Loading...
HomeMy WebLinkAboutSDP201700010 Review Comments Minor Amendment 2017-09-11Short Review Comments Report for: SDP201700010 SubApplication Type: Scottsville Elementary School Security Addition-Minor Minor Amendment Date Completed:03/24/2017 Reviewer:Sarah Baldwin CDD Planning Review Status:Requested Changes Reviews Comments:Provide Minor Amendment to SDP1979-42 on front cover. Provide overall parking count, parking removed and parking spaces added on front cover. Please label security entrance on sheet C-4. [4.12.19] Dumpster pad must be screened. Division: Date Completed:03/15/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments:Comments per MIA plan dated 2/21/2017: -An approved VSMP plan's required before FSP approval. -Remove E&SC and SWM plan from site plan (sheets C3.0, C3.1, C3.2, C6.0) -Callout MH-1 at connection, and provide a detail. -Sidewalks abutting parking to be 5’ minimum wide with bumper blocks or s/w 6’ minimum (Design manual, Sect. 7). -Include note about the pipe extension and installation. -Sheet C0.0—Source topography says Dec 2017. Provide actual date and existing site conditions (18-32.6.2). -Sheet C1.0—Fix the AC SWM notes that are running off sheet (bottom of plan) to fit in the layout view. -Proposed parking area should not exceed 5% grade in any direction and you are just exceeding the limit (18-4.12). -Sheet C4.0—Show the actual parking spaces for the parking lots, and any existing pavement markings. -Sheet L1.0—The table shows 6 for Red Maple. 5 are called out in the plan, but it appears that 6 are shown, please revise. Division: Date Completed:03/09/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:1. Please add the following note to both the architectural and site plan drawings: “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 2. Please add the following note to the landscape plan: “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” 3. A note on the landscape plan near a maple tree symbol indicates “5” maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. 4. Note that new and replacement signs require a separate permit and review. Division: Date Completed:04/27/2017 Reviewer:Keith Huckstep CDD Inspections Review Status:Requested Changes Reviews Comments:plans dated 2/21/17. Need specifications / drawings of the new 7' and 11' wide concrete ramps to verify ADA compliance. Division: Date Completed:03/14/2017 Robbie GilmerPage:1 of 3 County of Albemarle Printed On:September 28, 2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 1/21/17. no comments or objections. Division: Date Completed:03/13/2017 Reviewer:Josh Kirtley Health Department Review Status:No Objection Reviews Comments:Based on my conversation with a representative, the proposed work at Scottsville Elementary will not increase the number of students/staff nor will it impede on the existing septic field. At this point, I have no further comments. Division: Date Completed:04/28/2017 Reviewer:Sarah Baldwin CDD Planning Review Status:No Objection Reviews Comments:No objection 4-28-17 Division: Date Completed:04/18/2017 Reviewer:Keith Huckstep CDD Inspections Review Status:No Objection Reviews Comments:No object plans dated 4/3/17 Division: Date Completed:04/27/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments:Comments per MIA plan dated 4/3/2017: -An approved VSMP plan's required before FSP approval. All other comments appear to have been adequately addressed. Division: Date Completed:04/26/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:1. Add the following note to the architectural drawings: “Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated.” Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” 3. A note on the landscape plan near a maple tree symbol indicates “5” maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. Division: Date Completed:08/03/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:1. A screen wall has been added west of the addition. Provide updated architectural plans for review. 2. Add the following note to the architectural drawings: “Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated.” 3. Indicate on the site and architectural drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. Division: Page:2 of 3 County of Albemarle Printed On:September 28, 2017 Date Completed:08/15/2017 Reviewer:Michael Dellinger CDD Inspections Review Status:No Objection Reviews Comments:No objections Division: Date Completed:07/31/2017 Reviewer:David James CDD Engineering Review Status:See Recommendations Reviews Comments:Comments per MIA plan dated 7/13/2017: -An approved VSMP plan's required before FSP approval. UPDATE: Per 9-7-17 conversation w/ David James the VSMP was approved. CPP Division: Date Completed:08/16/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments:1. [32.5.2(b)] Information regarding the proposed use. On the plan provide the square footage of the addition to the school building. 2. [32.5.2(l)] Existing and proposed utilities. Depict, label, and dimension the private water line on the plans. 3. [4.12] Parking. Parking calculations on sheet 1 list 7 spaces being removed; however, there appears to only be 1 space being removed via stripping of the space. Revise. 4. [4.12.13] Dumpster Pads. Dumpster pads shall not impede any vehicular circulation aisles. The minimum concrete pad is only required to be 8’ beyond the front of the dumpster. Currently it appears the dumpster pad is extending into the travelway. Division: Date Completed:09/07/2017 Reviewer:Christopher Perez CDD Planning Review Status:No Objection Reviews Comments: Division: Date Completed:09/07/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:No Objection Reviews Comments:No objections, per phone conversation. CPP Division: Date Completed:09/11/2017 Reviewer:Christopher Perez CDD Planning Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:September 28, 2017 Christopher Perez From: Jonathan Showalter <Jonathan.Showalter@timmons.com> Sent: Thursday, September 07, 2017 10:39 AM To: Margaret Maliszewski; Craig Kotarski Cc: Christopher Perez Subject: RE: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Margaret, The 8/7/17 set is the full plan set that was sent out for bid including both VSMP and Site Plan items. This site plan resubmission breaks out all of the Site Plan specific sheets and excludes VSMP sheets. The only changes to the those sheets from the 8/7/2017 bid set was a call out of the mechanical unit on C4.0 showing it is behind the screening wall to address your 8/4 comment#3 and the three changes noted below to address Chris's comment from 8/16. Let me know if you have any other questions. Thank you, Jonathan From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Thursday,September 07, 2017 9:58 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com>;Craig Kotarski<Craig.Kotarski@timmons.com> Cc:Christopher Perez<cperez@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Jonathan, The set of plans I approved for the ARB had a date of 8/7/17. Can you tell me how the set of plans you just sent (revision date 9/6/17) differs from the 8/7/17 set? Margaret From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Thursday,September 07, 2017 9:51 AM To:Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Cc: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment Chris, Sorry for the confusion that was an older version. Thank you for double checking. Please see the attached update version and let us know if you have any questions or comments. Thank you, Jonathan From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Thursday,September 07, 2017 9:17 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com>; Craig Kotarski<Craig.Kotarski@timmons.com> Cc: Margaret Maliszewski<MMaliszewski@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment 1 • • Jonathan, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment Are you sure you sent the correct revised site plan?This version has a revision date of 7-13-17 and I am noticing my comments are not addressed. Christopher P. Perez I Senior Planner Department of Community Development 'County of Albemarle,Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext.3443 From: Christopher Perez Sent:Thursday,September 07, 2017 7:08 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc: 'Jonathan Showalter'<Jonathan.Showalter@timmons.com>; Craig Kotarski<craig.kotarski@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Margaret, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment The applicant has revised the above ref site plan and has provided the attached PDF of the plan.The only remaining reviewers with required changes are you and I. Will the PDF be sufficient for you to conduct your last review to assure your comments are addressed?If so, let me know. If not, I will request two hard copies for review. thanks Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,September 06,2017 3:24 PM To:Christopher Perez<cperez@albemarle.org>; Craig Kotarski<craig.kotarski@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, Thank you for your comments. We have updated the plans per your comments and responses are included under each comment below in blue. We have heard from Steve Mundt with Gimm and Parker that they have addressed all ARB comments and received a certificate of appropriateness from Margaret Maliszewski. We have noted the one added mechanical unit on sheet C4.0 indicating that it will be screened by the screening wall which will be designed to match the existing building per the architectural plans. Please let us know if you have any question or further comments on these plans or if you would like hard copies for this review. If these PDFs are sufficient to confirm remaining comments have been addressed please let me know how many copies we should submit for signature. Thank you for your help in wrapping up this project, Jonathan 2 Christopher Perez From: Christopher Perez Sent: Wednesday, August 16, 2017 3:51 PM To: 'Jonathan Showalter; Craig Kotarski Subject: RE: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Johnathan, RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Sorry for the delay. I got pulled into a bunch of directions this morning. Below are my and the building officials' comments. I believe you now have all reviewer comments. Planning Comments—Christopher Perez a�( , .Gsr...,t/ 1. 132.5.2(b)] Information regarding the proposed use. On the plan provide the square footage of the addition to the school building. 2. [32.5.2(1)] Existing and proposed utilities.Depict, label,,a d dimension the private water line on the plans. 3. [4.12] Parking. Parking calculations on sheet 1 lis '7 spaces being removed; however, there appears to only be 1 space being removed via stripping of the space. Revise. 4. [4.12.13] Dumpster Pads. Dumpster pads all not impede any vehicular circulation aisles. The minimum concrete pad is only required to be 8' beyond the front the dumpster. Currently it appears the dumpster pad is extending into the travelway. Revise. Building Official—Mike Dellinger 1. No objections. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday, August 15, 2017 1:39 PM To:Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, Thank you for the update. We received approval of the VSMP plan per the attached email and we plan to send copies for signature as soon as we can address any remaining comments on the site plan. Per ARB comment 3 below we will confirm that we show the location of any new mechanical equipment and screening on our plans. Have you received or do you think you will have any additional comments? Thank you for your help finalizing this plan, Jonathan From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday,August 04, 2017 7:52 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com>; Craig Kotarski <Craig.Kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Jonathan, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment ARB has the following comments: 1. A screen wall has been added west of the addition. Provide updated architectural plans for review. 2. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." 3. Indicate on the site and architectural drawings the location of new equipment and the method by which visibility will be eliminated.Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. Engineering has the following comments: G>��lb -An approved VSMP plan's required before FSP approva q„D I am still pending comments from the buil g official, and I still need to review it. I hope to have my comments to you by Monday the 1 4thp a�� Christopher P.Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday,August 01, 2017 10:55 AM To: Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, We received comments on the VSMP plan last week and wanted to check on the site plan resubmission to see if you think you will have any comments. There were no comments on the previous submission but I know the plan has changed a bit with the removal of the bus loop work and the addition getting smaller. Bid drawings are due the end of the week so if you do have any comments you can share before that it would be appreciated. Thank you, Jonathan Jonathan Showalter, PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 ionathan.showalterta�timmons.com Your Vision Achieved Through Ours 2 �r► sqlre To send me files greater than 20MB click here. From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,July 12, 2017 11:00 AM To: Craig Kotarski<Craig.Kotarski@timmons.com> Cc: David Benish <DBENISH@albemarle.org>;Johnathan Newberry<inewberry@albemarle.org>;Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Craig, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment The above ref plan has been reassigned to me. Please begin forwarding all comments or questions to me with regard to this project. While I am getting up to speed on this, did you ever submit the LOR for the trailer?If so, did it get approved? When do you anticipate a resubmitting?Whenever you resubmit please assure you submit a minimum of 4 review copies. Thanks Christopher P. Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To: Christopher Perez<cperez@albemarle.org> Subject: FW: SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,June 21, 2017 10:12 AM To: Sarah Baldwin <sbaldwin@albemarle.org> Cc: Craig Kotarski<craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. 3 vow My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From: Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3. A note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc: Francis MacCall <FMACCALL@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah,thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. 4 Christopher Perez From: Christopher Perez Sent: Friday, August 04, 2017 7:52 AM To: 'Jonathan Showalter; Craig Kotarski Cc: Keith Huckstep Subject: RE: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Jonathan, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment ARB has the following comments: 1. A screen wall has been added west of the addition. Provide updated architectural plans for review. 2. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." 3. Indicate on the site and architectural drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. Engineering has the following comments: 44,02_017 —19 -An approved VSMP plan's required before FSP approval. ` a f firot4d O . �'3-aot7 ✓' I am still pending comments from the building official, and I still need to review it. I hope to have my comments to you by Monday the 14t1i. Christopher P.Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5832 ext. 3443 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday, August 01, 2017 10:55 AM To: Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, We received comments on the VSMP plan last week and wanted to check on the site plan resubmission to see if you think you will have any comments. There were no comments on the previous submission but I know the plan has changed a bit with the removal of the bus loop work and the addition getting smaller. Bid drawings are due the end of the week so if you do have any comments you can share before that it would be appreciated. Thank you, Jonathan Jonathan Showalter, PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 1 %wig '"w • „ jonathan.showalter(atimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,July 12, 2017 11:00 AM To: Craig Kotarski<Craig.Kotarski@timmons.com> Cc: David Benish <DBENISH@albemarle.org>;Johnathan Newberry<inewberry@albemarle.org>;Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Craig, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment The above ref plan has been reassigned to me. Please begin forwarding all comments or questions to me with regard to this project. While I am getting up to speed on this, did you ever submit the LOR for the trailer?If so, did it get approved? When do you anticipate a resubmitting?Whenever you resubmit please assure you submit a minimum of 4 review copies. Thanks Christopher P. Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To: Christopher Perez<cperez@albemarle.org> Subject: FW: SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarie.org 434.296.5832 ext. 3023 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Wednesday,June 21, 2017 10:12 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc:Craig Kotarski<craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. 2 My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1.Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3. A note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin <sbaldwin@albemarle.org> Cc: Francis MacCall<FMACCALL@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah, thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. 3 Christopher Perez From: Christopher Perez Sent: Tuesday, August 15, 2017 3:21 PM To: 'Jonathan Showalter; Craig Kotarski Subject: RE: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Jonathan, I plan to review this plan tomorrow before noon and provide my comments to you then. I was away on vacation last week and Monday was my 15t day back. From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday,August 15, 2017 1:39 PM To: Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, Thank you for the update. We received approval of the VSMP plan per the attached email and we plan to send copies for signature as soon as we can address any remaining comments on the site plan. Per ARB comment 3 below we will confirm that we show the location of any new mechanical equipment and screening on our plans. Have you received or do you think you will have any additional comments? Thank you for your help finalizing this plan, Jonathan From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday, August 04, 2017 7:52 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com>; Craig Kotarski<Craig.Kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Jonathan, RE: SDP2017-10 Scottsville ES Sec -Minor Site Plan Amendment ARB has the following comments: 1. A screen wall has been added west of the addition. Provide updated architectural plans for review. 2. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." 3. Indicate on the site and architectural drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. Engineering has the following comments: 1 ��rr -An approved VSMP plan's requireabefore FSP approval. . I am still pending comments from the building official, and I still need to review it. I hope to have my comments to you by Monday the 14"'. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday, August 01, 2017 10:55 AM To: Christopher Perez<cperez@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, We received comments on the VSMP plan last week and wanted to check on the site plan resubmission to see if you think you will have any comments. There were no comments on the previous submission but I know the plan has changed a bit with the removal of the bus loop work and the addition getting smaller. Bid drawings are due the end of the week so if you do have any comments you can share before that it would be appreciated. Thank you, Jonathan Jonathan Showalter, PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 jonathan.showalter(c�timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,July 12, 2017 11:00 AM To: Craig Kotarski<Craig.Kotarski@timmons.com> Cc: David Benish <DBENISH@albemarle.org>;Johnathan Newberry<jnewberry@albemarle.org>;Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Craig, RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment The above ref plan has been reassigned to me. Please begin forwarding all comments or questions to me with regard to this project. While I am getting up to speed on this, did you ever submit the LOR for the trailer? If so, did it get approved? When do you anticipate a resubmitting?Whenever you resubmit please assure you submit a minimum of 4 review copies. Thanks 2 mmw Christopher P. Perez Senior Planner ""1 Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To: Christopher Perez<cperez@albemarle.org> Subject: FW: SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Wednesday,June 21, 2017 10:12 AM To: Sarah Baldwin <sbaldwin@albemarle.org> Cc: Craig Kotarski<craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments �.. Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 3 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3.A note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin <sbaldwin@aibemarle.org> Cc: Francis MacCall <FMACCALL@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah,thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. 411 4 II .4/4 L A 6 G I !/ 4 . - ''er '' Christopher Perez From: Christopher Perez Sent: Tuesday,August 15, 2017 3:24 PM To: Michael Dellinger Subject: FW: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Attachments: Fwd: Planning Application Review for WP0201700019 Scottsville Elementary School Security Addition -VSMP. Mike, J Oh(ef.1-it•••S �7 .J RE: SDP2017-10 Scottsville ES Sec- Minor Site ' an Amendment V IS-17 Do you have any comments on the abo - ref plan? If you have yet to review it, when do you anticipate looking at it? Thanks Christopher P.Perez Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road J Charlottesville,VA 22902 434.296.5832 ext. 3443 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday,August 15, 2017 1:39 PM To:Christopher Perez<cperez@albemarle.org>; Craig Kotarski<craig.kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Chris, Thank you for the update. We received approval of the VSMP plan per the attached email and we plan to send copies for signature as soon as we can address any remaining comments on the site plan. Per ARB comment 3 below we will confirm that we show the location of any new mechanical equipment and screening on our plans. Have you received or do you think you will have any additional comments? Thank you for your help finalizing this plan, Jonathan From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday,August 04, 2017 7:52 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com>; Craig Kotarski<Craig.Kotarski@timmons.com> Cc: Keith Huckstep<KHUCKSTE@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Jonathan, 1 400 RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment ARB has the following comments: 1. A screen wall has been added west of the addition.Provide updated architectural plans for review. 2. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." 3. Indicate on the site and architectural drawings the location of new equipment and the method by which visibility will be eliminated.Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. Engineering has the following comments: -An approved VSMP.plan's required before FSP approval. I am still pending comments from the building official, and I still need to review it. I hope to have my comments to you by Monday the 10 Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Tuesday,August 01,2017 10:55 AM To:Christopher Perez<cperez@albemarle.org>; Craig Kotarski<craig.kotarski@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment Chris, We received comments on the VSMP plan last week and wanted to check on the site plan resubmission to see if you think you will have any comments. There were no comments on the previous submission but I know the plan has changed a bit with the removal of the bus loop work and the addition getting smaller. Bid drawings are due the end of the week so if you do have any comments you can share before that it would be appreciated. Thank you, Jonathan Jonathan Showalter, PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 ionathan.showalter c(Dtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Wednesday,July 12, 2017 11:00 AM To:Craig Kotarski<Craig.Kotarski@timmons.com> Cc: David Benish<DBENISH@albemarle.org>;Johnathan Newberry<inewberrv@albemarle.org>;Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment 2 Nee *Ad Craig, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment The above ref plan has been reassigned to me. Please begin forwarding all comments or questions to me with regard to this project. While I am getting up to speed on this,did you ever submit the LOR for the trailer?If so,did it get approved? When do you anticipate a resubmitting?Whenever you resubmit please assure you submit a minimum of 4 review copies. Thanks Christopher P.Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To:Christopher Perez<cperez@albemarle.org> Subject: FW:SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,June 21, 2017 10:12 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc:Craig Kotarski<craig.kotarski@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments 3 4110 *11110 Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3.A note on the landscape plan near a maple tree symbol indicates"5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc: Francis MacCall<FMACCALL@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Sarah,thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. 4 NMI Christopher Perez From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Wednesday,July 12, 2017 11:04 AM To: Christopher Perez Cc: David Benish;Johnathan Newberry;Jonathan Showalter Subject: RE: SDP2017-10 Scottsville ES Sec - Minor Site Plan Amendment Thanks for the heads up Chris. County Schools was submitting the LOR directly to you all. We were not making that submission. Our submission, for the front addition, is changing from what was submitted, as the scope has been cut to some extent. However, we think it makes it easier on the review side, as it reduced the area of impact. Best, Craig Craig Kotarski, P.E., LEED AP Sr. Project Manager TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1688 I Fax: 434.295.8317 Mobile: 434.964.7148 I craiq.kotarski(a�timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Wednesday, July 12, 2017 11:00 AM To: Craig Kotarski Cc: David Benish; Johnathan Newberry; Jonathan Showalter Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Site Plan Amendment Craig, RE: SDP2017-10 Scottsville ES Sec-Minor Site Plan Amendment The above ref plan has been reassigned to me. Please begin forwarding all comments or questions to me with regard to this project. While I am getting up to speed on this, did you ever submit the LOR for the trailer? If so, did it get approved? When do you anticipate a resubmitting?Whenever you resubmit please assure you submit a minimum of 4 review copies. Thanks Christopher P.Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 1 14I111► ti 401 McIntire Road I Charlottesville,VA 22902 IN 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To: Christopher Perez<cperez@albemarle.org> Subject: FW: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield,Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter [mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,June 21, 2017 10:12 AM To: Sarah Baldwin <sbaldwin@albemarle.org> Cc:Craig Kotarski<craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From: Sarah Baldwin [mailto:sbaldwin(Walbemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office,so please let me know if you have questions. 1.Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; 2 §..0 . 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Leah Brumfield Sent:Tuesday,July 11, 2017 5:12 PM To:Christopher Perez<cperez@albemarle.org> Subject: FW: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,June 21,2017 10:12 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc:Craig Kotarski<craig.kotarski@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1. Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; 2 1 • the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3.A note on the landscape plan near a maple tree symbol indicates"5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin <sbaldwin@albemarle.org> Cc: Francis MacCall<FMACCALL@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah,thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. 3 sive Christopher Perez From: Leah Brumfield Sent: Tuesday,July 11, 2017 5:12 PM To: Christopher Perez Subject: FW: SDP2017-10 Scottsville ES Sec - Minor Reviews Comments Chris, This was the most recent correspondence regarding Scottsville. Leah Brumfield, Zoning Senior Planner County of Albemarle Department of Community Development Ibrumfield@albemarle.org 434.296.5832 ext. 3023 From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent:Wednesday,June 21, 2017 10:12 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc: Craig Kotarski<craig.kotarski@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Thank you Sarah, The Architect is corresponding with Margaret Maliszewski to ensure the ARB comments are addressed on the next resubmission of the site plan once some details are worked out with the school system. My understanding is that the LOR for the trailers has already been filed by the school system directly to move along separate from the site plan for the security addition. Let us know if you have any questions. Thank you, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,June 20, 2017 11:51 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Jonathan: I'm following up on this SDP. I found the following ARB comments which are below. Also, I understand that you will be submitting an LOR for mobile trailers? I'm back in the office, so please let me know if you have questions. 1.Add the following note to the architectural drawings: "Visibility of all new mechanical equipment from the Entrance Corridor shall be eliminated." Indicate on the drawings the location of new equipment and the method by which visibility will be eliminated. Note that the preference is for the building itself to accomplish the screening. If a rooftop screen is proposed, clarify why this is the only viable option and show that the screen is fully coordinated with the architecture. 2. Note that the landscape plan was not included in the 4/3/2017 revision. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; 1 410 1111111) the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 3.A note on the landscape plan near a maple tree symbol indicates"5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. From:Jonathan Showalter[mailto:Jonathan.Showalter@timmons.com] Sent: Friday, May 19, 2017 9:17 AM To:Sarah Baldwin<sbaldwin@albemarle.org> Cc: Francis MacCall<FMACCALL@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah,thank you for checking into that! We will finish addressing the VSMP comments and resubmit of that part of the plan. From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent: Friday, May 19, 2017 7:21 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: Francis MacCall<FMACCALL@albemarle.org> Subject: Re:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments I reviewed the plans and if ARB didn't have comments you can submit 4 copies for signature. Sent from my iPhone On May 18, 2017, at 3:54 PM,Jonathan Showalter<Jonathan.Showalter@timmons.com>wrote: Hey Sarah, I went on County View but I do not see any ARB comments posted. I assume no objection mean they do not have any more comments? Do you have any updates on when your comments will be ready? I am hoping we can address any comments before the draft set that needs to go out Monday. Thank you for looking into this, Jonathan <image001.jpg> From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday, May 16, 2017 10:39 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: Re:SDP2017-10 Scottsville ES Sec- Minor Reviews Comments You can go online to receive ARB comments-I'm checking on Fire/Rescue. I'll try to find the comments. Sent from my iPhone On May 16,2017, at 10:03 AM,Jonathan Showalter<Jonathan.Showalter@timmons.com>wrote: Hey Sarah, 2 Noe I don't believe we received comment on the resubmission from April 4th so that is 42 days since submission. We did receive VSMP comments from Geoff Elsie and David James. Please feel free to give me a call to discuss if I am missing something. Thank you, Jonathan 434-327-1681 From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday, May 16, 2017 9:43 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: Re: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments We normally give 20 days for reviews. I've only seen comments from ARB and Fire/Rescue. Sent from my iPhone On May 15, 2017, at 4:44 PM,Jonathan Showalter <Jonathan.Showalter@timmons.com>wrote: Sarah, I wanted to touch base on the Scottsville Site Plan second review. Do you have a timeline on when we will receive comments or approval? Thank you for the help, Jonathan From:Sarah Baldwin [mailto:sbaldwin@albemarle.org] Sent:Tuesday,April 04, 2017 8:31 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Subject: Re: SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Six should be sufficient. Sent from my iPhone On Apr 3, 2017, at 4:14 PM,Jonathan Showalter <Jonathan.Showalter@timmons.com>wrote: Sarah, How many copies of the update site plan should we include with the resubmittal? Thank you, Jonathan Jonathan Showalter, EIT Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 3 jonathan.showalter@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: "Sarah Baldwin" <sbaldwin@albemarle.org> To: "Steven Hoffmann" <shoffmann@albemarle.org>, "Craig Kotarski" <Craig.Kotarski@timmons.com> Cc: "Steve Mundt" <smundt@gparch.com> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Reviews Comments Please see attached comments for SDP2017-10. From:Steven Hoffmann Sent:Thursday, March 23, 2017 6:15 PM To:Sarah Baldwin <sbaldwin@albemarle.org> Cc:Steve Mundt <smundt@gparch.com>; Craig Kotarski <craig.kotarski@timmons.com>; Patricia Saternye <psaternye@albemarle.org> Subject: RE: SDP2017-10 Scottsville ES Sec- Minor Reviews Comments Sarah, Do you have any questions or concerns on the review of SDP2017-10 Scottsville ES Sec— Minor? Regards, Steve Hoffmann Project Management Division County of Albemarle/ Facilities & Environmental Services 401 McIntire Road Charlottesville,VA 22902-4596 PH - 434-872-4501 ext: 3128 Fax-434-972-4091 Cell -434-995-9479 shoffmann@albemarle.org 4 Please consider the environment before printing this e-mail. From: Patricia Saternye Sent: Friday, March 17, 2017 4:32 PM To:Craig Kotarski <craig.kotarski@timmons.com>;Steven Hoffmann <shoffmann@albemarle.org>; Steve Mundt<smundt@gparch.com> Cc:Sarah Baldwin <sbaldwin@albemarle.org> Subject: RE:SDP2017-10 Scottsville ES Sec-Minor Reviews Comments I had been unaware that you had a set bid date and it was so soon. With your bid date being so near, and because I have other project submissions with mandatory deadlines that cannot be delayed, we have asked Sara Baldwin to take over the review of SDP2017-10 Scottsville ES Sec—Minor. It is our hope that she will be able to get your 1st round of comments to you a little sooner. I will copy her on this email so that she will have all of your contact information. Thanks, Paty Saternye Senior Planner Community Development Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternve@albemarle.org 5 V www.albemarle.org From:Craig Kotarski [mailto:Craig.Kotarski@timmons.com] Sent:Thursday, March 16,2017 3:21 PM To: Patricia Saternye <psaternye@albemarle.org>; Steven Hoffmann <shoffmann@albemarle.org>; Steve Mundt<smundt@gparch.com> Subject: RE:Scottsville ES Sec- Reviews Comments Yes, I tried Chrome as well...usually I can get on, so not sure what is up. Craig Kotarski, P.E., LEED AP Sr. Project Manager TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 Office: 434.327.1688 I Fax: 434.295.8317 Mobile: 434.964.7148 craiq.kotarskia.timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Patricia Saternye [mailto:osaternye@@albema rle.orq] Sent: Thursday, March 16, 2017 3:18 PM To: Craig Kotarski; Steven Hoffmann; Steve Mundt Subject: RE: Scottsville ES Sec - Reviews Comments Craig, Yes, I will be sending more comments when they are available. I hope that will be sometime next week. Have you tried a different browser? I used to use Internet Explorer and had to start using something else because it was no longer able to view County View. Chrome appears to work for me these days. 6 V Paty Saternye Senior Planner Community Development X Albemarle County 401 McIntire Road Charlottesville,VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.org From: Craig Kotarski [mailto:Craig.Kotarski@timmons.com] Sent:Thursday, March 16, 2017 3:12 PM To:Steven Hoffmann <shoffmann@albemarle.org>; Steve Mundt<smundt@gparch.com> Cc: Patricia Saternye <psaternye@albemarle.org> Subject: RE:Scottsville ES Sec- Reviews Comments County View does not seem to be working for me...I've tried coming at it several different ways (your link, County website, different browser, etc.), but no luck. We did receive the VSMP comments, which were straight forward. David James and I have already worked through one of them, which was the only one requiring questions. Paty, will you be sending the other comments when they are ready? Thanks so much for everyones assistance,especially with the quick turnaround needed on this one to get it out for bid. Best, Craig 7 410 '1114 Craig Kotarski, P.E., LEED AP Sr. Project Manager TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 Office: 434.327.1688 I Fax: 434.295.8317 Mobile: 434.964.7148 craiq.kotarski(a�timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Steven Hoffmann [mailto:shoffmann@albemarle.orq] Sent: Thursday, March 16, 2017 2:55 PM To: Steve Mundt Cc: Craig Kotarski; Patricia Saternye Subject: Scottsville ES Sec - Reviews Comments Steve M, Please note the following link from Community Development to view the Site Plan Application Status for this project. http://countyviewweb.albemarle.org/ Web view planning Web view planni ng PermitPagel.aspx Permit#SDP201700010 Even though some of the review items are still pending there are items available to you for revision. Please verify that you look at the "Short Review Comments" box at the bottom even if the Status says"No Objections". Let me know if you have questions—if it helps expedite things,feel free to contact Community Development with questions directly as they are more than happy to discuss these items with you,just be sure to keep me in the loop. Please let me know if you have any questions or concerns. 8 Thanks, Steve Hoffmann Project Management Division County of Albemarle/ Facilities& Environmental Services 401 McIntire Road Charlottesville,VA 22902-4596 PH - 434-872-4501 ext: 3128 Fax-434-972-4091 Cell-434-995-9479 shoffmann@albemarle.org Please consider the environment before printing this e-mail. 9 *400 • IP 608 Preston Avenue Suite 200 P 434.295.5624 TI M M O N S GROUP Charlottesville,VA 22903 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. www.timmons.com April 3, 2017 Sarah Baldwin Albemarle County Community Dev. 401 McIntire Rd Charlottesville, VA 22903 RE: Scottsville ES Security— Minor Site Plan Review Comment Response Letter (SDP201700010) Dear Ms. Baldwin: We have reviewed all of your comments from March 23, 2017 and made the necessary revisions. Please find our responses to the comments below in bold lettering. CDD Engineering- David James: I. An approved VSMP plan's required before FSP approval. Acknowledged. 2. Remove E&SC and SWM plan from site plan (sheets C3.0, C3.I, C3.2, C6.0) E&SC and SWM plan sheets have been removed from the set. 3. Callout MH-I at connection, and provide a detail. A cleanout has been added at the connection between the existing 12"steel pipe and proposed HDPE. See sheet C5.0. 4. Sidewalks abutting parking to be 5' minimum wide with bumper blocks or s/w 6' minimum (Design manual Sect. 7). Bumper blocks have been added between parking spaces adjacent to sidewalk. See sheet C4.0. 5. Include note about the pipe extension and installation. Note has been added. See sheet C5.0. 6. Sheet C0.0—Source topography says Dec 2017. Provide actual date and existing site conditions. (18-32.6.2). Date has been updated on cover Sheet C0.0. Survey data was obtained on December 13, 2016. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 7. Sheet C I.0— Fix the AC SWM notes that are running off sheet (bottom of plan)to fit in the layout view. Sheet C I.0 has been revised accordingly. 8. Proposed parking area should not exceed 5%grade in any direction and you are just exceeding the limit (18-4.12). Parking slop is a function of the slope of the existing road. Much of this area is already along the road is already being used as existing gravel parking at the same slope as the proposed condition. Regrading of the road is beyond the scope of this project. 9. Sheet C4.0 —Show the actual parking spaces for the parking lots, and any existing pavement markings. Sheet C4.0 has been revised to show all existing parking spaces and pavement markings. 10.Sheet L 1.0—The table shows 6 for Red Maple. 5 are called out in the plan, but it appears that 6 are shown, please revise. Label has been revised accordingly on Sheet L I.0. CDD Inspections—Keith Huckstep: I. Plans dated 02/21/2017 need specifications/drawings of the new 7' and I I'wide concrete ramps to verify ADA compliance. Ramps layout and grading are shown on sheets C4.0 & C5.0. The surface will be in accordance with the sidewalk section and details located on sheet C1.0. Handrail is detailed on architectural sheet A-9.1 submitted under a separate cover. CDD Planning—Sarah Baldwin: . Provide minor Amendment to SDP 1979-42 on front cover. Sheet C0.0 has been revised accordingly. 2. Provide overall parking count, parking removed and parking spaces added on front cover. Overall parking count, parking removed and parking spaces added has been updated on Sheet C0.0 under"Site Data". 3. Please label security entrance on Sheet C-4. Security Entrance has been labeled on Sheet C4.0. 4. [4.12.19] Dumpster pad must be screened. Dumpster pad is shown to be screened with a wooded fence. See Sheet C4.0 for detail. 'fir11111011' CDD ARB—Margaret Maliszewski: . Please add the following note to both the architectural and site plan drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated". See note #23 under"General Notes"on Sheet C I.0 for revision. 2. Please add the following note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant". See last bullet under"Inspections/Guarantee"on Sheet L I.0 for note. 3. A note on the landscape plan near a maple tree symbol indicates "5" maples; however, 6 are listed in the schedule and shown on the plan. Please correct/coordinate. Label has been revised accordingly. 4. Note that new and replacement signs require a separate permit and review. Acknowledged. We have included 6 copies of the plans for your review. If you have any questions or comments, please feel free to give me a call at 434.964.7148. Sincerely, Jonathan Showalter Project Engineer CC: Craig Kotarski, PE COUNTY OF ALBEMARLE Department Community Development Planning Services Division 74f 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596 Phone: (434)296-5823 • Fax: (434)972-4035 Transmittal From: Sarah Baldwin Date: 04/12/17 To: OKeith Huckstep - Inspections 0 ODavid James - Engineering 0 OMargaret Maliszewski -ARB 0 0 0 0 0 J We are sending you the following items: ® Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ® Plans ❑ Plats ❑ Specifications ❑ Other # of Date Description Copies 1 4/3/17 response letter 1 It revised plan These are transmitted as checked below: ® For review and comments ❑ For approval ❑ Other Remarks: Please review as soon as you can. Comments are due in City View or email by: 4/21/17 Signature: Sarah Baldwin �t9 -1-Lo 1. 2b COUNTY OF ALBEMARLE `r' °F Department Community Development $'No_+., Planning Services Division _ +N 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596 Phone: (434)296-5823 • Fax: (434)972-4035 Transmittal From: Paty Saternye Date: 02/23/17 To: -Frank Pohl-Eng - -Margaret Maliszewski -ARB -) -*Keith Huckstep- Inspections .3 -*Robbie Gilmer-Fire and Rescue -* JOB#/FILE NAME:SDP-2017-10 Scottsville Elementary School Security Addition- Minor We are sending you the following items: ® Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ® Plans ❑ Plats ❑ Specifications ❑ Other # of Date Description Copies 1 2/21/17 Scottsville Elementary School Security Addition- Minor Site Plan Amendment These are transmitted as checked below: ® For review and comments ® For approval ❑ Other Remarks: Comments are due in City View or email by: 3/14/17 Signature: Paty Saternye q(JY rr)' 115 01: WorPrIblvitIZ-- -ilk it (ji_C i3D}R \a ' ir +1)2.. hit Sklq2 ��