Loading...
HomeMy WebLinkAboutSP199600002 Action Letter ,\.' l/\ . . , COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 Mcintire Road Charlottesville, Virginia 22902-4596 (804) 296-5823 May 20, 1996 Brian P. Smith, PE Civil Engineering, Inc 801 East High St Charlottesville, VA 22902 RE: SP-96-02 Gary Edgecomb & Edgecomb Auto Sales Tax Map 77, Parcel 8A Dear Mr. Edgecomb: The Albemarle County Board of Supervisors, at its meeting on May 15, 1996, approved the above-noted request to amend a previously approved special use permit to allow expansion of parking and display area on 1.72 acres. Please note that this approval is subject to the following conditions: 1. The additional building should match the existing building with no substantial change proposed in design and material. 2. The lighting proposed on the site shall be shielded and directed down onto the site. 3. Additional trees should be added to the site in the area between the parking and Route 742. The trees should be 3 Yz" caliper spaced 35' on center. 4. Buffer shrubs, 24" in height, should be specified around the perimeter of the parking area between the parking and Route 742. 5. One tree (2 'i2" caliper) for every ten parking spaces will be required for the interior parking spaces. e tit , Page 2 May 20, 1996 6. A Certificate of Appropriateness shall be required prior to approval of the site plan, and should include: a) b) c) Samples of the materials proposed, including colors. Photometric Plan. Dumpster location and any mechanical equipment location. These should be screened with a material compatible with the building material used. Elevations of the building. d) In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875. If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincerely, .. , v.w VWC/jcf cc: Amelia McCulley Jo Higgins Gary Edgecomb