Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201500098 Permit WPO VSMP 2016-12-30
skiss COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address:629 East Main Street,Richmond,Virginia 23219 Molly Joseph Ward Mailing address:P.O.Box 1105,Richmond,Virginia 23218 David K.Paylor Secretary of Natural Resources www.deq.virginia.gov Director (804)698-4000 1-800-592-5482 December 30, 2016 SM Charlottesville LLC 11710 Plaza America Dr Ste 1100 Reston,VA 20190 swinkjw@stanleymartin.com RE: Coverage under the VPDES Construction General Permit(VAR10) General Permit No.VAR10J150 Wintergreen Farm Residential Albemarle Dear Permittee: DEQ has reviewed your Registration Statement received on November 24, 2015 and determined that the proposed land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or the date of this letter, whichever is later. A copy of the general permit can be obtained from DEQ's webpage at the following location: http://www.deq.virginia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf. The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for compliance with all permit conditions. DEQ staff has determined that the proposed land-disturbing activity will discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for (i) sediment or a sediment-related parameter or (ii) nutrients. Therefore, the following general permit(Part 1.6.4)and SWPPP requirements (Part II.A.5) must be implemented for the land-disturbing activity: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every(5) business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general sore permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to submit the registration statement after the expiration date of the general permit. If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at ConstructionGP©deq.virginia.gov. Sincerely, efia141:"..104. 4 Frederick K. Cunningham, Director Office of Water Permits 2 pimmimallIMMINNI a COUNTY OF ALBEMARLE Community Development 401 McIntire Road Charlottesville,Vriginia 22902-4596 (434)296-5832 EROSION CONTROL PERMIT Date of Application: 11/24/2015 Permit Effective Date: 12/30/2016 Number: WPO-2015-00098 LANDOWNER: SM Charlottesville LLC Phone: 5713095043 11710 Plaza America Dr Ste 1100 Reston,VA20190 CONTRACTOR: Sheila Scott/Contour Construction Phone: (434)466-1980 1713,2-B Allied Street Charlottesville,VA22903 REPONSIBLE LAND Mark Hutchison Phone: (434)981-4988 DISTURBER: 1713,2-B Allied Street Charlottesville,VA22903 Certification/License#: 34036 Type: Responsible Land Disturber Plans Prepared By: Collins Engineering Plans Dated: 11/23/2015 Last Revised: 03/30/2016 Plans Entitled: Wintergreen Farm Location: Dist. 27.1 Acreage: Tax Map: 07600-00-00-049B0 Hydrological JR15 Unit: Issued By:Kenny Thacker Title:Erosion Control Officer /Z:30— 2- ,., IP CZ.Z---- Signature Date Of AL% Request for Pre-constrion Meeting and Grading Perp from Albemarle County wl .: tw„A$'p' Approved Plan Number: WPO- 2015-00098 Approved Plan Name: Wintergreen Farm VSMP Plan (Plans must be approved prior to a pre-construction meeting) Bond approved date: 11/21/2016 (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: Mark Hutchison State Certification Number: 34036 Address 1713,2-B Allied Street City Charlottesville State VA Zip 22903 Daytime Phone(434) 981-4988 E-mail contoutmark@aol.com Primary Contractor: Print Name Sheila Scott/Contour Construction Address 1713.„2-B Allied Street City Charlottesville State VA Zip 22903 Daytime Phone(434) 466-1980 E-mail Sheila@contourconstruction.net Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112:00 For plans exempt from VSMP,VESCP fees were paid with the application. rz�S S � v e 41t(;50 I ).40, 6 &.f.--3 7/1/14,Revised: 8/29/14 Page 1 of 3 ,41400, . Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Sheila Scott Contour Construction Sheila(a,contourconstruction.net Mark Hutchison Contour Construction contoutmark@aol.com Jeremy Swink Stanley Martin Homes SwinkJW@stanleymartin.com John Kessler Stanley Martin Homes KesslerJA@stanleymartin.com Scott Collins Collins Engineering scott@collinsengineering.com The second part ofthe application fee is required to be paid with this request This fee amount is; iroa arms use mix Permit Imes nitre Broke/ 711114,Revised:8129114 Page 2 of 3 Information for Permit apSeants; `wr+ • 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9) months after the date the land disturbing activity commenced, except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface,including,but not limited to,the following surfaces:(i) roadways and sidewalks covered by gravel, asphalt pavement, or concrete;(ii)trails or paths covered by gravel,stone dust,or mulch; (iii)buildings and other permanent structures;and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (see code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest,and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period,the permit will be revoked,and a Stop Work Order will be issued for working without a current permit Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures (including traps and basins)removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro-rated at payment,other than the first year VSMP fee as indicated in code section 17-209B. Re-inspection Fees Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250 per inspection,or as given in code sections 17-207 and 17-208. 7/1/14,Revised: 8/29/14 Page 3 of 3