Loading...
HomeMy WebLinkAboutSDP201700042 Review Comments Final Site Plan and Comps. 2017-08-29COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Memorandum To: Michael F. Myers, PE (mmerss(&dominioneng com) From: Tim Padalino, AICP Division: Planning Date: August 28, 2017 Subject: Review Comment Letter UPDATES SDP201700042 — Springhill / Towneplace Suites (Final Site Plan dated July 12, 2017) The major site plan amendment referred to above (dated July 12, 2017) has been reviewed by the Department of Community Development and other applicable agencies. Additional review of the final site plan has resulted in new comments; please see UPDATE comments below, in bold font. The Planning Division will approve the above -referenced final site plan after the outstanding issues identified in this letter have been addressed and resolved to the satisfaction of the applicable reviewer. Additional comments or conditions may be added or eliminated based on further review. Please work directly with each reviewer to address and resolve their comments. Approvals from each reviewer or outside agency should be forwarded to the lead planner upon receipt. Please contact me at your earliest convenience if you have questions or requests for assistance, or if require any clarification or additional information. Sincerely, 1� put.� Tim Padalino, AICP Senior Planner (434)-296-5832 x 3088 ttpadalino&albemarle.org Page 1 of 3 Albemarle County Planning Services (Planner) — Tim Padalino, tpadalino(c�r�,albemarle.org — Requested changes: 1. Please continue to coordinate directly with ARB staff to obtain the required Certificate of Appropriateness. Please see the attached review comments from Ms. Margaret Maliszewski, Chief of Planning/Resource Management, dated August 11. 2. Please continue to coordinate directly with Engineering Services to address and resolve all issues identified in the most recent review comments. Please see the attached review comments from Mr. David James, Civil Engineer I, dated August 23. 3. Please continue to coordinate directly with Building Inspections to address and resolve the issue of accessible parking spaces. Please see the attached review comment from Mr. Michael Dellinger, Albemarle County Building Official, dated July 25. The issue appears to be whether a minimum of six (6) ADA accessible spaces are required [as indicated by the Parking Requirements notes on Sheet SP2 which state that "6 total accessible spaces" are required "with 1 being van accessible," citing "ADA Standard for Accessible Design Section 4.1.2 (5)(A)"]; or if a minimum of seven (7) ADA accessible spaces are required [as indicated by Building Inspections, citing Mr. Jay Schlothauer's review comments (dated December 9, 2016) pertaining to the initial site plan for this project (SDP201600070)]. 4. Please continue to coordinate directly with ACSA. Please see the attached review comments from Mr. Alexander Morrison, PE, dated August 14, which request three (3) copies of the construction plans, along with water and sewer data sheets, for ACSA review. This review comment was previously forwarded to you on August 15. 5. Please continue to coordinate directly with VDOT to address and resolve all issues identified in the most recent review comments. Please see the attached review comments from Mr. Adam Moore, PE, dated August 10. 6. UPDATE: Please remove the "Proposed Subdivision Line" and corresponding annotation from the final site plan. Although that information is intended to be helpful, the final site plan is not the appropriate document on which to include such information. The regulatory review of proposed division(s) of property(s) must occur via submission and review of a subdivision plat, and should be kept separate from site plan submission and review. To separately pursue the proposed division of the "Future Development Parcel," a plat of division must be prepared and submitted pursuant to Subdivision Ordinance Section 14-207 ("two -lot subdivisions"), inclusive of the required $581.00 application fee per Subdivision Ordinance Section 14-203(B)-1(a). 7. UPDATE: [Section 14-303(E)]: Please remove easements which are not required for this final site plan (such as the "Proposed Access Easement" for the "Future Development Parcel" or the "Proposed 24' Interparcel Access Easement"). Easements which are required for this Final Site Plan (such as the "Proposed 20' Drainage Easement," per Zoning Ordinance Section 17.32.7.4.2) must be identified using bearings and distances and/or other acceptable dimensions standards. Please revise accordingly. However, if the "Proposed Access Easement" to the "Future Development Parcel" must remain on the final site plan for any particular reason: please provide explanation of that reason; add a note to Sheet SP6 to briefly explain the use or necessity of the proposed access easement; and please revise the width of the proposed access easement to ensure it is wide enough to provide a lane for ingress as well as a lane for egress between the future development parcel and Route 29. 8. UPDATE: A corresponding easement plat depicting all required easements must be prepared and submitted pursuant to Subdivision Ordinance Section 14-208.2 ("Easement plats"), inclusive of the required $215.00 application fee per 14-203.3(D)-3. The required easement plat must be reviewed, approved, and recorded prior to County approval of the final site plan. 9. UPDATE: Note #3 on Sheet SP6 indicates that the "Existing Flaming Wok to remain open until such time that grading is performed on future development parcel that will result in the loss of utility service or safe customer access. " This note leaves open the possibility that both the existing restaurant and future hotel could be in operation concurrently. If the applicant wishes to preserve the possibility for those two uses to occur on the same property at the same time, then it must be demonstrated on the final site plan that the subject property contains all necessary improvements as required by County Code to support the concurrent use of TMP #61Z- 03-2 for hotel and restaurant operations. Therefore, if the existing restaurant use is to be continued or if the existing restaurant structure is to remain in Page 2 of 3 place at any time after the hotel use has been commenced, please demonstrate compliance with the minimum parking requirements (aggregated for all uses on the subject property), as specified in Zoning Ordinance Section 4.12.6. If the existing restaurant use is to be discontinued or if the existing restaurant structure is to be demolished prior to the hotel use being commenced, please remove or otherwise modify Note #3 on Sheet SP6. Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski, mmaliszewskikalbemarle.org — Requested Changes (see attached). Albemarle County Engineering Services (Engineer) —David James, diameskalbemarle.org — Requested Changes (see attached). Albemarle County Building Inspections — Michael Dellinger, mdellingerkalbemarle.org — Denied (see attached). Albemarle County Department of Fire Rescue — Shawn Maddox, smaddox(&albemarle.org — No Objection (see attached). Albemarle County Information Services (E911) — Elise Kiewra, ekiewra@albemarle.org— No Objection (see attached). Albemarle County Service Authority (ACSA) — Alex Morrison, PE, aorrison(&serviceauthority.org_— Requested Changes (see attached). Virginia Department of Transportation — Adam Moore, PE, Adam.Moorekvdot.vir ig nia.gov — Requested Changes (see attached). Rivanna Water and Sewer Authority (RWSA) — Victoria Fort, PE, vfortnxivanna.org — Pending: To date, no review comments have been received from RWSA. All review comments from RWSA will be forwarded to the Primary Contact upon receipt. Note: The Initial Site Plan review comments indicate that the primary issue involving RWSA is the requirement for RWSA to review and approve the proposed sewer connection(s). Page 3 of 3