HomeMy WebLinkAboutSUB201400187 Review Comments Road Plan and Comps. 2016-07-07Short Review Comments Report for: SUB201400187 SubApplication Type: Foothills Crossing II - Road Plans New Public Use Road Plan Date Completed:06/16/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:See Recommendations Reviews Comments:6-16-16- Bond estimate is for Park Ridge Drive, Red River Road (Binion Drive), and Brazos Street (Park Ridge Way). Division: Date Completed:12/22/2014 Reviewer:Justin Deel CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/23/2014 Reviewer:Shelly Plaster VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/19/2014 Reviewer:Rachel Falkenstein CDD Planning Review Status:See Recommendations Reviews Comments:The road network and lot layout shown on the road plans do not match the preliminary subdivision plat SUB201400094 - Foothill Crossing II. The proposed layout and lot locations will require a new preliminary subdivision plat. Further, the density proposed for the R-2 portion of the site appears to be higher than the permitted density and would require a rezoning application. Approval of zoning map amendment and preliminary subdivision plat should precede road plans. Large street trees should be 50’ on center; medium street trees should be 40’ on center. A conservation plan as specified in section 32.7.9 is required, including a conservation plan checklist. The conservation plan checklist must be signed and dated. Division: Date Completed:12/20/2014 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments:Based on plans dated 11/07/14 1. Indicate how the streets will be marked for No Parking. (signs or painted curbs) 2. Fire Rescue is requesting the connection to Hill Top street be installed. This will allow for the second means of access for developments greater than 30 single family homes. VSFPC D107.1 Division: Date Completed: Reviewer:Jeremy Lynn ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:05/05/2015 Reviewer:Justin Deel CDD EngineeringDivision: Page:1 of 4 County of Albemarle Printed On:September 20, 2017 Review Status:Requested Changes Reviews Comments: Date Completed:05/05/2015 Reviewer:Rachel Falkenstein CDD Planning Review Status:No Objection Reviews Comments:Easements will be required for any portion of roadway or temporary construction on adjacent parcels. Adjacent parcel 056A2-04-00-000A2 will need to be dedicated to public use prior to construction of the portion of the road connecting to Hill Top St. Division: Date Completed:04/12/2015 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:No Objection Reviews Comments:Based on Road Plans dated 3/25/15 No objections or comments Division: Date Completed:08/28/2015 Reviewer:Justin Deel CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed: Reviewer:Shelly Plaster VDOT Review Status:Pending Reviews Comments: Division: Date Completed:08/27/2015 Reviewer:Rachel Falkenstein CDD Planning Review Status:Pending Reviews Comments:Previous comments still apply: Easements will be required for any portion of roadway or temporary construction on adjacent parcels. Adjacent parcel 056A2-04-00-000A2 will need to be dedicated to public use prior to construction of the portion of the road connecting to Hill Top St. Division: Date Completed:08/15/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 7/20/15. No comments or objections. Division: Date Completed: Reviewer:Jeremy Lynn ACSA Review Status:Pending Reviews Comments: Division: Date Completed:02/01/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:No Objection Reviews Comments: Division: Page:2 of 4 County of Albemarle Printed On:September 20, 2017 Reviews Comments: Date Completed:02/10/2016 Reviewer:Troy Austin VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:02/18/2016 Reviewer:Rachel Falkenstein CDD Planning Review Status:Requested Changes Reviews Comments:Staff is drafting a letter to Parkside Village HOA requesting the dedication of TMP 56A2-04-A2 to public use to allow the connection to Hill Top Street. A deed dedicating this parcel will need to be recorded prior to approval of road plans. Applicant should also determine if any additional area is needed for a temporary construction easement to build Hill Top Street connection. If so, easement should be obtained prior to approval. Stormwater maintenance easement on adjacent parcel should be platted and recorded prior to approval. Division: Date Completed:02/14/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 1/7/16. No comments or objections. Division: Date Completed: Reviewer:Jeremy Lynn ACSA Review Status:Pending Reviews Comments: Division: Date Completed:06/01/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:05/24/2016 Reviewer:Joel DeNunzio VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/01/2016 Reviewer:Rachel Falkenstein CDD Planning Review Status:No Objection Reviews Comments:Staff has sent a letter to Parkside Village HOA requesting the dedication of TMP 56A2-04-A2 to public use to allow the connection to Hill Top Street. A deed dedicating this parcel will need to be recorded prior to issuance of grading permit. Division: Date Completed:05/15/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 4/28/16. No comments or objections. Division: Page:3 of 4 County of Albemarle Printed On:September 20, 2017 Date Completed:07/07/2016 Reviewer:Jeremy Lynn ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:06/15/2016 Reviewer:Justin Deel VDOT Review Status:No Objection Reviews Comments: Division: Page:4 of 4 County of Albemarle Printed On:September 20, 2017 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner June 15, 2016 Mr. Matthew Wentland County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2014-00187 Foothill Crossing II Road Plan Dear Mr. Wentland: We have reviewed the Foothill Crossing II Road Plan, with the latest revision date of June 15, 2016, as submitted by Collins Engineering. Previous comments have been adequately addressed and VDOT has no objection to the plan as submitted. If have further questions please contact Justin Dee] at (434) 422-9894. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING Ntise '444•01 Matthew Wentland From: Matthew Wentland Sent: Wednesday,June 01, 2016 3:47 PM To: 'Scott Collins' Subject: Foothills Crossing II Road Plan Scott, Planning has no objection to the road plan. However, a grading permit will not be issued until we have the strip of land dedicated to the County to allow connection to Hill Top Street.Staff has sent a letter to Parkside Village HOA requesting the dedication. Engineering and Fire Rescue also have no objection,VDOT comments were forwarded on 5/24/16, and I believe you've been dealing with the ACSA directly.You will need to add phasing to correspond to the road bonds, though. Let me know if you have any questions. Thank you, Matt Wentland, P.E. Civil Engineer II 1 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION IWI Orange Road Charles A. Kilpatrick, P.E. Culpeper, Virginia 22701 Commissioner May 24, 2016 Mr. Matthew Wetland County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2014-00187 Foothill Crossing II Road Plan Dear Mr. Wentland: We have reviewed the Foothill Crossing II Road Plan, with the latest revision date of April 28, 2016, as submitted by Collins Engineering, and offer the following comments: 1. Previous comment: "The offset front the edge of travel way, and centerline offset should be provided for the intersection sight line triangles". Decision point A of the sight line triangles should be located 14.5 feet from the edge of pavement. See Appendix B(1)-19 & -20. Sight line distances and profiles for alleys that intersect public roads were not found; sight distance lines and profiles should be provided for all streets and/or alleys that intersect public roads. Additionally, landscaping should be shown with sight lines on plans and on profiles. 2. Previous comment: "It is understood that the tie-in oil Hill Top Street is after the last existing entrance. However, the mill and overlay will extend 25' beyond the open cut and once the overlay begins it may restrict access to the entrance. Therefore, the maintenance of traffic plan should be provided and the advanced warning signs should be placed to scale. This may be a separate submission ". 3. Previous comment: "Additional curb ramps have been added at intersections; however, the ramps should be located at the tangent points (PC's/PT's) throughout the project. Refer to Appendix "A" of the VDOT Road Design Manual for curb ramp placement requirements. " 4. Previous comment: "Since an additional turn lane has been added on Eastern Avenue the typical road section should be updated to reflect the additional lane. " Additionally, there is discrepancy between the plan R/W width (80') and section R/W width (73'), bike lanes are shown on the north of Park Ridge Drive section but not shown on the plans, and the right turn lane dimension extends to the curb. Please make typical section stationing reflect what is being proposed with this plan. 5. Previous comment: "When bike lanes approach an intersection and continue parallel to the left of the right turn lane the bike lane should be a ntinimttin of 5'. Refer to Appendix "A" of the VDQT Road Design Manual tinder Bike Lanes and Tuni Lanes, Figure A-5-3. Tit typical road section should be updated." 6. Previous comment: "Sheet 8: Newport Street & Alley C profile- the location for the proposed "T" and G. V.'s remain mislabeled on the profile. Approx. Station 12+69" This appears to have been removed from the plan, but the label remains. Please clarify. 7. Previous comment: Sheet 20. a. Stonn Sewer Computations: i. The upper inverts for storm runs 14B thrtt 14 and 14 thru 12 do not match the stone profiles. ii. There are multiple areas where the slopes do not match the storm profiles. Le.: 44H thru 44B, 62 thru 58 etc. b. Drainage Descriptions: i. There are nutltiple areas where the slopes do not match the profiles. 1. e.: structure 44G, 44E, 44C, 46C, 61 etc. c. HGL Computations: i. The Rint elevation for structure 58B does not appear to match the storm profile or drainage description. 8. Previous comment: Sheet 22: a. The pipe lengths in the drainage description as svell as the stain coinptttations for storm rims, 118 thrtt 104 and C2B thru 114, do not match the profile pipe lengths. b. Structure C2B- The drainage description slot length of 12' does not match the profile and computations. c. The rint elevation in the drainage description for structure 102 does not match the profile. 9. Provide angle of intersection for Park Ridge Way and Park Ridge Drive, should be 90 degrees. Park Ridge Way needs its own typical section, as it does not include bike lines as proposed. If additional information is needed concerning this project, please do not hesitate to contact me at (434) 422-9782. Sincer , Joel DeNunzio, P.E. Resident Engineer, Charlottesville Culpeper District WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION i6ol orange Road Culpeper. Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner February 10, 2016 Mr. Matthew Wetland County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -201400187 Foothill Crossing If Road Plan Dear Mr. Wetland: We have reviewed the Foothill Crossing II Road Plan, with the latest revision date of January 7, 2016, as submitted by Collins Engineering, and offer the following comments: 1. Previous comment: A signature on each sheet by a professional engineer is necessary or the plans should be clearly marked "Preliminary". This is a recurring comment and future resubmittals that have not been signedimarked preliminary will be returned unreviewed. 2. Previous comment: "The offset from the edge of travel way, and centerline offset should be provided for the intersection sight line triangles ". 3. Previous comment: "It is understood that the tie-in on Hill Top Street is after the last existing entrance. However, the mill and overlay will extend 25' beyond the open cut and once the overlay begins it may restrict access to the entrance. Therefore, the maintenance of traffic plan should be provided and the advanced warning signs should be placed to scale. This may be a separate submission ". 4. Additional curb ramps have been added at intersections: however, the ramps should be located at the tangent points (PC's'PT's) throughout the project. Refer to Appendix "A" of the VDOT Road Design Manual for curb ramp placement requirements. 5. Since an additional tum lane has been added on Eastern Avenue the typical road section should be updated to reflect the additional lane. 6. Previous comment: "When bike lanes approach an intersection and continue parallel to the left of the right turn lane the bike lane should be a minimum of 5'. Refer to Appendix "A " of lire VDOT Road Design Manual under Bike Lanes and Turn Lanes, Figure A-5- 3. " The typical road section should be updated. 7. Previous comment: "Sheet 7: The latest reWsion of the CG -12 details should be provided. The latest update is 7-15. " 8. Sheet 8: Newport Street & Alley C profile- the location for the proposed "T" and G.V.'s remain mislabeled on the profile. Approx. Station 12+69 9. Sheet 20: a. Storm Sewer Computations: i. The upper inverts for storm runs 14B thru 14 and 14 thru 12 do not match the storm profiles. ii. There are multiple areas where the slopes do not match the storm profiles. Le.: 44H thru 44B, 62 thru 58 etc. b. Drainage Descriptions: i. There are multiple areas where the slopes do not match the profiles. Le.: structure 44G, 44E, 44C, 46C, 61 etc. c. HGL Computations: i. The Rim elevation for structure 58B does not appear to match the storm profile or drainage description. 10. Sheet 22: a. The pipe lengths in the drainage description as well as the storm computations for storm runs, 118 thru 104 and C213 thru 114, do not match the profile pipe lengths. b. Structure C213- The drainage description slot length of 12' does not match the profile and computations. c. The rim elevation in the drainage description for structure 102 does not match the profile. If additional information is needed concerning this project, please do not hesitate to contact me at (434) 422-9782. Sincerely, 7 1 Troy Austin, P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING (33 COLLINS EN C I ; E R I N G *.•00 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.corn January 7, 2016 Justin Deel County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: SUB-2014-00187-Foothill Crossing II; WPO-2014-00092 Dear Justin: Thank you for your comments dated August 18, 2015. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: SUB-2014-00187 A. Engineering 1. — 2. — 3. — 4. — 5. — 6. — 7. — 8. — 9. —Both Alley F and Alley D extend to the R-6/R-1 boundary line and have temporary turnarounds and easements (labeled on Sheet 3). These alleys will continue on and tie back into streets with the development of the adjacent parcel. We also adjusted the alignment of Alley F to further reduce stream buffer impacts. 10. — 11. — 12. — 13. — 14. — 15. — 16. — 17. The structure numbers and storm sewer network changed with the previous submission based on a redesign of the SWM and the creation of SWM facility behind lots 54-55. The two locations that you had raised concern were the sumps the cul-de- sacs of Freemont Street and Newport Street. We have modified the lot grading to provide overland relief. A swale will be cut behind the back of sidewalk and between the proposed homes to allow emergency overflow to crest the sidewalk and convey to the existing stream. This is shown on Sheet 5. Revision 1 Comments The applicant acknowledges this comment. Revision 2 Comments The applicant has reached out to Rachel Falkenstein, and she has no comments or objections. The applicant has discussed with Rachel Falkenstein,and she is looking into proceeding forward with this. B. VDOT 1. The sets are marked preliminary. 2. The centerline offset is 4' and the other point is 20' offset from the center of the travel lane (as described in Appendix B, Section B-3 D). A label was added to Sheet 3 at the intersection of Freemont St&Alley D noting these typical dimensions. 3. Thank you for this clarification. The MOT plan will be submitted as a separate submission. 4. The alignment of Alley C has been shifted per your comment. 5. The intersection angle is 80°at Park Ridge Drive and Eastern Avenue. 6. The crosswalks have been revised as requested. 7. A. The sidewalk transition has been adjusted to make it more gradual, but it must hit a certain spot at the property line based on the smaller existing ROW outside of our site. B. The layout of that parcel is only conceptual at this point. Site distance easements will be taken into account with that layout geometry with its future submission; however,the site distance line will most likely be in the ROW and not require an easement. 8. The waterlines have been updated based on comments from the ACSA. Jeremy Lynn is very specific with his location preferences. 9. A turn lane has been added. 10. The bike lane is now 5' in this location. 11. The new CG-12 Detail has been provided 12. Road profiles have been checked and updated with revised water line items. 13. The angle between storm pipes have been added to the calcs so that the junction loss are properly shown. 14. A. The calcs and profiles have been updated. B. The calcs and profiles have been updated. C. The drainage description has been updated. C. ACSA SHEET 1 1. The applicant acknowledges this comment. 2. Projected wastewater flows and development schedule have been provided. 3. The applicant acknowledges this comment. 4. The benchmark is now shown clearly. SHEET 4 1. Blow-off is now provided. 2. Blow-off is now provided. 3. Fire hydrant text has been updated. 4. The lateral has been updated. 5. Thrust block called out of fire hydrant adjacent to MH 23. 6. The water connection on Westlake Phase 1 will be through Binion Drive,which will continue south and then head east as part of a rezoning plan. This includes all of the area between this project and Foothills Phase 4-5. The 10"Binion Drive waterline will eventually connect to Eastern Avenue, and then run south to tie into the 12" waterline of Westlake Hills Phase 1. This will provide the looped connection. SHEET 8 1. 3' of cover are already provided over all waterlines. SHEET 11 1. See comment#6 of Sheet 4. The looped connection to Westlake Hills will be provided via Binion Drive,which will tie into Eastern Avenue south of the intersection in question. SHEET 15 1. Pipe material labels reflect the update. SHEET 19 1. There is no water connection at this location based on other comment responses. WPO-2014-00092 A. Stormwater Pollution Prevention Plan(SWPPP) 1. A revised registration statement specific to this project has been included. 2. - 3. The general permit has been corrected and an exhibit of this project's area is included. 4. - 5. An operator has been named on the SWPPP. 6. All items in County Code section 17-405 are now included. B. Pollution Prevention Plan(PPP) 1. - C. Stormwater Management Plan(SWMP) 1. - 2. Easements for the offsite pond are forthcoming. 3. - 4. - 5. - 6. - 7. - 8. The wet pond side slopes have been revised to 4:1 in the area of treatment volume. Above the treatment volume elevation, where the pond functions strictly for detention, slopes of up to 3:1 have been utilized. The profiles have been updated and a note with this information has been provided on the pond plan detail. 9. The ditch has been shifted and the riprap adjusted to reduce the angle at the point of outfall. 10. - 11. - 12. - 13. A baffle curtain detail is now provided on sheet 7. 14. Landscaping for the SWM ponds has been moved to the SWM detail sheets. A note has been added to the SWM plans requiring a diffuser for aeration in each wet pond. 15. - 16. - 17. - 18. - 19. Alley F is removed from the stream buffer. 20. The SWM detail sheets have been revised to remove excess design information. 21. The profile scale has been revised. 22. The pond top of dam has been raised to create an embankment in fill as requested. 23. The forebays are no longer counted. D. Erosion and Sediment Control Plan(ESCP) 1. - 2. - 3. - 4. - 5. - 6. - 7. - 8. - 9. - 10. - 11. - 12. The required easements for offsite work are forthcoming. 13. - 14. - 15. - 16. - 17. - 18. - 19. - 20. - 21. - 22. - 23. See response to SWM item 22 above. 24. Basin dimensions are now provided on the plans. 25. The basin profile scales have been revised. 26. The topsoil mention has been removed from the dam core note. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE Justin Deel From: Justin Deel Sent: Friday, August 28, 2015 2:30 PM To: 'Scott Collins'; 'Kaitlyn Kostelec Walthall' Subject: Planning Application Review for SUB201400187 Foothills Crossing II - Road Plans. Attachments: SUB2014000187 R2.pdf; SUB-2014-00187 Foothill Crossing II Road Plan 8-27-15.pdf The Review for the following application has been completed: Application Number=SUB201400187 Reviewer=Justin Deel Review Status = Requested Changes Completed Date =08/28/2015 1 Nksio' Aoc e".411, 114- vise, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Road and Drainage Plan Review Project title: The Foothill Crossing II Project file number: SUB-2014-00187 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Foothill Crossing, Inc. Plan received date: 11 November 2014 (Rev. 1) 1 April 2015 (Rev. 2) 30 July 2015 Date of comments: 22 December 2014 (Rev. 1) 5 May 2015 (Rev. 2) 28 August 2015 Reviewers: Justin Deel 1. Provide source and date of topographic infoiniation. (Rev. 1)Comment addressed. 2. Please show WPO buffer limits(Block I). (Rev. 1) Comment partially addressed. Please provide further evidence for adjusted stream buffer at west side of project parcel. (Rev. 2)Comment addressed. 3. Please show existing or approved sanitary sewer and water easements/lines east of proposed project site. There is no tie-in shown for the proposed lines on this side of the project. (Rev. 1)Comment addressed. 4. Please provide both pavement and right-of-way widths for existing streets. (Rev. 1)Comment not addressed. (Rev. 2)Comment addressed. 5. Please clarify"Open Space A"boundaries. (Rev. 1)Comment partially addressed. The alleys are hatched with what appears to be your open space hatching. Please address. (Rev.2)Comment addressed. 6. Please check curb and gutter label that appears on Block L on Layout Plan. (Rev. 1)Comment addressed. 7. Please label existing and proposed grade lines on Park Ridge Drive profile. Line types are not consistent,please correct. (Rev. 1)Comment addressed. 8. Show proposed street intersections on Park Ridge Drive profile. (Rev. 1)Comment not addressed. Please provide street and alley intersections on profiles. There are no intersections provide the Park Ridge Drive/Ext. profiles. (Rev.2) Comment addressed. 9. Provide approved turnarounds(cul-de-sacs)on Maryland Street and Binion Street. For a viable connection to development on an adjacent parcel,a temporary cul-de-sac can be provided, otherwise a permanent cul-de-sac is required. (Rev. 1)Comment partially addressed. Please provide your reference for a turnaround not leering Review Comments Page 2 of 3 being required if less than 150' from nearest intersection. Given the intent for future development, your design for Binion Street is acceptable. However,the alleys added with this resubmission require turnarounds. Please provide. (Rev.2)Comment not addressed. The previous review requested turnarounds in alleys; however,upon further research it should be noted that"Alleys must intersect streets at two locations.Dead-end alleys with turnarounds may be permitted by waiver from the County Engineer" [Albemarle County Design Standards Manual, Section 7.D.4]. Please ensure that all alleys intersect streets at two locations, eliminating the need for turnarounds. 10. Please label existing and proposed grades on drainage profiles. Please ensure that the line type is consistent. (Rev. 1) Comment addressed. 11. VDOT approval is required. (Rev. 1) Comment acknowledged. 12. The road and grading plan must reflect required changes to the stormwater management plan. The concept for the entire southwest side of the development is going against the natural grades, and has been requested to change on the stormwater plans. This will affect the entire drainage system for this road plan. (Rev. 1) Comment addressed. 13. Provide the as-built grades of the existing portions of Park.Ridge Drive and Hill Top Street. Show enough of existing roads on the profile to tie in to any curves and to match the existing grades. There should not he any grade breaks for road continuations. (Rev. l.) Comment partially addressed. See comment 14. (Rev. 2) Comment addressed. 14. Remove negative stationing and renumber stations. Show stationing on all road plan sheets. This plan is too difficult to follow. (Rev. 1) Comment partially addressed. Please provide stationing for Park Ridge Drive/Ext. on plans. (Rev.2) Comment addressed. 15. Show underdrains and cross-drains on the profiles. (Rev. I) Comment addressed. 16. The drainage computation tables were cut off by the binding this time. Some of the inlets could. not he found on the plans. (i.e. 6J) (Rev. 1)Comment addressed. 17. Inlets 32 and 36 are key sump locations that do not appear to be at the natural low point in the topography. These should be moved to where the low points correspond with the points perpendicular to the topography lines. Overland relief must be provide on the grading plans and driveway locations with concrete aprons indicated so that this drainage does not end up in houses when it overflows. (Rev. 1)Comment not addressed. The referenced sumps appear largely unchanged. (Rev.2)Comment not addressed. I cannot see evidence of you comment response on the plans. It's confusing,have the structure number changed? 18. The Maryland Street existing ground profile and tie-in is unfinished. (Rev. 1) Comment addressed. 19. The Billion Street drainage would appear to run off the right-side curb. The grade is so slight that it is unlikely to reverse the drainage when constructed. (Rev. l.) Comment addressed. 20. Please consult the road plan checklist at the document center on the Albemarle County website for further details. (Rev. 1) Comment acknowledged. ' ftre haemeering Review Comments • Page 3 of 3 The following comments from Rachel Falkenstein(Planning)will need to be addressed prior to approval: • The road network and lot layout shown on the road plans do not match the preliminary subdivision plat SUB201400094 -Foothill Crossing II. The proposed layout and lot locations will require a new preliminary subdivision plat.Further, the density proposed for the R-2 portion of the site appears to be higher than the permitted density and would require a rezoning application. Approval of zoning map amendment and preliminary subdivision plat should precede road plans. Large street trees should be 50' on center; medium street trees should be 40' on center. Revision 1 Comments Easements will be required for any portion of roadway or temporary construction on adjacent parcels. Revision 2 Comments Planning comments will be forwarded as they are received. Adjacent parcel 056A2-04-00-000A2 will need to be dedicated to public use prior to construction of the portion of the road connecting to Hill Top St. The following comments from Robbie Gilmer(Fire&Rescue)will need to he addressed prior to approval: 1. indicate how the streets will be marked for No Parking. (signs or painted curbs) 2. Fire Rescue is requesting the connection to Hill Top street he installed. This will allow for the second means of access for developments greater than 30 single family homes. .VSFFC D107.1 VDOT comments attached. 2HL 7 R Store `rr1 • COLLINS •1N 5. ;:a, 200 GARRETT ST,SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com June 22,2015 Rachel Falkenstein County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: SUB-2014-00187-Foothill Crossing II; WPO-2014-00092 Dear Rachel: Thank you for your comments dated May 5,2015. Revised road plans are hereby submitted incorporating the following changes in response to the items in your letter: Planning 1. Easements are provided for the roadway and temporary construction on the adjacent parcels. 2. Parcel 056A2-04-00-000A2 will be dedicated to public use prior to construction of the required roadway connection to Hill Top Street. Engineering 1. — 2. The adjusted stream buffer at the west of the project parcel was recorded at D.B. 1974, Pg. 487-492. This document is provided with this submission. 3. — 4. Pavement and ROW information of existing streets is now shown on Existing Conditions. 5. The open space has been revised. 6. — 7. — 8. The profiles have been updated to show street and alley intersections. 9. A turnaround is not required if less than 150' from the nearest intersection. This guideline is found in the VDOT Road Design Manual Appendix B Subdivision Street Design Guide, Section F Cul-de-Sacs and Turn-Arounds. It is also a recurring comment from Fire&Rescue on other projects that we are required at 150' to provide a turn- around. 10.— 11.— 12.— 13. See response to#14. 14. Stationing for Park Ridge Drive and Extension is provided on the plans on sheet 12A Road Stations Plan. N 15.— 16.— 17. The grading has been modified to provide overland relief at Structures 30 and 38. A swale will be cut behind the back of sidewalk and between the proposed homes to allow emergency overflow to crest the sidewalk and convey to the existing stream. 18.— 19.— 20.— VDOT 1. The applicant notes this requirement. 2. This project is by-right,no rezoning or waivers obtained at this point. 3. The connection to Hill Top Street is located at 38°04'05.87"N and 78°41'33.33"W. The connection to Park Ridge Drive is located at 38°03'55.64"N and 78°41'06.96"W. 4. Plan legend is now provided. 5. A benchmark is provided at Hill Top Street and shown on the Existing Conditions and Grading Sheet 6. The posted speed limits are listed on the Existing Conditions Sheet 7. The proposed lot acreage is provided on Sheet 3. 8. The existing lot ROW is listed for Hill Top on the Existing Conditions Sheet 9. An additional sheet 12A Road Stations plan was added to show centerline stationing,PT, and PC. 10. Existing and proposed easements are labeled. 11. The sight distance triangles are now fully shown. 12. The sight line arrow has been adjusted to the center of the travelway. 13. The Asphalt Pavement Restoration permit is attached. The detail is also on our Detail Sheet. 14. The tie-in to Hill Top Street begins after at a dead-end after the last driveway on the road. All existing residences will maintain access during the connection to Hill Top Street. 15. Sheet 3 now shows the sight line as it extends onto Hill Top Street. 16. The curb ramps have been revised. 17. The Road Design Manual Appendix B Subdivision Street Design Guide, Section D Intersections,Item 3 Minimum Radii states that when traffic volume of the receiving street is less than 400 vehicles per day,a radius of not less than 15' may be used. The radius in question was increased to 18',the maximum allowable for the current design. The vehicles per day making a left turn out of the alley,or a right from the cul-de-sac onto the alley will be negligible. 18. The curb and gutter to edge of pavement transitions now continue around the radius and the gutter pan does not taper. 19. The road centerline angles of intersection are now provided. 20. The Alley C and Newport Street alignment meets all centerline radius requirements. The entrance alignment is required to provide adequate width for the proposed future units. 21. Site distance triangles and profiles have been added to all commercial entrances. 22. Eastern Avenue and Park Ridge Drive intersect at an 80 degree angle,within the allowable intersection tolerances. 'Sari �.rf 23. The projected Eastern Avenue alignment is now shown on the Road Stations Plan sheet 12A. 24. The waterline has been shifted out from under the wheel path on Park Ridge Drive. The proposed 10"waterline will not run down Eastern Avenue at this project. At a future time,the waterline down Binion Street will connect to a new development,and tie into Eastern Avenue and Westlake Hills at the south. 25.Road names have been added. Road Stationing is shown on the Road Alignment Sheet 26. Water line is now shown. Spotshots have been added. 27. Structure 14 has been relocated. 28. Structure 46 was moved slightly. Structures 46&48 are located as close as possible to their respective intersection to capture the maximum drainage 29.A CG-9D has been added to Park Ridge Drive to access the SWM facility. 30. Sheet 7 has been updated to include Eastern Avenue 31. Sheet 8 has been updated to reflect these comments and other design changes. 32. Drainage calcs have been updated to reflect and match profiles. 33. Drainage calcs have been updated to reflect and match profiles. 34. Drainage calcs have been updated to reflect and match profiles. 35. Site distance triangles have been updated. 36. Landscaping has been updated. 37. Crosswalk markings have been added. 38. The ESC & SWM Plan is submitted for review with this resubmission. WPO-2014-00092 A. Stormwater Pollution Prevention Plan(SWPPP) 1. The VSMP and grading permit has been revised to only include the area of land disturbance with this project. 2. A new SWPPP for the project has been provided. 3. The general permit has been revised for this project with corrected information. 4. — 5. An operator has been named on the SWPPP. B. Pollution Prevention Plan(PPP) 1. — C. Stormwater Management Plan(SWMP) 1. — 2. Easements for the offsite pond are provided in this resubmission. 3. The post-development stormwater management plan title has been revised. 4. — 5. The Future Development note has been removed from the plan sheets,the design volume has been retained as"excess capacity". 6. The B and C soils are now shown on the plans and reflected in the TR-55 calculations. 7. The boundary between DA#2C and DA#2B has been revised,homes will drain towards the street and the proposed drop inlets,the remainder will run off as bypass. `\r/ 8. The wet pond side slopes have been revised to 4:1 in the area of treatment volume. Above the treatment volume elevation,where the pond functions strictly for detention, slopes of up to 2:1 have been utilized. The profiles have been updated and a note with this information has been provided on the pond plan detail. 9. The ditch has been shifted and the riprap adjusted to reduce the angle at the point of outfall. 10. The SWM facilities are now labeled on the pre and post-development plan views. 11. The SWM1A easternmost forebay outfall has been shifted away from the forebay embankment. 12.The scales on the SWM facility details have been moved out of the binding. 13. SWM facility#2B will utilize permanent baffles to increase the flow path ratio. A note has been added to the plans requiring the installation of permanent baffles. 14. Landscaping for the SWM ponds has been included on the landscaping plan. A note has been added to the SWM plans requiring a diffuser for aeration in each wet pond. 15. The sheet layout plan has been revised to remove the hatch. 16. Mitigation is not required within existing easements per the Albemarle County Code, Section 17-602(b)public sewer improvements are exempt from duties to retain, establish or maintain a stream buffer. 17. The SWM calculations have been revised as requested,the Water Balance test of channel adequacy is now provided instead of the previous channel analysis. 18. The earthen ditch will be maintained within a SWM maintenance and access easement. The future plan will capture this area where any future overlap may occur. 19. The WPO buffer disturbance associated with Alley F has been designed to be as minimal as possible. Per the Albemarle County Code, Section 17-604(a) disturbance in the buffer may be permitted within the first landward 50 horizontal feet if the improvement is necessary infrastructure to allow reasonable use of the lot. The applicant requests that this small encroachment into the stream buffer be permitted by the program authority per the code section. D. Erosion and Sediment Control Plan(ESCP) 1. The plat is submitted with these plans. 2. — 3. — 4. — 5. — 6. — 7. — 8. — 9. — 10.- 11.— 12. The required easements for offsite work are provided with this plan. 13.— 14.— Sri Nftel 15.All non-existing conditions have been removed from the existing conditions sheet. 16. Symbols for all ESC measures are now provided. 17. The sediment basin 2 drainage area has been adjusted to reflect the new drainage ditch placement. The sediment basin 1 drainage boundary has been adjusted as well. 18. Silt fence is provided behind the two proposed ditches. 19. Silt fence has been added to the area southeast of the Alley D terminus. 20. The sediment basin detail scales have been shifted out of the binding. 21. Grass `earthen' emergency spillways are now provided in cut. 22. Additional contours have been added to the ESC plans,the basins are labeled in all views. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE Justin Deel From: Justin Deel Sent: Tuesday, May 05, 2015 4:52 PM To: 'Kaitlyn Kostelec Walthall'; 'Scott Collins' Subject: P ni ation Review for SUB201400187 Foo ' ossin II - Road Plans. Attachments: Engineering and VDOT comments attached. The Review for the following application has been completed: Application Number=SUB201400187 Reviewer=Justin Deel Review Status = Requested Changes Completed Date = 05/05/2015 1 �pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Road and Drainage Plan Review Project title: The Foothill Crossing II Project file number: SUB- 2014 -00187 Plan preparer: Collins Engineering [scoff @collins - engineering.com] Owner or rep.: Foothill Crossing, Inc. Plan received date: 11 November 2014 (Rev. 1) 1 April 2015 Date of comments: 22 December 2014 (Rev. 1) 5 May 2015 Reviewers: Justin Deel 1. Provide source and date of topographic information. (Rev. 1) Comment addressed. 2. Please show WPO buffer limits (Block I). (Rev. 1) Comment partially addressed. Please provide further evidence for adjusted stream buffer at west side of project parcel. 3. Please show existing or approved sanitary sewer and water easements /lines east of proposed project site. There is no tie -in shown for the proposed lines on this side of the project. (Rev. 1) Comment addressed. 4. Please provide both pavement and right -of -way widths for existing streets. (Rev. 1) Comment not addressed. 5. Please clarify "Open Space A" boundaries. (Rev. 1) Comment partially addressed. The alleys are hatched with what appears to be your open space hatching. Please address. 6. Please check curb and gutter label that appears on Block L on Layout Plan. (Rev. 1) Comment addressed. 7. Please label existing and proposed grade lines on Park Ridge Drive profile. Line types are not consistent, please correct. (Rev. 1) Comment addressed. 8. Show proposed street intersections on Park Ridge Drive profile. (Rev. 1) Comment not addressed. Please provide street and alley intersections on profiles. There are no intersections provide the Park Ridge Drive/Ext. profiles. 9. Provide approved turnarounds (cul -de -sacs) on Maryland Street and Binion Street. For a viable connection to development on an adjacent parcel, a temporary cul -de -sac can be provided, otherwise a permanent cul -de -sac is required. (Rev. 1) Comment partially addressed. Please provide your reference for a turnaround not being required if less than 150' from nearest intersection. Given the intent for future development, you design for Binion Street is acceptable. However, the alleys added with this resubmission require turnarounds. Please provide. 10. Please label existing and proposed grades on drainage profiles. Please ensure that the line type is consistent. (Rev. 1) Comment addressed. Engineering Review Comments Page 2 of 3 11. VDOT approval is required. (Rev. 1) Comment acknowledged. 12. The road and grading plan must reflect required changes to the stormwater management plan. The concept for the entire southwest side of the development is going against the natural grades, and has been requested to change on the stormwater plans. This will affect the entire drainage system for this road plan. (Rev. 1) Comment addressed. 13. Provide the as -built grades of the existing portions of Park Ridge Drive and Hill Top Street. Show enough of existing roads on the profile to tie in to any curves and to match the existing grades. There should not be any grade breaks for road continuations. (Rev. 1) Comment partially addressed. See comment 14. 14. Remove negative stationing and renumber stations. Show stationing on all road plan sheets. This plan is too difficult to follow. (Rev. 1) Comment partially addressed. Please provide stationing for Park Ridge Drive/Ext. on plans. 15. Show underdrains and cross - drains on the profiles. (Rev. 1) Comment addressed. 16. The drainage computation tables were cut off by the binding this time. Some of the inlets could not be found on the plans. (i.e. 6J) (Rev. 1) Comment addressed. 17. Inlets 32 and 36 are key sump locations that do not appear to be at the natural low point in the topography. These should be moved to where the low points correspond with the points perpendicular to the topography lines. Overland relief must be provide on the grading plans and driveway locations with concrete aprons indicated so that this drainage does not end up in houses when it overflows. (Rev. 1) Comment not addressed. The referenced sumps appear largely unchanged. 18. The Maryland Street existing ground profile and tie -in is unfinished. (Rev. 1) Comment addressed. 19. The Binion Street drainage would appear to run off the right -side curb. The grade is so slight that it is unlikely to reverse the drainage when constructed. (Rev. 1) Comment addressed. 20. Please consult the road plan checklist at the document center on the Albemarle County website for further details. (Rev. 1) Comment acknowledged. The following comments from Rachel Falkenstein (Planning) will need to be addressed prior to approval: The road network and lot layout shown on the road plans do not match the preliminary subdivision plat SUB201400094 - Foothill Crossing II. The proposed layout and lot locations will require a new preliminary subdivision plat. Further, the density proposed for the R -2 portion of the site appears to be higher than the permitted density and would require a rezoning application. Approval of zoning map amendment and preliminary subdivision plat should precede road plans. Large street trees should be 50' on center; medium street trees should be 40' on center. Revision 1 Comments Easements will be required for any portion of roadway or temporary construction on adjacent parcels. Engineering Review Comments Page 3 of 3 Adjacent parcel 056A2- 04- 00 -000A2 will need to be dedicated to public use prior to construction of the portion of the road connecting to Hill Top St. The following comments from Robbie Gilmer (Fire & Rescue) will need to be addressed prior to approval: 1. Indicate how the streets will be marked for No Parking. (signs or painted curbs) 2. Fire Rescue is requesting the connection to Hill Top street be installed. This will allow for the second means of access for developments greater than 30 single family homes. VSFPC D 107.1 File: SUB2014000187 Rl.doc ,M4 . 10 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper V rgirea 22701 Charles A.Kilpatrick,P.E Commissioner April 29,2015 Mr. Justin Deel County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB-201400187 Foothill Crossing II Road Plan Dear Mr. Deel: We have reviewed the Foothill Crossing II Road Plan, with the latest revision date of March 25, 15, as submitted by Collins Engineering, and offer the following comments: 1. A signature on each sheet by a professional engineer is necessary or the plans should be clearly marked"Preliminary". 2. Reference of all previously approved waivers, rezoning's etc. should be provided along with the date of approval, approving entity, and the zoning reference number. 3. The latitude and longitude of connections to all VDOT maintained roadways should be provided (i.e. Hill Top). 4. A plan legend should be provided. 5. A benchmark/monument should be included in the plans this could be the latitude and longitude of a property corner of the parent track. 6. The posted speed.<regulatory speed limit of all existing VDOT maintained roadways that are being connected to the development should be provided. 7. The lot acreage should be identified in the plans(for the proposed lots). 8. The existing right-of-way should be labeled on Hill Top Street. 9. Centerline stationing and points of curvature and tangents should be labeled in plan view. 10. All existing and proposed easements should be clearly labeled. Include the use, legal reference and bearings and distances. 1 l. The offset from the edge of travel way, and centerline offset should be provided for the intersection sight line triangles. 12. On sheet 3,the sight Iine arrows(for height of object)should be adjusted to the center of the travel way in order to accurately show the sight distance easements. 13.A permit will be required for the proposed waterline connection on Hill Top Street. The connection should be in accordance with the"Asphalt Pavement Restoration"detail for open cut utility installations (LUP-OC). 14. A maintenance of traffic(MOT)plan should be provided. Specifically for the waterline connection on Hill Top Street and when tying into existing streets. 15. Sheet 3 should be adjusted to show the sight line as it extends onto Hill Top Street. 16. Per the Road Design Manual, Appendix A page A-116,diagonal curb ramps are not recommended for new construction since the ramps force pedestrians descending the ramp to proceed into the intersection before turning to cross the street. 17.The minimum face of curb radius for the entrance of Alley D onto Newport Street should be 25' as defined in Appendix F of the Road Design Manual. 18. When transitioning curb and gutter to edge of pavement,the curb and gutter should be continued around the radius and into the alleys, rather than having the gutter pan taper. See sheet 3. 19. The angle between road centerlines at each skew intersection should be clearly labeled (i.e. Alley C, Eastern Avenue etc.). 20. Alley C should be adjusted to be directly across from Newport Street rather than the slight offset. 21. All commercial entrances require adequate line of sight(i.e.: the intersection of Park Ridge Drive& Eastern Avenue and the intersections along Alley D and Binion Drive, Alley D and Fremont Street and Alley D onto Fremont Street). Profiles should also be provided for the alleys. 22. Eastern Avenue should be designed to intersect Park Ridge Drive at a right angle. 23.The projected alignment for Eastern Avenue should be provided. 24. Sheet 4: the waterline should be adjusted outside of the wheel path along Park Ridge Drive. Also,will there be a need for the proposed 10"waterline to extend to the south of the intersection of Park Ridge Drive and Eastern Avenue? 25. Sheet 4: road names and centerline stationing should be added. 26. Sheet 5: the waterline should be shown; the label for storm structure 44F and 14B should be shown. Additional spot elevations should be added along the entrance radii to ensure positive drainage(i.e.: the intersection of Alley D onto Fremont Street, Alley B onto Park Ridge Drive, Alley D to the east side of Newport Street, Binion Drive onto Park Ridge Drive) 27. Storm structure 14 should be located directly across storm structure 14B. 28. Storm structure 48 should be located directly across storm structure 46. 29. A CG-9 should be provided on Park Ridge Drive to access to the SWM facility. 30. Sheet 7: the typical section and geometric standard should be provided for Eastern Avenue. 31. Sheet 8: the road intersections, their stations and elevations should be provided along Park Ridge Drive. The storm 14A crossing appears to be missing from the Park Ridge Drive profile. Newport Street&Alley C profile-the locations for the proposed bend, G.V. and hydrant location as well as the proposed"T"and G.V.'s appears to have been reversed. WE KEEP VIRGINIA MOVING 32. Sheet 17: Some of the inlet throat lengths do not appear to match the computations and'or drainage summary(i.e.: structure 14). Some of the structure tops do not appear to match the computations and/or drainage summary(i.e.: structures 14, 12, 12B,6 and 8) 33. Sheet 18: Some of the structure tops do not appear to match the computations and/or drainage summary (i.e.: structures 44B, 44D and 58): Some of the inlet throat lengths do not appear to match the computations and-or drainage summary(i.e.: structures 64D, 64B, 58B, 58 and 62). 34. Sheet 19: Some of the pipe lengths do not appear to match the computations and/or drainage summary(i.e.: structures 114 thru 104 and C2B thru C2). The throat length for structure C2B does not match the computations and/or drainage summary. 35. Sheet 23: sight lines should be shown for all entrances to ensure an unobstructed view (i.e.: entrances onto alley D and the intersection of Park Ridge Drive and Eastern Ave.) 36. To maintain sight lines, trees,vegetation and other objects shall be restricted from the corners, for distances of 30' on all sides,measured from the end of the curb return radii. See the Subdivision Street Design Guide, B (1)-43-44. 37. Crosswalk markings along Park Ridge Drive and Eastern Avenue should be provided. For additional information refer to Part 3 of the Virginia Supplement to the 2009 MUTCD--Revision 1. 38.The stormwater management plan and the erosion and sediment control plan should be submitted for review. This could be submitted separately. If you need further information concerning this project, or wish to schedule a meeting, please do not hesitate to contact me at(434)422-9894. Sincerely, frf-e-,017°/4141412 Shelly A. Plaster Land Development Engineer Culpeper District WE KEEP VIRGINIA MOVING COLLINS °` 'tool200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com February 25, 2015 Justin Deel County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: SUB-2014-00187& WPO-2014-00092 Foothill Crossing II Dear Justin: Thank you for your comments dated December 22, 2014. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: Planning (SUB-2014-00187) 1. A new revised preliminary subdivision plat is under review consistent with the design submitted herein. 2. The R-2 portion will meet required density. 3. Street trees have been updated. 4. Conservation plan& checklist added to the Landscaping Details sheet. Engineering Road Plan Review Comments (SUB-2014-00187) 1. The source and date of topographic information is provided on the cover sheet. 2. The WPO buffer limits have been revised. 3. The sanitary sewer and water tie ins are now shown. 4. Labels of existing R/W and pavement widths have been added. 5. Open Space areas have changed and are delineated on the Layout Plan. 6. The label has been removed. 7. Profile and labels have been updated. 8. The Park Ridge Drive profile has been updated with street intersections. 9. Temporary turnaround is no longer required on Binion Street due to proximity of other intersections less than 150'. 10. Storm profiles updated to have clearer labels and linetypes. 11. The applicant acknowledges this comment. 12. The applicant has revised the SWM plan as required. 13. As built info has been utilized in the redesign of Park Ridge Drive, existing spot shots are shown on the profile. 14. The stationing has been updated. It is also now shown on the grading sheet. 15. Under drains and cross drains have been added to the profiles. fir✓ Corr+' 16. The Drainage Calcs sheet has been updated. 17. The sumps are now located at natural lows and are provided overland relief. 18. The plan has been updated to no longer include Maryland Street. 19. The Binion Street road profile has updated. 20. The road plan checklist has been consulted. Stormwater Pollution Prevention Plan (SWPPP) 1. The land area has been revised for the area of land disturbance. 2. The SWPPP amendment is submitted with this plan set. 3. The notice of General Permit coverage is provided. 4. The nature of activity is now provided. 5. The operator is now named and has signed the documents. Pollution Prevention Plan(PPP) 1. The PPP has been revised with this submission. Stormwater Management Plan(SWMP) 1. As previously discussed, the project is submitted under the new Virginia SWM guidelines. 2. An additional pond has been added to capture runoff from the natural drainage of site topography. 3. The title of the post-development plan has been revised. 4. The basin now has 3:1 slopes leading down to it, as required. Erosion and Sediment Control Plan(ESCP) 1. The WPO buffer is now shown in its entirety as required,the development has been shifted to avoid buffer disturbance wherever possible. 2. The project now provides access from both Park Ridge Drive and Hill Top Street. 3. The diversion dikes have been reduced in lengths and additional sediment trapping measures incorporated into the plans (one additional basin). 4. The diversion dikes no longer pass through home lots. 5. The LOD has been revised. 6. The plan view has been revised to avoid text conflicts. 7. Silt fencing has been provided to protect the church property. 8. The existing contours at SB1 are now labeled. 9. A plan legend is now provided. 10. A note concerning the diversion and sanitary sewer is now provided on the plans. 11. The phase II plan has been revised. 12. Easements will be provided for off-site work prior to final road plan approval. 13. The existing or approved sanitary and water lines east of the proposed project are now shown. 14. The proposed sanitary sewer line is now labeled. Fire and Rescue 1. No parking signs will be provided on one-side of the street. 2. The connection to Hill Top Street will be installed. 1r/ Virginia Department of Transportation(SUB-2014-00187) 1. The design has changed and the profiles and calc sheets have been updated. 2. The layout has been changed again, and is now similar to the preliminary plat. 3. Line of sight profiles have been provided. 4. The design speeds are now shown on the profiles. 5. The commercial entrance separation minimums are met and the distances between intersections are listed on sheet 3. 6. Eastern Avenue south of the intersection of Park Ridge Drive is now part of a separate project but the intersection itself and the north branch to the property line is now shown. 7. Maryland Street no longer exists but centerline radii are provided for all other streets. 8. Private driveway entrances as well as the dwelling units are not shown on the road plans, but will be provided with the final site plan. 9. Sanitary runs now cross streets as close to 90° as feasible. 10. Yard drains now have private easements outside of the ROW. 11. Storm structures are all labeled. 12. CD-1s and CD-2s are now shown on the road profiles. 13. More spot elevations are provided within the cul-de-sacs ensuring positive drainage. 14. The drainage design has been reviewed to target flow velocities between 3 and 10 fps, when achievable. In cases where the velocity is necessary to be over 10 fps due to design constraints, the velocity will still be below 15 fps. 15. The viewports have been updated. 16. The throat lengths have been updated. 17. The profiles and calc sheets have been updated. 18. The profiles and calc sheets have been updated. 19. The profiles and calc sheets have been updated. 20. The applicant acknowledges this comment. The easements for storm sewer located outside of the right-of-way will be private, and will be platted as such. 21. Temporary turnarounds are provided where required. 22. The CG-12 detail is now provided. 23. CD-1 & CD-2 details are now provided. 24. The drainage calcs have been updated. 25. The grades and sanitary rims have been updated. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE WATER DATA SHEEP— Date: 2/25/15 I. PROJECT NAME Foothill Crossing II. PROJECT LOCATION Crozet. VA at terminus of Park Ridge Drive III. CONSULTANTS Collins Engineering, Inc. IV. SOURCES V. DESIGN POPULATION 73 Single Family Units VI. HYDRAULIC CAPACITY VII. PIPE MATERIAL Cl. 52 Ductile Iron VIII. PIPE DIAMETER (INCHES) LENGTH(FEET) 4" 6" 843 8" 943 10" 2016 12" IX. FIRE HYDRANT ASSEMBLIES 7 (NUMBER) X. VALVES (A) GATE 16 (NUMBER) (B) AIR RELIEF (NUMBER) XI. FITTINGS (A) CROSS (NUMBER) (E) 22 %2°BEND (NUMBER) (B) TEE 10 (NUMBER) (F) REDUCER 1 (NUMBER) (C) 90°ELL 1 (NUMBER) (G) BLOW-OFF ASSEMBLIES (NUMBER) (D) 45°BEND (NUMBER) XII. MINIMUM PRESSURE AT CRITICAL WATER METER 20 psi (20 psi Required) AUTHORITY PROVIDE: BOOSTER STATION STORAGE RESERVOIR Mrd SEWER DATA SHEET Date: 2/25/15 I. PROJECT NAME Foothill Crossing II II. PROJECT LOCATION Crozet. VA at terminus of Park Ridge Drive III. CONSULTANTS Collins Engineering. Inc. IV. WASTE TREATMENT FACILITY Moore's Creek Wastewater Treatment Plant V. DESIGN POPULATION 73 Single Family Units (NUMBER) VI. CONNECTIONS 3 (NUMBER) VII. INDUSTRIAL WASTE N/A VIII. PIPE MATERIAL SDR 35 PVC IX. PIPE DIAMETER (INCHES) LENGTH(FEET) 6" 8" 3736 10" 12" 15" 18" 21" 24" TOTAL FEET 3736 X. MANHOLES (A) STANDARD 25 (NUMBER) (B) DROP 1 (NUMBER) XI. (A) SIPHONS AND PUMP STATIONS (NUMBER) (B) FORCE MAIN(SIZE-LENGTH) (FEET) AUTHORITY PROVIDE: DRAINAGE BASIN SUB DRAINAGE BASIN t COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1501 Orange Road Culpeper. Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner December 23, 2014 Mr. Justin Deel County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB - 2014 -00166 Dear Mr. Deel: We have reviewed the Foothill Crossing II Road Plan, dated November 7`i', 2014, as submitted by Collins Engineering, and offer the following comments: 1. The slopes on the profiles conflict with the computations and should be updated. 2. The overall layout does not match the Preliminary Plat. However, this is of little concern since it does not generate an excessive amount of additional traffic. 3. The line of sight profiles should be provided. 4. The design speed should be called out on the road profiles. 5. Since Park Ridge Drive will likely be classified as a collector road keep in mind that commercial entrance separation minimums will need to be met as required by the access management regulations. 6. The proposed intersection of the county connector road, "Eastern Avenue" should be shown. 7. The centerline radius should be provided on Maryland Street. S. The private entrances (driveway aprons) should be shown. 9. Sanitary sewer runs, 11 thru 10 and 13 thru 12, should cross perpendicular to the road. 10. Private storm sewer easements should be provided, up to the ROW, between block A & B for the yard drains. 11. Stone structure 6D should be labeled on the site plan. 12. The locations of CD -1 fCD -2's should be shown on the road profiles. 13. Additional spot elevations should be shown along the cul -de -sac's to ensure positive flow. 14. Slopes that incur uniform velocities in excess of 10 fps should be avoided because of the potential for abrasion. 15. The viewport on the storm profile, for STR 1413, has cut off the invert out information. 16. The throat length on the profile for storm STR 40 does not match the computations. 17. The storm profile, for run 38B thru 38, does not match the computations (inverts and lengths) 18. STR 40B invert out information on the profile does not match the computations. 19. The pipe length on the profile, for STM STR 40B, does not match the computations. 20. VDOT will not maintain stone sewer located outside of the ROW. Maintenance will stop at the last inlet within the ROW. For example the following structures will not be maintained by VDOT: 35- 34 -33, 29 -28 -27 and 6C 21. Temporary Turn - around should be provided for any temporary or stub street longer than 150' from the point of intersection to the end of pavement. Any portion outside of the dedicated ROW may be placed in an easement. 22. A CG -12 detail should be provided. 23. CD- L:CD -2 details should be provided. 24. Why is a Sl -1 required for STR 2? See sheet 9, note 8. Sl -1 is required when drop inlets are greater than 12. 25. Grade adjustments are needed on the sanitary profiles (the proposed grade lines adjusted to the tops or the tops adjusted to the proposed grade). If you need further information concerning this project, or wish to schedule a meeting, please do not hesitate to contact me at (434) 422 -9894. Sincerely, / __. Shelly A. Plaster Land Development Engineer Culpeper District WE KEEP VIRGINIA MOVING �pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: Road and Drainage Plan Review The Foothill Crossing II SUB- 2014 -00187 Collins Engineering [scott@collins - engineering.com] Foothill Crossing, Inc. 11 November 2014 22 December 2014 Justin Deel 1. Provide source and date of topographic information. 2. Please show WPO buffer limits (Block I). 3. Please show existing or approved sanitary sewer and water easements /lines east of proposed project site. There is no tie -in shown for the proposed lines on this side of the project. 4. Please provide both pavement and right -of -way widths for existing streets. 5. Please clarify "Open Space A" boundaries. 6. Please check curb and gutter label that appears on Block L on Layout Plan. 7. Please label existing and proposed grade lines on Park Ridge Drive profile. Line types are not consistent, please correct. 8. Show proposed street intersections on Park Ridge Drive profile. 9. Provide approved turnarounds (cul -de -sacs) on Maryland Street and Binion Street. For a viable connection to development on an adjacent parcel, a temporary cul -de -sac can be provided, otherwise a permanent cul -de -sac is required. 10. Please label existing and proposed grades on drainage profiles. Please ensure that the line type is consistent. 11. VDOT approval is required. 12. The road and grading plan must reflect required changes to the stormwater management plan. The concept for the entire southwest side of the development is going against the natural grades, and has been requested to change on the stormwater plans. This will affect the entire drainage system for this road plan. 13. Provide the as -built grades of the existing portions of Park Ridge Drive and Hill Top Street. Show enough of existing roads on the profile to tie in to any curves and to match the existing grades. There should not be any grade breaks for road continuations. 14. Remove negative stationing and renumber stations. Show stationing on all road plan sheets. This plan is too difficult to follow. 15. Show underdrains and cross - drains on the profiles. 16. The drainage computation tables were cut off by the binding this time. Some of the inlets could not be found on the plans. (i.e. 6J) 17. Inlets 32 and 36 are key sump locations that do not appear to be at the natural low point in the topography. These should be moved to where the low points correspond with the points perpendicular to the topography lines. Overland relief must be provide on the grading plans and driveway locations with concrete aprons indicated so that this drainage does not end up in houses when it overflows. Engineering Review Comments Page 2 of 2 18. The Maryland Street existing ground profile and tie -in is unfinished. 19. The Binion Street drainage would appear to run off the right -side curb. The grade is so slight that it is unlikely to reverse the drainage when constructed. 20. Please consult the road plan checklist at the document center on the Albemarle County website for further details. The following comments from Rachel Falkenstein (Planning) will need to be addressed prior to approval: The road network and lot layout shown on the road plans do not match the preliminary subdivision plat SUB201400094 - Foothill Crossing II. The proposed layout and lot locations will require a new preliminary subdivision plat. Further, the density proposed for the R -2 portion of the site appears to be higher than the permitted density and would require a rezoning application. Approval of zoning map amendment and preliminary subdivision plat should precede road plans. Large street trees should be 50' on center; medium street trees should be 40' on center. The following comments from Robbie Gilmer (Fire & Rescue) will need to be addressed prior to approval: 1. Indicate how the streets will be marked for No Parking. (signs or painted curbs) 2. Fire Rescue is requesting the connection to Hill Top street be installed. This will allow for the second means of access for developments greater than 30 single family homes. VSFPC D107.1 File: Foothill Crossing I1 Road - Drainage Plan Review.doc