Loading...
HomeMy WebLinkAboutSP199800012 Action Letter , . r COUNTY OF ALBEMARLE Dept. of Plallllll1g & Cornrnlll11ty Dewlllprnent 401 Mclntlrf' Road Charlot tesville, Virgll1ia 229024S96 (804) 2965823 July 14, 1998 M. E. Gibson, Jr., Esq Tremblay & Smith, LLP 105-109 East High St Charlottesville, VA 22902 RE: SP-98-12 Charlottesville Catholic School Tax Ma l61A, Parcel 29 Dear Me Gibson: The Albemarle County Board of Supervisors, at its mccting on July 8, 1998, approved the above-noted request to construct a private school for 600 students. Please note that this approval is subject to the following conditions: I, The site plan shall conform generally to the conceptual plan, dated June 5, 1998, submitted with this petition. Relationships of recreational areas to property boundaries, buildings to recreational areas, and provision of pedestrian access parallel to Rio Road and from Rio Rod into the parcel shall be maintained, Pedestrian access shall be provided from parking lots to the school buildings, 2, Enrollment will be limited to not more than six hundred (600) students. 3, Use of temporary units is allowed until pennanent facilities are constructed. Construction of permanent facilities shall commence within five years of the date of the site plan approval. A full site development plan will be required for the facility regardless of the use of temporary units or permanent construction, 4. A walkway or pedestrian path will be provided with the first phase of the project, if the County is able to fund adjoining connections to Pen Park Lane and Penn Park Road. If such connections cannot be made at that time, then the school will bond pathway improvements to be constructed by the school when the County is able to fund the adjoining connections. If those improvements have not been constructed within eight years of site plan approval, the bond will be released and the pathway not required to be installed, In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such pennit, the same shall be dccmed abandoned and the authority granted thereunder shall thereupon tenninate. For purposes of this section, the tenn "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (I) year, ., Page 2 July 14, 1998 Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875, If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me, Sincerely, U . \ .w~: éç¿f5; Dire~:~;~f~=ng Comm i Development YWC/jcf Cc: Amelia McCulley Jack Kelsey