HomeMy WebLinkAboutSUB201600185 Approval - Agencies Final Plat 2017-06-15 s✓ `rI'
Christopher Perez
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Thursday,June 15, 2017 3:43 PM
To: Nena Harrell
Cc: Christopher Perez
Subject: RE: SUB2016-185_Briarwood Phase 4 (portion) & Phase 6 (portion) - Final Subdivision
Plat
Chris,
The plat is hereby approved. Let me know if you need anything further.
Alexander J. Morrison, P.E. j
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
a
Charlottesville,Virginia 22911
(0)434-977-4511 Ext. 116iPa
(C)434-981-5577
(F)434-979-0698
From: Nena Harrell [mailto:ulcwww@embarqmail.com]
Sent: Thursday, June 15, 2017 11:47 AM
To: Alexander Morrison
Cc: 'Christopher Perez'
Subject: RE: SUB2016-185_Briarwood Phase 4 (portion) &Phase 6 (portion) - Final Subdivision Plat
Thanks!
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
From:Alexander Morrison [mailto:amorrison@serviceauthority.org]
Sent:Thursday,June 15, 2017 11:37 AM
To: Nena Harrell<ulcwww@embargmail.com>
Subject: Re: SUB2016-185_Briarwood Phase 4(portion) & Phase 6(portion) - Final Subdivision Plat
I will take a look at the resubmitted plat today to confirm approval is still in place. I will CC you on my email to the
county.
Alexander J. Morrison, PE
Albemarle County Service Authority
Civil Engineer
434-977-4511 ext. 116
1
From: Nena Harrell<ulcwww@embargmail.com>
Sent:Thursday,June 15, 2017 11:04:12 AM
To:Alexander Morrison
Subject: FW:SUB2016-185_Briarwood Phase 4(portion) & Phase 6 (portion) - Final Subdivision Plat
Hi Alex,
Please see comment from Chris Perez below. I assume he is talking about
you. Do you have any comments? I thought you had already approved. Am
trying to get plat signed.
Thanks much,
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
Original Message
From:Christopher Perez[mailto:cperez@albemarle.org]
Sent:Thursday,June 15,2017 10:18 AM
To: Nena Harrell<ulcwww@embargmail.com>
Subject:RE:SUB2016-185_Briarwood Phase 4(portion)&Phase 6(portion)-
Final Subdivision Plat
You do not have any other outstanding platting comments on this plat,but
I'd wait till you receive Alex's final approval on the plat to avoid having
to get them to resign if he has a change.
Original Message
From:Nena Harrell [mailto:ulcwww@embargmail.com]
Sent:Thursday,June 15,2017 10:10 AM
To:Christopher Perez<cperez@albemarle.org>
Cc:'Chris Kean'<chris.kean@lincolnsurveying.com>;'Scott Collins'
<scott@collins-engineering.com>;Frank Pohl<fpohl@albemarle.org>;Jonney
Otto<jotto@albemarle.org>; Matthew Wentland<mwentland@albemarle.org>; Lisa
Green<Igreen2@albemarle.org>;'Adam Long'<adam@collins-engineering.com>
Subject:RE:SUB2016-185_Briarwood Phase 4(portion)& Phase 6(portion)-
Final Subdivision Plat
Chris,
Adam Long hopefully has spoken to you by now re what type of exhibit you
want. Hunter just verified the trail has been built so not sure where
Jonney went. It has been built for some time.
I still need bond amount for rec area. I have included Lisa Green on this
email. I provided info to her approx.2 weeks ago.
I have bond amount for ACSA and will bring down as soon as I get rec area
bond-hopefully later today or tomorrow.
I need to have the owners of lots 124&125 sign subdivision plat. Is it ok
to go ahead and get those signatures?
2
Sol
'tool
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
Original Message
From:Christopher Perez[mailto:cperez@albemarle.org]
Sent:Thursday,June 15, 2017 8:57 AM
To: Nena Harrell<ulcwww@embargmail.com>
Cc:Chris Kean<chris.kean@lincolnsurveying.com>;Scott Collins
<scott@collins-engineering.com>;Frank Pohl<fpohl@albemarle.org>;Jonney
Otto<iotto@albemarle.org>; Matthew Wentland<mwentland@albemarle.org>
Subject:RE:SUB2016-185_Briarwood Phase 4(portion)&Phase 6(portion)-
Final Subdivision Plat
Nena,
RE:SUB2016-185_Briarwood Phase 4(portion)&Phase 6(portion)-Final
Subdivision Plat
Yes,you are correct the plat depicts the trails location and has shown it
since the December version was submitted. But the rest of the comment is not
addressed. If the applicant(you or Scott)does not want to do the exhibit
but would rather just put all the information requested for that comment in
the WPO plan,that's fine too but it still needs to be reviewed/approved to
assure the trails meet proper grade...etc. Additionally,Jonney Otto went
out to the site last Friday and it was not built.
Christopher P. Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
Original Message
From:Nena H [mailto:ulcwww@embarqmail.com]
Sent:Thursday,June 15,2017 8:36 AM
To:Christopher Perez<cperez@albemarle.org>
Cc:Chris Kean<chris.kean@lincolnsurveying.com>;Scott Collins
<scott@collins-engineering.com>; Frank Pohl<fpohl@albemarle.org>
Subject: Re:SUB2016-185_Briarwood Phase 4(portion)& Phase 6(portion)-
Final Subdivision Plat
Chris/Matt,
The trail is shown on plat. It is built. I asked Frank about inspection via
email couple of weeks ago.Scott thought we did not need separate exhibit
because nothing is disturbed because it is a primitive trail. Do we need
exhibit?
Nena Harrell
Sent from my iPhone
3
>On Jun 13,2017,at 3:21 PM,Christopher Perez<cperez@albemarle.org>
wrote:
>Nena/Chris/Scott,
>SUB2016-185_Briarwood Phase 4(portion)& Phase 6(portion)-Final
Subdivision Plat
>Attached are the review comments for the above ref plat.
>Nena,
>FYI-both legal docs(drainage dedication and Coy&Restrictions doc
>have
been approved by the County Attorney).When the plat is approved I'll give
you both of these docs to record with the plat.
>
>Christopher P. Perez I Senior Planner
>Department of Community Development I County of Albemarle,Virginia
>401 McIntire Road I Charlottesville,VA 22902
>434.296.5832 ext.3443
><winmail.dat>
4
Christopher Perez
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Wednesday, December 28, 2016 9:01 AM
To: Christopher Perez
Subject: SUB201600185: Briarwood Phase 4 (23 Lots) - Final Plat
Chris,
I have reviewed the above referenced plat and have no further comments. The utilities are still under construction so a
revised easement plat may be required if there are any field changes during construction. I hereby recommend approval
of SUB201600185.
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698