Loading...
HomeMy WebLinkAboutSP199700065 Action Letter e e f/ COUNTY OF ALBEMARLE Dept. of Planning & Community Development 40] MclntJre Hoad Charlottesville, Virginia 229024596 (804) 296 5823 April 17, 1998 Nancy Brody 503 Falconer Drive Chrlottesville, VA 22903 RE: SP-97-65 Greenwood Farm Bridge Tax Map 71, Parcel 2 Dear Ms. Brody: The Albemarle County Board of Supervisors, at its meeting on April I, 1998, approved the above-noted request for fill in the floodplain to construct a road and bridge over Yellow Mountain Creek. Please note that this approval is subject to the following conditions: I. In addition to agricultural, forestal, and recreational activities (which activities include, but are not limited to, construction and use of structures related thereto), the bridge shall serve no more than two building sites for dwellings (or three building sites for dwellings if one or more of those sites is created as part of a family division) on the south side of Yellow Mountain Creek. The bridge shall also serve accessory structures for the dwellings. 2. The building sites'shall be located below the elevation of 900 feet, as identified on the County's Open Space Plan. 3. Engineering Department approval of an erosion control plan. 4. Engineering Department receipt of proof of compliance with Federal and State agencies regulating activities affecting wetlands and watercourses. 5. Engineering Department approval of a mitigation plan outlining mitigation measures for encroachments into the stream buffer. e e Page 2 April 17, 1998 6. Engineering Department approval of hydrologic and hydraulic computations for the crossing. These computations must demonstrate compliance with sections 30.3.2.2 and 30.3.3 of the Zoning Ordinance. Plans must show the existing and proposed floodplain boundaries and elevations. 7. Engineering Department approval of structural plans, details, and computations. 8. Engineering Department approval of grading plans to evaluate cut and fill in the floodplain. 9. The 14 foot wide bridge and floodplain crossing shall be in substantial accord with the plan submitted by the applicant with the special use permit, subject to such modifications as are approved by the Engineering Department. 10. The land owner shall have the right to maintain, repair and replace the bridge and flood plain crossing, provided that the replacement, if any, shall be in substantial accord with the design of the original bridge and floodplain crossing unless modifications thereto are approved by the Engineering Department; and 11. A biological surveyor such other investigation as may be deemed appropriate by the Water Resources Manager to determine the presence of the James Spinymussel in the areas in Yellow Mountain Creek immediately affected by the proposed bridge be conducted prior to development of the water quality mitigation plan required in Condition 5. The results of the surveyor investigation will be reported to the Water Resources Manager for development of design changes and/or mitigation measures to minimize impact on the species, iffound. In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (I) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875. .. e e .. Page 3 April 17, 1998 If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincerely, (j - . / ( UC"~ r:v!-b / V. Wa;neë¡?m erg( Director of Planning Communi VWC/jcf cc: Amelia McCulley Jack Kelsey