Loading...
HomeMy WebLinkAboutSP199900074 Action Letter ;,;.~0~ (~~H~~:~I \,...,~., i '.~~-}"¡ '·~·.~~íl' ~~ COUNTY OF ALBEMARLE Department of Planning & Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902-4596 (804) 296 - 5823 Fax (804) 972 - 4012 June 27, 2000 Kurt Gloeckner 2246 Ivy Road, Suite 5 Charlottesville, VA 22903 RE: SP-99-74 Townwood Mobile Home Park; Tax Map 61, Parcel 8 Dear Mr. Gloeckner: The Albemarle County Board of Supervisors, at its meeting on June 21, 2000, approved the above-noted request to amend the existing special use permit to allow for 19 additional mobile home sites on approximately 12,6 acres, Please note that this approval is subject to the following conditions: A. Approval for the addition of 25 units and the internal relocation of the existing units y.¡ithin Townwood Mobile Home Park. If the owner satisfies the issues identified by the Engineering Department (2/22/00 memo, Attachment J) and Planning Department (including the location/design of recreational facilities and the relocation of lot 16) to the satisfaction the Agent and County Engineer, then up to seven additional lots shall be allowed (for a total of up to 32). B, Modify Section 31.2.4.4 to allow development improvements to commence within two years of special use permit approval. This development project shall be completed within two years from commencement of improvements from such date. The phases and sub-phases are outlined in the following chronological timeline: 1. Phase 1: a. Installation of necessary supporting infrastructure, which must include: 1. Installation of new water lines for domestic consumption; 2. Installation of the new water lines for fire safety (including three new fire hydrants); 3. Installation of the new stormwater system; and, Page 2 June 27,2000 4. Widening of the internal road. a. Construction of the first 13 Lots (Lots 7,9,10, and 11 through 20) as depicted on the application plan. No existing mobile homes are to be relocated during Phase 1, except by request of any existing resident or for the purpose of constructing the second entrance to T ownwood Drive. b. Install a recreation area of 10,000 square feet in size, in a location to be determined with the review of the site plan. c. Installation of Phase 1 landscaping, which includes compliance with the tree preservation area located within the rear fifty-foot buffer and cemetery site, Street trees a minimum of 50 feet apart as typically called for in the ordinance shall be added along with screening along Rio Road. All trees should be a minimum of 2" caliper. These additions are minimums and should not in any way limit landscape treatment that the ARB might impose, If any subsequent phases present a threat to landscaping shown in Phase 1, the applicant can bond accordingly the landscaping that may need to be established during other phases. 2. Phase 2: a, Installation of a second entrance onto Townwood Drive at the northernmost Intersection of Tower Court and Townwood Drive. The Planning Commission may approve the Townwood entrance in the location shown on the " application plan if it is determined that this location will better address issues of grading, and visibility of the site, including accommodation of landscaping/fencing, A Certificate of Occupancy will not be granted for the 14th unit until the second entrance is constructed. Townwood Drive must be accepted into the state system with the construction of this second entrance. b, Installation of a screening fence that must be entirely on the Townwood Mobile Home Park property and must span the length of all developed lots adjacent to Townwood Drive. The new screening fence shall be constructed prior to, or simultaneously with the removal of the existing screening fence. c. Installation of a screening fence that is entirely on the Townwood Mobile Home Park property and must span the length of all developed lots along the Four Seasons PUD property line; d. Construction of Lots 6, 31, and 23 through 27, as it will not involve realignment of any existing units; e. Realignment of the existing units along Townwood Drive and within the center of the Park's internal loop road to accommodate construction of Lots 1 through 6 and Lot 8; f. Construction of Lots 1 through 6 and Lot 8; · Page 3 June 27, 2000 g. Installation of the second tot lot, fronting Rio Road West; h, Installation of the final surfacing to the internal loop road; and, I. Installation of Phase 2 landscaping. Landscaping shall include plantings at the new second entrance and the new travelway, with major street trees every 50 feet on both sides along this internal travelway, and street trees approaching Townwood Drive. If any subsequent phases present a threat to landscaping shown in Phase 2, the applicant can bond accordingly the landscaping that may need to be established during other phases, 3. Phase 3: a, Realignment of the remaining units that are located along the Four Seasons PUD side of the subject parcel; b. Construction of Lots 21, 22, 28, 29, 30, and 32; and, c. Installation of all remaining landscaping. C. No trees are to be removed within the rear fifty-foot buffer and cemetery site. Preserve trees along Townwood Drive to the greatest extent possible, D. The applicant shall install a street light at the new second entrance onto Townwood Drive. Staff will review the overall lighting needs for the site during the site plan review process, and the applicant will provide lighting as recommended by staff. E. ,Planning Commission Modifications of: 1, Section 5.3.3.1 to allow for the reduction in the 4,500 square-feet area and required 45-foot width for the 71 existing and realigned units; 2. Section 5.3.4.1 as noted in Section 5.3.7.2; 3, Section 5.3.4.3 to allow for a reduction to 30 feet distant to two dumpsters for five units. A screening fence must be installed around both dumpsters; 4, Section 5.3.4.4 to allow for the reduction of the 30-foot minimum distance between the existing and realigned 71 units. Issuance of the Modification is subject to Fire Official approval of the Final Site Plan, 5. Section 5.3.5.1 to allow for a reduction of the 50-foot setback for 12 existing and realigned homes along Townwood Drive, but not less than 3 feet between the homes and the property line, 6, Section 5.3,5.2 to allow twenty-one existing and realigned homes, along the Four Seasons PUD property line, a reduction of the 50 foot setback as follows: Between Rio Road and new lot 28, a. Seven homes to 3 feet; b. Two homes to 13 feet; and, c. One home to 30 feet. 4, Page 4 June 27, 2000 Between new Lot 21 and the bioretention pond, a. Eleven homes to 15 feet. 7, Section 5.3.5.3 to allow for 7 homes, of the existing and realigned 71 homes, a reduction of the 15-foot setback to 5 feet from the internal private street; 8. Section 5.3.5.4 to waive the requirements for lot lines of the 71 existing and realigned homes. Sheds and other storage structures may be constructed to a common wall. 9. Sections 5.3.6 and 5.3.6.1 to allow for a waiver of application plan requirements, conditioned that the County approve both preliminary and final site plans before any construction activity is permitted, Site plan approval will not be granted unless adequate parking and outdoor living areas are provided on each existing, realigned, and/or proposed lot. 10. Section 5.3.7.2 to waive the requirements for all markers for the new, existing, and realigned lots, conditioned that each mobile home be numbered and posted accordingly to the Road Naming and Property Numbering Ordinance and Manual for E911 purposes. 11. Section 5.3.8,1 to waive the required six recreational vehicle parking spaces in the common area, F, The applicant shall provide screening of the dumpster site from the adjacent cemetery, G, No waiver for provision of 100 square feet of outdoor living space, '. In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year, Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296- 5875. .. Page 5 June 27, 2000 If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me, Sincerely, - " VWC/jcf Cc: Amelia McCulley Jack Kelsey Tex Weaver Steve Allshouse Bob Ball, VDOT ,- ATTACHMENT J Albemarle County Development Departments S P-1999-074 SPIN Submission and Comments Townwood Mobile Home Park Engineering revised plan revision 2 reviewer Glenn Brooks received 2/10/00 reviewed 2/22/00 decision approved with conditions The revised schematic plan accompanying the Special Use Permit application, received on 10 Februarry 2000, has been reviewed. The Engineering department can recommend approval of the Special Use Permit with the condition that a site plan be required. The following items will need to be addressed either with the Special Use Permit or with the Site Plan: (These items are repeated from the previous comment letter of 24 Jan, as the revisions to the plan do not appear to completely resolve them, Comments regarding this revision are in parenthesis.) 1. Stormwater Management should capture as much of the site as practical. The conceptual plan appears satisfactory. As discussed with the applicant on-site, care will need to be taken with the downstream channel from the proposed pond, and the northeast portion of the site will should designed to drain to the proposed pond, The applicant has indicated that pipes and gutters along the improved travelways will channelize drainage on the site, 2. The right-of-way of Greenbrier Drive must be cleared of all fences, sheds, and other items serving the mobile home park. (A note has been added to the plan to relocated fencing, All sheds, poles and other right-of-way obstructions must also be moved.) 3. The Engineering Department supports the recommendation of VDOT that another entrance be provided to either Greenbrier Drive or Four Seasons Drive, This will provide access to a signalized intersection, which will be more important with time, (The 20' second access next to proposed lot 7 addresses this concern, However, grading in this area for the road may affect the adjacent lots,) 4, The existing pipe running from Greenbrier Drive on proposed lot 7 to proposed lot 17 must be provided with a drainage easement. The easement must be a minimum 20' wide. The easement should continue through the property over the proposed pond and the stream. (With the grading of the access road, and this easement, lot 7 adjacent to the access road may be lost.) 5. The radius of the loop road next to proposed lot 17 does not provide adequate sight distance. The minimum allowed for site travelways is 100'. The minimum allowed for private roads is 200'. A three-way intersection should be created here with the proposed cul-de-sac, 6, The loop road on the west side between proposed lots 1, 3, 4, and 5 is currently a split travelway, which leaves inadequate area for parking, and creates circulation problems. One travelway in this location, as seems to be shown by the schematic plan, should be provided. 2/25/00 03:38 PM Page 1 of 1 @