, 1999 (Adjourned Meeting) (} l0t O 27 ~'~:
1)
At its meeting on June 16, 1999, the Board of Supervisors of Albemarle County, Virginia,
ourned to June 22, 1999, 7:00 p.m., at the Juvenile Domestic and Relations Court, 411 East High
reet Charlottesville, Virginia. The purpose of this meeting is a public information meeting on the
;harlottesville-AIbemarle County Court Facilities Study.
Mr. David P. Bowerman (arrived at 8:15 p.m.), Ms. Charlotte Y. Humphris, Mr. Charles S. Martin
at 8:00 p.m.) and Ms. Sally H. Thomas were present at the meeting.
At 7:05 p.m., Ms. Roxanne White, Assistant County Executive, welcomed everyone to the
g. Ms. VVhite stated that the firm of Moseley, Harris & McClintock was selected by the Consultant
~election Committee, consisting of representatives from the City of Charlottesville, County of Albemarle
the court system, to conduct the Charlottesville-Albemarle Courts Facilities Study. The firm was
to undertake the study and look at alternatives. She then introduced Mr. Jay Moore who would make
~resentation. After the presentation, there will be an opportunity for community input on the
alternatives.
Mr. Moore presented a slide presentation with the following agenda outline:
a) Study purpose, scope and process;
b) Existing court facilities;
c) Current and future building needs;
d) Current and future parking needs;
e) Alternatives considered;
f) Recommended concept; and
g) Preliminary budget.
After discussing each aspect of the study, Mr. Moore presented the following three alternatives
were considered:
a) Acquire and renovate existing facility;
b) Development judicial complex somewhere else in the City or County; and
c) Integrate judicial center at Court Square.
Mr. Moore explained that the Committee and Consultants' recommendation is to integrate a
center at Court Square. The total projected preliminary cost in 1999 dollars is $36,810,000. After
immarizing the process and timeline, Mr. Moore opened the meeting up for questions, comments and
estions from the public.
The meeting was adjourned at approximately 9:30 p.m.