Katurah S. Roell
195 Riverbend Drive
Charlottesville, VA 22911
RE: SP-97-46 Virginia Land Trust (Korean Community Church) Floodplain Crossing
Tax Map 32, Parcel 22K, Lot A
Dear Mr. Roell:
The Albemarle County Board of Supervisors, at its meeting on October 15, 1997, approved
the above-noted request to permit crossing of the Flat Branch floodplain. Please note that this approval
is subject to the following conditions:
I. Grading within the flood plain shall occur only in association with relocation of the entrance road
from Route 29, and such grading shall comply with all requirements set forth in the August 1,
1997 memorandum from the Department of Engineering, included herein as Attachment I (copy
attached); and
2. The use, structure or activity for which this permit is issued shall commence within five years
from the date this permit is issued. The term "commenced" shall mean commencement of any
structure necessary for the use of the permit or the issuance of a VDOT entrance permit.
In the event that the use, structure or activity for which this special use permit is issued shall not be
commenced within five (5) years after the issuance of such permit, the same shall be deemed abandoned
and the authority granted thereunder shall thereupon terminate.
Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the
Zoning Department will issue a clearance, you must comply with the conditions in this letter. For
further information, please call Jan Sprinkle at 296-5875.
It
e
Page 2
October 27, 1997
If you should have any questions or comments regarding the above-noted action, please do not hesitate
to contact me.
S incerel y,
,~~
David B.Benish
Chief of Community Development
David B. Benish, Chief of Community Development/jcf
cc: Amelia McCulley
Jack Kelsey
cc: Amelia McCulley
Jo Higgins
-
e
[ATTACHMENT 'I
:~~ ,~~:, ~ .~. ':-: ~ '1/ ::. :
COUNTY OF ALBEMARLE
Department of Engineering & Public Works
MEMORANDUM
~Ub j: 1 lqq7
¡:ì! ,-~ r> ,.~ .~, rt \-.\;~ r '!
. I (.,J :: .: ':....¡ ~.~. l
TO:
FROM:
DATE:
RE:
Susan Thomas, Senior Planner
Glenn E. Brooks, Senior Engineer Gcn
I August 1997
Korean Church (Virginia Land Trust)
The sketch plan and special use permit application received on 18 July 1997 has been reviewed.
This application is for the church use as well as for access road fill in the floodplain of Flat
Branch near its confluence with the North Fork Rivanna River. There is an existing crossing of
Flat Branch as shown on the applicant's sketch plan, with a 48" diameter corrugated metal pipe
culvert in fair condition. The existing access road fill is not wide enough to accommodate a road
under current private or public road standards, nor the commercial travelway standards of the
Zoning Ordinance. Steep wooded river valley slopes surround the proposed site. The sketch
plan indicates that the intent is not to disturb these slopes.
The floodplain level in this area appears to be dictated by the North Fork Rivanna River
downstream, rather than the Flat Branch tributary. Thus, relocating and increasing the amount of
tìll for the access road crossing should not significantly affect flood levels. The water level
downstream of the culvert and access road fill will continue to be dictated by the water level in
the North Fork Rivanna River. Upstream of the culvert, in the worst case, water levels will
increase above downstream levels enough to push the flat Branch flow through the submerged
culvert.
It is recommended a wide enough crossing of the Flat Branch be provided to accommodate any
future development of the property beyond the proposed church property, especially if multiple
exit lanes are anticipated at the entrance.
A left turning lane may be required within the median on Rt. 29. This can be resolved with the
site plan for the church. The University Real Estate Foundation will be installing an entrance at
the median break across Rt. 29 and a traffic signal for their North Fork Research Park.
Additional signal faces and phases will be required for the church.
The Engineering Department recommends approval of the special use permits provided that the
following conditions are met:
1. The entrance and Flat Branch crossing are aligned with the North Fork Research Park
entrance across Rt. 29, with appropriate signal and turn lane improvements to be
incorporated with the improvements provided by the University Real Estate Foundation.
2. The Flat Branch crossing is to be used for the remainder of the property (T.M. J2-22K).
J. The site construction is not to disturb the natural water quality buffer of stream and river
valley wooded slopes.