VSMP Permit plan review
Project title: Hollymeade Town Center Block C6
Project file number: WP0201700039
Plan preparer:
Dustin Green, Dominion Engineering [dgreene@dominioneng.com]
Owner or rep.:
Katurah Roell, Town Properties LLC [katurahsr@gmail.com]
Plan received date:
Rev 1 — May 81" 2017
Rev 2 — July 14t", 2017
Rev 3 — Aug 17", 2017
Date of comments:
Rev 1 June 91, 2017
Rev 2 — August 9", 2017
Rev 3 — August 31', 2017
Reviewers:
Rev 1 — Bobby Jocz
Rev 2 — Rnhhv JOV7
Rev 3 — Bobby Jocz
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is Approved. The
rationale is given in the comments below.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. [Cover Sheet] Provide the WPO Application number (WP0201700039) on the cover sheet and
SWPPP document.
Rev 2 — Addressed.
2. [Registration statement] As presented, total disturbed area is larger than total land area
development. It appears these values were swapped. Please provide corrected registration
statement for next submittal.
Rev 2 — Addressed.
3. [General] Low maintenance ground cover should be provided on slopes >=3:1.
Rev 2 — Addressed.
4. [EP2] Topography must be field verified by designer within the past year. Verify and provide date
of verification.
Rev 2 — Addressed.
5. [EP3] Identify areas containing managed slopes.
Rev 2 — Addressed.
6. Remove landscape plan and sewer profiles from WPO submittal.
Rev 2 — Addressed.
Engineering Review Comments
Page 2 of 3
Rev 2 Additional Comments
1. Please clarify what hatching at north end of site is referencing. Pattern not included in key
or referenced elsewhere.
Rev 3 - Addressed
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Provide PPP exhibit, or identify on E&S plans, Initial planned locations for stockpiles, concrete
washout, dumpsters, portable bathroom facilities, etc.
Rev 2 — Addressed.
2. Complete section A of the PPP plan outlining pollutant activities and prevention practices.
Rev 2 — Addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is Approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. [All] Clarify status of "SDG" at the north end of the property connecting to Ex-1. Is this structure
to be removed? If so, eliminate the structure from proposed layouts and provide drainage relief for
existing depression. If it is to remain, include in stormwater calculations and profiles.
Rev 2 — Addressed.
2. [EP5] Side slopes for conveyance channel should be limited to 3: 1. Ensure EC-2 matting is Type
lI due to velocities being >4fps.
Rev 2 — Acknowledged.
3. [EP 10] Please provide context for stormsewer segments presented in LD-229 storm drain
computations. It is unclear what segments this chart is referring to, and where on the overall
Hollymeade property they are located.
Rev 2 — Not addressed adequately. See comments below.
Rev 3 - Addressed
4. [EP 10] Provide documentation related to compliance with water quality requirements. Water
Quality cannot be addressed as described.
Rev 2 — Adequately Addressed.
5. [Details] Provide profile and calculations for drainage passing through 8" Duraslot drains. Provide
manufacturers specifications and maintenance details.
Rev 2 — Acknowledged.
Rev 2 Additional Comments
1. Correct the Scaling on sheet EP-7. It is difficult to see stormsewer structures referenced in
comment 3 above due to cutoff at bottom of sheet. It is also difficult to see which symbols
are associated with each structure/pipe. Some labels are covered by features/lines, some
labels are duplicated elsewhere on the sheet (pipe 5 is noted in 2 places).
Rev 3 — Addressed.
2. Structure labels still do not match those as presented in the LD-229 spreadsheet (no
reference for structure ST-IA).
Rev 3 - Addressed
Engineering Review Comments
Page 3 of 3
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is Approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. [SP4 & SP5] Provide soil boundaries
Rev 2 — Addressed.
2. [SP4 & SP5] Provide inlet protection for inlets along the south curb of Laurel Park lane.
Rev 2 — Addressed.
3. [EP9] Provide detail for drop inlet protection.
Rev 2 — Addressed.
4. [SP4 & SP5] Provide perimeter silt fence or indicate temporary seeding for areas adjacent to
property boundaries.
Rev 2 — Addressed.
Rev 2 Additional Comments
1. Revise construction sequence item #7 to reference the appropriate ST for removal.
Currently states ST-1 will be removed following consult from County when it should
Rev 3 - Addressed
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. The County's Management Analyst
will prepare bond agreement forms, which will need to be completed by the owner and submitted along
with cash, certificates or sureties for the amounts specified
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
Bobby Jocz, EIT
Civil Engineer I
(434) 296-5832 ext: 3283
County of Albemarle
Department of Community Development
401 McIntire Rd.
Charlottesville, VA 22902