HomeMy WebLinkAboutWPO201400102 Review Comments WPO VSMP 2017-06-02Short Review Comments Report for:
WPO201400102
SubApplication Type:
Stonefield Block G - VSMP
Stormwater Management/BMP Plan
Erosion and Sediment Control Plan
Stream Buffer Mitigation Plan
Date Completed:12/12/2014
Reviewer:Michelle Roberge CDD Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:12/29/2014
Reviewer:Michelle Roberge CDD Engineering
Review Status:Pending
Reviews Comments:This submittal was just a PPP. I will review with the application on submitted on 12/29/14.
Division:
Date Completed:01/14/2015
Reviewer:Michelle Roberge CDD Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:02/25/2015
Reviewer:Michelle Roberge CDD Engineering
Review Status:Approved
Reviews Comments:The applicant submitted a SWPP package. The SWPP and PPP for Block F&G (WPO2013-69) and
Block G (WPO2014-102) are the same. See file WPO2014-102 for SWPP booklet. The VSMP permit
is for 26.30 acres.
Division:
Date Completed:03/23/2015
Reviewer:Michelle Roberge CDD Engineering
Review Status:No Objection
Reviews Comments:
Division:
Date Completed:04/27/2015
Reviewer:Ana Kilmer CDD Central Intake
Review Status:Approved
Reviews Comments:4/17/2015 - swa submitted. Incorrect recordatiion fee.
4/22/2015- correct recordation fee was submitted.
4/22/2015 - swa forwarded to CAO for approval
4/22/2015 - swa approved by CAO
4/22/2015 - swa forwarded to county executive for signature
4/23/2015 - swa signed by county executive
4/27/2015 - swa recorded in deed book 4611, page 386
Division:
Date Completed:06/02/2017
Reviewer:Bobby Jocz CDD Engineering
Review Status:Approved
Reviews Comments:
Division:
Date Completed:06/02/2017
Reviewer:Bobby Jocz CDD Engineering
Review Status:Approved
Division:
Page:1 of 2 County of Albemarle Printed On:October 02, 2017
Review Status:Approved
Reviews Comments:
Page:2 of 2 County of Albemarle Printed On:October 02, 2017
�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewers:
VSMP Permit plan review
Stonefield- Block G
WP0201400102
WW Associates, Inc
Albemarle Place EAAP, LLC
13 Feb 2015
25 Feb 2015
Michelle Roberge
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP
authority to act on any VSMP permit by issuing a project approval or denial. This project is
approved. See the process for the bonding procedure below.
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond
estimate request form and fee to the Department of Community Development. One of the plan reviewers
will prepare estimates and check parcel and easement information based on the approved plans. The
County's Management Analyst will prepare bond agreement forms, which will need to be completed by
the owner and submitted along with cash, certificates or sureties for the amounts specified. The
agreements will need to be approved and signed by the County Attorney and County Engineer. This may
take 2 -4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted along with court
recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a
DEQ database for state application processing. DEQ will review the application information based on
local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction
conference. Applicants will need to complete the request for a pre - construction conference form, and pay
the remainder of the application fee. The form identifies the contractor and responsible land disturber, and
the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hqp://www.albemarle.org/deptforms.asp?department--cdena3Wo
�.►� •,./
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
February 6,2015
Michelle Roberge, P.E.
County of Albemarle 7?00:e,
Department of Community Development
401 McIntire Road, Room 227 !
, 44 ?eon
Charlottesville,VA 22902-4596
Re: WPO201400102—Stonefield Block G—VSMP Plan
WWA Project No. 213118.01
Dear Ms. Roberge:
Enclosed please find four (4) copies of the revised Final Site Plan for the above-
referenced project. We offer the following responses to your comments dated January
14,2015 with regard to the Minor Amendment application:
A. Stormwater Pollution Prevention Plan(SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A
SWPPP must contain(1) a PPP, (2) an ESCP, (3) a SWMP, and(4) any TMDL measures
necessary.
1) [Comment] Include the registration statement in the SWPP booklet.
For future submissions, please use the Albemarle County SWPP template. It
can be found in the following link:
http://www.albemarle.org/deptforms.asp?department=cdengwpo
[Revision 1] Comment addressed.Please note the SWPPP book onsite
should include the latest coverage letter,approved E&S,SWM and
11"x17" pollution prevention Ilan.
COMMONWEALTH of VIRGINIA
DEPARTMENT OF FNVIRONMF.ATAI,QUALITY
Sbare(nddc s.629 Eia Mail Sncet Rtcamand.Virginia 232t9
Map maga WA, Madaw address P 0.Boz 1145,Ricbeaad,Virgieia 21218 uwd IL l a,k
'wary<MAW Remoras we.deqnircoor
October 15,2014 i '
502
Many CWCen
2495 ead Ivy Rd
Charlottes.w VA 22906
RE. Coverage under the 2014'WOES Cansnurdion General Pen%(VAR'01
Genteel Pero*No VAR 100061
Mesmer*Race
Pewees-Carreneect iefteadenllal
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434)978-1444
Charlottesville•Lynchburg
*two'
B. Pollution Prevention Plan(PPP)
The PPP content requirements can be found in County Code section 17-404.
1) [Comment] Include an 11"x 17" Pollution Prevention Plan map showing
concrete washout, porta johns, fueling stations, and trash containers. This will
be marked up by the contractor as construction of site progresses.
[Revision 1] Comment addressed.
C. Stormwater Management Plan(SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or
disapprove a SWMP. This plan is disapproved, and the reasons are provided in the
comments below. The stormwater management plan content requirements can be found in
County Code section 17-403.
1) [Comment] The title on the plans should state"VSMP".
[Revision 1] Comment addressed.
2) [Comment] The LOD area noted on sheet C-20 is 4.6 acres. Please provide a
note on the title sheet to clarify that this area is covered under an existing
general permit and state the registration number.
[Revision 1] Comment addressed.
3) [Comment] I compared sheet C-19 of Stonefield Block G to the approved
sheet 29 of Stonefield Block F and G. There are stormsewer pipes on Block G
that appear to be existing,but do not match what was proposed on the previous
block F&G plans. The demo sheet clarifies some revisions to the pipe layout.
Please clarify other pipes so it is clear what is already installed, what are
revisions to the previous approved plan under Stonefield Block F & G, and
what are new proposed pipes under this plan. Also, include new profiles for
stormsewers if they changed from the previously approved WPO plans.
✓[Revision 1] Comment addressed.The applicant submitted a supplemental
construction exhibit for clarification.This plan shows the existing pipes
prior to the construction of stormsewer pipes proposed with this
application.
4) [Comment] On sheet C-14, under Stormwater Narrative, a note refers to
WPO2010-23. However, another plan was approved under WPO2013-69,
where the North SWM Facility layout and vortechs stormfilter were revised.
WPO2013-69 should be noted in the narrative as well. Also, it should be noted
in this proposal that the vortechs location has been shifted slightly to a new
location. Provide revisions to the stormsewer pipes and the vortechs profiles
since it has changed from the previously approved plans.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-11111
Charlottesville•Lynchburg
Page 2 of 4
,/ [Revision 11Comment partially addressed.The note was included,but the
wrong WPO application was noted.Please revise to WP02013-69.
' Response: The note on Drawing Number C-14 has been revised.
5) [Comment] Label existing str 160.1 on sheet C-11.
,/ [Revision 1] Comment addressed.
6) [Comment] On sheet C-10, many existing structures' inverts in/out and top
elevations do not appear to match what was approved in the previous
WP02013-69. It is labeled as existing on this plan, but it is unclear if these
are as-built info or just revisions to the previous plan. Please clarify on the
plan.
[Revision 1] Comments partially addressed. The applicant submitted a
supplemental construction exhibit for clarification.There are still some
discrepancies between profiles, plan and calculations.Please address the
following:
tra) Is the top inlet elevation 473.25,472.35 or 473.19 for Ex
188.Revise profile, calc,and plan sheet C8(second line of
spreadsheet).Note that the construction exhibit shows
473.25.
V Response: The elevations shown on Drawing Number C-8 and C-12 have been
revised to 473.25.
b) On C-12,for Ex 188 to 232,revise"upper end" to 463.34.
- Response: This has been revised on Drawing No. C-12.
v c) On C-12,for 232 to Ex 161, revise"lower end" to 458.55.
Response: This has been revised on Drawing No. C-12.
d) On C-12,for 233 to Ex 160,the"lower end" is 464.72. The
profile states 464.50 and construction exhibit shows 457.20.
Revise so they all match.It appears it will 1 change from the
construction exhibit plan.
Response: The correct invert from 233 to Ex 160 is 464.50. The 457.20 invert is
coming from Ex 160.1. The invert from 233 to Ex 160 is not shown on the
construction sketch.
e) On C-12,for 235 to Ex 212 revise"lower end"to 462.86
Response: This has been revised on Drawing No. C-12.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
.................................................................................................................................................
Charlottesville •Lynchburg
Page 3 of 4
7) [Comment] For str 178 (existing) match top elevation on sheet C-10 with
sheet C-12.
✓ [Revision 1] Comment addressed.
8) [Comment] Is the pipe between existing STR 160-160.1 being proposed or
is it already built? It is shown as a thicker lineweight, but it is not shown in
the profiles. Please clarify.
[Revision 1] Comment partially addressed.The pipes are proposed and
profiles are now included with the plans.It appears the existing str 163 to
162 is a 30" pipe. The profile for str 162 to 161 should also be 30." Please
revise on plan and profile.
Response: The pipe has been updated to a 30".
9) [Comment] For the north swm facility please update the tables labeled
Albemarle Place Pre/Post Development Runoff Analysis, Albemarle Place
BMP Computations Summary and Albemarle Place SWM Facilities
Storage Volume. Please include with the proposed plans. This can be
obtained from sheet C-25 WPO2010-23. Update calculations pertaining to
the north SWM facilities.
[Revision 1] Comment addressed.
D. Erosion and Sediment Control Plan(ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an
ESCP. This plan is disapproved, and the reasons are provided in the comments below. The
erosion control plan content requirements can be found in County Code section 17-402.
1) [Comment] On sheet C-20 under sequence of construction, note no 2 refers
to WPO-200900074. This should be coordinated with the approved
WPO2013-69. Please state in note no 2.
[Revision 1] Comment addressed.
We trust that the above responses and revised plans properly address the outstanding
items. If you have any questions,please contact me.
Sincerely,
WW Associates, Inc.
it) dVY
Robert C. Umberger
Project Manager
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434) 978-1444
.............................................................................................
Charlottesville •Lynchburg
Page 4 of 4
vti�cttylQ
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewers:
VSMP Permit plan review
Stonefield- Block G
WP0201400102
WW Associates, Inc
Albemarle Place EAAP, LLC
29 Dec 2014
14 Jan 2015
Michelle Roberge
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1) [Comment] Include the registration statement in the SWPP booklet.
For future submissions, please use the Albemarle County SWPP template. It can be found in the
following link: http:/ /www.albemarle.ora /dgtforms.asp ?department =cden w o
[Revision 11 Comment addressed. Please note the SWPPP book onsite should include the
latest coverage letter, approved E &S, SWM and 11 "x17" pollution prevention plan.
COMMONWEALTH of f7RGINIA
DEFAK MENTOF&WRde1 MNlAL QUALVT
Mwar add, —: 629 Et Main Sft-L Richmond Vi,&ia 232t9
WMI) I."Wra Man add;—: P -O. B" I ID5, Richnwnd, vowa 232n
m+iexrarlc.
3ard. r± of B.Wd Raourm — .- deq.w4nia.$ov
TA�m
14K-w4w
october 15.2014
Mindy Coltlen
2496 Old Ivy Rd
Charlottesri le, VA 22906
RE Cm&w eunderme2014 WOES Cans twcUonGaneralPenrlh(NRR1U)
Garr el Perm No VAR 100061
Albemarle Place
A'i4ZM1e - cdmrllerclaVRmdenGal
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
Engineering Review Comments
Page 2 of 4
1) [Comment] Include an 11 "x 17" Pollution Prevention Plan map showing concrete washout,
porta johns, fueling stations, and trash containers. This will be marked up by the contractor as
construction of site progresses.
[Revision 11 Comment addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
1) [Comment] The title on the plans should state "VSMP"
[Revision 11 Comment addressed.
2) [Comment] The LOD area noted on sheet C -20 is 4.6 acres. Please provide a note on the title
sheet to clarify that this area is covered under an existing general permit and state the registration
number.
[Revision 11 Comment addressed.
3) [Comment] I compared sheet C -19 of Stonefield Block G to the approved sheet 29 of Stonefield
Block F and G. There are stormsewer pipes on Block G that appear to be existing, but do not
match what was proposed on the previous block F &G plans. The demo sheet clarifies some
revisions to the pipe layout. Please clarify other pipes so it is clear what is already installed, what
are revisions to the previous approved plan under Stonefield Block F & G, and what are new
proposed pipes under this plan. Also, include new profiles for stormsewers if they changed from
the previously approved WPO plans.
[Revision 11 Comment addressed. The applicant submitted a supplemental construction
exhibit for clarification. This plans shows the existing pipes prior to the construction of
stormsewer pipes proposed with this application.
4) [Comment] On sheet C -14, under Stormwater Narrative, a note refers to WP02010 -23. However,
another plan was approved under WP02013 -69, where the North SWM Facility layout and
vortechs stormfilter were revised. WP02013 -69 should be noted in the narrative as well. Also, it
should be noted in this proposal that the vortechs location has been shifted slightly to a new
location. Provide revisions to the stormsewer pipes and the vortechs profiles since it has changed
from the previously approved plans.
[Revision 1]Comment partially addressed. The note was included, but the wrong WPO
application was noted. Please revise to WP02013 -69.
5) [Comment] Label existing str 160.1 on sheet C -11.
[Revision 11 Comment addressed.
6) [Comment] On sheet C -10, many exisiting structures' inverts in/out and top elevations do not
appear to match what was approved in the previous WP02013 -69. It is labeled as existing on this
Engineering Review Comments
Page 3 of 4
plan, but it is unclear if these are as -built info or just revisions to the previous plan. Please clarify
on the plan.
[Revision 11 Comments partially addressed. The applicant submitted a supplemental
construction exhibit for clarification. There are still some discrepancies between profiles,
plan and calculations. Please address the following:
a) Is the top inlet elevation 473.25, 472.35 or 473.19 for Ex 188. Revise profile,
calc, and plan sheet C8 (second line of spreadsheet). Note that the
construction exhibit shows 473.25.
b) On C -12, for Ex 188 to 232, revise "upper end" to 463.34.
c) On C -12, for 232 to Ex 161, revise "lower end" to 458.55.
d) On C -12, for 233 to Ex 160, the "lower end" is 464.72. The profile states
464.50 and construction exhibit shows 457.20. Revise so they all match. It
appears it will l change from the construction exhibit plan.
e) On C -12, for 235 to Ex 212 revise "lower end" to 462.86
7) [Comment] For str 178 (existing) match top elevation on sheet C -10 with sheet C -12.
[Revision 11 Comment addressed.
8) [Comment] Is the pipe between existing STR 160 -160.1 being proposed or is it already built? It is
shown as a thicker lineweight, but it is not shown in the profiles. Please clarify.
[Revision 11 Comment partially addressed. The pipes are proposed and profiles are now
included with the plans. It appears the existing str 163 to 162 is a 30" pipe. The profile for
str 162 to 161 should also be 30." Please revise on plan and profile.
9) [Comment] For the north swm facility please update the tables labeled Albemarle Place Pre /Post
Development Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle
Place SWMFacilities Storage Volume. Please include with the proposed plans. This can be
obtained from sheet C -25 WP02010 -23. Update calculations pertaining to the north SWM
facilities.
[Revision 11 Comment addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17 -402.
1) [Comment] On sheet C -20 under sequence of construction, note no 2 refers to WPO- 200900074.
This should be coordinated with the approved WP02013 -69. Please state in note no 2.
[Revision 11 Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 4 copies of the complete permit package
with a completed application form. All revisions to calculations shall be resubmitted, signed, sealed and
dated.
Engineering Review Comments
Page 4 of 4
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hlt2://www.albemarle.org/deptforms.asp?department--cdengMo
File: E1_vsmp_ review projectname.doc
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
December 22,2014
Michelle Roberge, P.E.
County of Albemarle
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, VA 22902-4596
Re: WP0201400102—Stonefield Block G—VSMP Application
WWA Project No. 213118.01
Dear Ms. Roberge:
Enclosed please find four (4) copies of the revised Final Site Plan for the above-
referenced project. We offer the following responses to your comments dated December
5, 2014 with regard to the Minor Amendment application:
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1)a PPP, (2)an ESCP, (3)a SWMP, and(4)any TMDL measures
necessary.
1) Comment: Include the registration statement in the SWPP booklet.
For future submissions,please use the Albemarle County SWPP template. It
can be found in the followinglink:
http://www.albemarle.org/deptforms.asp?department=cdengwpo
Response: The registration statement is in the SWPPP book located in the site
construction trailer. The SWPPP was prepared by Wetlands Studies and Solutions, Inc.
and has been updated by Wetlands.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1) Comment: Include an 11"x 17"Pollution Prevention Plan map showing
concrete washout,porta johns, fueling stations, and trash containers. This will
be marked up by the contractor as construction of site progresses.
Response: A Pollution Prevention Plan has been added to the SWPPP book in the field
and has been submitted to Albemarle County under separate cover.
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434) 978-1444
Charlottesville •Lynchburg
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or
disapprove a SWMP. This plan is disapproved, and the reasons are provided in the
comments below. The stormwater management plan content requirements can be found in
County Code section 17-403.
`/1) Comment: The title on the plans should state "VSMP".
Response: "VSMP"has been added to the title on Drawing No. C-1.
VComment: The LOD area noted on sheet C-20 is 4.6 acres. Please provide a
note on the title sheet to clam that this area is covered under an existing
general permit and state the registration number.
Response: A note referencing the permit number and the registration number has been
added to the cover sheet.
/3) Comment: I compared sheet C-19 of Stonefield Block G to the approved sheet
29 of Stonefield Block F and G. There are stormsewer pipes on Block G that
appear to be existing, but do not match what was proposed on the previous
block F&G plans. The demo sheet clarifies some revisions to the pipe layout.
Please clarify other pipes so it is clear what is already installed, what are
revisions to the previous approved plan under Stonefield Block F&G, and
what are new proposed pipes under this plan. Also, include new profiles for
stormsewers if they changedfrom the previously approved WPO plans.
Response: The plans reflect current field changes that have occurred. All tops have been
noted on this set of plans.
4) Comment: On sheet C-14, under Stormwater Narrative, a note refers to
WPO2010-23. However, another plan was approved under WP02013-69,
where the North SWM Facility layout and vortechs stormfilter were revised
WP02013-69 should be noted in the narrative as well. Also, it should be noted
in this proposal that the vortechs location has been shifted slightly to a new
location. Provide revisions to the stormsewer pipes and the vortechs profiles
since it has changedfrom the previously approved plans.
Response: Reference to WP02013-69 has been added to the narrative. The Stormfilter
and Vortechs have not changed location in this plan.
/5) Comment: Label existing str 160.1 on sheet C-11.
Response: Structures 160.1 and 162 have been labeled on Drawing No. C-11.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434) 978-1444
Charlottesville•Lynchburg
Page 2 of 4
%owl 44.01
6) Comment: On sheet C-10, many existing structures'inverts in/out and top
elevations do not appear to match what was approved in the previous
WPO2013-69. It is labeled as existing on this plan, but it is unclear if these are
as-built info or just revisions to the previous plan. Please clarify on the plan.
Response: New top elevations have been added to the plan. Inverts were adjusted with
the latest SWM plan review.
17) Comment: For str 178 (existing) match top elevation on sheet C-10 with sheet
C-12.
Response: The top elevation of structure 178 has been updated on Drawing No. C-12.
8) Comment: Is the pipe between existing STR 160-160.1 being proposed or is it
already built?It is shown as a thicker lineweight, but it is not shown in the
profiles. Please clarify.
Response: Structure 161 has shifted with this plan. A new profile from structures 160.1
to 162 has been added to the plan on Drawing No. C-10.
9) Comment: For the north swm facility please update the tables labeled
Albemarle Place Pre/Post Development Runoff Analysis, Albemarle Place
BMP Computations Summary and Albemarle Place SWM Facilities Storage
Volume. Please include with the proposed plans. This can be obtained from
sheet C-25 WPO2010-23. Update calculations pertaining to the north SWM
facilities.
Response: Tables for the North Facility have been added to this plan on Drawing No.
C-12.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code§62.1-44.15:55 requires the VESCP authority to approve or disapprove an
ESCP. This plan is disapproved, and the reasons are provided in the comments below. The
erosion control plan content requirements can be found in County Code section 17-402.
..4) Comment: On sheet C-20 under sequence of construction, note no 2 refers to
WPO-200900074. This should be coordinated with the approved WP02013-
69. Please state in note no 2.
Response: A coordination note has been added to Drawing No. C-20.
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434)978-1444
---------...------
Charlottesville •Lynchburg
Page 3 of 4
We trust that the above responses and revised plans properly address the outstanding
items. If you have any questions,please contact me.
Sincerely,
WW Associates, Inc.
Robert C. Umberger
Project Manager
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434)978-1444
Charlottesville•Lynchburg
Page 4 of 4
�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewers:
VSMP Permit plan review
Stonefield- Block G
WP0201400102
WW Associates, Inc
Albemarle Place EAAP, LLC
5 Dec 2014
12 Dec 2014
Michelle Roberge
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1) Include the registration statement in the SWPP booklet.
For future submissions, please use the Albemarle County SWPP template. It can be found in the
following link: http: // www.albemarle.org /dgtforms.asp ?department= cdengnoo
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
1) Include an 11 "x 17" Pollution Prevention Plan map showing concrete washout, porta johns,
fueling stations, and trash containers. This will be marked up by the contractor as construction of
site progresses.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
1) The title on the plans should state "VSMP"
Engineering Review Comments
Page 2 of 3
2) The LOD area noted on sheet C -20 is 4.6 acres. Please provide a note on the title sheet to clarify
that this area is covered under an existing general permit and state the registration number.
3) I compared sheet C -19 of Stonefield Block G to the approved sheet 29 of Stonefield Block F and
G. There are stormsewer pipes on Block G that appear to be existing, but do not match what was
proposed on the previous block F &G plans. The demo sheet clarifies some revisions to the pipe
layout. Please clarify other pipes so it is clear what is already installed, what are revisions to the
previous approved plan under Stonefield Block F & G, and what are new proposed pipes under
this plan. Also, include new profiles for stormsewers if they changed from the previously approved
WPO plans.
4) On sheet C -14, under Stormwater Narrative, a note refers to WPO2010 -23. However, another plan
was approved under WPO2013 -69, where the North SWM Facility layout and vortechs stormfilter
were revised. WPO2013 -69 should be noted in the narrative as well. Also, it should be noted in
this proposal that the vortechs location has been shifted slightly to a new location. Provide
revisions to the stormsewer pipes and the vortechs profiles since it has changed from the
previously approved plans.
5) Label existing str 160.1 on sheet C -11.
6) On sheet C -10, many exisiting structures' inverts in/out and top elevations do not appear to match
what was approved in the previous WPO2013 -69. It is labeled as existing on this plan, but it is
unclear if these are as -built info or just revisions to the previous plan. Please clarify on the plan.
7) For str 178 (existing) match top elevation on sheet C -10 with sheet C -12.
8) Is the pipe between existing STR 160 -160.1 being proposed or is it already built? It is shown as a
thicker lineweight, but it is not shown in the profiles. Please clarify.
9) For the north swm facility please update the tables labeled Albemarle Place Pre /Post Development
Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle Place SWM
Facilities Storage Volume. Please include with the proposed plans. This can be obtained from
sheet C -25 WPO2010 -23. Update calculations pertaining to the north SWM facilities.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17 -402.
1) On sheet C -20 under sequence of construction, note no 2 refers to WPO- 200900074. This should
be coordinated with the approved WPO2013 -69. Please state in note no 2.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 4 copies of the complete permit package
with a completed application form. All revisions to calculations shall be resubmitted, signed, sealed and
dated.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
Engineering Review Comments
Page 3 of 3
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.