Loading...
HomeMy WebLinkAboutSP199700005 Action Letter · e Õ:~J-'~ ( COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 Mcintire Road Charlottesville, Virginia 22902-4596 (804) 296-5823 June 27, 1997 Frank Cox The Cox Company 220 East High St Charlottesville, V A 22902 RE: SP-97-5 Wingspread Farm Estates SUB-97-009 Wingspread Farm Estates Preliminary Plat Dear Mr. Cox: The Albemarle County Board of Supervisors, at its meeting on June 18, 1997, approved the above-noted request to allow construction of a bridge in the floodway in conjunction with proposed Wingspread Subdivision. Please note that this approval is subject to the following conditions: 1. Water Resources Manager approval of a Water Quality Impact Assessment and inclusion of mitigation measures for critical sections immediately upstream and downstream of the stream crossing in the Erosion and Sediment Control Plan. 2. Engineering Department approval of the final crossing plans and details. These plans must clearly show the before and after construction 100-year flood elevations and boundaries. 3. Engineering Department approval of structural plans, details, and computations. 4. Engineering Department approval of hydrologic and hydraulic computations for the crossing. These computations must demonstrate compliance with sections 30.3.2.2 and 30.3.3 of the Zoning Ordinance. Flood elevations at the upstream property line must not lllcrease. - tit Page 2 June 27, 1997 5. Engineering Department receipt of proof of compliance with Federal and State agencies regulating activities affecting wetlands and watercourses. The applicant is encouraged to contact the Federal and State agencies in the early stages of the design process. 6. Verification that the access easement which exists on the property, as shown crossing Lots 12 and 13, can be used for emergency access from the subdivision to Route 29. 7. Provision of a gate across the emergency accessway which discourages shortcuts through the adjoining properties, but provides unimpeded emergency access during flooding or other emergency conditions. In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875. If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincerely, David B. Benish Chief of Community Development DB/jcf cc: Amelia McCulley Jack Kelsey