Now' sus,
Christopher Perez
From: Christopher Perez
Sent: Monday, March 07, 2016 8:42 AM
To: 'Scott Collins'
Cc: Francis MacCall
Subject: RE: Pre-app for Briarwood
Scott,
Yes, I'll schedule it, how does 2-3pm sound?
Also, I'm ready to conditionally approve SUB2016-4_Briarwood Phase 4 - Preliminubdivision;
however, as previously discussed I need the notification fee paid: $255. Once this i paid I'll issue the
conditional approval letter.
thanks fa
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
From:Scott Collins [mailto:scott@collins-engineering.com]
Sent: Friday, March 04, 2016 8:32 AM
To:Christopher Perez<cperez@albemarle.org>
Cc: Francis MacCall<FMACCALL@albemarle.org>
Subject: Pre-app for Briarwood
Chris, Francis-
Can you schedule us for a pre-app on Monday, March 14th to discuss Briarwood Park(recreational area required with the
proffers) located on Phase 4 of the project. We want to start getting this moving forward and want to discuss the best
way to move it forward.
Thanks!
Scott
From: Danielle Roth
Sent:Wednesday, February 24,2016 4:48 PM
To:Christopher Perez<cperez@albemarle.org>;Scott Collins<scott@collins-engineering.com>
Cc: David Benish<DBENISH@albemarle.org>
Subject: RE:SUB2016-004 Briarwood -Adjacent owner mailing fees
Scott,
I have processed a refund for$435 to United Land Corporation. This refund is the difference of the
variation fee paid at time of intake as stated in the below email. Please allow up to 2 months for the refund
to fully process. If you have any question please let me know.
Thank you,
Danielle Roth
1
4100
Intake/Support Specialist II
Community Development
County of Albemarle
(434) 296-5832, Ext 3835
From:Christopher Perez
Sent:Wednesday, February 17, 2016 9:55 AM
To:Scott Collins<scott@collins-engineering.com>
Cc: Danielle Roth<droth@albemarle.org>;Judy Martin - BC/ZS<Imartin4@albemarle.org>; David Benish
<DBENISH@albemarle.org>
Subject: RE:SUB2016-004 Briarwood-Adjacent owner mailing fees
Scott,
SUB2016-004 Briarwood-fees
While reviewing the fees for the project it appears you overpaid for the Variation to the phasing plan for the PRD.You
paid the appropriate subdivision fee;however,you also paid an$892 fee listed on the subdivision application for a
Variation or Exception under section 14-203.1 before approval of final plat.This is not the correct fee for this type of
Variation,as it is authorized under section 8.5.5.3 and not section 14-203.1.The appropriate fee for this type of Variation
is$457 which is listed under Section 35.1(i)(2) Special Exceptions.
Please work with intake to process a refund for the difference in the Variation fee($435). As discussed below you still
owe the public notification fees of$255.
Hope this helps.
Christopher P.Perez I Senior Planner
Department of Community Development County of Albemarle,Virginia
401 Mclntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Bill Fritz
Sent:Wednesday, February 03,2016 4:25 PM
To:Scott Collins<scott@collins-engineering.com>;Carla Harris-CDD<CHARRIS@albemarle.org>
Cc:Christopher Perez<cperez@albemarle.org>; Nena Harrell<ulcwww(Wembargmail.com>
Subject: RE:SUB2016-004 Briarwood -Adjacent owner mailing fees
I wish I could give you a better answer. The simple fact is that we have talked to the Board before about notices
for by-right subdivisions and they have not amended the ordinance to reduce notice for these types of
subdivisions. I can't give you any answer other than that. We can bring it up again when discussions occur
about processes or fees.
William D. Fritz,AICP
434-296-5$23 extension 3242
From:Scott Collins [mailto:scott@collins-engineering.com]
Sent:Wednesday, February 03, 2016 4:11 PM
To:Carla Harris-CDD<CHARRIS@albemarle.org>; Bill Fritz<BFRITZ@albemarle.org>
Cc:Christopher Perez<cperez@albemarle.org>; Nena Harrell<ulcwwwtWembargmail.corn>
Subject: RE:SUB2016-004 Briarwood-Adjacent owner mailing fees
Bill-
On this application for Briarwood when we submitted it, the client paid the flat fee of$200 for the mailings on this
simple subdivision plat for a section in Briarwood. Carla just informed me that another$255 is necessary,totaling a cost
2
Christopher Perez
From: Christopher Perez
Sent: Friday, May 06, 2016 8:33 AM
To: 'Scott Collins'
Subject: SUB2016-4_Briarwood Phase 4 and 6 - Preliminary Subdivision.
Attachments: APPROVAL PACKAGE - SUB2016-4_Briarwood Phase 4 and 6 - Preliminary Subdivision.pdf
Scott,
Attached is the conditional approval letter SUB2016-4_Briarwood Phase 4 and 6 - Preliminary Subdivision.
This has also been uploaded to Countyview. The phasing variation is scheduled to go to the BOS on June 8th
Christopher P.Perez 1 Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
From: Christopher Perez
Sent: Wednesday, February 17, 2016 9:55 AM
To: 'Scott Collins' <scott@collins-engineering.com>
Cc: Danielle Roth <droth@albemarle.org>;Judy Martin- BC/ZS<jmartin4@albemarle.org>; David Benish
<DBENISH@albemarle.org>
Subject: RE: SUB2016-004 Briarwood -Adjacent owner mailing fees
Scott,
SUB2016-004 Briarwood- fees
While reviewing the fees for the project it appears you overpaid for the Variation to the phasing plan for the PRD. You
paid the appropriate subdivision fee; however,you also paid an $892 fee listed on the subdivision application for a
Variation or Exception under section 14-203.1 before approval of final plat. This is not the correct fee for this type of
Variation, as it is authorized under section 8.5.5.3 and not section 14-203.1. The appropriate fee for this type of Variation
is $457 which is listed under Section 35.1(i)(2) Special Exceptions.
Please work with intake to process a refund for the difference in the Variation fee($435). As discussed below you still
owe the public notification fees of$255. The fee was paid the last week in April.
Hope this helps.
Christopher P.Perez Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
From: Bill Fritz
Sent:Wednesday, February 03, 2016 4:25 PM
To:Scott Collins<scott@collins-engineering.com>; Carla Harris-CDD<CHARRIS@albemarle.org>
Cc: Christopher Perez<cperez@albemarle.org>; Nena Harrell <ulcwww@embargmail.com>
Subject: RE:SUB2016-004 Briarwood -Adjacent owner mailing fees
I wish I could give you a better answer. The simple fact is that we have talked to the Board before about notices
for by-right subdivisions and they have not amended the ordinance to reduce notice for these types of
1
Num. ,ftre
subdivisions. I can't give you any answer other than that. We can bring it up again when discussions occur
about processes or fees.
William D. Fritz,AICP
434-296-5823 extension 3242
From:Scott Collins [mailto:scott@collins-engineering.com]
Sent: Wednesday, February 03, 2016 4:11 PM
To: Carla Harris-CDD<CHARRIS@albemarle.org>; Bill Fritz<BFRITZ@albemarle.org>
Cc:Christopher Perez<cperez@albemarle.org>; Nena Harrell<ulcwww@embarcimail.com>
Subject: RE: SUB2016-004 Briarwood -Adjacent owner mailing fees
Bill-
On this application for Briarwood when we submitted it, the client paid the flat fee of$200 for the mailings on this
simple subdivision plat for a section in Briarwood. Carla just informed me that another$255 is necessary,totaling a cost
of$455 for mailings on a simple subdivision plat for Briarwood. This is crazy. I can understand if it was a rezoning, but
for a simple subdivision,for the client to have to pay$455 for notification fees is just not right. It's all because it abutted
an open space that carries through the property. Something needs to be done so that property owners do not have
such a financial burden for this notification fee amount when the county is notifying people that clearly have no
attachments to what is being subdivided.
Scott Collins
From: Carla Harris-CDD [mailto:CHARRIS@albemarle.org]
Sent: Wednesday, February 03, 2016 11:47 AM
To:Scott Collins
Cc: Christopher Perez
Subject:SUB2016-004 Briarwood -Adjacent owner mailing fees
Hello Scott,
This email is to inform you of the adjacent owner fees for the above name project.
• Amount Due $255.00(payable to the County of Albemarle)
• Due Date 2/18/16 (by close of business 5 pm)
• Project Number SUB2016-004
Project Reviewer Christopher Perez
❖ (Please place the above project number on your check)
If you have any questions concerning the fees, please give us a call.
Thanks,
Carla Harris
BZA Clerk/Zoning Support
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext.3834
2
eharris@albemarle.org
3
Christopher Perez
From: Christopher Perez
Sent: Friday, February 19, 2016 10:47 AM
To: 'ajn@apple.com'; 'Allan Nathanson'
See my second responses below in red.
Christopher P. Perez I Senior Planner
Department of Community Development 'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext. 3443
Original Message
From: Allan Nathanson [mailto:ajn@mac.com]
Sent: Friday, February 19, 2016 10:35 AM
To: Christopher Perez<cperez@albemarle.org>
Subject: Re: SUB2016-4_Briarwood Phase 4 and 6- Preliminary Subdivision
>On Feb 19, 2016, at 10:19 AM, Christopher Perez<cperez@albemarle.org>wrote:
>Allan,
>See my comment/response below.
>Christopher P. Perez I Senior Planner
> Department of Community Development 'County of Albemarle, Virginia
>401 McIntire Road I Charlottesville, VA 22902
>434.296.5832 ext. 3443
> Original Message
> From:Allan Nathanson [mailto:ajn@mac.com]
>Sent: Friday, February 19, 2016 9:58 AM
>To: Christopher Perez<cperez@albemarle.org>
>Subject: Re: SUB2016-4_Briarwood Phase 4 and 6- Preliminary
>Subdivision
> Hi Chris-
>Thank you for forwarding the letters AND the web link.
>Q? In your letter of 02/16, #5,you talk about the trail being platted from behind lot 18. Lot 18 appears to be on the
Camelot(non-river) side of the street. Did you mean to suggest extending the trail to the open space between the lots
37 and 38?
> My response: Good catch, this appears to be a type on my part and
>should truly be Lot 28.Thus the trail would go from behind Lot 28 to /
> lot 43. I'll correct this on the approval letter.Thanks
1
>Also, with regard to the walking trail, I noted that the trail entrance between lots 49 and 50 appears to cut the corner
of lot 49. IMHO, this will only create trouble for the future owners of lot 49 and for the HOA. What would be the best
way for me to communicate this concern?
> My response:You have already communicated your concerns to me and I
>feel it is fine be it is located in a platted easement maintained by
>the HOA, also it's already built. Any purchaser of this proposed lot
>will see it on the plat when they go to buy the property,
Assuming that Ryan Homes points it out to they buyers when looking over possible lots (and before the paperwork has
been signed). Having purchased a lot/home from Ryan, the sales reps don't always point out things like that. It's only
later,when you want to put up a fence, that you figure out where you can/cannot build:`
>or if they visit the site before they buy the home they will see it built. Right, and where would the lot stake be ... in the
corner. The stakes will most certainly not highlight the easements. '
> If you would like I can provide a recommendation in my conditional approval letter that he rethink the lot layout for
Lot 49 to omit the easement from that lot when they are designing the final plat for the reasons you stated, I can even
site resident concerns in this recommendation.
Great. IMHO,they could also shift the trail so that they are not cutting the corner. I'll make the recommendation;
however, I do not think they will relocate the built trail. But they might.
> He may think it's a good idea and remedy this issue. Other than a recommendation, I cannot require it be rectified
because it meets the ordinance. If the above is not enough, you may contact Scott Collins about it and stress your
concerns(434-293-3719).
If you were to pass along a recommendation/resident concern, how soon would you get some feedback? The
recommendation would be in the conditional approval letter and we would not receive any feedback until the final plat
is submitted. Once the final plat is submitted we'd know if he took the recommendation or not. The prelim plat is valid
for 5 years provided they submit a final plat within 1 yr of the approval.
Also, I would think they'd take your recommendations a bit stronger than one call from an existing resident. But, if you
think it's wise, I'd have no issue with making a followup call to Scott Collins. Recommendations are recommendations,
I've found it does not matter who they come from, if the developer thinks it's a good idea that will not hurt them nor
cost them additional money they may do it. I could see this being a financial benefit to the seller of that lot to move the
easement over.
Q?would your conditional approval recommendation be part of the "public" record ... and something that those making
the final approval would see?Yes, the conditional approval letter goes hand in hand with the approved preliminary plat.
We use it as an additional checklist when reviewing the final subdivision plat. I'll send you a copy once it's finalized.
>Thanks,
>-Allan
> 301-216-1899
> p.s. I missed yesterday's"Site Review Committee" meeting :-(
2
»On Feb 19, 2016, at 7:23 AM, Christopher Perez<cperez@albemarle.org>wrote:
»Allan,
>>SUB2016-4_Briarwood Phase 4 and 6- Preliminary Subdivision
>>As you requested attached are the comments for the above referenced project.Also, attached are Engineering's
comments which came in two days late. I'm still awaiting VDOT's comments. Per a discussion with VDOT they say they
do not see any big issues and that their comments, if any, will be minor. Once I receive VDOT's comments the
preliminary subdivision plat will be approved with conditions. Each of the comments in the comment letter will be the
conditions which must be met prior to final subdivision plat approval for this phase. I estimate the approval letter will go
out by March 2nd at the latest. Below is a link to Countyview for citizens to track reviews of projects. Hope this helps.
>> http://countyviewweb.albemarle.org/
»Christopher P. Perez I Senior Planner Department of Community
>> Development 'County of Albemarle,Virginia
>>401 McIntire Road I Charlottesville, VA 22902
»434.296.5832 ext. 3443
>><CD1 SUB2016-4_Briarwood Phase 4 and 6- Preliminary
>>Subdivision.pdf><Engineering Comments 2-18-16.pdf>
Christopher P.Perez Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
3
Christopher Perez
From: Christopher Perez
Sent: Friday, February 19, 2016 7:24 AM
To: 'AJN@mac.com'; 'ajn@apple.com'
Subject: SUB2016-4_Briarwood Phase 4 and 6-Preliminary Subdivision
Attachments: CD1 SUB2016-4_Briarwood Phase 4 and 6-Preliminary Subdivision.pdf; Engineering
Comments 2-18-16.pdf
Allan,
SUB2016-4 Briarwood Phase 4 and 6-Preliminary Subdivision
As you requested attached are the comments for the above referenced project. Also,attached are Engineering's comments
which came in two days late. I'm still awaiting VDOT's comments. Per a discussion with VDOT they say they do not see
any big issues and that their comments, if any, will be minor. Once I receive VDOT's comments the preliminary
subdivision plat will be approved with conditions. Each of the comments in the comment letter will be the conditions
which must be met prior to final subdivision plat approval for this phase. I estimate the approval letter will go out by
March 2nd at the latest. Below is a link to Countyview for citizens to track reviews of projects. Hope this helps.
http://countyviewweb.albemarle.org/
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road!Charlottesville,VA 22902
434.296.5832 ext. 3443
1
Slime '*0010
of
uNa
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
February 16, 2016
Scott Collins
200 Garrett Street, Suite K.
Charlottesville VA 22902
SUB2016-4 Briarwood Phase 4(Lots 1-50,24A,25A) &Phase 6(lots 1—4)—Prelim Subdivision
Mr. Collins:
The Site Review Committee has reviewed the development proposal referenced above. Initial comments
for the following divisions of the Department of Community Development and other agencies, as
applicable,are attached:
Albemarle County Planning Services
Albemarle County Information Services(E911)
Albemarle County Department of Fire Rescue
Albemarle County Building Inspections
Albemarle County Service Authority
Virginia Department of Transportation [Comments to be forwarded once received]
Albemarle County Engineering Services ✓
Comments reflect information available at the time the development proposal was reviewed,and should
not be considered final. However,the Site Review Committee has attempted to identify all issues that
will be required to be resolved prior to Final Subdivision Plat approval. The Lead Reviewer will either
approve with conditions or deny the Preliminary Subdivision Plat within 15 days of the Site Review
Meeting.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
Senior Planner
imP4 '%01
pF AI
4 I I I�;ro,M1
County of Albemarle 3o -‘j_______---' '
Department of Community Development �{ca� ,�,,,, _,.. r-s
401 McIntire Road, 4i_ . !,r„e_ (.c..4.4- ;
Charlottesville,VA,22902 re..1
Phone 434-296-5832 Fax 434-972-4126
Memorandum
To: Scott Collins
From: Christopher P.Perez,Senior Planner
Division: Planning
Date: February 16,2016
Subject: SUB2016-4 Briarwood Phase 4(Lots 1-50,24A,25A)&Phase 6(lots 1—4)-Preliminary Subdivision
The County of Albemarle Planning Division will grant or recommend approval of the Subdivision Plat referenced above
once the following comments have been addressed: [Each comment is preceded by the applicable reference,which is to the
Subdivision/Zoning Ordinances unless otherwise specified.]
1. [Comment] Pay the$255 public notification fee prior to any further review/action of the plan.
2. [ZMA2004-14 Application plan,Proffer 4,and Proffer 1] The primary recreation area south of Camelot shall
be built or bonded prior to fmal plat approval of Phase 4.The recreational area shall consist of a
baseball/multipurpose field,two half basketball courts,playground equipment,and picnic facilities.Prior to fmal
plat approval an approved site plan and WPO plan shall be required for the primary recreational area and the off
street parking,access aisles,and commercial entrance serving this area.
3. [ZMA2004-14 Application plan,Proffer 1,and 4.12.6] On the site plan provide the required parking.
Baseball field-20 spaces per field
Basketball courts-2 spaces per basket
Playground equipment- 1 space per one hundred twenty-five(125)square feet of useable recreation area
4. [ZMA2004-14 Application plan,Proffer 1 &4,and ZMA95-20 Proffer 19]The fmal plat shall depict and
dedicate to the HOA the primary recreational area and its access.The alignment of the access road is required to
go through TMP 32E-2 within the area reserved for access as approved on ZMA95-20,which is an amendment to
ZMA79-32.Provide the owner signature of TMP 32E-2 on the final plat. 1o,1...
5. [ZMA2004-14 Application plan,Proffer 4]The open space in Phase s all contain a walking/jogging trail.On
the fmal plat depict,label("Passive Recreational Area consistin walking/jogging trails"),and dimension the
trail.At a minimum the trail shall be platted from behinLot 18 on through to Lot 42 and connect to the existing
trail in phase 4.Also,provide a trail connection to either Ives cul-de-sac or Sunset Drive at either the
proposed SWM facility(pond 4)or in the open space area between Lots 32 and 33.
6. [ZMA2004-14 Application plan,Proffer 4] Prior to fmal plat approval the trail shall be built.Provide a trail plan
exhibit which shall be used by the County to approve the design of the trail.The exhibit shall contain a cross-
section of the trail,topography(elevation contours 50' on either side of the trail),and a plan view of the trail.Once
the trail plan has been approved provide the above mentioned information on the amended WPO201600001
currently under review.Once approved please construct the trail and then request an inspection of the trail.
7. [14-302(B)(10)]Stream buffers.Provide the following note: "The stream buffer(s)shall be managed in
accordance with the Albemarle County Water Protection Ordinance".
8. [14-428]Dedication of streets. Provide the following note: "51'Public R/W is hereby dedicated for public use."
1
\rr'
9. [14-428]Dedication of open space.Provide the following note: "Open Space is hereby dedicated to the HOA."
10. [14-302(A)(8)]Proposed Lots. Provide the area of each proposed lot.
11. [14-303(A)]Statement of consent to division. Provide the following note:"The platting or dedication of the
following described land[insert correct description of the land subdivided]is with free consent and in accordance
with the desire of the undersigned owners,proprietors and trustees, if any."
12. [14-302(A)(15)]Identification of all owners and certain interest holders. Provide the address for each owner of
record,to include the owner of TMP 32E-2.
13. [14-303(0)&(P)]Signature panels.Provide owner signature lines and notary statements for each owner of record.
Under the owner signature lines provide a signature panel for the"Agent for the Board of Supervisors".This will
be used by the Subdivision Agent to approve the plat.
14. [14-303(Q)] Water Supply.Provide the following note: "Under current county policy,public water and/or sewer
will be available to this property."
15. 114-302(B)81 Yards.Under setbacks include "12'building separation". Also,provide the following note: "No
minimum lot area is specified".
16. [14-311]Infrastructure improvement plans. Road Plan and WPO Plan must be approved,all required
improvements must be built or bonded,and all required Deeds and Declarations must be reviewed and approved
prior to final plat approval.
17. [14-317]Instrument evidencing maintenance of certain improvements. With the fmal plat submit an instrument
assuring the perpetual maintenance of the stormwater management facilities,open space area and the trails,
primary recreational area,and any other improvements that are to be maintained by the HOA in perpetuity.County
Attorney approval is required prior to fmal plat approval.
18. [14-302(A)4&5]Easements. Provide the deed book and page reference information for all existing easements.
Include the 10'walking/jogging trail easement previously platted in Phases 4 and 5,and the existing 20'drainage
easement.
19. [14-302(B)7]Agricultural-Forestal District. Provide the following note: "This site does not lie within an
agricultural forestal district."
20. [14-302(A)4&5]Drainage Easements. On the plat label all drainage easements as either public or private.
21. [14-302(A)3]Existing or platted streets. Provide the State Route Number 1511 for St.Ives Road.
22. [Comment]Under general notes revise the retaining wall note as follows: "Retaining walls are proposed."
23. [Comment]For tracking purposes it is suggested that the numbering of Lots 24A and 25A be revised to Lots 51
and 52.
24. [14-303F]Identification of sections, blocks,and lots. On the final plat provide a current phasing plan.
25. [Comment]Prior to final plat approval the phasing variation request shall be approved by the Board of
Supervisors.Planning's comments on the variation are provided below.Engineering comments on the variation
will be forwarded to the applicant once received.
4s 5t,v_ oarv's 17 cv4A-4-5 L plAr,se 1)/uvW‘A1-5.1
2
• 'ern►' \r/
Phasing Variation Request
1. [Comment] Provide a visual with the current phasing plan that was approved by the Board of Supervisors on
September 4,2013 alongside the proposed phasing plan.This visual will be utilized as an attachment in the staff
report.
2. [Comment] The land being platted as Lot 50 and a portion of open space adjacent to Lot 49 are part of Phase 5 on
the current phasing plan.Revise the variation request to modify the phase lines to include these portions of land in
phase 4.Also,as part of the variation request include the two lots next to Lot 4 in the request to shift lots from
phase 4 to phase 6."
3. [Comment] Engineering comments on the variation if any will be forwarded to the applicant once received.
Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept up to
date by the County Attorney's office.The Code may found on the County Attorney's website which may be found under
"Departments and Services"at Albemarle.org.
In accord with the provisions of Section 14-229(B)of Chapter 14 of the Code if the developer fails to submit a revised final
plat to address all of the requirements within six(6)months after the date of this letter the application shall be deemed to
have been voluntarily withdrawn by the developer.
Please contact Christopher P.Perez in the Planning Division by using cperezAalbemarle.org or 434-296-5832 ext.3443 for
further information.
3
Sore *.rol
9. [14-428]Dedication of open space.Provide the following note: "Open Space is hereby dedicated to the HOA."
10. [14-302(A)(8)]Proposed Lots. Provide the area of each proposed lot.
11. [14-303(A)]Statement of consent to division. Provide the following note: "The plattin, or dedication of the
following described land[insert correct description of the land subdivided]is with fre consent and in accordance
with the desire of the undersigned owners,proprietors and trustees, if any."
12. [14-302(A)(15)]Identification of all owners and certain interest holders. Prov;de the address for each owner of
record,to include the owner of TMP 32E-2.
13. [14-303(0)&(P)]Signature panels.Provide owner signature lines and otary statements for each owner of record.
Under the owner signature lines provide a signature panel for the"A=,-nt for the Board of Supervisors".This will
be used by the Subdivision Agent to approve the plat.
14. [14-303(Q)] Water Supply. Provide the following note: "Unde current county policy,public water and/or sewer
will be available to this property."
15. 114-302(B)81 Yards. Under setbacks include "12'buildi : separation". Also,provide the following note: "No
minimum lot area is specified".
16. [14-311]Infrastructure improvement plans. Road P an and WPO Plan must be approved,all required
improvements must be built or bonded,and all re• ired Deeds and Declarations must be reviewed and approved
prior to fmal plat approval.
17. [14-317]Instrument evidencing maintenance of certain improvements. With the fmal plat submit an instrument
assuring the perpetual maintenance of the • ormwater management facilities,open space area and the trails,
primary recreational area,and any other' provements that are to be maintained by the HOA in perpetuity. County
Attorney approval is required prior to al plat approval.
18. [14-302(A)4&5]Easements. Provi. the deed book and page reference information for all existing easements.
Include the 10' walking/jogging ail easement previously platted in Phases 4 and 5,and the existing 20' drainage
easement.
19. [14-302(B)7]Agricultural-F•restal District. Provide the following note: "This site does not lie within an
agricultural forestal distri t."
20. [14-302(A)4&5]Drai ege Easements. On the plat label all drainage easements as either public or private.
21. [14-302(A)3]Existi g or platted streets. Provide the State Route Number 1511 for St.Ives Road.
22. [Comment] Un.-r general notes revise the retaining wall note as follows: "Retaining walls are proposed."
23. [Comment] 'or tracking purposes it is suggested that the numbering of Lots 24A and 25A be revised to Lots 51
and 52.
24. [14-303 Identification of sections, blocks, and lots. On the fmal plat provide a current phasing plan.
25. [Coil ent] Prior to final plat approval the phasing variation request shall be approved by the Board of
Su. rvisors.Planning's comments on the variation are provided below. Engineering comments on the variation
w. 1 be forwarded to the applicant once received.
2
See '1010
Christopher Perez
From: Alex Morrison <amorrison@serviceauthority.org>
Sent: Monday, February 08, 2016 9:25 AM
To: Christopher Perez
Subject: SUB201600004: Briarwood Phase 4(Lots 1-50, 24A and 25A)and Phase 6(Lots 1-4)
Preliminary Subdivision Plat
Chris,
I have reviewed the above referenced application and have the following comments:
• Construction plans are currently under review by the ACSA(Jeremy Lynn).
• Contact Jeremy Lynn (ACSA)to discuss the required dedication for final approval.
• Call out the Deed Book and Page for the existing ACSA sewer easement.
• The applicable charge for the NFRPS Special Rate North Zone will be assessed during the application for each
water/sewer service.
Alexander J.Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville,Virginia 22911
(0)434-977-4511 Ext. 116
(C)434-981-5577
(F)434-979-0698
Christopher Perez
From: John Anderson
Sent: Wednesday, February 17, 2016 4:58 AM
To: Scott Collins
Cc: Christopher Perez
Subject: Planning Application Review for SUB201600004 Briarwood Phase 4 (Lots 1-50, 24A, 25A)&
Phase 6(Lots 1-4)-Preliminary.
The Review for the following application has been completed:
Application Number=SUB201600004
Reviewer=John Anderson
Review Status = No Objectionv��r'i \ ` 04.
°
Completed Date =02/17/2016
Thanks for your patience.