HomeMy WebLinkAboutZMA201700006 Review Comments Zoning Map Amendment 2017-09-01COUNTY OF ALBEMARLE
Department of Community Development
Division of Planning
(434) 296 — 5823
September 1, 2017
Hollymead Corner LLC
c/o Peadar Little
809 Club Drive
Keswick, VA 22947
RE: ZMA201700006 Hollymead Corner
Dear Mr. Little:
401 McIntire Road, Room 218
Charlottesville, Virginia 22902-4596
Fax (434) 972 - 4035
Staff has reviewed your initial submittal to increase the maximum allowable non-residential square
footage permitted in Block I by Table A of the Code of Development for Hollymead Town Center
(Area C) by 40,000 square feet. We have a number of questions and comments which we believe
should be resolved before you resubmit. We would be glad to meet with you on these issues to
discuss them. Our comments are consolidated below:
Planning
The "project summary" section of the application narrative states that Block I currently "has 100
gross square feet of buildable area remaining, which renders the property incapable of being
developed in accordance with the Hollymead Town Center NMD or the Comprehensive Plan."
Staff researched this information by reviewing the existing approved development in Block I. Staff
found the Bojangles on Lot A utilizes approximately 3,516 square feet and that 0 square feet of
non-residential square footage has been approved in Lot B. Staff determined the preliminary
approval for the proposed Comfort Suites in Lot B had expired. However, a new initial site plan for
a hotel on Lot B has been submitted and is currently under review. It is proposed to occupy 46,680
square feet.
As a result of this analysis, staff determined there is approximately 16,804 non-residential square
footage remaining in Block I under the existing Code of Development. Therefore, it appears the
actual scope of the request to construct the office building as shown on the Application Plan is
approximately 23,000 non-residential square feet (as opposed to 40,000 square feet described in the
project narrative).
Understanding the exact scope of your request is particularly important because of an Official
Letter of Determination made by Ron Higgins, Deputy Zoning Administrator, on August 18, 2017.
This determination found that the existing Rosewood Village facility in Block III of Area C does
not count towards the 50,000 square foot limit of non-residential square footage (see attached). This
interpretation of the Code means there is currently an opportunity to transfer non-residential square
footage from Block III to Block I as was done between Block II and Block I in 2010.
Additionally, since my email to you on August 18, 2017, staff has received comments from VDOT
and the County's Transportation Planner regarding the traffic study. Both reviewers have comments
that are significant and directly related to this request.
I would like to schedule a time to meet with you and discuss this application after you have had a
chance to review these comments. Please call me to discuss these comments and schedule a time to
meet at your earliest convenience. We don't recommend moving forward to the Planning
Commission until there's been an opportunity to discuss this application further.
Neighborhood Model
Overall, the form of development proposed on the revised Application Plan appears to meet many
of the Neighborhood Model principles. More detailed comments will be provided at a later date
once the exact scope of the request has been confirmed.
Zoning — Ron Higgins
No objection at this time.
Proffers — Rebecca Ragsdale/J.T. Newberry
Please confirm that you are not requesting to modify the existing proffers approved under
ZMA200100020.
Engineering and Water Resources — Frank Pohl
No objection at this time.
Entrance Corridor — Margaret Maliszewski
It is anticipated that any impacts on physical form resulting from the proposal can be addressed
with ARB review of the site and building plans.
ACSA — Alex Morrisson
I hereby recommend approval of both ZMA's with the following comments:
• All site development plans proposing the extension of public water and/or sewer
infrastructure will require a construction plan review by the ACSA.
• RWSA Wastewater Capacity Certification will be required at the final site plan stage.
• Prior to final site plan approval the applicant will be required to enter into a wastewater
capacity agreement with the ACSA.
Transportation Planner — Kevin McDermott
• A scoping meeting to determine the assumptions and methodology used in the traffic
analysis wasn't held making this memorandum difficult to review. In the future please
coordinate with the County and VDOT on the development of the scope for these traffic
studies.
• The traffic analysis states in assumption #5 that a 25% reduction was applied to all trips to
account for the Berkmar Extension and then in assumption # 6 a 25% reduction was also
applied to background traffic was for two movements to account for the Berkmar Extension.
Please explain the difference in these two reductions and how the second one was applied. I
see the first in the reduction in overall reduction in trips generated.
• Trip distribution describes 10% of the trips as coming from the west. Are those all coming
in on Timberwood Boulevard or does that include Lockwood Drive as well?
2
• I would like to have a better explanation as to how the capacity thresholds were developed
and set. The analysis says total inbound or outbound peak hour should not exceed 320 but I
don't see how that number was arrived at. Were the number of trips just increased in the
model until a movement went to failing or if it was already failing until it decreased to a
certain level?
• I calculated a much higher trip generation by approximately 1000 daily trips under both the
by right and the proposed. This is likely partially due to your use of LU code 932 High
Turnover Sit Down Restaurant for Bojangles when it should be a Fast Food LU code 934 or
933 but it is difficult to tell without the breakdown of trips by block. Please provide a
display or table showing the breakdown of trips by block to assist in the identification of
impacts.
• The analysis states that the roundabouts were reviewed from a cursory level to ensure
adequate capacity is available. There are no statements regarding the results of that review.
Please provide these.
• Please provide a general evaluation of internal left turn movements and the effect of the
increase trips on those to insure adequate capacity in the turn lanes or the need for turn lanes
if they do not exist.
• There is no trip distribution to the right in right out from Block 1 directly to US 29. Please
explain if and how that movement might impact other movements in the corridor.
VDOT — Adam Moore
Comments from VDOT - attached
Action after Receipt of Comments
As indicated above, I would like to set up a meeting with you regarding this project. However, you
have several different options, which are identified on the "Action After Receipt of Comment
Letter" which is attached. After you have read this letter, please take one of the actions.
Re%uhmittal
If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal.
Resubmittals are received on the first and third Mondays of each month. The 2017 Submittal and
Resubmittal Schedule may be found here:
http://www.albemarle.org/upload/images/forms_center/departments/Community Development/for
ms/schedules/Special_ Use Permit_& Zoning Map Amendment_Schedule.pdf.
Notification and Advertisement Fees
The zoning ordinance specifies that applicants pay for the notification costs for public hearings.
Prior to scheduling a public hearing with the Planning Commission, payment of the following fees
is needed:
$ 350 Cost for newspaper advertisement
215 Cost for notification of adjoining owners (minimum $200 + actual postage/$1 per
owner after 50 adjoining owners)
$ 565 Total amount due prior to Planning Commission public hearing
Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the
Board hearing needed.
$ 350.00 Additional amount due prior to Board of Supervisors public hearing
$ 915.00 Total amount for all notifications Fees may be paid in advance. Payment for both
the Planning Commission and Board of Supervisors public hearings may be paid at the same time.
Additional notification fees will not be required unless a deferral takes place and adjoining owners
need to be notified of a new date.
Please feel free to contact me if you wish to meet or need additional information.
Sincerely,
J.T. Newberry
Senior Planner
attach
M
Charles A. Kilpatrick, P.E.
Commissioner
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper Virginia 22701
August 23, 2017
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: J.T. Newberry
Re: HoIlymead Town Center Area C-Block I, II, III, VII- Rezoning Amendment Application
Plan.
ZMA-2017-00005
ZMA-2017-00006
Review #1
Dear Mr. Newberry:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced rezoning amendment application plan as
submitted by, Shimp Engineering, PC., dated June 19, 2017 and offer the following
comment.
1. This study does not appear to account for the North Pointe development which will
increase the traffic on the Route 29 corridor and is under the site plan development
stage. This development along with the opening of Berkmar Extended will change
traffic patterns in the area. This should be included in the analysis.
2. The study does not include the currently proposed connection of Berkmar Drive
(Meeting Street) through to Airport Road. This connection is a significant priority for
the county and should be included in the analysis.
3. VDOT currently has safety concerns at the intersection of Town Center Drive and the
two opposing shopping center entrances (near Harris Teeter). These concerns are
informed by a concentration of crash incidents and citizen feedback. At this time
alternative intersection designs should be analyzed as there is insufficient spacing
between the signal at Route 29 and the roundabout for an additional traffic signal.
Any changes may necessitate changes in trip distribution assumptions.
If further information is desired please contact Willis C. Bedsaul at (434) 422-9866.
Sincerely,.
Adam J. ore, P.E.
Area Land Use Engineer
Charlottesville Residency
WE KEEP VIRGINIA MOVING
FOR OFFICE USE ONLY SP # or ZMA #
Fee Amount $ Date Paid By who? Receipt # Ck# By:
Resubmittal of information for Special Use Permit or���,
Zoning Map Amendment �l�grllP'�
PROJECT NUMBER: ZMA201700022 PROJECT NAME: Hollymead Town Center Area C Block 1
❑ Resubmittal Fee is Required
J.T. Newbe
Community Development Project Coordinator
P. hwk,7�,
1/19/17
Signature Date
❑ Per Request X Resubmittal Fee is Not Required
Name of Applicant
Signature
FEES
Phone Number
Date
Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,000
X First resubmission
FREE
❑ Each additional resubmission
$500
Resubmittal fees for original Special Use Permit fee of $2,000
❑ First resubmission FREE
❑ Each additional resubmission $1,000
Resubmittal fees for original Zoning Map Amendment fee of $2,500
❑ First resubmission
FREE
❑ Each additional resubmission $1,250
or—
Resubmittal fees for original Zoning Map Amendment fee of $3,500
❑ First resubmission
FREE
❑ Each additional resubmission
$1,750
❑ Deferral of scheduled public hearing at applicant's request — Add'l notice fees will be required
$180
To be Daid after staff review for Dublic notice:
Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission
and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing
a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be
provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body.
MAKE CHECKS TO COUNTY OF ALBEMARLE/PAYMENT AT COMMUNITY DEVELOPMENT COUNTER
Preparing and mailing or delivering up to fifty (50) notices
$200 + actual cost of first-class postage
Preparing and mailing or delivering each notice after fifty (50)
$1.00 for each additional notice + actual
cost of first-class postage
Legal advertisement (published twice in the newspaper for each public hearing)
Actual cost
minimum of $280 for total of 4publications)
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
6/7/2011 Page 1 of 1
DEPARTMENT OF COMMUNITY DEVELOPMENT
o 9L
ACTION AFTER RECEIPT OF COMMENT LETTER
Within 30 days of the date of this letter, please do one of the following:
(1) Resubmit in response to review comments
(2) Request indefinite deferral
(3) Request that your Planning Commission public hearing date be set
(4) Withdraw your application
(1) Resubmittal in Response to Review Comments
If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal
date as published in the project review schedule. The full resubmittal schedule may be found at
www.albemarle.org in the "forms" section at the Community Development page. Be sure to include
the resubmittal form on the last page of vour comment letter with vour submittal.
The application fee which you paid covers staff review of the initial submittal and one resubmittal.
Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.)
(2) Request Indefinite Deferral
If you plan to resubmit after 30 days from the date of the comment letter, you need to request an
indefinite deferral. Please provide a written request and state your justification for requesting the
deferral. (Indefinite deferral means that you intend to resubmit/request a public hearing be set with
the Planning Commission after the 30 day period.)
(3) Request Planning Commission Public Hearing Date be Set
At this time, you may schedule a public hearing with the Planning Commission. However, we do not
advise that you go directly to public hearing if staff has identified issues in need of resolution that can
be addressed with a resubmittal.
After outstanding issues have been resolved and/or when you are ready to request a public hearing,
staff will set your public hearing date for the Planning Commission in accordance with the Planning
Commission's published schedule and as mutually agreed by you and the County. The staff report and
recommendation will be based on the latest information provided by you with your initial submittal or
resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date.
Revised 6-15-17 mcy
By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper
advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule.)
Your comment letter will contain the actual fees you need to pay. Payment for an additional
newspaper advertisement is also required twenty-two (22) days prior to the Board of Supervisors
public hearing.
Please be advised that, once a public hearing has been advertised, only one deferral prior to the
Planning Commission's public hearing will be allowed during the life of the application. The only
exception to this rule will be extraordinary circumstances, such as a major change in the project
proposal by the applicant or more issues identified by staff that have not previously been brought to
the applicant's attention. As always, an applicant may request deferral at the Planning Commission
meeting.
(4) Withdraw Your Application
If at any time you wish to withdraw your application, please provide your request in writing.
Failure to Respond
If we have not received a response from you within 30 days, we will contact you again. At that time,
you will be given 10 days to do one of the following: a) request withdrawal of your application, b)
request deferral of your application to a specific Planning Commission date as mutually agreed to with
staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of
these choices is made within 10 days, staff will schedule your application for a public hearing based on
the information provided with your original submittal or the latest submittal staff received on a
resubmittal date.
Fee Payment
Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make
checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator.
Fees may also be paid by credit card using the secure online payment system, accessed at
http://www.albemarle.org/department.asp?department=cdd&relpage=21685.
Revised 6-15-17 mcy