Loading...
HomeMy WebLinkAboutSUB201700099 Checklist - Project Closeout (Administrative) Preliminary Plat 2017-08-31 SUBDIVISION/SITE PLAN • '�•` FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and sta bel. CDA will forward to the Imaging Center for digital closeout. SDP/.UB # (2-0/7 -'1°I PROJECT TITLE W e51 ��iy�Sl,�b —ptilw,. uT FULL AME OF LEAD REVIEWER 66 6 5 dit.e.Z-- FINAL ACTION DATE: d7-3/—/ 7 AApplication,Page 2 Data Entered C _ .:._ • - .. Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse 1 chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide 1 clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ..❑rEngineerin Folder Information/documentation Scan ❑ Saved location ja-Applicati signature copy) Scan 0 Saved location PublicNo ' ation records/Abutting Owner correspondence 1 Scan ❑ Saved location Applicantrrespondence(to/from,memos/emails) Scan 0 Saved location Mw Jomplete of printed Review Comments Scan 0 Saved location Is Approved plat(signed,or stamped"Approved"with Planner/Engineer name) Scan ❑ Saved location - • e-er • miss : rve . '• Or Jr Scan 0 Saved location C - op-- •ac age- • ` 'eport mc use p a pa presen e. ° - ': : • _ _ - .er) ❑—'Scan U ave ocation s 0 Scan Q Savedlvcation EI -explain-i.e. Studies)- DScan 0 Saved location 6 : • -xp : -•. . .•_ ❑ Scan 1:1-StWiTadation 1 0 At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearl marked as unapproved and contain a note clarifying why it was included. �] Scan ❑ Saved location [Additional Information on this project: