Loading...
HomeMy WebLinkAboutWPO201700016 Checklist WPO VSMP 2017-09-15 (2)Old Trail Village Stormwater Management Master Plan Reference Checklist (Draft — To be Provided at Design Submittal) Name: Legend: ✓ - Complete Inc. - Incomplete N/A - Not Applicable Item Plan PreparerNotes Reviewer Reviewer Comments Preparer Underdrains included on all biofdters. Maximum ponding depth of 6" on all biofdters Safety/Aquatic bench provided on the two retention basins Steep slopes are not implicitly approved in the master plan — Impacts steep slopes? Floodplain ;moacts are not plicitly ,nrnverl in the master plan - Encroachment into Floodplain? Wetland impacts are not implicitly approved in the master plan — Impacts to Jurisdictional Features? Stream Buffer impacts for SWM BMPs, BMP access, and Greenway trails within landward 5o' are approved with MP Stream buffer impact (Yes No?) If so, stream buffer impact mitigation is included? Outfall protection included in design Media -+onifinatin.. ,vided in Emergency Forebay or pretreatment High flow bypass included for individual bioretention cells with greater than acres of direct arain e? Connectivity between facility outfall and eidsting downstream channel provided. A lo'wide vehicle access graded at less than 20%, unless paved or raveled provided Necessary lot adjustments provided — reference site plan Design storm (2 - year and io-year) attenuation to predevelopment flow levels provided per SMP outfall? Water QuaMyCorm fiance Tracking See WQ Compliance Tracking Ledger - Is there sufficient -inning mpliance capture surplus (prior approved plans + plans submitted under this review) across the project for the development to remain in compliance?