. Notably, it typically takes 10 days for all reviewers to sign the plans. In anticipation of this I sent the notice to all reviewers two days ago. But I still don't have all signatures on the plan. What are your thoughts? Christopher P.Perez Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road'Charlottesville,VA 22902 434.296.5832 ext.3443 From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent: Friday, May 19, 2017 11:50 AM To:Jen Surber<iensurber@surberdev.com>; Emily Cox<ecox@albemarle.org> Cc:<mmelton@gemmanagement.net><mmelton@gemmanagement.net>;Christopher Perez<cperez@albemarle.org>; Frank Pohl<fpohl@albemarle.org>;Ana Kilmer<akilmer@albemarle.org> Subject: Re: Planning Application Review for WP0201700005 Timberland Park Apartments-DIGITAL. 1 toils 411111110 4 • Thank you Emily for getting that done. We greatly appreciate it and I understand that the other items still cannot get done until the plat is approved. We will work diligently to get that done. Chris, Are you able to approve the SDP approval now and provide a revised letter without continegencies? I appreciate all of your help to get this done. Thanks, Kent Sent from my Verizon,Samsung Galaxy smartphone Original message From: Jen Surber<jensurber@surberdev.com> Date: 5/19/17 11:45 AM (GMT-05:00) To: Emily Cox <ecox@albemarle.org>, Kent O'Donohue<dodonohue@balzer.cc> Cc: "<mmelton@gemmanagement.net>" <mmelton(a,gemmanagement.net>, Christopher Perez <cperez@albemarle.org>, Frank Pohl <fpohl@albemarle.org>, Ana Kilmer<akilmer@,albemarle.org> Subject: Re: Planning Application Review for WP0201700005 Timberland Park Apartments - DIGITAL. Thank you so much, Emily. As you know,we are under an extremely tight deadline and I greatly appreciate your help in getting us through this step. Sincerely, Jen Surber 276-698-8760 (cell) Get Outlook for iOS From: Emily Cox<ecox@albemarle.org> Sent:Saturday, May 20,2017 12:40:57 AM To: Kent O'Donohue;Jen Surber Cc:Christopher Perez;Ana Kilmer; Frank Pohl Subject: Planning Application Review for WP0201700005 Timberland Park Apartments- DIGITAL. Kent, The Director of Community Development, Mark Graham, authorized me to approve the WPO Plan. See below. Please note that the land disturbance permit and DEQ permit will not be issued until the deed and plat are approved and recorded. Let me know if you have any questions. 2 The Review for the following application has been completed: Application Number=WPO201700005 Reviewer= Emily Cox Review Status =Approved Completed Date =05/19/2017 This email was sent from County View Production. Thanks! Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org 3 voilr Christopher Perez From: Moore,Adam PE (VDOT) <Adam.Moore@vdot.virginia.gov> Sent: Friday, May 19, 2017 1:20 PM To: Christopher Perez Subject: RE: FINAL SITE PLAN READY FOR APPROVAL- SDP2017-16 Timberland Park Apt- Final Site Plan Chris, Let this email serve as approval of the plan and for you to sign on my behalf. Adam J. Moore,P.E. I Assistant Resident Engineer—Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I VA main 434.422.9782 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday, May 19, 2017 12:36 PM To: Moore, Adam PE (VDOT); Robbie Gilmer Cc: Emily Cox Subject: RE: FINAL SITE PLAN READY FOR APPROVAL- SDP2017-16 Timberland Park Apt- Final Site Plan Adam &Robbie, SDP2017-16 Timberland Park Apt- Final Site Plan The above ref site plan is ready for approval and the applicant is in a frenzy. VDOT &Fire and Rescue are the only ones left to sign the final site plan. Can I sign these plans on your behalf? If not, please explain why for my discussions with the applicant and Mark Graham. Or maybe you could come in today and get this done before 3:30pm? Please let me know your thoughts. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Wednesday, May 17,2017 3:29 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org>; Emily Cox<ecox@albemarle.org>; 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; 'Alexander Morrison'<amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep<KHUCKSTE@albemarle.org>; Michael Dellinger<mdellinger@albemarle.org> Cc:Judy Martin-BC/ZS<imartin4@albemarle.org>; David Benish<DBENISH@albemarle.org> Subject: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan All, 1 SDP2017-16 Timberland Park Apt- Final Site Plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. FYI - These applicants are on a tight deadline for approval due to financing, so if you could come in and sign sooner than later that would be much appreciated. Thanks Christopher P.Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 2 fir/ '.4100 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Friday, May 19, 2017 11:50 AM To: Jen Surber; Emily Cox Cc: <mmelton@gemmanagement.net>; Christopher Perez; Frank Pohl;Ana Kilmer Subject: Re: Planning Application Review for WP0201700005 Timberland Park Apartments - DIGITAL. Thank you Emily for getting that done. We greatly appreciate it and I understand that the other items still cannot get done until the plat is approved. We will work diligently to get that done. Chris, Are you able to approve the SDP approval now and provide a revised letter without continegencies? I appreciate all of your help to get this done. Thanks, Kent Sent from my Verizon, Samsung Galaxy smartphone Original message From: Jen Surber<jensurber@surberdev.com> Date: 5/19/17 11:45 AM (GMT-05:00) To: Emily Cox<ecox@albemarle.org>, Kent O'Donohue<dodonohue@balzer.cc> Cc: "<mmelton@gemmanagement.net>" <mmelton@gemmanagement.net>, Christopher Perez <cperez@albemarle.org>, Frank Pohl <fpohl@albemarle.org>, Ana Kilmer<akilmer@albemarle.org> Subject: Re: Planning Application Review for WPO201700005 Timberland Park Apartments - DIGITAL. Thank you so much, Emily. As you know, we are under an extremely tight deadline and I greatly appreciate your help in getting us through this step. Sincerely, Jen Surber 276-698-8760 (cell) Get Outlook for iOS From: Emily Cox<ecox@albemarle.org> Sent:Saturday, May 20, 2017 12:40:57 AM To: Kent O'Donohue;Jen Surber Cc:Christopher Perez;Ana Kilmer; Frank Pohl Subject: Planning Application Review for WP0201700005 Timberland Park Apartments- DIGITAL. 1 Kent, The Director of Community Development, Mark Graham, authorized me to approve the WPO Plan. See below. Please note that the land disturbance permit and DEQ permit will not be issued until the deed and plat are approved and recorded. Let me know if you have any questions. The Review for the following application has been completed: Application Number= WPO201700005 Reviewer= Emily Cox Review Status =Approved Completed Date =05/19/2017 This email was sent from County View Production. Thanks! Emily Cox, PE Civil Engineer II 434 296-5832 Ext. 3565 1 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org 2 Christopher Perez From: Moore,Adam PE (VDOT) <Adam.Moore@vdot.virginia.gov> Sent: Friday, May 19, 2017 1:20 PM To: Christopher Perez Subject: RE: FINAL SITE PLAN READY FOR APPROVAL- SDP2017-16 Timberland Park Apt - Final Site Plan Chris, Let this email serve as approval of the plan and for you to sign on my behalf. Adam J. Moore,P.E. I Assistant Resident Engineer—Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I VA main 434.422.9782 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday, May 19, 2017 12:36 PM To: Moore, Adam PE (VDOT); Robbie Gilmer Cc: Emily Cox Subject: RE: FINAL SITE PLAN READY FOR APPROVAL - SDP2017-16 Timberland Park Apt - Final Site Plan Adam & Robbie, SDP2017-16 Timberland Park Apt- Final Site Plan The above ref site plan is ready for approval and the applicant is in a frenzy. VDOT &Fire and Rescue are the only ones left to sign the final site plan. Can I sign these plans on your behalf? If not, please explain why for my discussions with the applicant and Mark Graham. Or maybe you could come in today and get this done before 3:30pm? Please let me know your thoughts. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Wednesday, May 17, 2017 3:29 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org>; Emily Cox<ecox@albemarle.org>; 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; 'Alexander Morrison'<amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep<KHUCKSTE@albemarle.org>; Michael Dellinger<mdellinger@albemarle.org> Cc:Judy Martin-BC/ZS<imartin4@albemarle.org>; David Benish<DBENISH@albemarle.org> Subject: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan All, 1 10110 SDP2017-16 Timberland Park Apt- Final Site Plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. FYI - These applicants are on a tight deadline for approval due to financing, so if you could come in and sign sooner than later that would be much appreciated. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 2 Christopher Perez From: Christopher Perez Sent: Friday, May 19, 2017 12:36 PM To: 'Moore,Adam PE (VDOT)'; Robbie Gilmer Cc: Emily Cox Subject: RE: FINAL SITE PLAN READY FOR APPROVAL- SDP2017-16 Timberland Park Apt - Final Site Plan Adam& Robbie, SDP2017-16 Timberland Park Apt- Final Site Plan The above ref site plan is ready for approval and the applicant is in a frenzy. VDOT & Fire and Rescue are the only ones left to sign the final site plan. Can I sign these plans on your behalf? If not,please explain why for my discussions with the applicant and Mark Graham. Or maybe you could come in today and get this done before 3:30pm? Please let me know your thoughts. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Wednesday, May 17, 2017 3:29 PM To: Margaret Maliszewski<MMaliszewski@albemarle.org>; Emily Cox<ecox@albemarle.org>; 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; 'Alexander Morrison'<amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep<KHUCKSTE@albemarle.org>; Michael Dellinger<mdellinger@albemarle.org> Cc:Judy Martin-BC/ZS<jmartin4@albemarle.org>; David Benish<DBENISH@albemarle.org> Subject: FINAL SITE PLAN READY FOR APPROVAL-SDP2017-16 Timberland Park Apt- Final Site Plan All, SDP2017-16 Timberland Park Apt- Final Site Plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. FYI - These applicants are on a tight deadline for approval due to financing, so if you could come in and sign sooner than later that would be much appreciated. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Sur *uroo, Christopher Perez From: Christopher Perez Sent: Wednesday, May 17, 2017 3:29 PM To: Margaret Maliszewski; Emily Cox; 'Moore,Adam PE (VDOT)'; 'Alexander Morrison'; Robbie Gilmer; Keith Huckstep; Michael Dellinger Cc: Judy Martin - BC/ZS; David Benish Subject: FINAL SITE PLAN READY FOR APPROVAL- SDP2017-16 Timberland Park Apt - Final Site Plan All, SDP2017-16 Timberland Park Apt- Final Site Plan I have received tentative approvals from each of you on the above ref plan. It is now ready for County approval. Please come in within the next 7 days and sign the plan. The plans are located in the signature cubbyhole adjacent to Conference Room B. FYI - These applicants are on a tight deadline for approval due to financing, so if you could come in and sign sooner than later that would be much appreciated. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Christopher Perez From: Christopher Perez Sent: Wednesday, May 17, 20-17 7:52 AM To: Emily Cox Subject: FW:Timberland Park Apartments - Plat Emily, Because these folks are in such a rush be of financing I would like to get the final site plan signatures rolling, aka send out the"the final site plan is ready for approval" email to all reviewers to get them in the office and sign the plan. You are the final reviewer b4 it's approvable. If you could quickly check your eight remaining comments and let me know if you are good with the revised plan set. I'll take the copy back and drop the plans downstairs for the email to be sent out. And then we can keep moving on the plat and deed as this signature process takes 10 days. Thanks From:Christopher Perez Sent:Wednesday, May 17,2017 7:47 AM To: 'Kent O'Donohue'<dodonohue@balzer.cc>; David Pryzwansky<David@pryzlaw.com>;jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Emily Cox<ecox@albemarle.org> Subject: RE:Timberland Park Apartments- Plat Kent, The time line looks ok. I'll provide edits/comments below in red. From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Tuesday, May 16, 2017 5:32 PM To: David Pryzwansky<David@pryzlaw.com>;jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat All, After talking with John Colvin I want to clarify. What I described below is to achieve Permits as that is what was asked. Knowing that you all are looking for a letter that says the plans are approved without contingencies in order to close on the property without penalty (which is passed due and accruing as we speak), I will clarify the timeline for that. 1. David will have me the signed Plat on Thursday 5/18 via UPS. 2. On 5/18 we will sign the Plat seal and deliver it to the County for the County Attorney's signature. I do not need the County Attorney to sign the plat; rather, the Subdivision Agent (in this case me) signs the plat. I'm ready to sign the plat once I have notarized signatures on the plat. Send it over asap. 3. The County Attorney already has the Deed to sign, so once he has the Plat both can be signed. We received the deed yesterday but it will not be sent to the County Attorney for signatures till the signed plat is provided as that's the plat that the deed references. Once we have the plat I'll sign it/approve it and Emily will distribute it and the deed to the County Attorney's office for"approval to form"then off to Doug Walker for signature. Chris had previously told me this can take up to a week 5/25. It can take longer than a week. I would advise/stress to Emily to put a rush notice to the County Attorney's office on this approval once the plat comes in and request a 1 quick turnover due to financing issues.John will talk to the County Attorney and see if there is any way we can expedite that once the Plat is delivered.Yes, I'd advise you to do this. 4. When we have the signed Deed and Plat (5/19-5/26)then I will deliver them to the Clerk's Office for recordation.That day they will be recorded with a Deed Book (DB) and Page Number(PG) associated with them. Yes. 5. At this time I can give the DB&PG to the Engineering Department that can immediately approve the WPO plans. Yes. 6. At the time of WPO plan approval Chris can approve the SDP plans and provide a revised letter without contingencies.Yes. 7. Once this letter is received the property can be closed on with hopefully a minimal penalty and we can start the bonding and permitting processes. I am hoping that#4-6 can all be done in the same day. Chris, Please let me know if you think any of this is incorrect or is not feasible. This timeline is very critical with no room for error so if you see any issues please let us know. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: Kent O'Donohue Sent:Tuesday, May 16, 2017 3:56 PM To: 'David Pryzwansky'<David@pryzlaw.com>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat David, Recordation. My hope is that when the Deed and Plat are signed by the County I can drive there, pick them up,take them to the Clerk's Office myself and get them recorded that same day. If I can do that,then I will be delivering the DB & PG to the Engineering Department that day. Once they have that then they will send the Registration Statement to DEQ and approve the WPO plans. Once the WPO plans are approved then the SDP plans will be approved along with them receiving the DB& PG record. At this time the Building Permit can be applied for and the Grading Permit. This is a 2 very long and linear process. We can only do one thing at a time and once that one thing is done we can move on to the next. Exactly.This process started back in March with the Bond request. We are very close to the end though. Let me know if you have any further questions. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: David Pryzwansky [mailto:David@pryzlaw.com] Sent:Tuesday, May 16, 2017 3:37 PM To: Kent O'Donohue<dodonohue@balzer.cc>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat Kent—what is the final thing that needs to be done in order for the permits to be released? Recordation of the documents or just delivery of the Deed of Dedication and Plat to the County? David T. Pryzwansky The Pryzwansky Law Firm, P.A. 507 West Peace Street,Suite 101 Raleigh, NC 27603 919-828-8668(phone) 919-828-8202(fax) The information contained in this communication may be confidential, is intended only for the use of the recipient named above, and may be legally privileged. If the reader of this message is not the intended recipient,you are hereby notified that any dissemination,distribution,or copying of this communication,or any of its contents,is strictly prohibited. If you have received this communication in error, please re-send this communication to the sender and delete the original message and any copy of it from your computer system. Thank you. 3 (10 Circular 230 Disclosure:To ensure compliance with requirements imposed by the IRS,unless specifically indicated otherwise,any tax advice contained in this communication(including any attachments)was not intended or written to be used,and cannot be used,for the purpose of avoiding tax related penalties or promoting,marketing or recommending to another party any tax related matter addressed herein. From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Tuesday, May 16,2017 2:44 PM To: David Pryzwansky<David@pryzlaw.com>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject:Timberland Park Apartments- Plat David, Please see attached Plat that needs to be signed and notarized. These are 11x17 sheets that need to be printed at 100% size with no "scaling" or"fit to page" options selected. You only need to print SHEET 1 as this one needs the Owner's signature,date, and notary. SHEET 2 is provided for your own records. We will need a minimum of four copies wet signed and overnighted to us in a flat file if possible. If you would like any copies signed by the County for your records then please provide additional copies. Once we have them we will sign the surveyor seal and hand deliver them to the County. The address to mail these is: Balzer&Associates, Inc. Attn: Kent O'Donohue 1561 Commerce Road Suite 401 Verona,VA 24482 We need to get these to the County ASAP because it can take a week for the County Attorney to sign them. Once he has signed them we will deliver them to the Clerk's Office for recordation. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 4 Christopher Perez From: Christopher Perez Sent: Wednesday, May 17, 2017 7:47 AM To: 'Kent O'Donohue'; David Pryzwansky;jensurber@surberdev.com Cc: William Moore; Emily Cox Subject: RE: Timberland Park Apartments - Plat Kent, The time line looks ok. I'll provide edits/comments below in red. From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Tuesday, May 16, 2017 5:32 PM To: David Pryzwansky<David@pryzlaw.com>;jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat All, After talking with John Colvin I want to clarify. What I described below is to achieve Permits as that is what was asked. Knowing that you all are looking for a letter that says the plans are approved without contingencies in order to close on the property without penalty (which is passed due and accruing as we speak), I will clarify the timeline for that. 1. David will have me the signed Plat on Thursday 5/18 via UPS. 2. On 5/18 we will sign the Plat seal and deliver it to the County for the County Attorney's signature. I do not need the County Attorney to sign the plat; rather, the Subdivision Agent (in this case me) signs the plat. I'm ready to sign the plat once I have notarized signatures on the plat. Send it over asap. 3. The County Attorney already has the Deed to sign, so once he has the Plat both can be signed. We received the deed yesterday but it will not be sent to the County Attorney for signatures till the signed plat is provided as that's the plat that the deed references. Once we have the plat I'll sign it/approve it and Emily will distribute it and the deed to the County Attorney's office for"approval to form" then off to Doug Walker for signature. Chris had previously told me this can take up to a week 5/25. It can take longer than a week. I would advise/stress to Emily to put a rush notice to the County Attorney's office on this approval once the plat comes in and request a quick turnover due to financing issues.John will talk to the County Attorney and see if there is any way we can expedite that once the Plat is delivered.Yes, I'd advise you to do this. 4. When we have the signed Deed and Plat (5/19-5/26) then I will deliver them to the Clerk's Office for recordation. That day they will be recorded with a Deed Book (DB) and Page Number(PG) associated with them. Yes. 5. At this time I can give the DB&PG to the Engineering Department that can immediately approve the WPO plans. Yes. 6. At the time of WPO plan approval Chris can approve the SDP plans and provide a revised letter without contingencies. Yes. 7. Once this letter is received the property can be closed on with hopefully a minimal penalty and we can start the bonding and permitting processes. I am hoping that#4-6 can all be done in the same day. Chris, Please let me know if you think any of this is incorrect or is not feasible. This timeline is very critical with no room for error so if you see any issues please let us know. 1 Neve Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners •Architects • Engineers • Surveyors R n��4� Ri:�hmnnfl i [?h,,. �jn�l ,, Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: Kent O'Donohue Sent:Tuesday, May 16, 2017 3:56 PM To: 'David Pryzwansky'<David@pryzlaw.com>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat David, Recordation. My hope is that when the Deed and Plat are signed by the County I can drive there, pick them up, take them to the Clerk's Office myself and get them recorded that same day. If I can do that,then I will be delivering the DB & PG to the Engineering Department that day. Once they have that then they will send the Registration Statement to DEQ and approve the WPO plans. Once the WPO plans are approved then the SDP plans will be approved along with them receiving the DB& PG record. At this time the Building Permit can be applied for and the Grading Permit. This is a very long and linear process. We can only do one thing at a time and once that one thing is done we can move on to the next. Exactly.This process started back in March with the Bond request. We are very close to the end though. Let me know if you have any further questions. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Jai ii iCL. Glyl(ic;G'is '' Juiveyors Roanoke • Richmond • New River Valley•Staunton •Harrisonbur' Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc 2 Noe Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: David Pryzwansky [mailto:David@pryzlaw.com] Sent:Tuesday, May 16, 2017 3:37 PM To: Kent O'Donohue<dodonohue@balzer.cc>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject: RE:Timberland Park Apartments- Plat Kent—what is the final thing that needs to be done in order for the permits to be released? Recordation of the documents or just delivery of the Deed of Dedication and Plat to the County? David T. Pryzwansky The Pryzwansky Law Firm, P.A. 507 West Peace Street,Suite 101 Raleigh, NC 27603 919-828-8668(phone) 919-828-8202 (fax) The information contained in this communication may be confidential,is intended only for the use of the recipient named above, and may be legally privileged. If the reader of this message is not the intended recipient,you are hereby notified that any dissemination,distribution,or copying of this communication,or any of its contents, is strictly prohibited. If you have received this communication in error, please re-send this communication to the sender and delete the original message and any copy of it from your computer system. Thank you. Circular 230 Disclosure:To ensure compliance with requirements imposed by the IRS,unless specifically indicated otherwise,any tax advice contained in this communication(including any attachments)was not intended or written to be used,and cannot be used,for the purpose of avoiding tax related penalties or promoting,marketing or recommending to another party any tax related matter addressed herein. From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Tuesday, May 16, 2017 2:44 PM To: David Pryzwansky<David@pryzlaw.com>; jensurber@surberdev.com Cc:William Moore<wmoore@balzer.cc>; Christopher Perez<cperez@albemarle.org> Subject:Timberland Park Apartments- Plat David, Please see attached Plat that needs to be signed and notarized. These are 11x17 sheets that need to be printed at 100% size with no "scaling" or"fit to page" options selected. You only need to print SHEET 1 as this one needs the Owner's signature, date, and notary. SHEET 2 is provided for your own records. We will need a minimum of four copies wet signed and overnighted to us in a flat file if possible. If you would like any copies signed by the County for your records 3 then please provide additional copies. Once we have them we will sign the surveyor seal and hand deliver them to the County. The address to mail these is: Balzer&Associates, Inc. Attn: Kent O'Donohue 1561 Commerce Road Suite 401 Verona,VA 24482 We need to get these to the County ASAP because it can take a week for the County Attorney to sign them. Once he has signed them we will deliver them to the Clerk's Office for recordation. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. 'iasiste fs » r uuiE;eb • Enyinetrs • Susveyors Roanoke• Richmond • New River Valley•Staunton • Harrisonh, Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 4 Short Review Comments Report for: SDP201700016 SubApplication Type: TIMBERLAND PARK APARTMENTS - FINAL DIGITAL Final Site Development Plan Date Completed:04/07/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments:1. WPO Plan (WPO 201700005) must be approved before final site plan can be approved. 2. The cover sheet should reference SDP201700016, which is the final site plan number. 3. Per the Engineering Design Standards Manual, Section 8, any slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plans. Please add this note on the plan for any slopes steeper than 3:1. 4. Note that a building permit will be required for the retaining walls. 5. Please show a ‘SWM Facility Easement’ around all SWM facilities. (County Code 18-32.7.4) This should match what is shown on the WPO Plan. 6. VDOT entrance permit will be required. 7. Note that storm systems are under review with the VSMP Plan. 8. Please show the location of the proposed temporary grading easement on the plans. Division: Date Completed:04/26/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/25/2017 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:The plans are currently under construction plan review. I spoke with the engineer this morning and will be sending out comments this week. I am coordinating another plan between this site and 5th Street Place for required sewer improvements for both sites. It looks like they just about have the cost sharing worked out which I would like in place before I approve these plans. Division: Date Completed:04/11/2017 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/29/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Approved Reviews Comments:Approved. Division: Date Completed:04/25/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments: Based on plans dated 3/14/17. No comments or objections. Division: Date Completed:04/25/2017 Reviewer:Keith Huckstep CDD InspectionsDivision: Page:1 of 2 County of Albemarle Printed On:August 24, 2017 Review Status:No Objection Reviews Comments: Date Completed:04/18/2017 Reviewer:Derek Bedarf CDD E911 Review Status:No Objection Reviews Comments:NO OBJECTION - Based on plans dated 3/14/17. Division: Date Completed:05/01/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/10/2017 Reviewer:Adam Moore VDOT Review Status:Approved Reviews Comments: Division: Date Completed:05/17/2017 Reviewer:Emily Cox CDD Engineering Review Status:No Objection Reviews Comments:-Approved pending WPO VSMP approval. Division: Date Completed:05/16/2017 Reviewer:Christopher Perez CDD Planning Review Status:No Objection Reviews Comments: Division: Date Completed:05/16/2017 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:August 24, 2017 Christopher Perez From: Christopher Perez Sent: Tuesday, May 16, 2017 9:50 AM To: 'Alexander Morrison' Subject: RE: SDP2017-16 Timberland Park Apt — final site plan Alex, Ok, I'll go ahead and list you in Countyview as "No objections" on the final site plan. Once the easement plat is approved/recorded in the clerks office then I can send out the notification to all SRC reviewers to come in and sign (approved) the final site plans. From: Alexander Morrison [mailto:amorrison@serviceauthority.org] Sent: Tuesday, May 16, 2017 9:41 AM To: Christopher Perez <cperez@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apt — final site plan I am working through the approval package. Once I have all signatures it will be approved. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Christopher Perez [mailto:cperez@albemarle.orq] Sent: Tuesday, May 16, 2017 9:40 AM To: Alexander Morrison Subject: SDP2017-16 Timberland Park Apt — final site plan Alex, SDP2017-16 Timberland Park Apt — final site plan Has ACSA approved the revised set that they recently sent you? The easement plat still needs revisions and for everyone to sign off on it, but I wanted to touch base with you about the site plan ... have yall approved that yet? From: Alexander Morrison[mailto:amorrison@serviceauthority.org] Sent: Tuesday, May 16, 2017 9:37 AM To: Christopher Perez <cperez@albemarle.org> Subject: Call Follow -Up Chris, I see I missed a call from you. I am in a meeting now. Wanted to check in and see what you needed. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 Christopher Perez From: Christopher Perez Sent: Thursday, May 11, 2017 3:45 PM To: 'William Moore'; Kent O'Donohue Cc: Andrew Gast-Bray; David Benish Subject: RE: SDP2017-16 Timberland Park Apt - Final Site Plan Attachments: 5-11-17 SDP2017-16 Timberland Park Apt - Final Site Plan What is left prior to approval.pdf William/Kent, See attached revised letter. Hope this helps. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: William Moore [mailto:wmoore@balzer.cc] Sent:Thursday, May 11, 2017 3:41 PM To: Christopher Perez<cperez@albemarle.org>; Kent O'Donohue<dodonohue@balzer.cc> Cc:Andrew Gast-Bray<agastbray@albemarle.org>; David Benish<DBENISH@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apt- Final Site Plan Chris, Bill William S. Moore, PE Associate Balzer and Associates, Inc. Pianners •Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley•Staunton • Harrisonburg Phone 540.433.1908 • Mobile 540.294.0258 Website: www.balzer.cc From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday, May 11, 2017 3:08 PM To: Kent O'Donohue<dodonohue@balzer.cc> Cc:William Moore<wmoore@balzer.cc>;Andrew Gast-Bray<agastbray@albemarle.org>; David Benish <DBENISH@albemarle.org> Subject:SDP2017-16 Timberland Park Apt- Final Site Plan 1 rr 4111110 Kent, SDP2017-16 Timberland Park Apt- Final Site Plan Attached is the letter for you/your bank, take a look at it and let me know if you need anything else added to this letter or if you prefer a specific modification. Overall, I think we are almost done with this project and ready for approval. I have the hard copies of the final site plan in my hands and will look them over come Tuesday. Again, sorry for the delay in responding to your request but I was attending out of town training and did not receive your request till today. I'll work with our computer folks here at the County to figure out why my out of the office email response didn't get sent to you. Hope this helps. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday, May 11, 2017 8:45 AM To:Christopher Perez<cperez@albemarle.org> Cc:William Moore<wmoore@balzer.cc> Subject:Timberland Park Apartments- Letter Request Mark(But now Chris), We have a dilemma and I am hoping you can help us out with it. Our client has a past due deadline from a bank with a credit violation of upwards of$1 million since this project is VHDA. I know I would not like to lose $1 million and I am sure you would not either. The bank has really waited as long as they can past this deadline. Our client says all she needs is a letter from the County saying that plans are approved contingent on any Agreements, Easements, or any *ther non-plan related items needing to be addressed. Since I got comments in April I have very quickly addressed all comments with ACSA,VDOT, Engineering, and Planning as follows: • Engineering comments were identical to the WPO comments which have been addressed and the WPO plans are approved with these changes reflected on them barring Easement Deeds. • ACSA had some minor changes like pipe material, additional hydrants, and relocation of some building connections. All of these have been made and approved my ACSA via email as attached. There will be a Deed and Plat approval pending. • VDOT had no plan changes. Attached is the email that plans are adequate barring a Maintenance Agreement for the retaining walls which has been sent to them. There will also be a Deed and Plat approval pending. • Planning had some landscaping and setback note changes. Those have been addressed and approved via email. With these departments changes to the plans the physical hard copy of the plans are approvable. We understand that you have a process to get signatures and you want Deeds and agreements and etc. taken care of first before you might sign the plans. But our client just needs a letter stating that the plans are approvable as is with a contingency that certain agreements and deeds are taken care of. This does not need to be an official County approval. We just need documentation to give to the bank. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager 2 slow %%id Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 3 • • N � r I", r'fRonr County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone:434-296-5832 Memorandum To: Kent O'Donohue,Jr. From: Christopher P. Perez, Senior Planner Division: Planning Date: May 11,2017 Subject: SDP2017-16 Timberland Park Apt-Final Site Plan The above referenced final site plans are approved contingent on the following: 1)Approval&Recordation of SUB2017-66-Easement Nat (Plat showing VDOT R/W dedication, SWM Facility Easement,Proposed Water and Sewer Easements) 2)Approval of WP02017-5—Virginia Stormwater Management Program(VSMP)Permit If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443,cperez@albemarle.org. Sincerely, Christopher P. Perez Senior Planner 1 • a�ALat, 1- _ :T ali i �'�IiGI1�P County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone:434-296-5832 Memorandum To: Kent O'Donohue,Jr. From: Christopher P. Perez,Senior Planner Division: Planning Date: May 11,2017 Subject: SDP2017-16 Timberland Park Apt-Final Site Plan FetiAI Si ie- 'JAW .r geePoved The above referenced is•are-epprat=ebie contingent on the following: 1)Approval&Recordation of SUB2017-66-Easement Plat (Plat showing VDOT R/W dedication,SWM Facility Easement,Proposed Water and Sewer Easements) 2)Approval of WP02017-5—Virginia Stormwater Management Program(VSMP)Permit • . . • L - . • e4 . •. . .- !t• - . . ... . •. . . .r. co. - . . , . •. •. • . . If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443,cperez@albemarle.org. Sincerely, •Christopher P.Perez Senior Planner 1 Christopher Perez From: Christopher Perez Sent: Thursday, May 11, 2017 3:27 PM To: 'Kent O'Donohue' Cc: 'William Moore'; Emily Cox Subject: RE: SDP2017-16 Timberland Park Apt - Final Site Plan Attachments: SDP2017-16 Timberland Park Apt - Final Site Plan What is left prior to approval 5-11-17.pdf Kent, SDP2017-16 Timberland Park Apt- Final Site Plan I just received an email from Ana stating the storinwater management agreement was approved and recorded today. Thus I have modified the letter, see attached. Take a look at it and let me know if you need anything else added to this letter or if you prefer a specific modification. Hope this helps. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Christopher Perez Sent:Thursday, May 11, 2017 3:08 PM To: 'Kent O'Donohue' <dodonohue@balzer.cc> Cc:William Moore<wmoore@balzer.cc>; Andrew Gast-Bray<agastbray@albemarle.org>; David Benish <DBENISH@albemarle.org> Subject:SDP2017-16 Timberland Park Apt- Final Site Plan Kent, SDP2017-16 Timberland Park Apt- Final Site Plan Attached is the letter for you/your bank, take a look at it and let me know if you need anything else added to this letter or if you prefer a specific modification. Overall, I think we are almost done with this project and ready for approval. I have the hard copies of the final site plan in my hands and will look them over come Tuesday. Again, sorry for the delay in responding to your request but I was attending out of town training and did not receive your request till today. I'll work with our computer folks here at the County to figure out why my out of the office email response didn't get sent to you. Hope this helps. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday, May 11, 2017 8:45 AM 1 (1111i' Now To:Christopher Perez<cperez@albemarle.org> Cc:William Moore<wmoore@balzer.cc> Subject:Timberland Park Apartments-Letter Request Mark(But now Chris), We have a dilemma and I am hoping you can help us out with it. Our client has a past due deadline from a bank with a credit violation of upwards of$1 million since this project is VHDA. I know I would not like to lose$1 million and I am sure you would not either. The bank has really waited as long as they can past this deadline. Our client says all she needs is a letter from the County saying that plans are approved contingent on any Agreements, Easements, or any other non-plan related items needing to be addressed. Since I got comments in April I have very quickly addressed all comments with ACSA,VDOT, Engineering, and Planning as follows: • Engineering comments were identical to the WPO comments which have been addressed and the WPO plans are approved with these changes reflected on them barring Easement Deeds. • ACSA had some minor changes like pipe material,additional hydrants, and relocation of some building connections. All of these have been made and approved my ACSA via email as attached. There will be a Deed and Plat approval pending. • VDOT had no plan changes. Attached is the email that plans are adequate barring a Maintenance Agreement for the retaining walls which has been sent to them. There will also be a Deed and Plat approval pending. • Planning had some landscaping and setback note changes. Those have been addressed and approved via email. With these departments changes to the plans the physical hard copy of the plans are approvable. We understand that you have a process to get signatures and you want Deeds and agreements and etc.taken care of first before you might sign the plans. But our client just needs a letter stating that the plans are approvable as is with a contingency that certain agreements and deeds are taken care of. This does not need to be an official County approval. We just need documentation to give to the bank. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners •Architects• Engineers • Surveyors Roanoke • Richmond •New River Valley•Staunton• Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 2 Niro z ALN, Ji IIIA Aria County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone:434-296-5832 Memorandum To: Kent O'Donohue,Jr. From: Christopher P.Perez,Senior Planner Division: Planning Date: May 11,2017 Subject: SDP2017-16 Timberland Park Apt-Final Site Plan The above referenced plans are approvable contingent on the following: 1)Approval&Recordation of SUB2017-66-Easement Plat (Plat showing VDOT R/W dedication,SWM Facility Easement,Proposed Water and Sewer Easements) The following are required prior to the above ref plan approval: -a couple minor changes to the plan(notes changes) 2)Approval of WP02017-5—Virginia Stormwater Management Program(VSMP)Permit The following are required prior to the above ref plan approval: -a minor note change to the plan -four(4)hard copies of the plan -two(2)hard copies of calculations and SWPPP If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443,cperez@albemarle.org. Sincerely, Christopher P.Perez Senior Planner 1 .,s Christopher Perez From: Christopher Perez Sent: Thursday, May 11, 2017 3:08 PM To: 'Kent O'Donohue' Cc: William Moore; Andrew Gast-Bray; David Benish Subject: SDP2017-16 Timberland Park Apt - Final Site Plan Attachments: SDP2017-16 Timberland Park Apt - Final Site Plan_Items left prior to approval 5-11-17.pdf Kent, SDP2017-16 Timberland Park Apt- Final Site Plan Attached is the letter for you/your bank, take a look at it and let me know if you need anything else added to this letter or if you prefer a specific modification. Overall, I think we are almost done with this project and ready for approval. I have the hard copies of the final site plan in my hands and will look them over come Tuesday. .Again, sorry for the delay in responding to your request but I was attending out of town training and did not receive your request till today. I'll work with our computer folks here at the County to figure out why my out of the office email response didn't get sent to you. Hope this helps. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday, May 11, 2017 8:45 AM To: Christopher Perez<cperez@albemarle.org> Cc:William Moore <wmoore@balzer.cc> Subject:Timberland Park Apartments- Letter Request Mark(But now Chris), We have a dilemma and I am hoping you can help us out with it. Our client has a past due deadline from a bank with a credit violation of upwards of$1 million since this project is VHDA. I know I would not like to lose$1 million and I am sure you would not either. The bank has really waited as long as they can past this deadline. Our client says all she needs is a letter from the County saying that plans are approved contingent on any Agreements, Easements, or any other non-plan related items needing to be addressed. Since I got comments in April I have very quickly addressed all comments with ACSA,VDOT, Engineering, and Planning as follows: • Engineering comments were identical to the WPO comments which have been addressed and the WPO plans are approved with these changes reflected on them barring Easement Deeds. • ACSA had some minor changes like pipe material, additional hydrants, and relocation of some building connections. All of these have been made and approved my ACSA via email as attached. There will be a Deed and Plat approval pending. • VDOT had no plan changes. Attached is the email that plans are adequate barring a Maintenance Agreement for the retaining walls which has been sent to them. There will also be a Deed and Plat approval pending. • Planning had some landscaping and setback note changes. Those have been addressed and approved via email. i ,w, yew With these departments changes to the plans the physical hard copy of the plans are approvable. We understand that you have a process to get signatures and you want Deeds and agreements and etc.taken care of first before you might sign the plans. But our client just needs a letter stating that the plans are approvable as is with a contingency that certain agreements and deeds are taken care of. This does not need to be an official County approval. We just need documentation to give to the bank. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Arc . • Surveyors Roanoke• Richmond •New River Valley•Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, .`,# specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 2 CR A1.1;•A 111 `Ji •'lilll /MAN\N County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone:434-296-5832 Memorandum To: Kent O'Donohue,Jr. From: Christopher P.Perez, Senior Planner Division: Planning Date: May 11,2017 Subject: SDP2017-16 Timberland Park Apt- Final Site Plan The above referenced plans are approvable contingent on the following: Prt 1)Approval&Recordation of SUB2017-66-Easement Plat (Plat showing VDOT R/W dedication,SWM Facility Easement,Proposed Water and Sewer Easements) The following are required prior to the above ref plan approval: -a couple minor changes to the plan(notes changes) -approval of the stormwater management agreement(maintenance agreement),which is the same document required for WPO2017-5 2)Approval of WP02017-5—Virginia Stormwater Management Program(VSMP)Permit The following are required prior to the above ref plan approval: -a couple minor changes to the plan(notes changes) -approval of the stormwater management agreement(maintenance agreement) If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443,cperez@albemarle.org. Sincerely, Christopher P.Perez Senior Planner 1 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Thursday, May 11, 2017 8:45 AM To: Christopher Perez Cc: William Moore Subject: Timberland Park Apartments - Letter Request Attachments: RE:Timberland Park Apartments - Hard Copy Plans; FW:Timberland Park Apartments; FW:Timberland Park Apartments; RE: SDP2017-16 Timberland Park Apt— Final Site Plan Mark(But now Chris), We have a dilemma and I am hoping you can help us out with it. Our client has a past due deadline from a bank with a credit violation of upwards of$1 million since this project is VHDA. I know I would not like to lose$1 million and I am sure you would not either. The bank has really waited as long as they can past this deadline. Our client says all she 4eeneeds is a letter from the County saying that plans are approved contingent on any Agreements, Easements, or any other non-plan related items needing to be addressed. Since I got comments in April I have very quickly addressed all comments with ACSA,VDOT, Engineering, and Planning as follows: •_--Engineering comments were identical to the WPO comments which have been addressed and the WPO plans are approved with these changes reflected on them barring Easement Deeds. • ACSA had some minor changes like pipe material, additional hydrants, and relocation of some building connections. All of these have been made and approved my ACSA via email as attached. There will be a Deed and Plat approval pending. • VDOT had no plan changes. Attached is the email that plans are adequate barring a Maintenance Agreement for the retaining walls which has been sent to them. There will also be a Deed and Plat approval pending. • Planning had some landscaping and setback note changes. Those have been addressed and approved via email. With these departments changes to the plans the physical hard copy of the plans are approvable. We understand that you have a process to get signatures and you want Deeds and agreements and etc. taken care of first before you might sign the plans. But our client just needs a letter stating that the plans are approvable as is with a contingency that certain agreements and deeds are taken care of. This does not need to be an official County approval. We just need documentation to give to the bank. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley•Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. 1 Nravre `"ter/' ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. • 2 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Thursday, May 11, 2017 8:43 AM To: Christopher Perez Cc: William Moore Subject: RE:Timberland Park Apartments - Hard Copy Plans Thank you. But FYI I never got an auto response from your email so I do not think it was setup correctly. Also we have been calling David as well and have gotten no responses. I was literally just about to email Mark Graham. I will remove him from the email and just send it to you because it is a good summary of what we need. Thanks, 416. D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager 51d- c Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors y- Cti( eyv,w'S Roanoke• Richmond • New River Valley•Staunton•Harrisonburg tv` // / Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 (SCG i 44 6- / w�;,S /fie . Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday, May 11, 2017 8:39 AM To: Kent O'Donohue<dodonohue@balzer.cc> Cc:William Moore <wmoore@balzer.cc> .Subject: RE:Timberland Park Apartments- Hard Copy Plans Kent, YI - I've been out of the office since Thursday COB. I set my email auto response to alert emailers Only .sence. I just returned to the office today. I'm just getting into all my emails and will check my mail for the plans also. From: Kent O''Donohue [mailto:dodonohue@balzer.cc] Sent:Tuesday, IVlay 0 2017 12:40 PM To: Christopher Perez<c er utl�m�,rfc. 1 Cc:William Moore<wmoore@balzer.cc> Subject:Timberland Park Apartments- Hard Copy Plans Chris, 4 Copies of the Site plans with all department comments addressed and approved have been delivered to the front counter. They should have a sticky note on them with your name on it. Do you have an update on being able to get a letter for our client about the plans being approved as is with a contingency for a few agreements and plats that are currently being processed? Thanks, 4 D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond •New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates,Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 2 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Wednesday, May 10, 2017 6:37 PM To: Christopher Perez; Andrew Gast-Bray Cc: William Moore Subject: RE: Timberland Park Apartments - Hard Copy Plans Chris, I do not know why I have not heard from you but I have emailed and called you many times asking for correspondence and some kind of guidance with this issue that our client has and we have tried to call you and David many times and have heard nothing. This is extremely unprofessional and it is disappointing when localities are not even remotely ,responsive to people's needs. If I do not hear anything by 8am tomorrow morning then I am going to assume you are just ignoring me and I will very quickly start_emailing, calling, and showing up to everybody up the chain at the County until I get some kind of response. I had this same problem with JT on a project a while ago and for 6 months—he never responded to myinauiries fl This Is unacceptable andway_to_do-business. Even if you do not know what to tell me just a general sincere reply is always appreciated to let me know that we are not being ignored and you are taking our concerns into consideration. There are many times clients(like right now) are pounding down my door requesting demands and ignoring them is never an option even if I am working on getting them their request and just need more time. Even a simple phone call can go a long way. There may even be something I can help you with to get it done. Communication is a two way thing. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. 7 Planners • Architects• Engineers • Surveyors � e " - _- - Roanoke • Richmond • New River Valley•Staunton • Harrisonburg C` b Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 � ��'� ,/ -� W0t5 �' "4•" Website: www.balzer.cc Pr 50 v44:301 ApA amA,t,,cc etA Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electPbrYi��l Th a es recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: Kent O'Donohue Sent:Tuesday, May 09, 2017 5:00 PM To: Christopher Perez<cperez@albemarle.org> Cc: Bill Moore <wmoore@balzer.cc> Subject: RE:Timberland Park Apartments- Hard Copy Plans 1 MOW 411111110' 141111111110 Chris, • Do you have any correspondence for us? If we do not hear anything soon then our client will be driving there tomorrow and will want to meet with someone. All she needs is a letter showing progress that the plans are adequate. The bank does not care about plats or agreements or anything else at this time,they just want to know there is a current plan set approved that meets County requirements. If you are working on something please let me know, but I need to hear something so I can get with our client and avoid her driving there tomorrow. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners• Architects• Engineers • Surveyors Roanoke • Richmond • New River Valley• Staunton•Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. From: Kent O'Donohue Sent:Tuesday, May 09, 2017 12:40 PM To: Christopher Perez<cperez@albemarle.org> Cc: Bill Moore<wmoore@balzer.cc> Subject:Timberland Park Apartments- Hard Copy Plans Chris, 4 Copies of the Site plans with all department comments addressed and approved have been delivered to the front counter. They should have a sticky note on them with your name on it. Do you have an update on being able to get a letter for our client about the plans being approved as is with a contingency for a few agreements and plats that are currently being processed? Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Pianners • Aichitects • Lngineers • Surveyors Roanoke• Richmond • New River Valley•Staunton• Harrisonburg 2 Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional,due to,among other causes,transmission,conversion,media degradation,software error,or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates,Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates,Inc. 3 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Monday, May 08, 2017 12:07 PM To: Christopher Perez Subject: RE: SDP2017-16 Timberland Park Apt— Final Site Plan Chris, I left you a voicemail as well. Feel free to call me to discuss if that is easier or you have more questions. Alex is working to get me plan approval today based on the minor changes to the plans I sent him last week based on his comments. Once I have approval from him I will be sending or delivering 4 hard copies to you for signatures barring the deeds and plat approvals needed for WPO,VDOT,and ACSA. The client needs to get the bank an approval letter by today with a condition of these items needing to be addressed. They basically need to know the physical plans themselves are good with everyone,they are not concerned about the deeds and everything. She will try to delay the bank a day or two to get this letter but she really needs it or it can cost her a significant amount of money. Is this something you can provide for her once I get you hard copies approved by ACSA(we previously had VDOT approval and your approval based on prior plan coordination via email and we already had other department approvals)? I do apologize for this rushed request but since it is a VHDA project they have very strict timeline requirements and if they are not met then they impose very harsh penalties. Just to help summarize and to be sure we have everything covered for conditional approval: VDOT= Maintenance Agreement for the retaining walls& ROW Dedication Plat/Deed ACSA=ACSA Easement Dedication Plat/Deed WPO=SWM Easement Dedication Plat/Deed (SWM Maintenance Agreement has been delivered and currently being recorded by the County) Please let me know if I am leaving anything out, but based on conversations and comment letters this is my understanding of what is needed at this point for SDP&WPO approval. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports,documents,or other information recorded on or transmitted as electronic media, including but not limited to"CAD Documents", are subject to undetectable alteration, either intentional or unintentional,due to,among other causes,transmission,conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. 1 The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc. and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. Original Message From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, May 01, 2017 11:10 AM To: Kent O'Donohue<dodonohue@balzer.cc> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan A min of 4 copies for signature (3 for our office: 1 for the file, 2 for zoning)& 1 for you. Original Message From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent: Monday, May 01, 2017 11:06 AM To:Christopher Perez<cperez@albemarle.org> Subject: RE:SDP2017-16 Timberland Park Apt—Final Site Plan Thanks Chris. FYI,VDOT is good and they do not have any other proposed plan changes. He did provide me a template Maintenance Agreement from the retaining walls, so we are working on getting that taken care of with the client. And of course we need to get the Plat taken care of if there are comments on that. Also, I have ACSA comments and they require some minor adjustments to some connections. So aside from the Plat we should be good here as well. So once I make those ACSA changes and get his approval on the changes I will get final plans to you for approval which cannot be signed obviously until we have the Plat and Agreements all taken care of. How many hard copies do you need again for signatures? Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports, documents, or other information recorded on or transmitted as electronic media,including but not limited to"CAD Documents", are subject to undetectable alteration, either intentional or unintentional, due to, among other causes,transmission,conversion, media degradation, software error, 2 or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc.and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. Original Message From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, May 01, 2017 10:42 AM To: Kent O'Donohue<dodonohue@balzer.cc> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Great work. Looks good.Attached are the revised comments taking into account the new landscape plan. Original Message From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday,April 27, 2017 2:51 PM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specifications, reports,documents,or other information recorded on or transmitted as electronic media, including but not limited to"CAD Documents",are subject to undetectable alteration,either intentional or unintentional, due to, among other causes,transmission, conversion, media degradation, software error, or human alteration. Accordingly,all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc. and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. 3 Original Message From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday,April 27,2017 2:31 PM To: Kent O'Donohue<dodonohue@balzer.cc> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Kent, I'll take a look at it hopefully by COB Friday but most likely sometime Monday. Original Message From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday,April 27, 2017 12:30 PM To:Christopher Perez<cperez@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Chris, Attached is the LA Plan and Schedule with all of the additional plantings you did not previously see as well as the corrections you requested in the comments. You will see with the buffer strip, I left the deciduous trees because that was ARB related, but I did move them back 10' so the are 20'from the sidewalk. The shrubs are 10'O.C.diagonally, but horizontally they are 12'. The code was not clear eaxactly where that 10' spacing occurs. Which this staggered configuration you end up with a 16' shrub buffer with the ARB trees 4' behind that. If you could please review this and let me know if this does not address your coments I would appreciate it. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley• Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports,documents,or other information recorded on or transmitted as electronic media, including but not limited to"CAD Documents", are subject to undetectable alteration, either intentional or unintentional,due to, among other causes,transmission, conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc. and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon 4 SrarreS by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. Original Message From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,April 26, 2017 11:06 AM To: Kent O'Donohue<dodonohue@balzer.cc> Cc:William Moore<wmoore@balzer.cc> Subject: Recall: SDP2017-16 Timberland Park Apt—Final Site Plan Christopher Perez would like to recall the message, "SDP2017-16 Timberland Park Apt—Final Site Plan ". 5 Stied ''01111/11011 Christopher Perez ( Afo rik pl,\A From: Bedsaul, Willis C. (VDOT) <Willis.Bedsaul@VDOT.Virginia.gov> Sent: Wednesday, May 10, 2017 2:07 PM To: Christopher Perez Cc: Moore,Adam PE (VDOT) Subject: RE: SDP-2017-16-Timberland Park Apartments-Final Site Plan Attachments: SDP-2017-00016 Plan - Revised-TIMBERLAND PARK APT - FINAL SITE PLAN-5-10-17.pdf; 2017-05-08 Declaration of Perpetual Maintenance to VDOT - 5-10-17-Timberland SIG....pdf Chris, Please see response to questions 1 through 5,attached you'll find the revised review letter along with the maintenance agreement for retaining wall. If you have any questions please call. 1. Sheet C5;offsite grading within the 64 right of way, have reviewed and find it to be generally acceptable. 2. Sheet C18;have reviewed plans and find it to be generally acceptable. 3. Received maintenance agreement,and find it to be generally acceptable. 4. Have reviewed plans and find it to be generally acceptable. 5. This has been corrected please see revised attached review letter. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-717-0005 From: Christopher Perez [mailto:cperez(aalbemarle.orq] Sent: Wednesday, April 26, 2017 3:02 PM To: Bedsaul, Willis C. (VDOT) Cc: Moore, Adam PE (VDOT) Subject: RE: SDP-2017-16-Timberland Park Apartments-Final Site Plan I want VDOT to confirm you looked at the following: 1) sheet C5,offsite grading within the 64 right of way(do you have everything you need for this, at SRC you admitted you didn't see this aspect of the plan). 2) sheet C18, proposed sidewalk in VDOT r/w(is this adequate). 3) retaining wall adjacent to r/w(did they provide you all you need to approve this, be at SRC you mentioned if it fails it's going to come down in the R/W). 4) sheet C3, R/W dedication, yall don't mention anything about this is your letter 5) the comment letter referenced Scott Collins as doing the plans?These plans were done by Kent O'Donohue 1 • From: Bedsaul,Willis C. (VDOT) [mailto:Willis.Bedsaul@VDOT.Virginia.gov] Sent:Wednesday,April 26, 2017 11:30 AM To:Christopher Perez<cperez@albemarle.org> Cc: Moore,Adam PE (VDOT)<Adam.Moore@vdot.virginia.gov> Subject: RE:SDP-2017-16-Timberland Park Apartments-Final Site Plan Hello Chris, Can you please follow up with me in an email with your concerns, per our phone conversation , on exactly what you want me to go back and review on the above subject. I'm currently in the process of another review, and I don't want anything to slip by our review. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-717-0005 From: Christopher Perez [mailto:cperez©albemarle.orq] Sent: Wednesday,April 26, 2017 10:09 AM To: Bedsaul, Willis C. (VDOT) Cc: Moore, Adam PE (VDOT) Subject: RE: SDP-2017-16-Timberland Park Apartments-Final Site Plan Willis, SDP2017-16 Timberland Park Apt I thought the comments on the above proposal came from Adam, after hunting down the email it appears to be from you. Can you give me a quick call on this plan. Attached are your comments. Thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Bedsaul,Willis C. (VDOT) [mailto:Willis.Bedsaul@VDOT.Virginia.gov] Sent: Friday, March 31, 2017 8:41 AM To:Christopher Perez<cperez@albemarle.org> Cc: Moore,Adam PE (VDOT)<Adam.Moore@vdot.virginia.gov> Subject:SDP-2017-16-Timberland Park Apartments-Final Site Plan 2 `rte sumo, Chris, Attached you'll find the review comment letter on the above subject. If you have any questions please call. County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Chris Perez Re: Timberland Park Apartments SDP-2017-16 Final Site Plan Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, most recently revised 14 March 2017, and offer the following comments: 1. Please show and provide calculations on plans that the existing culvert crossing SR 780 is adequate in the post development condition. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired please contact me at (434) 422-9782. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-717-0005 3 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of approval for the initial site plan 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. Final: Comment addressed. 2. 132.5.1(c), 4.191 Front Setbacks/Non-Infill. The property meets the definition of a corner lot (abutting on two or more rects at their intersection). Front maximums do not apply to a corner lot abutting a principal arterial highway. Revise the Front Setbacks as follows: "Minimum Front Setback— 5 feet. Maximum Front Setback— None. " Final: Comment addressed. Also, list Non -Infill Stepbacks as: "Front Stepback on Old Lynchburg Road — the third story of Building 2 Shall be stepped back a minimum of 15 feet". Final: Comment no longer relevant. Please omit the note and the stepback line on the plan. Stepbacks are not applicable to this development as it contains 3 story buildings. 3. [32.5.1(c), 4.191 Side Setbacks/Non-Infill Building Separation. On sheet 1 under Setbacks please label it as a `Non - Infill Setback" development. Also, under the Side Setbacks provide the following note: "Minimum Side Setback - any building that exceeds 35 feet in height shall be separated from any other building by 10 feet plus one foot for each foot the building exceeds 35 feet in height". As proposed there is not any problem with your side setbacks/building separation. Final: Comment addressed. 4. [32.5.2(d), 30.7.4(b)(h)] Slopes less than 25% based on new topographic information. The steep slopes (preserved and managed slopes) depicted on the plan do not match those slopes that are shown on the County GIS Overlay. When dealing with preserved and managed slopes you cannot mix and match topographic information between County GIS and field survey, as the overlay is truly a zoning overlay district adopted by the County. You must choose one or the other in their entirety. The plan depicts portions of "additional" preserved slopes being impacted by improvements associated with the proposal (parking area and BMP). Please omit the "additional preserved slopes" on the plan. Final: Comment addressed. [4.16, 4.16.11 Recreation Area. On the plan provide recreational area calculations (required and provided). The site is required to provide 200SF/unit of recreation area onsite in common area or open space, for a minimum of 16,000 SF. Please document on the plan the areas being provided to meet the recreation area requirements onsite and assure they meet the guidelines as provided in Section 4.16.1: [L Slope in active recreation areas shall not exceed ten (10) percent. Slope and drainage shall be approved by the county engineer; 2. The size and shape of each recreation area shall be adequate for the intended use; 3. Groundcover shall consist of turf grass or contained mulch such as pine bark, shredded tires, or pea gravel; 4. Existing wooded or steep areas may qualify as passive recreation area provided no other suitable area is available on the site; 5. Access shall be adequate for pedestrians and service vehicles if necessary; 6. Location shall be compatible with adjoining uses, convenient to users and suitable for supervision.] Final: Comment addressed. Memorandum To: Kent O'Donohue, Jr. From: Christopher P. Perez, Senior Planner Division: Planning Date: May 1, 2017 Subiect: SDP2017-16 Timberland Park Aut - Final Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of approval for the initial site plan 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. Final: Comment addressed. 2. 132.5.1(c), 4.191 Front Setbacks/Non-Infill. The property meets the definition of a corner lot (abutting on two or more rects at their intersection). Front maximums do not apply to a corner lot abutting a principal arterial highway. Revise the Front Setbacks as follows: "Minimum Front Setback— 5 feet. Maximum Front Setback— None. " Final: Comment addressed. Also, list Non -Infill Stepbacks as: "Front Stepback on Old Lynchburg Road — the third story of Building 2 Shall be stepped back a minimum of 15 feet". Final: Comment no longer relevant. Please omit the note and the stepback line on the plan. Stepbacks are not applicable to this development as it contains 3 story buildings. 3. [32.5.1(c), 4.191 Side Setbacks/Non-Infill Building Separation. On sheet 1 under Setbacks please label it as a `Non - Infill Setback" development. Also, under the Side Setbacks provide the following note: "Minimum Side Setback - any building that exceeds 35 feet in height shall be separated from any other building by 10 feet plus one foot for each foot the building exceeds 35 feet in height". As proposed there is not any problem with your side setbacks/building separation. Final: Comment addressed. 4. [32.5.2(d), 30.7.4(b)(h)] Slopes less than 25% based on new topographic information. The steep slopes (preserved and managed slopes) depicted on the plan do not match those slopes that are shown on the County GIS Overlay. When dealing with preserved and managed slopes you cannot mix and match topographic information between County GIS and field survey, as the overlay is truly a zoning overlay district adopted by the County. You must choose one or the other in their entirety. The plan depicts portions of "additional" preserved slopes being impacted by improvements associated with the proposal (parking area and BMP). Please omit the "additional preserved slopes" on the plan. Final: Comment addressed. [4.16, 4.16.11 Recreation Area. On the plan provide recreational area calculations (required and provided). The site is required to provide 200SF/unit of recreation area onsite in common area or open space, for a minimum of 16,000 SF. Please document on the plan the areas being provided to meet the recreation area requirements onsite and assure they meet the guidelines as provided in Section 4.16.1: [L Slope in active recreation areas shall not exceed ten (10) percent. Slope and drainage shall be approved by the county engineer; 2. The size and shape of each recreation area shall be adequate for the intended use; 3. Groundcover shall consist of turf grass or contained mulch such as pine bark, shredded tires, or pea gravel; 4. Existing wooded or steep areas may qualify as passive recreation area provided no other suitable area is available on the site; 5. Access shall be adequate for pedestrians and service vehicles if necessary; 6. Location shall be compatible with adjoining uses, convenient to users and suitable for supervision.] Final: Comment addressed. 6. [4.16.2] Minimum Facilities within the Recreation Areas. On the final site plan document the amenities provided in the tot lots: 1 swing set (4 seats), 1 slide, 2 climbers, 1 buckabout or whirl, two benches. Final: Comment addressed. 7. [32.7.9.7(a)(2)] Screening/Parking Areas. Parking areas shall be screened from adjacent residential districts. Revise the landscape plan to provide the required screening as provided in Sec 32.7.9.7. Final: The plantings (3 CBs, 22VNs) provided as screening are not adequate as they are deciduous. These plants need to be revised to be evergreen. Also, revise the plant schedule to provide the evergreen trees are a minimum of 4' tall when planted. Additionally, the planting strip needs to be a minimum of 20' deep, currently it scales to 15'. REV 1: Comment addressed. 8. [32.7.9.7(a)(3)] Screening/Features that May Have Negative Visual Impacts. Retaining walls that are over 6 foot tall which face an abutting residential development are considered to cause negative visual impacts and require screening. On the final site plan please call out any segments of the many retaining walls onsite which meet the above criteria and provide the required screening. Final: Comment not relevant as no walls are visible from adjacent residential development. 9. [32.5.2(e), 32.7.9.4(c)] Existing landscape features. On the landscape plan identify whether existing wooded areas being preserved are evergreen, deciduous, or a mix thereof. Final: Comment addressed. 10. [32.7.9.2, 32.7.9.3, 32.7.9.4] Landscape Plan. The agent shall act on the landscape plan prior to final site plan approval. A complete review of the landscape plan submitted with the initial site plan was not conducted because of required changed to the site that may impact proposed plantings and/or require additional plantings. Final: Landscaping Within the Parking Area: An area of at least five (5) percent of the paved parking and vehicular circulation area shall be landscaped with trees or shrubs. Provide the "required and provided" calculations for interior landscaping of the parking lot/travelways. REV 1: Comment addressed. Canopy Calculations: Within the plant schedule provide the amount of canopy for each new tree that will be at least 5' at maturity of ten years. Please utilize the approved plant canopy calculations to obtain these numbers (attached). REV 1: Comment addressed. 11. [Albemarle County Engineering Design Standards Manual] Retaining Walls. Safety provisions for vehicles and pedestrians shall be required for all walls over 2.5 feet tall. This requirement can be met w/ a guardrail or fencing. Label and depict such safety measures on the final site plan. Final: Comment addressed. 12. [4.12.6] Parking Requirements. The plan lists 160 spaces required and provided; however, staff found 169 spaces. Please verify the number of spaces provided is accurate. Final: Comment addressed. 13. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the site shall be required prior to final site plan approval. Final: VDOT comments attached; however, per recent discussion w/ VDOT they may have some additional comments once they look at a couple additional items I noticed in my review. Please touch base with them in a couple days. Thanks 14. [32.6.2(h)] Signature Panel. Omit the Health Department from the signature block. Final: Comment addressed. 15. [Comment] The title of the plan provides an SDP#, which is associated with the preapplication plan. Either revise the title to reference the pre -application plan after the file #, or revise the title to provide the correct SDP# for the initial site plan: SDP2016-74. Final: Revise the title to utilize SDP2017-16. 16. [32.5.1(c)] Dimensions. Provide dimensions on all travelway aisles into and out of the parking area. Final: Comment addressed. 17. [32.5.1(c)] Dimensions. Throughout the plan dimension all proposed improvements. Final: Comment addressed. 18. [32.5.2(a)] The plan inaccurately depicts the adjacent property, Sherwood Manor's Common Area, as extending to the center of Old Lynchburg Road. The Sherwood Manor subdivision plat dedicated right-of-way along Old Lynchburg Road prior to its realignment with the VDOT 5th Street Extension project. Refer to the attached Site Plan Markup and the Sherwood Manor plat (DB 504 PG 114). Please accurately depict this on the plan. Final: Comment addressed. 19. [Recommendation] An ongoing County project will rebuild the ADA ramp at Doncaster Lane to bring it up to current standards. Since the offsite right-of-way exists (as mentioned above), it is recommended that your development extend the curb & gutter and sidewalk within this right-of-way to complete the pedestrian improvements to Doncaster Lane. By continuing the pedestrian access as recommended (approximately a 60 foot section within Right -of -Way) these multifamily units will be connected to the existing sidewalks along Old Lynchburg Road, which will afford your residents safe and convenient access to a bustop further down Old Lynchburg Road (see site plan markup below for a visual). Final: Comment addressed. 20. [Comment] Adjacent Residential Neighborhood Questions and Concerns. As a heads up, attached is a list of 10 questions provided by the Sherwood Manor development, which Planning staff received on 2-8-17. Final: Comment acknowledged. Additional Comments on the final 21. [32.5.2(1), 32.7.1.1)] Prior to final site plan approval the right-of-way dedication and easement plat will need to be reviewed and approved on a subdivision plat. The Deed Book Page Reference information shall be provided on the final site plan. Please contact Christopher P. Perez in the Planning Division by using cperezkalbemarle.org or 434-296-5832 ext. 3443 for further information. Christopher Perez From: Christopher Perez Sent: Monday, May 01, 2017 11:10 AM To: 'Kent O'Donohue' Subject: RE: SDP2017-16 Timberland Park Apt— Final Site Plan A min of 4 copies for signature (3 for our office: 1 for the file,2 for zoning) & 1 for you. Original Message From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent: Monday, May 01,2017 11:06 AM To: Christopher Perez<cperez@albemarle.org> Subject: RE:SDP2017-16 Timberland Park Apt—Final Site Plan Thanks Chris. FYI,VDOT is good and they do not have any other proposed plan changes. e did provide me a template Maintenance Agreement from the retaining walls,so we are working on getting that t en care of with the client. And of course we need to get the Plat taken care of if there are comments on that. Also, I have ACSA comments and they require some minor adjust nts to some connections. So aside from the Plat we should be good here as well. So once I make those ACSA changes and get his approval on the changes I will get final plans to you for pproval which cannot be signed obviously until we have the Plat and Agreements all taken care of. How many har copies do you need again for signatures? Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports,documents,or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration, either intentional or unintentional, due to, among other causes,transmission, conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. 1 • "err/ Kent, I'll take a look at it hopefully by COB Friday but most likely sometime Monday. Original Message From: Kent O'Donohue [mailto:dodonohue@balzer.cc] Sent:Thursday,April 27, 2017 12:30 PM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Chris, Attached is the LA Plan and Schedule with all of the additional plantings you did not previously see as well as the corrections you requested in the comments. You will see with the buffer strip, I left the deciduous trees because that was ARB related, but I did move them back 10' so the are 20'from the sidewalk. The shrubs are 10' O.C.diagonally, but horizontally they are 12'. The code was not clear eaxactly where that 10' spacing occurs. Which this staggered configuration you end up with a 16'shrub buffer with the ARB trees 4' behind that. If you could please review this and let me know if this does not address your coments I would appreciate it. Thanks, D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports,documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents",are subject to undetectable alteration,either intentional or unintentional, due to, among other causes,transmission, conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc. and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. Original Message From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,April 26, 2017 11:06 AM To: Kent O'Donohue<dodonohue@balzer.cc> 3 Christopher Perez From: Kent O'Donohue <dodonohue@balzer.cc> Sent: Thursday, April 27, 2017 12:30 PM To: Christopher Perez Subject: RE: SDP2017-16 Timberland Park Apt— Final Site Plan Attachments: 20170427124220308.pdf Chris, Attached is the LA Plan and Schedule with all of the additional plantings you did not previously see as well as the 4-L corrections you requested in the comments. You will see with the buffer strip, I left the deciduous trees because that was ARB related, but I did move them back 10' so the are 2p'_from the sidewalk Tie shrubs are 10' 0.C. diagonally, but horizontally they are 12'. The code was not clear eaxactly where that 10' spacing occurs. Which this staggered configuration you end up with a 16' shrub buffer with t,fie ARB trees 4' behind that. If you could please review this and let me know if isrdoes not address your coments I would appreciate it. Thanks, l D. Kent O'Donohue Jr., LA Landscape Architect Civil Engineering Project Manager Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke • Richmond • New River Valley • Staunton • Harrisonburg Phone 540.248.3220 • Fax 540.248.3221 • Cell 540.820.8301 Website: www.balzer.cc Balzer and Associates, Inc. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans,specifications, reports, documents, or other information recorded on or transmitted as electronic media, including but not limited to "CAD Documents", are subject to undetectable alteration, either intentional or unintentional, due to, among other causes, transmission, conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the Firms Instruments of Service are the only true contract documents of record. Nothing contained herein alters the terms of any other Agreements between the Owner and the Firm. ©2016 Balzer and Associates, Inc. All rights reserved. The materials attached to this communication are the proprietary property of Balzer and Associates, Inc. and are protected by copyright and other intellectual property rights. No portion of these materials may be used or relied upon by any person or entity other than the recipient of this communication without prior written permission from Balzer and Associates, Inc. Original Message From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Wednesday, April 26, 2017 11:06 AM To: Kent O'Donohue <dodonohue@balzer.cc> Cc: William Moore<wmoore@balzer.cc> 1 Subject: Recall: SDP2017-16 Timberland Park Apt—Final Site Plan Christopher Perez would like to recall the message, "SDP2017-16 Timberland Park Apt—Final Site Plan ". 2 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of approval for the initial site plan 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. Final: Comment addressed. 2. [32.5.1(c), 4.191 Front SetbacksNon-Infill. The property meets the definition of a corner lot (abutting on two or more streets at their intersection). Front maximums do not apply to a corner lot abutting a principal arterial highway. Revise the Front Setbacks as follows: `Minimum Front Setback— 5 feet. Maximum Front Setback— None. " Final: Comment addressed. Also, list Non -Infill Stepbacks as: "Front Stepback on Old Lynchburg Road — the third story of Building 2 shall be stepped back a minimum of 1 S feet ". Final: Comment no longer relevant. Please omit the note and the stepback line on the plan. Stepbacks are not applicable to this development as it contains 3 story buildings. 3. [32.5.1(c), 4.191 Side Setbacks/Non-Infill Building Separation. On sheet 1 under Setbacks please label it as a `Non - Infill Setback" development. Also, under the Side Setbacks provide the following note: "Minimum Side Setback - any building that exceeds 35 feet in height shall be separated from any other building by 10 feet plus one foot for each foot the building exceeds 35 feet in height". As proposed there is not any problem with your side setbacks/building separation. Final: Comment addressed. 4. [32.5.2(d), 30.7.4(b)(h)] Slopes less than 25% based on new topographic information. The steep slopes (preserved and managed slopes) depicted on the plan do not match those slopes that are shown on the County GIS Overlay. When dealing with preserved and managed slopes you cannot mix and match topographic information between County GIS and field survey, as the overlay is truly a zoning overlay district adopted by the County. You must choose one or the other in their entirety. The plan depicts portions of "additional" preserved slopes being impacted by improvements associated with the proposal (parking area and BMP). Please omit the "additional preserved slopes" on the plan. Final: Comment addressed. [4.16, 4.16.11 Recreation Area. On the plan provide recreational area calculations (required and provided). The site is required to provide 200SF/unit of recreation area onsite in common area or open space, for a minimum of 16,000 SF. Please document on the plan the areas being provided to meet the recreation area requirements onsite and assure they meet the guidelines as provided in Section 4.16.1: [L Slope in active recreation areas shall not exceed ten (10) percent. Slope and drainage shall be approved by the county engineer; 2. The size and shape of each recreation area shall be adequate for the intended use; 3. Groundcover shall consist of turf grass or contained mulch such as pine bark, shredded tires, or pea gravel; 4. Existing wooded or steep areas may qualify as passive recreation area provided no other suitable area is available on the site; 5. Access shall be adequate for pedestrians and service vehicles if necessary; 6. Location shall be compatible with adjoining uses, convenient to users and suitable for supervision.] Final: Comment addressed. Memorandum To: Kent O'Donohue, Jr. From: Christopher P. Perez, Senior Planner Division: Planning Date: REVISED REVISED April 26, 2017 Subiect: SDP2017-16 Timberland Park Ant - Final Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of approval for the initial site plan 1. [35.1] Fees. The public notification fee of $215 was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. Final: Comment addressed. 2. [32.5.1(c), 4.191 Front SetbacksNon-Infill. The property meets the definition of a corner lot (abutting on two or more streets at their intersection). Front maximums do not apply to a corner lot abutting a principal arterial highway. Revise the Front Setbacks as follows: `Minimum Front Setback— 5 feet. Maximum Front Setback— None. " Final: Comment addressed. Also, list Non -Infill Stepbacks as: "Front Stepback on Old Lynchburg Road — the third story of Building 2 shall be stepped back a minimum of 1 S feet ". Final: Comment no longer relevant. Please omit the note and the stepback line on the plan. Stepbacks are not applicable to this development as it contains 3 story buildings. 3. [32.5.1(c), 4.191 Side Setbacks/Non-Infill Building Separation. On sheet 1 under Setbacks please label it as a `Non - Infill Setback" development. Also, under the Side Setbacks provide the following note: "Minimum Side Setback - any building that exceeds 35 feet in height shall be separated from any other building by 10 feet plus one foot for each foot the building exceeds 35 feet in height". As proposed there is not any problem with your side setbacks/building separation. Final: Comment addressed. 4. [32.5.2(d), 30.7.4(b)(h)] Slopes less than 25% based on new topographic information. The steep slopes (preserved and managed slopes) depicted on the plan do not match those slopes that are shown on the County GIS Overlay. When dealing with preserved and managed slopes you cannot mix and match topographic information between County GIS and field survey, as the overlay is truly a zoning overlay district adopted by the County. You must choose one or the other in their entirety. The plan depicts portions of "additional" preserved slopes being impacted by improvements associated with the proposal (parking area and BMP). Please omit the "additional preserved slopes" on the plan. Final: Comment addressed. [4.16, 4.16.11 Recreation Area. On the plan provide recreational area calculations (required and provided). The site is required to provide 200SF/unit of recreation area onsite in common area or open space, for a minimum of 16,000 SF. Please document on the plan the areas being provided to meet the recreation area requirements onsite and assure they meet the guidelines as provided in Section 4.16.1: [L Slope in active recreation areas shall not exceed ten (10) percent. Slope and drainage shall be approved by the county engineer; 2. The size and shape of each recreation area shall be adequate for the intended use; 3. Groundcover shall consist of turf grass or contained mulch such as pine bark, shredded tires, or pea gravel; 4. Existing wooded or steep areas may qualify as passive recreation area provided no other suitable area is available on the site; 5. Access shall be adequate for pedestrians and service vehicles if necessary; 6. Location shall be compatible with adjoining uses, convenient to users and suitable for supervision.] Final: Comment addressed. 6. [4.16.2] Minimum Facilities within the Recreation Areas. On the final site plan document the amenities provided in the tot lots: 1 swing set (4 seats), 1 slide, 2 climbers, 1 buckabout or whirl, two benches. Final: Comment addressed. 7. [32.7.9.7(a)(2)] Screening/Parking Areas. Parking areas shall be screened from adjacent residential districts. Revise the landscape plan to provide the required screening as provided in Sec 32.7.9.7. Final: The plantings (3 CBs, 22VNs) provided as screening are not adequate as they are deciduous. These plants need to be revised to be evergreen. Also, revise the plant schedule to provide the evergreen trees are a minimum of 4' tall when planted. Additionally, the planting strip needs to be a minimum of 20' deep, currently it scales to 151. 8. [32.7.9.7(a)(3)] Screening/Features that May Have Negative Visual Impacts. Retaining walls that are over 6 foot tall which face an abutting residential development are considered to cause negative visual impacts and require screening. On the final site plan please call out any segments of the many retaining walls onsite which meet the above criteria and provide the required screening. Final: Comment not relevant as no walls are visible from adjacent residential development. 9. 132.5.2(e), 32.7.9.4(c)] Existing landscape features. On the landscape plan identify whether existing wooded areas being preserved are evergreen, deciduous, or a mix thereof. Final: Comment addressed. 10. [32.7.9.2, 32.7.9.3, 32.7.9.41 Landscape Plan. The agent shall act on the landscape plan prior to final site plan approval. A complete review of the landscape plan submitted with the initial site plan was not conducted because of required changed to the site that may impact proposed plantings and/or require additional plantings. Final: Landscaping Within the Parking Area: An area of at least five (5) percent of the paved parking and vehicular circulation area shall be landscaped with trees or shrubs. Provide the "required and provided" calculations for interior landscaping of the parking lot/travelways. Canopy Calculations: Within the plant schedule provide the amount of canopy for each new tree that will be at least 5' at maturity of ten years. Please utilize the approved plant canopy calculations to obtain these numbers (attached). 11. [Albemarle County Engineering Design Standards Manual] Retaining Walls. Safety provisions for vehicles and pedestrians shall be required for all walls over 2.5 feet tall. This requirement can be met w/ a guardrail or fencing. Label and depict such safety measures on the final site plan. Final: Comment addressed. 12. [4.12.6] Parking Requirements. The plan lists 160 spaces required and provided; however, staff found 169 spaces. Please verify the number of spaces provided is accurate. Final: Comment addressed. 13. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the site shall be required prior to final site plan approval. Final: VDOT comments attached; however, per recent discussion w/ VDOT they may have some additional comments once they look at a couple additional items I noticed in my review. Please touch base with them in a couple days. Thanks 14. [32.6.2(h)] Signature Panel. Omit the Health Department from the signature block. Final: Comment addressed. 15. [Comment] The title of the plan provides an SDP#, which is associated with the preapplication plan. Either revise the title to reference the pre -application plan after the file #, or revise the title to provide the correct SDP# for the initial site plan: SDP2016-74. Final: Revise the title to utilize SDP2017-16. 16. [32.5.1(c)] Dimensions. Provide dimensions on all travelway aisles into and out of the parking area. Final: Comment addressed. 17. [32.5.1(c)] Dimensions. Throughout the plan dimension all proposed improvements. Final: Comment addressed. 18. [32.5.2(a)] The plan inaccurately depicts the adjacent property, Sherwood Manor's Common Area, as extending to the center of Old Lynchburg Road. The Sherwood Manor subdivision plat dedicated right-of-way along Old Lynchburg Road prior to its realignment with the VDOT 5th Street Extension project. Refer to the attached Site Plan Markup and the Sherwood Manor plat (DB 504 PG 114). Please accurately depict this on the plan. Final: Comment addressed. 19. [Recommendation] An ongoing County project will rebuild the ADA ramp at Doncaster Lane to bring it up to current standards. Since the offsite right-of-way exists (as mentioned above), it is recommended that your development extend the curb & gutter and sidewalk within this right-of-way to complete the pedestrian improvements to Doncaster Lane. By continuing the pedestrian access as recommended (approximately a 60 foot section within Right -of -Way) these multifamily units will be connected to the existing sidewalks along Old Lynchburg Road, which will afford your residents safe and convenient access to a bustop further down Old Lynchburg Road (see site plan markup below for a visual). Final: Comment addressed. 20. [Comment] Adjacent Residential Neighborhood Questions and Concerns. As a heads up, attached is a list of 10 questions provided by the Sherwood Manor development, which Planning staff received on 2-8-17. Final. Comment acknowledged. Additional Comments on the final 21. [32.5.2(1), 32.7.1.1)] Prior to final site plan approval the right-of-way dedication and easement plat will need to be reviewed and approved on a subdivision plat. The Deed Book Page Reference information shall be provided on the final site plan. Please contact Christopher P. Perez in the Planning Division by using cperez(a)albemarle.org or 434-296-5832 ext. 3443 for further information. tkiwi **id Christopkter Perez From: Christopher Perez Sent: Wednesday, April 26, 2017 3:02 PM To: 'Bedsaul, Willis C. (VDOT)' Cc: Moore,Adam PE (VDOT) Subject: RE: SDP-2017-16-Timberland Park Apartments-Final Site Plan I want VDOT to confirm you looked at the following: 1) sheet C5,offsite grading within the 64 right of way(do you have everything you need for this, at SRC you admitted you didn't see this aspect of the plan). 2) sheet C18, proposed sidewalk in VDOT r/w(is this adequate). 3) retaining wall adjacent to r/w(did they provide you all you need to approve this, be at SRC you mentioned if it fails it's going to come down in the R/W). 4) sheet C3, R/W dedication, yall don't mention anything about this is your letter 5) the comment letter referenced Scott Collins as doing the plans?These plans were done by Kent O'Donohue From: Bedsaul,Willis C. (VDOT) [mailto:Willis.Bedsaul@VDOT.Virginia.gov] Sent:Wednesday,April 26, 2017 11:30 AM To:Christopher Perez<cperez@albemarle.org> Cc: Moore,Adam PE (VDOT) <Adam.Moore@vdot.virginia.gov> Subject: RE:SDP-2017-16-Timberland Park Apartments-Final Site Plan Hello Chris, Can you please follow up with me in an email with your concerns, per our phone conversation , on exactly what you want me to go back and review on the above subject. I'm currently in the process of another review, and I don't want anything to slip by our review. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-717-0005 From: Christopher Perez [mailto:cperezCa�albemarle.orq] Sent: Wednesday, April 26, 2017 10:09 AM To: Bedsaul, Willis C. (VDOT) Cc: Moore, Adam PE (VDOT) Subject: RE: SDP-2017-16-Timberland Park Apartments-Final Site Plan Willis, i SDP2017-16 Timberland Park Apt I thought the comments on the above proposal came from Adam, after hunting down the email it appears to be from you. Can you give me a quick call on this plan. Attached are your comments. Thanks Christopher P.Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Bedsaul,Willis C. (VDOT) [mailto:Willis.Bedsaul@VDOT.Virginia.gov] Sent: Friday, March 31, 2017 8:41 AM To:Christopher Perez<cperez@albemarle.org> Cc: Moore,Adam PE (VDOT)<Adam.Moore@vdot.virginia.Rov> Subject:SDP-2017-16-Timberland Park Apartments-Final Site Plan Chris, Attached you'll find the review comment letter on the above subject. If you have any questions please call. County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Chris Perez Re: Timberland Park Apartments SDP-2017-16 Final Site Plan Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, most recently revised 14 March 2017, and offer the following comments: 1. Please show and provide calculations on plans that the existing culvert crossing SR 780 is adequate in the post development condition. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired please contact me at (434) 422-9782. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation 2 low? .4000 Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph#434-422-9866 Cell# 540-717-0005 3 Christopher Perez From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Tuesday, April 25, 2017 12:16 PM To: Christopher Perez Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan Chris, The plans are currently under construction plan review. I spoke with the engineer this morning and will be sending out comments this week. I am coordinating another plan between this site and 5t" Street Place for required sewer improvements for both sites. It looks like they just about have the cost sharing worked out which I would like in place before I approve these plans. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Tuesday, April 25, 2017 11:19 AM To: Keith Huckstep; Alexander Morrison Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan W RE: SDP2017-16 Timberland Park Apartments — final site plan Checking on the review status of the above ref electronic review. I plan to send my comments out today; do you have any comments on this that you would like to add to my review comments? Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 From: Christopher Perez Sent: Friday, March 24, 2017 12:36 PM To: 'Moore, Adam PE (VDOT)' <Adam.Moore @vdot.virginia.gov>; Emily Cox <ecox@albemarle.org>; Margaret Maliszewski<MMaliszewski@albemarle.org>;'Alexander Morrison' <amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep <KHUCKSTE@albemarle.org>; Derek Bedarf <dbedarf@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan Plan Review Team, RE: SDP2017-16 Timberland Park Apartments — final site plan We have another electronic submittal, this time it's the final site plan to initial site plan (SDP2016-74) that we just approved w conditions. In addition to the actual site plan there are also other documents associated w/ this review that are uploaded in Bluebeam (comment response letter, water data sheet, and a temp grading easement request letter). Assure you enter all your review comments in Countyview like normal, or email me them to be entered. If you have any issues accessing these documents, give me a ring. Notably, all the files I uploaded to Bluebeam are also loaded into CV—just check "View RMS documents " in the reviews tab. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 Christopher Perez From: Ron Higgins Sent: Wednesday,April 26, 2017 2:26 PM To: Christopher Perez 54. gilleit41: Subject: RE: SDP2017-16 Timberland Park Apt— Final Site Plan ,iesie,tt;w Chris: I did not understand that they only have three stories. In that case, there is no stepback, because there are no floors above three stories. From:Christopher Perez Sent:Wednesday,April 26, 2017 1:39 PM To: Ron Higgins<rhiggins@albemarle.org> Subject: FW:SDP2017-16 Timberland Park Apt—Final Site Plan Ron, I'm getting some pushback from the applicant on the applicability of the stepback provisions to the development that we talked about earlier. I have discussed this case w/Francis and he agrees w/the applicant, as do I now, that the stepbacks would not apply. Before I revise my comments once more, I'd like to get your final say on it. Please let me know when I can meet with you, should be a quick 2 min meeting. Thanks Christopher P. Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 From:William Moore [mailto:wmoore@balzer.cc] Sent:Wednesday,April 26,2017 12:06 PM To:Christopher Perez<cperez@albemarle.org> Cc: Kent O'Donohue<dodonohue@balzer.cc> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Chris, The Code states, "Floors above 40 feet or the third story, whichever is less, shall be stepped back a minimum of 15 feet." We don't have ANY floors above 40 feet or the third story, because we ONLY have 3 stories. The Code schematic clearly shows a stepback of the 4th floor. This stepback does NOT apply to this project. William S. Moore, PE Associate Balzer and Associates, Inc. Planners • Architects • Engineers • Surveyors Roanoke• Richmond • New River Valley• Staunton • Harrisonburg Phone 540.433.1908 • Mobile 540.294.0258 1 Website: www.balzer.cc From... ' o •e e .1k •' `o:c•erez ' albemarle.org] Sent: �a�,}Air , , •'7°11:44 AM To: Kenif O 'onohue<did• ohue@balzer.cc>;William Moore<wmoore@balzer.cc> Subjyt. !104T'', ' -rland Park Apt—Final Site Plan Kent/William, SDP2017-16 Timberland Park Apt—Final Site Plan I just double checked on the stepback question and I've been informed by the Zoning Administrator that it applies to all buildings onsite that are 3 stories tall or 40' tall. Thus I have revised the comment letter to include this as comment#22. Attached are the revised review comments for the above ref plan. Also,below is the approved plant canopy calculations, as referenced in Planning's comment#10. htt•://www.albemarle.or./u•load/ima_es/forms center/de•artments/Communit Develosment/forms/a••lications/Plant Canopy_Calculations 02_05 03.pdf Christopher P.Perez I Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 • From:Christopher Perez Sent:Wednesday,April 26, 2017 11:09 AM To: 'Kent O'Donohue' <dodonohue@balzer.cc> Cc: 'William Moore' <wmoore@balzer.cc> Subject: RE: SDP2017-16 Timberland Park Apt—Final Site Plan Kent, SDP2017-16 Timberland Park Apt—Final Site Plan Attached are the review comments for the above ref plan.Also,below is the approved plant canopy calculations, as referenced in Planning's comment#10. http://www.albemarle.org/upload/images/forms center/departments/Community Development/forms/applications/Plant Canopy_Calculations_02_05 03.pdf Christopher P.Perez I Senior Planner Department of Community Development County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 2 Christopher Perez From: Keith Huckstep Sent: Tuesday, April 25, 2017 11:22 AM To: Christopher Perez Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan No objections Chris. Keith From: Christopher Perez Sent: Tuesday, April 25, 2017 11:19 AM To: Keith Huckstep <KHUCKSTE@albemarle.org>; Alex Morrison <amorrison@serviceauthority.org> Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan All, RE: SDP2017-16 Timberland Park Apartments — final site plan Checking on the review status of the above ref electronic review. I plan to send my comments out today; do you have any comments on this that you would like to add to my review comments? Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 From: Christopher Perez Sent: Friday, March 24, 2017 12:36 PM To: 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; Emily Cox <ecox@albemarle.org>; Margaret Maliszewski<MMaliszewski@albemarle.org>;'Alexander Morrison' <amorrison@serviceauthority.org>; Robbie Gilmer <rgilmer@albemarle.org>; Keith Huckstep <KHUCKSTE@albemarle.org>; Derek Bedarf <dbedarf@albemarle.org> Subject: RE: SDP2017-16 Timberland Park Apartments — final site plan Plan Review Team, RE: SDP2017-16 Timberland Park Apartments — final site plan We have another electronic submittal, this time it's the final site plan to initial site plan (SDP2016-74) that we just approved w conditions. In addition to the actual site plan there are also other documents associated w/ this review that are uploaded in Bluebeam (comment response letter, water data sheet, and a temp grading easement request letter). Assure you enter all your review comments in Countyview like normal, or email me them to be entered. If you have any issues accessing these documents, give me a ring. Notably, all the files I uploaded to Bluebeam are also loaded into CV—just check "View RMS documents " in the reviews tab. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443 �RCl, County of Albemarle Department of Community Development Memorandum To: Chris Perez From: Emily Cox Date: 7 April 2017 Subject: Timberland Park Apartments - FSP (SDP201700016) The final site plan for Timberland Park Apartments has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan (WPO 201700005) must be approved before final site plan can be approved. 2. The cover sheet should reference SDP201700016, which is the final site plan number. 3. Per the Engineering Design Standards Manual, Section 8, any slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plans. Please add this note on the plan for any slopes steeper than 3:1. 4. Note that a building permit will be required for the retaining walls. 5. Please show a `SWM Facility Easement' around all SWM facilities. (County Code 18- 32.7.4) This should match what is shown on the WPO Plan. 6. VDOT entrance permit will be required. 7. Note that storm systems are under review with the VSMP Plan. 8. Please show the location of the proposed temporary grading easement on the plans. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Charles A. Kilpatrick, P.E. Culpeper Virginia 22701 Commissioner March 30, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Chris Perez Re: Timberland Park Apartments SDP -2016-00074 Final Site Plan Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, most recently revised 14 March 2017, and offer the following comments: 1. PIease show and provide calculations on plans that the existing culvert crossing SR 780 is adequate in the post development condition. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired please contact me at (434) 422-9782. Sincerely, mm�- W+V Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING March 13,2017 Dominion Realty Partners, LLC Attn: Doug Brooks 4 :: :peinc.com ,) ArSherwood Manor&Timberland Park Apartments Temporary Grading Easement Agreement for Sherwood Manor Common Area Albemarle County,VA Dear Mr. Brooks, This letter represents our request for agreement to perform minor grading within the Sherwood Manor Common Area associated with the proposed sidewalk extension and storm system at the existing culvert under Old Lynchburg Road (Route 780). The grading will be in general compliance with the attached "Grading Plan", prepared by Balzer&Associates, dated March 14, 2017. This grading will be necessary to construct the proposed sidewalk connection to the existing sidewalk at Doncaster Lane, creating a continuous sidewalk, and to provide for installation of the stormwater management system. All temporary grading will be restored and stabilized in strict accordance with the Virginia Erosion & Sediment Control Handbook(VESCH). All stormwater being released by the proposed stormwater system will be below existing conditions in accordance with the Virginia Stormwater Management Program. Sincerely, Jen Surber Agreed To: GEM Management, Inc. 2021 Cross Beam Drive Nan 1 a/( 1 Charlotte, NC 28217 Signature&Date 276-698-8760 iensurber@surberdev.com Christopher Perez From: Christopher Perez Sent: Friday, March 24, 2017 12:36 PM To: 'Moore, Adam PE (VDOT)'; Emily Cox; Margaret Maliszewski; 'Alexander Morrison'; Robbie Gilmer; Keith Huckstep; Derek Bedarf Subject: RE: SDP2017-16 Timberland Park Apartments—final site plan Plan Review Team, RE: SDP2017-16 Timberland Park Apartments—final site plan We have another electronic submittal, this time it's the final site plan to initial site plan(SDP2016-74)that we just approved w conditions. In addition to the actual site plan there are also other documents associated w/this review that are uploaded in Bluebeam (comment response letter, water data sheet, and a temp grading easement request letter). Assure you enter all your review comments in Countyview like normal, or email me them to be entered. If you have any issues accessing these documents, give me a ring. Notably, all the files I uploaded to Bluebeam are also loaded into CV—just check "View RMS documents" in the reviews tab. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1