October 28. 1999
Joseph H. Jones
3630 Browns Gap Turnpike
Crozet, VA 22932
RE: SP-99-26 Jones Stream Crossing
Tax Map 26, Parcel 56
Dear Mr. Jones:
The Albemarle County Board of Supervisors, at its meeting on October 20, 1999, unanimously
approved the above-noted request to allow a stream crossing of the Moorman's River. Please
note that this approval is subject to the following conditions:
1. Engineering Department approval of an erosion control plan.
2. Engineering Department receipt of proof of compliance with Federal and State agencies
regulating activities affecting wetlands and watercourses.
3. Engineering Department approval of a mitigation plan outlining mitigation measures for
encroachments into the stream butter.
4. Engineering Department approval of hydrologic and hydraulic computations for the
crossing. These computations must demonstrate compliance with Sections 30.3.2.2
[verification of limits of flood way and floodway fringe] and 30.3.3 [general requirements
for flood hazard overlay districts] of the Zoning ordinance. Plans must show the existing
and proposed t100dplain boundaries and elevations.
5. Engineering Department approval of structural plans, details, and computations.
6. The landowner shall have the right to maintain, repair, and replace the bridge and
floodplain crossing provided that the replacement, if any. shall be in substantial accord
with the design of the original bridge and t100dplain crossing unless modifications thereto
are approved by the Engineering Department.
In the event that the use, structure or activity for which this special use permit is issued shall not
be commenced within eighteen (18) months after the issuance of such permit, the same shall be
deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes
of this section, the tern1 "commenced" shall be construed to include the commencement of
Page 2
October 28, 1999
construction of any structure necessary to the use of such permit within two (2) years from the
date of the issuance thereof which is thereafter completed within one (l) year.
Before beginning this use, you must obtain a zoning clearance from the Zoning Department.
Before the Zoning Department will issue a clearance, you must comply with the conditions in
this letter. For further information, please call Jan Sprinkle at 296-5875.
If you should have any questions or comments regarding the above-noted action, please do not
hesitate to contact me.
Sincerely,
David B. Benish
Chief of Planning & Community Development