Loading...
HomeMy WebLinkAboutSDP201600038 Review Comments Final Site Plan and Comps. 2016-11-28Short Review Comments Report for: SDP201600038 SubApplication Type: Hollymeade Town Center-Bojangles Final Site Development Plan Date Completed:08/19/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:1. [Section 32.4.3.1(a)] – The $215.00 notification fee for the SRC meeting required under the initial site plan review has not yet been paid. Please pay it with the revised final site plan. 2. [Section 32.5.2(n), Section 32.7.2.3, Proffers from ZMA200100020] – The sidewalk configuration does not match the approved Application Plan. Please revise. • Area for a planting strip and trees should be provided for the portion of sidewalk that extends from the intersection of Timberwood Boulevard to the portion of the off-site travelway that turns down to the Bojangles (see Application Plan). This revised design will allow for connectivity with the sidewalk shown on the road plans for Timberwood Boulevard that extend the sidewalk down from this intersection along the stormwater facility to Route 29. The Application Plan shows three trees in this planting strip. • The Application Plan shows sidewalks fully surrounding the adjacent stormwater facility. The road plans for Timberwood Boulevard show sidewalk adjacent to the stormwater facility. The proposal shows sidewalks ending along Route 29 in conjunction with the site’s northern property line. As a result, there is an approximately 220 foot gap of sidewalk between the intersection of Route 29/Timberwood Boulevard and the Bojangles’ site. How and when will the sidewalk be completed as shown on the Application Plan? 3. [Section 4.12.8(e) and 4.12.10] – A shared parking agreement according to this section must be approved prior to final site plan approval. 4. [Proffers for ZMA200100020] – Please include the improvements shown in the exhibit dated 7-18-16 and titled “Pond Viewing Area” on the revised final site plan. Division: Date Completed:06/30/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:This proposal will be reviewed by the ARB on July 18. Comments will be provided after that meeting. See action letter from August 15, 2016 ARB meeting. Division: Date Completed:07/11/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments:Bojangles FSP comments, based on plans dated 06-09-2016: 1. Road plans will be required for thru-road construction. Road will be built and accepted into the system or bonded prior to final site plan approval. (18-32.7.2.2) 2. Easement plat will be required for road across adjacent parcel. Permanent easements will also be needed for any offsite improvements and temporary easements for any offsite grading. 3. Approved VSMP plans will be required prior to final site plan approval. (18-32.7.4.1) 4. Gutters shall be required where necessary to control or direct stormwater runoff. (18-4.12.15.g) 5. Structure 11 is not shown on the profile and the pipe from 10-11 is not labelled. Some of the storm labeling is covered by other text on sheet C5. Division: Date Completed:06/23/2016 Reviewer:Andrew Slack CDD E911 Review Status:No Objection Reviews Comments:No Objection. Division: Page:1 of 4 County of Albemarle Printed On:September 25, 2017 Date Completed:07/12/2016 Reviewer:Adam Moore VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:07/25/2016 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments:JT, The above referenced application is currently under construction plan review at the ACSA. I will recommend approval once we grant construction approval for the utilities. Alexander J. Morrison, P.E. Civil Engineer Division: Date Completed:07/15/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated June 9, 2016. No comments or conditions. Division: Date Completed:07/11/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:See Recommendations Reviews Comments:I can’t release my review comments on the Bojangles Hollymead, until they bring their account current with Fire Rescue. Division: Date Completed:08/04/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:No Objection Reviews Comments:Based on plans dated 6/9/16. No comments or objections. Division: Date Completed:09/01/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:Took question related to Comment #2 to 9/1 Legal Meeting. Greg K. informed us that the owner of Parcel 41D3 will need to be responsible for completing the sidewalk connection. I provided the following comments to Justin Shimp: 1. [Section 4.12.8(e) and 4.12.10] – A shared parking agreement according to this section must be approved prior to final site plan approval. After review, it’s not clear that a shared parking agreement can satisfy the parking requirement. None of the other shared parking spots have been constructed. Beyond the interpretation of 4.12.8(e), the instrument recorded in D.B. 3667 refers to the language of the instrument in D.B. 3085, which says the parking will be shared after construction is complete (see Article VI, Section 6.06 on page 13 of the instrument in D.B. 3085). 2. [Proffers for ZMA200100020] – Please include the improvements shown in the exhibit dated 7-18-16 and titled “Pond Viewing Area” on the revised final site plan. Because this improvement will be located on an adjacent property, the County Attorney’s office has requested a note be added to Sheet 1 of the site plan. The note needs to document that this improvement is provided in lieu of an on-site deck as shown on the Application Plan. The note should read: “The improvements labeled as “Pond Viewing Area” on Sheet C4 and shown in the exhibit titled “Pond Viewing Area” (dated 7-18-16) are provided in lieu of the deck shown on the Application Plan referenced by the proffers for ZMA200100020.” Division: Page:2 of 4 County of Albemarle Printed On:September 25, 2017 improvement is provided in lieu of an on-site deck as shown on the Application Plan. The note should read: “The improvements labeled as “Pond Viewing Area” on Sheet C4 and shown in the exhibit titled “Pond Viewing Area” (dated 7-18-16) are provided in lieu of the deck shown on the Application Plan referenced by the proffers for ZMA200100020.” Date Completed:09/15/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:1. Because the plant symbols on the 20 scale landscape plans are not legible, please include the 10 scale landscape plans in the site plan set. This will avoid problems for future reviewers and inspectors. 2. The boundaries of the easements in the landscape area on Sheet C7 have been clarified. However, only some of the off-site plants shown on Sheet C8 are included within a landscape easement. The 3’ landscape easement that is shown includes some, but not all, of the shrubs at the bottom of the lower retaining wall, and the easement line stops between groups of shrubs. The shrubs between the walls are not in an easement, nor are the trees along the extended travelway. The Development Agreement and Declaration seems to address landscaping previously shown as Exhibit A, which does not include the landscaping on current Sheet C8. Please clarify. Division: Date Completed:09/14/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:See Recommendations Reviews Comments:Bojangles FSP comments, based on plans dated 08-29-2016: 1. Road plans will be required for thru-road construction. Road will be built and accepted into the system or bonded prior to final site plan approval. (18-32.7.2.2) Comment Addressed, response noted 2. Easement plat will be required for road across adjacent parcel. Permanent easements will also be needed for any offsite improvements and temporary easements for any offsite grading. Comment partially addressed, response noted 3. Approved VSMP plans will be required prior to final site plan approval. (18-32.7.4.1) Comment addressed, the VSMP is approved 4. Gutters shall be required where necessary to control or direct stormwater runoff. (18-4.12.15.g) Comment addressed, response noted 5. Structure 11 is not shown on the profile and the pipe from 10-11 is not labelled. Some of the storm labeling is covered by other text on sheet C5. Comment addressed Division: Date Completed: Reviewer:Alexander Morrison ACSA Review Status:Pending Reviews Comments: Division: Date Completed:09/06/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:Need to confirm revised parking calculation and note about "Pond Viewing Area" on Sheet 1. Division: Date Completed:11/07/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:See Recommendations Reviews Comments:Planning can sign this final site plan with the following change: 1. Please include the exhibit for the "Pond Viewing Area" in the plan. Division: Date Completed:10/25/2016 Reviewer:Matthew Wentland CDD EngineeringDivision: Page:3 of 4 County of Albemarle Printed On:September 25, 2017 Review Status:No Objection Reviews Comments: Date Completed:11/02/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:Please include in the site plan set a 10 scale version of the landscape plan on Sheet C9 so that the plant symbols for off-site landscaping are legible. Division: Date Completed: Reviewer:Alexander Morrison ACSA Review Status:Approved Reviews Comments: Division: Date Completed:11/16/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:No Objection Reviews Comments: Division: Date Completed:11/28/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:4 of 4 County of Albemarle Printed On:September 25, 2017 'r./ PROJECT MANAGEMENT sHimpCIVIL ENGINEERING LAND PLANNING ENGINEERINGa October 21, 2016 • J.T. Newberry Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Regarding: SDP 2016-00038--Hollymead Town Center Bojangles Final Site Development Plan Dear J.T., Thank you for your review of the final site plan for Hollymead Town Center Bojangles.We have reviewed and revised the plan per the most recent comments dated September 1, 2016(including follow up comments and clarification). See below for detailed responses to each of your comments. Planning: 1. Comment addressed. 2. Comment addressed. 3. Comment addressed; a shared parking agreement is no longer necessary as all required parking spaces are provided on the subject parcel. The parking calculation has been updated as discussed (and approved by Ron Higgins)via email. 4. The requested note has been added to the Cover Sheet. 5. The Deed Book and Page information has been added to the plan set for the recordation of both the Development Agreement and the waterline easement. Engineering(Matt Wentland): 1. Comment addressed. 2. Comment addressed. Easements have been recorded; Deed Book and Page information has been added to the plans. 3. Comment addressed; WPO application has been approved. 4. Comment addressed. 5. Comment addressed. ACSA(Alex Morrison): 1. Under construction review. ARB(Margaret Maliszewski): 1. A 10 scale landscape plan has been added to the plan set. 2. The plan has been revised to better show the location of all boundary lines;this should help clarify the easement locations. Additionally,the Development Agreement has been recorded and the associated Deed Book and Page information has been added to the plan set. Page 1 of 2 3. A note stating that all new planting shown on the plan, including all off-site planting, will be completed with the Bojangle's project has been added to the landscape plan. If you have any questions or concerns about these revisions please feel free to call me at(434) 227-5140 and we can discuss any questions that you may have in further detail. Best Regards, Ellie C. Ray, PLA Shimp Engineering, P.C. Attachments: 4 sets of the Final Site Plan Page 2 of 2 *4400,0 Newt Ana Kilmer From: Tara Boyd <tara@boydandsipe.com> Sent: Monday, September 19, 2016 11:20 AM To: Ana Kilmer Cc: Matthew Wentland Subject: Re: Easements for access to Bojangles site at Hollymead Yes, it was covered under both easements. The parcel numbers have changed over time, which makes the parcels a little difficult to track. Current TMP 32-41D3, 32-41D4, 32-41 D5 and 32-41 D6 were part of a larger tract owned by Post Office Land Trust referred to as the "Post Office Property" in the first instrument I referenced in my email below. That tract had been subdivided when the second instrument I referenced below was recorded, and all 4 parcels were "Parcels" as used in that instrument. Probably more info than you needed. Give me a call if you have any questions. Best, Tara R. Boyd, Esq. Boyd & Sipe PLC 126 Garrett St. Suite A/ PO Box 237 Charlottesville VA 22902 ph (804) 248-8713 fx (434) 326-0472 tara a(�boydandsipe.com http://bovdandsipe.com From:Ana Kilmer<akilmer@albemarle.org> Date: Monday, September 19, 2016 at 10:42 AM To:Tara Boyd <tara@boydandsipe.com> Cc: Matthew Wentland <mwentland@albemarle.org> Subject: RE: Easements for access to Bojangles site at Hollymead Tara: I just finished discussing the tmps with Matt Wentland. He is our engineer working on this project. TMP 32/41D6 is also being graded for this project. Is this TMP covered under the recorded easements that you provided?The owner is Hollymead Corner, LLC. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmert albemarle.org 1 ‘liase **ere From:Tara Boyd [mailto:tara@boydandsipe.com] Sent: Friday,September 16, 2016 12:18 PM To:Ana Kilmer<akilmer@albemarle.org> Subject: Easements for access to Bojangles site at Hollymead Ana, I enjoyed catching up with you yesterday and appreciate you taking the time to go over the bonding for the Bojangles site plan. I have prepared a letter confirming the authorized signers of the bond-related documents, and am having Will, Andrew and Andrew's counsel review it before sending it over to you. In the meantime, I've attached the two documents that establish easements for access to the Bojangles site (TMP 32-41D4). Here's what each one does: DB 2678 p 425: This Cross Access Easement and Construction Agreement was one of several agreements between the original developers of Hollymead Town Center granting access and utility easements for the whole center. This one obligates the developers to build a road behind Target connecting Rt. 29 up to Connor Dr. and grant easements for constructing and maintaining the driveway. These sections are highlighted for your reference, and I circled the corresponding easements on the exhibit at the back. The entrance from Rt. 29 along the Bojangles site was built, but the rest of the road has not yet been built. DB 3085 p 361: This Declaration creates additional easements and maintenance obligations for Hollymead Area C, which includes the Bojangles parcel as well as the other parcels between Target and Timberwood Blvd. Section 2.01 (highlighted on p. 6) establishes access and parking easements over all existing and future driveways constructed on the property. This establishes easements over the driveways and parking areas that will be built under the site plan currently under review for the Bojangles. I hope this is helpful. Please don't hesitate to call with any questions. Best, Tara R. Boyd, Esq. Boyd & Sipe PLC 126 Garrett St. Suite A/ PO Box 237 Charlottesville VA 22902 ph (804) 248-8713 fx (434) 326-0472 taraa.bovdandsipe.com http://bovdandsipe.com 2 Johnathan Newberry From: Johnathan Newberry Sent: Thursday, September 01, 2016 5:48 PM To: 'Justin Shimp, P.E.'; 'Ellie Ray' Subject: RE: Bojangles 29 Justin and Ellie, Thank you for your resubmittal of the final site plan dated 8-29-16.Two comments from Planning remain: review has not yet been paid. Please pay it with the revised final site plan. Thank you for paying this fee. the approved Application Plan. Please revise. Application Plan? Zoning and the County Attorney's office will be following up with the owner of Parcel 41D3 on completing the sidewalk connection. 3. [Section 4.12.8(e) and 4.12.10] —A shared parking agreement according to this section must be approved prior to final site plan approval. After review, it's not clear that a shared parking agreement can satisfy the parking requirement. None of the other shared parking spots have been constructed. Beyond the interpretation of 4.12.8(e),the instrument recorded in D.B. 3667 refers to the language of the instrument in D.B. 3085, which says the parking will be shared after construction is complete (see Article VI, Section 6.06 on page 13 of the instrument in D.B. 3085). Because this improvement will be located on an adjacent property,the County Attorney's office has requested a note be added to Sheet 1 of the site plan. The note needs to document that this improvement is provided in lieu of an on-site deck as shown on the Application Plan. The note should read: "The improvements labeled as "Pond Viewing Area" on Sheet C4 and shown in the exhibit titled "Pond Viewing Area" (dated 7-18-16) are provided in lieu of the deck shown on the Application Plan referenced by the proffers for ZMA200100020." From:Johnathan Newberry Sent: Friday,August 19, 2016 5:23 PM To: 'Justin Shimp, P.E.' <justin@shimp-engineering.com>; 'Ellie Ray'<ellie@shimp-engineering.com> Cc: 'Andrew Baldwin' <andrew@corecville.com>; 'Will Gordon'<will.gordon@bojangles.com>; Amelia McCulley <AMCCULLE@albemarle.org>; Sarah Baldwin<sbaldwin@albemarle.org> Subject: RE: Bojangles 29 1 N(.4 N/-..(,.., \W ANCWp) / i'.� `- ., .,J 00A N �co ( Wn N/W Wb 1NN � O e ,, N VA,</CO ' WWN WO OW \OO 7 WN A 7\cn N\\ 4 0 ~ A(a'" N Se N � 7* WO` n V -n O pf WN`OleOW N C4\ 00 V\W W N Yr OO ..a WNN ' ,NN43 O\ WW Ot `O Cn � NOO \I��N OC3? W (D CO N � Nv — c4lho W� t?'Bd \ N co N` \N Q'W WN /kUW IV N(.....1,0 CO N � N OW 3 j/A, O ND CCW W WW ° S. � N N N / r ItWWW coW W OOjoE Q0 CO_, WWWw Q O , 1 ' n0 0 n N n_N-n-N.;`' 6µNNcn N :cn 5 co to-A D p �N: O.e {�•-,Af- W W W \ NJA Ni LI S' Cr., Is).' -11t. CI if01(8, 119 r WAW 0 to CO , O 7cVv N 1H'fl .\>x j' Wl�O j S ed /"" WNWcD0? VA N N�cD 4 N N WNrlN� NAL 7‘.. IV N �� p 4 N 17 A C, + al v cn W al N N A V V J v X1 AA N N W N A_ 1 IiiP v (Aj W A O N W ✓ N A ca rn 4, /4/0, �OC� (111.1(' W a\ O400: A iiis O �' LC N tot). 46B4-1 D1 D o ��'p N .. R7 —s cn W w co co N/ CO N W \/P 0 N\ /D \ 4.1):d# / N\ mOIIII1 �-1 K] moe Z r (t.e- i i'g§- E i- '(a i .- ilIe E §' 1 o 3 _t,%., p.,-0 joei , i g P) m m W v 39N / 1r• mpi PROJECT MANAGEMENT CIVIL ENGINEERNG LAND PLANNING ENGINEERING August 29, 2016 J.T. Newberry Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Regarding: SDP 2016-00038—Hollymead Town Center Bojangles—Final Site Development Plan Dear J.T., Thank you for your review of the final site plan for Hollymead Town Center Bojangles.We have reviewed and revised the plan per the most recent comments dated August 19, 2016.See below for detailed responses to each of your comments. Planning: 1. The Initial Plan notification fee was paid with this resubmittal. 2. A planting strip has been added for the portion of sidewalk that extends from the intersection with Timberwood Blvd to the portion of off-site travelway that turns down to the Bojangles. The proposed street trees have been moved into this planting strip. The gap in sidewalk along Route 29 on the adjacent parcel in the responsibility of that parcel owner;the applicant is unclear on when the sidewalk will be completed. 3. The three parcels within Block Cl of Hollymead Town Center have a Development Agreement and Declaration that establish cross access and parking easements. A copy of these documents has been included in the submittal package. 4. The improvements shown on the Exhibit dated 7-18-16 and title "Pond Viewing Area" have been included on the revised Final Site Plan. Engineering(Matt Wentland): 1. As discussed, profile information has been provided for the off-site travelway that serves this proposed restaurant. The travelway is not a proposed road as each existing parcel has frontage on an existing road, and should therefore not require bonding or acceptance into the system. 2. An easement plat for the proposed waterline easement will be submitted on the next submittal date. Easements for landscaping and access are in process, recorded copies will be provided prior to Final Site Plan approval.Temporary construction and access easements are covered under the existing Development Agreement between the three parcel owners in Block Cl Hollymead Town Center. 3. VSMP plans are under review(WPO201600046). 4. Gutters have been provided where necessary. Roof drains have been designed and coordinated with the architect to collect and convey roof runoff appropriately. 5. The missing structure and pipe information is now shown on the plan. Labeling has been moved for clarity. Page 1 of 2 41111111) ACSA(Alex Morrison): 1. Under construction review. ARB(Margaret Maliszewski): 1. A sample of the retaining wall block has been provided directly from the supplier. 2. The lighting plan has been revised to indicate the wall packs will have a bronze finish. 3. The planting size of the Inkberry holly and Prague viburnum has been revised to 24" minimum. 4. Revisions have been made to provide better identification of the easements that allow planting on the adjacent parcels. Additionally,the three parcels with HTC Block Cl have a Development Agreement and Declaration that establishes the rights of each property owner to install and maintain improvements on the various parcels; a copy of these documents has been included in the submittal package. 5. Additional shrubs and grasses have been provided between and below the retaining walls to break up the length and soften the appearance. If you have any questions or concerns about these revisions please feel free to call me at(434) 227-5140 and we can discuss any questions that you may have in further detail. Best Regards, Ellie C. Ray, PLA Shimp Engineering, P.C. Attachments: 5 sets of the Final Site Plan 1 Development Agreement and Declaration Copies Page 2 of 2 Sari Johnathan Newberry From: Johnathan Newberry Sent: Friday, August 19, 2016 5:23 PM To: 'Justin Shimp, P.E.'; 'Ellie Ray' Cc: 'Andrew Baldwin'; 'Will Gordon';Amelia McCulley; Sarah Baldwin Subject: RE: Bojangles 29 Here are Planning comments for the final site plan: 1. [Section 32.4.3.1(a)]—The$215.00 notification fee for the SRC meeting required under the initial site plan review has not yet been paid. Please pay it with the revised final site plan. 2. [Section 32.5.2(n), Section 32.7.2.3, Proffers from ZMA200100020]—The sidewalk configuration does not match the approved Application Plan. Please revise. • Area for a planting strip and trees should be provided for the portion of sidewalk that extends from the intersection of Timberwood Boulevard to the portion of the off-site travelway that turns down to the Bojangles(see Application Plan).This revised design will allow for connectivity with the sidewalk shown on the road plans for Timberwood Boulevard that extend the sidewalk down from this intersection along the stormwater facility to Route 29.The Application Plan shows three trees in this planting strip. • The Application Plan shows sidewalks fully surrounding the adjacent stormwater facility.The road plans for Timberwood Boulevard show sidewalk adjacent to the stormwater facility.The proposal shows sidewalks ending along Route 29 in conjunction with the site's northern property line.As a result, there is an approximately 220 foot gap of sidewalk between the intersection of Route 29/Timberwood Boulevard and the Bojangles' site. How and when will the sidewalk be completed as shown on the Application Plan? 3. [Section 4.12.8(e) and 4.12.10]—A shared parking agreement according to this section must be approved prior to final site plan approval. 4. [Proffers for ZMA200100020]—Please include the improvements shown in the exhibit dated 7-18-16 and titled "Pond Viewing Area" on the revised final site plan. From:Johnathan Newberry Sent: Monday,August 01, 2016 6:23 PM To:Justin Shimp, P.E. <justin@shimp-engineering.com>; 'Ellie Ray'<ellie@shimp-engineering.com>; 'Andrew Baldwin' <andrew@corecville.com>; Will Gordon<will.gordon@bojangles.com> Cc: Robbie Gilmer<rgilmer@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Sarah Baldwin<sbaldwin@albemarle.org>; Amelia McCulley <AMCCULLE@albemarle.org> Subject: RE: Bojangles 29 I think the seating area concept works. I'm working to provide Planning comments as quickly as possible. As I work on Planning comments, you can follow-up with Fire/Rescue, Engineering and ARB who have requested changes. If you have already satisfied their comments, then please forward documentation of their approval. Thanks. From:Andrew Baldwin [mailto:andrew@corecville.com] Sent: Monday,August 01, 2016 3:58 PM To:Johnathan Newberry<inewberry@albemarle.org> Cc:Justin Shimp, P.E.<iustin@shimp-engineering.com>; Will Gordon <will.gordon@boiangles.com> Subject: Bojangles 29 1 JT, We are getting down to the final details on the Boj angles site plan on 29 north and wanted to make sure we have all of the questions answered for the county. We are under the gun from Bojangles corporate to open this store before the new year and really need to wrap this up. Most notably is the sidewalk and seating area that could be potentially required due to past proffers for Block A. Can we set a meeting time with you this week for 30min to an hour to make sure we are all on the same page and when we can expect to wrap this up and set bond amounts. Anything you can do would be greatly appreciated! Best Andrew Baldwin Principal Broker: Core Real Estate and Development. 195 Riverbend Dr. Suite 1 Charlottesville, Va 22911 0: 434 979 8181 F: 434 296 3510 C: 434 466 6566 www.corecville.com 2 CN) O ° r., g i f ti)...S'' .,filr:41 1 3 I / # , __,_ _ - _ \ C N = -pti • Z iii kL ________-__-•z--_- 4 / ,� •'. / C :I iril a - — :-. I i -,1 ' p3C-;j-: r: // 1f47.6 -•;•'.14-%OW,I itt. /*At.•.::,' -4i.'0.1••• -. 4W// _. .c0 l M J rn •.A..i.t. - 3 /1 e ' b (0 v ,,_ ,tip ' O t: 1 — — _ rt I I 01 Ot I /N•oir "•- p W cm t . \ .4ap0 °, f Ak '`�'1-7" `_1 `airI - __-_-- DJ a4 W �® o - �i ,, x �' ) las w)ols 11111t4Illk- ------ O iv - - ons ` j19� -- s— )rm Seger . -v trn 1 H 5 grot�� � o - a ,..ififimw, ... - -tip TWO �II` W p C O____________________ -- N )a a 'r-- -----'''',.-: � � - •• c� "c I _ ____ 44 = c-fi i3):1-111,kiit ..i ' 4-1110•-,-;,*4•:` ' -,!*•-• ' '")1 i "--111 = . ., co 7j cl _ ���� � ��/ti~rte •7, \ \ \ . ---------- �- "�-- :�/ . .4 1. . \ \ \\ . _lum /.� /ce -- 7. Kik ..%.!•44.-" i MMIInvilll WI _ _--0----- -g--W-_ f? �� „.....1., /r \. 4 -' -- �•� It �� -065 / I k 41) ---,_:/-:-..e..e,. . • LT cji ‘.. ..••• C/) * C/) Fr (A cii \ %? -\ �G •C �p O O • • _3.- t S_ 4. e ta.u�lw�'}_ �.......« .,.._..... - lill , Q FM1� � d V , r Y �i $ `� M eft ' -4'"'- �} _....t Y' v.-_' ,w: - �- Y,- F3 h A_+t {Mil. I Z r• f 1 Az _ ,�..r i / • , hi;u I / s ! t4 r• t-...—r-I $ N. ..k AP'10.-4.•17;.., p ��11 11:1‘ n •i Or2' i $_ /� v i OO a. ` I/ / /ri.. ii , T G -,�;"° ,--t•-§ r r !• // '/ // // // / / / sumo' Nrot Johnathan Newberry From: Margaret Maliszewski Sent: Monday, August 15, 2016 5:41 PM To: Johnathan Newberry Subject: Bojangles ARB action JT, here is the action from today's ARB meeting on the Bojangle's proposal.A formal action memo and letter will follow. a. ARB-2016-71: Bojangle's Restaurant at Hollymead Town Center—Final Site Development Plan(TM/Parcel 032000000041 D4) Proposal: To construct a 3,808 sf Bojangle's fast food restaurant with a drive-thru window and associated site improvements. Location: On the west side of Rt. 29,just north of the Target store in the Hollymead Town Center Motion: Mr. Lebo moved for approval of the Certificate of Appropriateness for ARB-2016-71: Bojangle's Restaurant at Hollymead Town Center Final Site Development Plan with the conditions listed in the staff report, modified as follows: 1. Provide a sample of the retaining wall block for review. 2. Indicate on the lighting plan that the wall packs will have a bronze finish 3. Revise the planting size of the Inkberry holly and Prague viburnum to 24" minimum. 4. Without reducing legibility of the plan, include notes on the plan to identify the easements that allow planting on the adjacent parcels. 5. Provide plants between the retaining walls and at the bottom of the lower wall to soften the appearance and break up the length. Provide natural groupings of plants rather than a continuous row. Plants species should be appropriate to transition from the pond to the more structured planting along the building. Consider use of shrubs and ornamental grasses to help soften the appearance of the wall. Mr. Binsted seconded the motion. The motion carried by a vote of 4:0. Margaret Maliszewski, Principal Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org E M1. Q a1 (13 C p 4,_, v +' -O L aC) .) i 3 L E a.) coL .Q a� O C 73 X cu C a) C C E ? Sipe Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Monday,July 25, 2016 10:12 AM To: Johnathan Newberry Subject: SDP201600038: Hollymead Bojangles - Final JT, The above referenced application is currently under construction plan review at the ACSA. I will recommend approval once we grant construction approval for the utilities. Alexander J. Morrison,P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 'Sao' vigoo° Y re 1. v COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Prange Road Culpeper Vlrprua 22701 Charles A.Kilpatrick,P.E. Commissioner July 12, 2016 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Johnathan Newberry Re: Hollymead Town Center Bojangles- Final site plan SDP-2016-00038 Review#2 Dear Mr. Newberry: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section,has reviewed the above referenced plan as submitted by Shimp Engineering,dated June 9, 2016, and find it to be generally acceptable. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way.The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at(434) 422-9399 for information pertaining to this process. Sincerely, • bf* Adam J. Moore, P.E. Area Land Use Engineer Culpeper District 4 � A ` sHimp PROJECTMANAGEMENT ENGINEERING LAND PLANNING ENGINEERING June 10th, 2016 Mr. J.T. Newberry, Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Regarding: SDP 2016-00017—Bojangles Restaurant at Hollymead Dear Mr. Newberry, Thank you for your review of the initial site plan for Bojangles Restaurant at Hollymead. We have reviewed and revised the plan per your most recent comments dated May 5, 2016. See below for detailed responses to each of your comments. Planning: cfr 1. Per our prior correspondence the requirement for the deck has been waived by the County. Sidewalks per the approved application plan has been added. The proposed use text on sheet Cl has been revised as requested. /3. Parcel overlay information has been added under"parcel note"on sheet Cl. 4. Additional text has been added to the water shed note on sheet Cl. 5. A compliant landscaping plan is shown on sheets C7 and C8. The proposed drive thru window is now labeled. See sheet C4. Additional landscaping is now shown more clearly with this resubmittal. Please see sheet C7 and 8. 8. Comment noted. 9. The scale shown on sheet C4 is now correctly displayed. 10. Additional sidewalks per the approved application plan are now shown with this submittal. Engineering (Max Greene): 1. A scale bar and north arrow are now shown on sheet C7 and C8. 2. The proposed landscaping in front of the 16'parking spaces have been shifted to be outside of the required 2' unobstructed overhang area. 3. Comment noted. 4. Comment noted. 5. Comment noted. 6. Comment noted. Fire& Rescue(Robbie Gilmer): 1. The requested fire flow information is attached with the resubmittal. 2. A patch of proposed gravel is now shown on the plan to allow access to the existing fire hydrant behind Target. See sheet C4. ti 4 3. The requested knox box note has been added under"Fire Code Requirement"on sheet Cl. ACSA(Alex Morrison): 1. Construction plans are attached with the 3 copies for your review. The required water and sewer data sheets are also attached. 2. The proposed sewer lateral connection has been revised as requested allowing proper flow and angles 90 degrees or greater. See sheet C5. 3. The proposed waterline connection with a blow off assembly has been extended to near the proposed water meter location. See sheet C5. 4. Fire flow data for the existing fire hydrant behind Target is attached with this submittal. 5. The proposed grease interceptor has been relocated outside of the drive thru lane. See sheet C5. Virginia Department of Health (Alan Mazurowski): 1. Comment noted 2. Comment noted If you have any questions or concerns about these revisions please feel free to call me at (434)227-5140 and we can discuss any questions that you may have in further detail. Be Regards, Chris Norvelle Shimp Engineering, P.C. Attachments: 1 copy of the Final Site Plan Application 8 sets of the Final Site Plan 1 copy of fire flow test report PROJECT MANAGEMENT S IM CIVIL ENGINEERING LAND PLANNING ENGINEERING June 10th, 2016 Mr. J.T. Newberry, Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Regarding: SDP 2016.00017—Bojangles Restaurant at Hollymead Dear Mr. Newberry, Thank you for your review of the initial site plan for Bojangles Restaurant at Hollymead. We have reviewed and revised the plan per your most recent comments dated May 5, 2016. See below for detailed responses to each of your comments. Planning: 1. Per our prior correspondence the requirement for the deck has been waived by the County. Sidewalks per the approved application plan has been added. 2. The proposed use text on sheet Cl has been revised as requested. 3. Parcel overlay information has been added under"parcel note"on sheet Cl. 4. Additional text has been added to the water shed note on sheet Cl. 5. A compliant landscaping plan is shown on sheets C7 and C8. 6. The proposed drive thru window is now labeled. See sheet C4. 7. Additional landscaping is now shown more clearly with this resubmittal. Please see sheet C7 and 8. 8. Comment noted. 9. The scale shown on sheet C4 is now correctly displayed. 10. Additional sidewalks per the approved application plan are now shown with this submittal. Engineering (Max Greene): 1. A scale bar and north arrow are now shown on sheet C7 and C8. 2. The proposed landscaping in front of the 16' parking spaces have been shifted to be outside of the required 2' unobstructed overhang area. 3. Comment noted. 4. Comment noted. 5. Comment noted. 6. Comment noted. Fire&Rescue(Robbie Gilmer): 1. The requested fire flow information is attached with the resubmittal. 2. A patch of proposed gravel is now shown on the plan to allow access to the existing fire hydrant behind Target. See sheet C4. 3. The requested knox box note has been added under"Fire Code Requirement"on sheet Cl. ACSA(Alex Morrison): 1. Construction plans are attached with the 3 copies for your review. The required water and sewer data sheets are also attached. 2. The proposed sewer lateral connection has been revised as requested allowing proper flow and angles 90 degrees or greater. See sheet C5. 3. The proposed waterline connection with a blow off assembly has been extended to near the proposed water meter location. See sheet C5. 4. Fire flow data for the existing fire hydrant behind Target is attached with this submittal. 5. The proposed grease interceptor has been relocated outside of the drive thru lane. See sheet C5. Virginia Department of Health (Alan Mazurowski): 1. Comment noted 2. Comment noted If you have any questions or concerns about these revisions please feel free to call me at (434) 227-5140 and we can discuss any questions that you may have in further detail. Be Regards, Chris Norvelle Shimp Engineering, P.C. Attachments: 1 copy of the Final Site Plan Application 8 sets of the Final Site Plan 1 copy of fire flow test report