Loading...
HomeMy WebLinkAboutSUB201700100 Review Comments Final Plat 2017-08-29Short Review Comments Report for: SUB201700100 SubApplication Type: Briarwood, Ph 8 Lots 40-58 and 98-111 - Final Final Plat Date Completed:07/27/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/04/2017 Reviewer:Adam Moore VDOT Review Status:Approved Reviews Comments: Division: Date Completed:07/16/2017 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:Fire rescue has no objections to the plat dated 6/21/2017. As development moves forward and site plans are submitted it should be noted that: 1. 20 feet of clear, unobstructed travel width will be required. 2. Emergency apparatus turn around will be required at the end of Elm Tree Court. Contact the Fire Marshal's Office at 434-296-5833 with any questions. Division: Date Completed:07/31/2017 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments:From: Jeremy Lynn [mailto:jlynn@serviceauthority.org] Sent: Monday, July 31, 2017 7:41 AM To: Christopher Perez <cperez@albemarle.org> Cc: Alex Morrison <amorrison@serviceauthority.org> Subject: SUB-2017-100 Briarwood Phase 8 (lots 40-58) and (lots 98-111) - Final Plat Chris, The ACSA doesn’t have any comments on this subdivision plat. Let me know if you have any questions. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 Division: Date Completed:07/14/2017 Reviewer:Elise Kiewra CDD E911 Review Status:No Objection Reviews Comments:per site plan dated 6/21/2017 Division: Date Completed:07/12/2017 Reviewer:Michael Dellinger CDD Building Code Zoning Review Status:No Objection Division: Page:1 of 2 County of Albemarle Printed On:August 30, 2017 Review Status:No Objection Reviews Comments: Date Completed:07/12/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/15/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/15/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments:1. This portion of Elm Tree Court will need to be bonded or built and accepted before plat approval. It appears that only the part of Elm Tree Court up to Lot 58 has been bonded. Division: Date Completed:08/29/2017 Reviewer:Christopher Perez CDD Planning Review Status:Approved Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:August 30, 2017 NINO VII" Christopher Perez From: Nena Harrell <ulcwww@embarqmail.com> Sent: Wednesday, August 16, 2017 12:17 PM To: Christopher Perez Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat (2ND SUBMITTAL) Attachments: Briarwood Seventh Supplemental Declaration.docx Chris, I agree that it is more work for you as well as us. It is simply how and the amount we are being taxed just because they are platted. Previously we were not taxed so high so we platted several at a time; however, we had phased at times. I have attached the supplement for approval. Assume you do not need full HOA Covenants& Restrictions again. . Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 ,---From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Wednesday, August 16, 2017 12:03 PM To: Nena Harrell<ulcwww@embarqmail.com> Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat(2ND SUBMITTAL) Nena, "Phasing"a final plat is not an option. If you want to modify the plat to take off some of the lots and come back in later and plat them that's the option. If you go that route,you will need to submit 5 new copies of the plat depicting what lots you want to plat. Reviewers required will be: ACSA, Planning, and Engineering. I'll put it on a 14 day resubmittal review time line and then we'll move forward. I don't know why you would do this, its more work for you and its more work for staff. Additionally during every review of every plat in briarwood that I've been associated with the time lines to get an approved final plat to sell lots. But that aspect of it is none of my business that's for sure. Anyways hope this guidance ‘ helps. Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena Harrell [mailto:ulcwww@embargmail.com] Sent:Wednesday, August 16, 2017 11:51 AM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11- Final Plat (2ND SUBMITTAL) Thanks, Chris. If we decide to phase this plat, what would be involved? Nena Harrell 1 United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Tuesday, August 15,2017 1:03 PM To: Nena Harrell<ulcwww@embargmail.com> Cc: Chris Kean<chris.kean@lincolnsurveying.com>; Matthew Wentland <mwentland@albemarle.org> Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat (2ND SUBMITTAL) Nena, SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-111 - Final plat Attached are the review comments for the above ref plat. Seems all we need now is the Coy and Restrictions doc submitted and reviewed/approved by the County Attorney's office. And then bonding of the remaining portion of the road. Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena Harrell [mailto:ulcwww@embarqmail.com] Sent:Tuesday, August 15, 2017 10:32 AM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11- Final Plat (2ND SUBMITTAL) Thanks, Chris. Two questions: if we should decide to phase this plat, what would be involved? Secondly, can I request bond amounts now? Most of the work has been done but sidewalks and final asphalt is not down yet. Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, August 14, 2017 3:17 PM To: Nena Harrell<ulcwww@embargmail.com> Subject: RE: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11- Final Plat (2ND SUBMITTAL) Nena, Todays the first day back in the office for me post vacation. I have your resubmittal on my desk. I'll be sending that out tomorrow for any reviewer I've yet to receive an approval from. Resubmittals typically take 14 days to review. 2 From: Nena Harrell [mailto:ulcwww@embargmail.com] Sent: Monday,August 14, 2017 3:14 PM To: Christopher Perez<cperez@albemarle.org> Subject: FW: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat (2ND SUBMITTAL) Chris, Adam Moore said he sent you approval. When do you anticipate final approval? Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville, VA 22905 434-975-3334 Fax 434-975-0267 From: Nena Harrell [mailto:ulcwww@embargmail.com] Sent:Wednesday, August 9, 2017 10:24 AM To: 'Christopher Perez'<cperez@albemarle.org> Subject: FW: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat(2ND SUBMITTAL) Chris, Attached is the revised plat pursuant to comments you provided. I am still awaiting VDoT comments but I doubt there will be any since they have already approved another phase on the same street. Adam said he would have comments early this week. Thought I would get this to you anyway. Thanks, Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville, VA 22905 434-975-3334 Fax 434-975-0267 From:Joe Keller [mailto:joe.keller@lincolnsurveying.com] Sent: Monday, August 7, 2017 1:21 PM To: Christopher Perez<cperez@albemarle.org>; Nena Harrell <ulcwww@embarqmail.com>; Chris Kean <chris.kean@lincolnsurveying.com> Subject: SUB2017-100 Briarwood - Phase 8_Lots 40-58 and 98-11 - Final Plat (2ND SUBMITTAL) Chris, Attached is the revised 33 lot plat addressing the comments from July 27, 2017. 3 111111111111. 111101 • Joe Keller Certified Survey Technician II Lincoln Surveying 632 Berkmar Circle Charlottesville,Va.22901 Office: 434-974-1417 Cell: 540-223-0545 Fax: 434-974-1776 t� .` ) L N innovation. Integrity. Vision. orb SURVEYING 4 Phone 434-296-5832 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Nena Harrell/Christopher Kean From: Christopher P. Perez, Senior Planner Division: Planning Date: August 15, 2017 Subject: SUB2017-100 Briarwood - Phase 8 Lots 40-58 and 98-111 - Final plat Fax 434-972-4126 The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [14-302(A)4&5] Drainage Easements. Why are the proposed storm drainage easements labeled as "public" when all other storm drainage easements in this area (including those depicted on Lots 91- 97) were previously platted as "Private"? Revise the storm drainage easements throughout the plat to "private". Rev 1. Comment addressed. 2. [14-302(A)4&5] Drainage Easements. As depicted on the final site plan (SDP2010-84), provide the 40' private storm drainage easement through the rear yards of Lots 98-104, and Lot 105 (through portions of rear yard and the side yard). Rev 1. Comment addressed. 3. [14-302(A)4&5] Drainage Easements. On sheet 6 depict Lot 97. Reasoning: it is not clear where in relation to the lot the actual easement is being platted. Rev 1. Comment addressed. 4. [ZMA2005-9] Within the open space adjacent to Camelot Drive, depict and label the required "20' screening strip" along the entire extent of the frontage. Notably, this strip was platted on the last section of phase 8. Rev 1. Comment addressed. 5. [14-302(B)l] General Information. Number the sheets. Ex) sheet 1/6, sheet 2/6. Sheet 3/6 ... etc Rev 1. Comment addressed. 6. [14-303S] Control points. Control points must be submitted. At the option of the subdivider, the control points may be shown on a copy of the final plat, rather than on the original final plat. Rev 1. Comment addressed. 7. [14-317] Instrument evidencing maintenance of certain improvements. Submit an instrument assuring the perpetual maintenance of the drainage easements, open space areas, and any other improvements that are to be maintained by the HOA in perpetuity. County Attorney approval is required prior to final plat approval. Rev 1. Comment not addressed. Engineering — Matthew Wentland 1. This portion of Elm Tree Court will need to be bonded or built and accepted before plat approval. It appears that only the part of Elm Tree Court up to Lot 58 has been bonded. Rev 1. Comment not addressed. 2. A drainage easement is missing from Lot 58 (as shown on SDP2010-84 plans). Rev 1. Comment addressed. 3. The drainage easement through the backs of Lots 98-105 should be 40' wide (as shown on SDP2010-84 plans). Rev 1. Comment addressed. VDOT — Adam Moore Approved. E911— Elise Kiewra No objection Building Inspections — Michael Dellinger No objection Fire and Rescue — Shawn Maddox No objection ACSA — Alex Morrison Approved. Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 14-229(B) of Chapter 14 of the Code if the developer fails to submit a revised final plat to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443, or at cperez@albemarle.org. Sincerely, Christopher P. Perez Senior Planner tide ,ofA Cj�1:�1! 46 Count)/of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Christopher Kean From: Christopher P. Perez,Senior Planner Division: Planning Date: July 27,2017 Subject: SUB2017-100 Briarwood-Phase 8_Lots 40-58 and 98-111 -Final plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed(The following comments are those that have been identified at this time.Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable r erence,which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. 4-302(A)4&51 Drainage Easements. Why are the proposed storm drainage easements labeled as"public"when all other storm drainage easements in this area(including those depicted on Lots 91-97)were previously platted as "private"?Revise the storm drainage easements throughout the plat to"private". [14-302(A)4&5]Drainage Easements. As depicted on the final site plan(SDP2010-84),provide the 40' private storm d nage easement through the rear yards of Lots 98-104,and Lot 105 (through portions of rear yard and the side yard). [14-302(A)4&5]Drainage Easements. On sheet 6 depict Lot 97.Reasoning: it is not clear where in relation to the lot the actual easement is being platted. /I. [ZMA2005-9] Within the open space adjacent to Camelot Drive,depict and label the required"20' screening strip" along the entire extent of the frontage.Notably,this strip was platted on the last section of phase 8. ✓5. [14-302(B)1] General information. Number the sheets. Ex)sheet 1/6,sheet 2/6. Sheet 3/6...etc . [14-303S] Control points. Control points must be submitted.At the option of the subdivider,the control points may be shown on a copy of the final plat,rather than on the original final plat. 7. [14-317]Instrument evidencing maintenance of certain improvements. Submit an instrument assuring the perpetual maintenance of the drainage easements,open space areas,and any other improvements that are to be maintained by the HOA in perpetuity.County Attorney approval is required prior to final plat approval. Engineering—Matthew Wentland 1.This portion of Elm Tree Court will need to be bonded or built and accepted before plat approval. It appears that only the part of Elm Tree Court up to Lot 58 has been bonded. v2.A drainage easement is missing from Lot 58(as shown on SDP2010-84 plans). v3.The drainage easement through the backs of Lots 98-105 should be 40' wide(as shown on SDP2010-84 plans). VDOT—Adam Moore Comments pending, to be forwarded once received. .- v E911—Elise Kiewra No objection Building Inspections—Michael Dellinger No objection 1 `err+ Fire and Rescue—Shawn Maddox No objection ACSA—Alex Morrison ‘4"/"'"r"''Comments pending,to be forwarded once received. Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be found under "Departments and Services"at Albemarle.org.In accord with the provisions of Section 14-229(B)of Chapter 14 of the Code if the developer fails to submit a revised final plat to address all of the requirements within six(6)months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443,or at cperez@albemarle.org. Sincerely, /477;"2 Christopher P.Perez Senior Planner 2 Phone 434-296-5832 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Christopher Kean From: Christopher P. Perez, Senior Planner Division: Planning Date: July 27, 2017 Subject: SUB2017-100 Briarwood - Phase 8 Lots 40-58 and 98-111 - Final plat Fax 434-972-4126 The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [14-302(A)4&5] Drainage Easements. Why are the proposed storm drainage easements labeled as "public" when all other storm drainage easements in this area (including those depicted on Lots 91- 97) were previously platted as "private"? Revise the storm drainage easements throughout the plat to "private". 2. [14-302(A)4&5] Drainage Easements. As depicted on the final site plan (SDP2010-84), provide the 40' private storm drainage easement through the rear yards of Lots 98-104, and Lot 105 (through portions of rear yard and the side yard). 3. [14-302(A)4&5] Drainage Easements. On sheet 6 depict Lot 97. Reasoning: it is not clear where in relation to the lot the actual easement is being platted. 4. [ZMA2005-9] Within the open space adjacent to Camelot Drive, depict and label the required "20' screening strip" along the entire extent of the frontage. Notably, this strip was platted on the last section of phase 8. 5. [14-302(B)1] General Information. Number the sheets. Ex) sheet 1/6, sheet 2/6. Sheet 3/6 ... etc 6. [14-303S] Control points. Control points must be submitted. At the option of the subdivider, the control points may be shown on a copy of the final plat, rather than on the original final plat. 7. [14-317] Instrument evidencing maintenance of certain improvements. Submit an instrument assuring the perpetual maintenance of the drainage easements, open space areas, and any other improvements that are to be maintained by the HOA in perpetuity. County Attorney approval is required prior to final plat approval. Engineering — Matthew Wentland 1. This portion of Elm Tree Court will need to be bonded or built and accepted before plat approval. It appears that only the part of Elm Tree Court up to Lot 58 has been bonded. 2. A drainage easement is missing from Lot 58 (as shown on SDP2010-84 plans). 3. The drainage easement through the backs of Lots 98-105 should be 40' wide (as shown on SDP2010-84 plans). VDOT — Adam Moore Comments pending, to be forwarded once received. E911— Elise Kiewra No objection Building Inspections — Michael Dellinger No objection Fire and Rescue — Shawn Maddox No objection ACSA — Alex Morrison Comments pending, to be forwarded once received. Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 14-229(B) of Chapter 14 of the Code if the developer fails to submit a revised final plat to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about these conditions or the submittal requirements please feel free to contact me at extension 3443, or at cperez@albemarle.org. Sincerely, Christopher P. Perez Senior Planner County of Albemarle Department of Community Development Memorandum To: Chris Perez From: Matt Wentland Date: 12 July 2017 Subject: Briarwood Phase 8 (Lots 40-58, 98-111) Final Plat — SUB201700100 The Final Plat for the Briarwood Phase 8 (Lots 40-58, 98-111) submittal has been reviewed by Engineering. The following comments will need to be addressed before recommending approval: 1. This portion of Elm Tree Court will need to be bonded or built and accepted before plat approval. It appears that only the part of Elm Tree Court up to Lot 58 has been bonded. 2. A drainage easement is missing from Lot 58 (as shown on SDP2010-84 plans). 3. The drainage easement through the backs of Lots 98-105 should be 40' wide (as shown on SDP2010-84 plans). File: SUB201700100 Briarwood Ph 8 FPT Engineering Comments 07-12-17.doc