Loading...
HomeMy WebLinkAboutWPO201400102 Review Comments WPO VSMP 2017-06-02Short Review Comments Report for: WPO201400102 SubApplication Type: Stonefield Block G - VSMP Stormwater Management/BMP Plan Erosion and Sediment Control Plan Stream Buffer Mitigation Plan Date Completed:12/12/2014 Reviewer:Michelle Roberge CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/29/2014 Reviewer:Michelle Roberge CDD Engineering Review Status:Pending Reviews Comments:This submittal was just a PPP. I will review with the application on submitted on 12/29/14. Division: Date Completed:01/14/2015 Reviewer:Michelle Roberge CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:02/25/2015 Reviewer:Michelle Roberge CDD Engineering Review Status:Approved Reviews Comments:The applicant submitted a SWPP package. The SWPP and PPP for Block F&G (WPO2013-69) and Block G (WPO2014-102) are the same. See file WPO2014-102 for SWPP booklet. The VSMP permit is for 26.30 acres. Division: Date Completed:03/23/2015 Reviewer:Michelle Roberge CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:04/27/2015 Reviewer:Ana Kilmer CDD Central Intake Review Status:Approved Reviews Comments:4/17/2015 - swa submitted. Incorrect recordatiion fee. 4/22/2015- correct recordation fee was submitted. 4/22/2015 - swa forwarded to CAO for approval 4/22/2015 - swa approved by CAO 4/22/2015 - swa forwarded to county executive for signature 4/23/2015 - swa signed by county executive 4/27/2015 - swa recorded in deed book 4611, page 386 Division: Date Completed:06/02/2017 Reviewer:Bobby Jocz CDD Engineering Review Status:Approved Reviews Comments: Division: Date Completed:06/02/2017 Reviewer:Bobby Jocz CDD Engineering Review Status:Approved Division: Page:1 of 2 County of Albemarle Printed On:October 02, 2017 Review Status:Approved Reviews Comments: Page:2 of 2 County of Albemarle Printed On:October 02, 2017 �pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review Stonefield- Block G WP0201400102 WW Associates, Inc Albemarle Place EAAP, LLC 13 Feb 2015 25 Feb 2015 Michelle Roberge County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. See the process for the bonding procedure below. After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hqp://www.albemarle.org/deptforms.asp?department--cdena3Wo �.►� •,./ ENGINEERS SURVEYORS PLANNERS ASSOCIATES February 6,2015 Michelle Roberge, P.E. County of Albemarle 7?00:e, Department of Community Development 401 McIntire Road, Room 227 ! , 44 ?eon Charlottesville,VA 22902-4596 Re: WPO201400102—Stonefield Block G—VSMP Plan WWA Project No. 213118.01 Dear Ms. Roberge: Enclosed please find four (4) copies of the revised Final Site Plan for the above- referenced project. We offer the following responses to your comments dated January 14,2015 with regard to the Minor Amendment application: A. Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1) a PPP, (2) an ESCP, (3) a SWMP, and(4) any TMDL measures necessary. 1) [Comment] Include the registration statement in the SWPP booklet. For future submissions, please use the Albemarle County SWPP template. It can be found in the following link: http://www.albemarle.org/deptforms.asp?department=cdengwpo [Revision 1] Comment addressed.Please note the SWPPP book onsite should include the latest coverage letter,approved E&S,SWM and 11"x17" pollution prevention Ilan. COMMONWEALTH of VIRGINIA DEPARTMENT OF FNVIRONMF.ATAI,QUALITY Sbare(nddc s.629 Eia Mail Sncet Rtcamand.Virginia 232t9 Map maga WA, Madaw address P 0.Boz 1145,Ricbeaad,Virgieia 21218 uwd IL l a,k 'wary<MAW Remoras we.deqnircoor October 15,2014 i ' 502 Many CWCen 2495 ead Ivy Rd Charlottes.w VA 22906 RE. Coverage under the 2014'WOES Cansnurdion General Pen%(VAR'01 Genteel Pero*No VAR 100061 Mesmer*Race Pewees-Carreneect iefteadenllal 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434)978-1444 Charlottesville•Lynchburg *two' B. Pollution Prevention Plan(PPP) The PPP content requirements can be found in County Code section 17-404. 1) [Comment] Include an 11"x 17" Pollution Prevention Plan map showing concrete washout, porta johns, fueling stations, and trash containers. This will be marked up by the contractor as construction of site progresses. [Revision 1] Comment addressed. C. Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1) [Comment] The title on the plans should state"VSMP". [Revision 1] Comment addressed. 2) [Comment] The LOD area noted on sheet C-20 is 4.6 acres. Please provide a note on the title sheet to clarify that this area is covered under an existing general permit and state the registration number. [Revision 1] Comment addressed. 3) [Comment] I compared sheet C-19 of Stonefield Block G to the approved sheet 29 of Stonefield Block F and G. There are stormsewer pipes on Block G that appear to be existing,but do not match what was proposed on the previous block F&G plans. The demo sheet clarifies some revisions to the pipe layout. Please clarify other pipes so it is clear what is already installed, what are revisions to the previous approved plan under Stonefield Block F & G, and what are new proposed pipes under this plan. Also, include new profiles for stormsewers if they changed from the previously approved WPO plans. ✓[Revision 1] Comment addressed.The applicant submitted a supplemental construction exhibit for clarification.This plan shows the existing pipes prior to the construction of stormsewer pipes proposed with this application. 4) [Comment] On sheet C-14, under Stormwater Narrative, a note refers to WPO2010-23. However, another plan was approved under WPO2013-69, where the North SWM Facility layout and vortechs stormfilter were revised. WPO2013-69 should be noted in the narrative as well. Also, it should be noted in this proposal that the vortechs location has been shifted slightly to a new location. Provide revisions to the stormsewer pipes and the vortechs profiles since it has changed from the previously approved plans. 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434) 984-2700 • Fax(434) 978-11111 Charlottesville•Lynchburg Page 2 of 4 ,/ [Revision 11Comment partially addressed.The note was included,but the wrong WPO application was noted.Please revise to WP02013-69. ' Response: The note on Drawing Number C-14 has been revised. 5) [Comment] Label existing str 160.1 on sheet C-11. ,/ [Revision 1] Comment addressed. 6) [Comment] On sheet C-10, many existing structures' inverts in/out and top elevations do not appear to match what was approved in the previous WP02013-69. It is labeled as existing on this plan, but it is unclear if these are as-built info or just revisions to the previous plan. Please clarify on the plan. [Revision 1] Comments partially addressed. The applicant submitted a supplemental construction exhibit for clarification.There are still some discrepancies between profiles, plan and calculations.Please address the following: tra) Is the top inlet elevation 473.25,472.35 or 473.19 for Ex 188.Revise profile, calc,and plan sheet C8(second line of spreadsheet).Note that the construction exhibit shows 473.25. V Response: The elevations shown on Drawing Number C-8 and C-12 have been revised to 473.25. b) On C-12,for Ex 188 to 232,revise"upper end" to 463.34. - Response: This has been revised on Drawing No. C-12. v c) On C-12,for 232 to Ex 161, revise"lower end" to 458.55. Response: This has been revised on Drawing No. C-12. d) On C-12,for 233 to Ex 160,the"lower end" is 464.72. The profile states 464.50 and construction exhibit shows 457.20. Revise so they all match.It appears it will 1 change from the construction exhibit plan. Response: The correct invert from 233 to Ex 160 is 464.50. The 457.20 invert is coming from Ex 160.1. The invert from 233 to Ex 160 is not shown on the construction sketch. e) On C-12,for 235 to Ex 212 revise"lower end"to 462.86 Response: This has been revised on Drawing No. C-12. 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434) 984-2700 • Fax(434) 978-1444 ................................................................................................................................................. Charlottesville •Lynchburg Page 3 of 4 7) [Comment] For str 178 (existing) match top elevation on sheet C-10 with sheet C-12. ✓ [Revision 1] Comment addressed. 8) [Comment] Is the pipe between existing STR 160-160.1 being proposed or is it already built? It is shown as a thicker lineweight, but it is not shown in the profiles. Please clarify. [Revision 1] Comment partially addressed.The pipes are proposed and profiles are now included with the plans.It appears the existing str 163 to 162 is a 30" pipe. The profile for str 162 to 161 should also be 30." Please revise on plan and profile. Response: The pipe has been updated to a 30". 9) [Comment] For the north swm facility please update the tables labeled Albemarle Place Pre/Post Development Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle Place SWM Facilities Storage Volume. Please include with the proposed plans. This can be obtained from sheet C-25 WPO2010-23. Update calculations pertaining to the north SWM facilities. [Revision 1] Comment addressed. D. Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1) [Comment] On sheet C-20 under sequence of construction, note no 2 refers to WPO-200900074. This should be coordinated with the approved WPO2013-69. Please state in note no 2. [Revision 1] Comment addressed. We trust that the above responses and revised plans properly address the outstanding items. If you have any questions,please contact me. Sincerely, WW Associates, Inc. it) dVY Robert C. Umberger Project Manager 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434) 984-2700 •Fax(434) 978-1444 ............................................................................................. Charlottesville •Lynchburg Page 4 of 4 vti�cttylQ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review Stonefield- Block G WP0201400102 WW Associates, Inc Albemarle Place EAAP, LLC 29 Dec 2014 14 Jan 2015 Michelle Roberge County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1) [Comment] Include the registration statement in the SWPP booklet. For future submissions, please use the Albemarle County SWPP template. It can be found in the following link: http:/ /www.albemarle.ora /dgtforms.asp ?department =cden w o [Revision 11 Comment addressed. Please note the SWPPP book onsite should include the latest coverage letter, approved E &S, SWM and 11 "x17" pollution prevention plan. COMMONWEALTH of f7RGINIA DEFAK MENTOF&WRde1 MNlAL QUALVT Mwar add, —: 629 Et Main Sft-L Richmond Vi,&ia 232t9 WMI) I."Wra Man add;—: P -O. B" I ID5, Richnwnd, vowa 232n m+iexrarlc. 3ard. r± of B.Wd Raourm — .- deq.w4nia.$ov TA�m 14K-w4w october 15.2014 Mindy Coltlen 2496 Old Ivy Rd Charlottesri le, VA 22906 RE Cm&w eunderme2014 WOES Cans twcUonGaneralPenrlh(NRR1U) Garr el Perm No VAR 100061 Albemarle Place A'i4ZM1e - cdmrllerclaVRmdenGal B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. Engineering Review Comments Page 2 of 4 1) [Comment] Include an 11 "x 17" Pollution Prevention Plan map showing concrete washout, porta johns, fueling stations, and trash containers. This will be marked up by the contractor as construction of site progresses. [Revision 11 Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1) [Comment] The title on the plans should state "VSMP" [Revision 11 Comment addressed. 2) [Comment] The LOD area noted on sheet C -20 is 4.6 acres. Please provide a note on the title sheet to clarify that this area is covered under an existing general permit and state the registration number. [Revision 11 Comment addressed. 3) [Comment] I compared sheet C -19 of Stonefield Block G to the approved sheet 29 of Stonefield Block F and G. There are stormsewer pipes on Block G that appear to be existing, but do not match what was proposed on the previous block F &G plans. The demo sheet clarifies some revisions to the pipe layout. Please clarify other pipes so it is clear what is already installed, what are revisions to the previous approved plan under Stonefield Block F & G, and what are new proposed pipes under this plan. Also, include new profiles for stormsewers if they changed from the previously approved WPO plans. [Revision 11 Comment addressed. The applicant submitted a supplemental construction exhibit for clarification. This plans shows the existing pipes prior to the construction of stormsewer pipes proposed with this application. 4) [Comment] On sheet C -14, under Stormwater Narrative, a note refers to WP02010 -23. However, another plan was approved under WP02013 -69, where the North SWM Facility layout and vortechs stormfilter were revised. WP02013 -69 should be noted in the narrative as well. Also, it should be noted in this proposal that the vortechs location has been shifted slightly to a new location. Provide revisions to the stormsewer pipes and the vortechs profiles since it has changed from the previously approved plans. [Revision 1]Comment partially addressed. The note was included, but the wrong WPO application was noted. Please revise to WP02013 -69. 5) [Comment] Label existing str 160.1 on sheet C -11. [Revision 11 Comment addressed. 6) [Comment] On sheet C -10, many exisiting structures' inverts in/out and top elevations do not appear to match what was approved in the previous WP02013 -69. It is labeled as existing on this Engineering Review Comments Page 3 of 4 plan, but it is unclear if these are as -built info or just revisions to the previous plan. Please clarify on the plan. [Revision 11 Comments partially addressed. The applicant submitted a supplemental construction exhibit for clarification. There are still some discrepancies between profiles, plan and calculations. Please address the following: a) Is the top inlet elevation 473.25, 472.35 or 473.19 for Ex 188. Revise profile, calc, and plan sheet C8 (second line of spreadsheet). Note that the construction exhibit shows 473.25. b) On C -12, for Ex 188 to 232, revise "upper end" to 463.34. c) On C -12, for 232 to Ex 161, revise "lower end" to 458.55. d) On C -12, for 233 to Ex 160, the "lower end" is 464.72. The profile states 464.50 and construction exhibit shows 457.20. Revise so they all match. It appears it will l change from the construction exhibit plan. e) On C -12, for 235 to Ex 212 revise "lower end" to 462.86 7) [Comment] For str 178 (existing) match top elevation on sheet C -10 with sheet C -12. [Revision 11 Comment addressed. 8) [Comment] Is the pipe between existing STR 160 -160.1 being proposed or is it already built? It is shown as a thicker lineweight, but it is not shown in the profiles. Please clarify. [Revision 11 Comment partially addressed. The pipes are proposed and profiles are now included with the plans. It appears the existing str 163 to 162 is a 30" pipe. The profile for str 162 to 161 should also be 30." Please revise on plan and profile. 9) [Comment] For the north swm facility please update the tables labeled Albemarle Place Pre /Post Development Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle Place SWMFacilities Storage Volume. Please include with the proposed plans. This can be obtained from sheet C -25 WP02010 -23. Update calculations pertaining to the north SWM facilities. [Revision 11 Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1) [Comment] On sheet C -20 under sequence of construction, note no 2 refers to WPO- 200900074. This should be coordinated with the approved WP02013 -69. Please state in note no 2. [Revision 11 Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 4 copies of the complete permit package with a completed application form. All revisions to calculations shall be resubmitted, signed, sealed and dated. Engineering Review Comments Page 4 of 4 Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hlt2://www.albemarle.org/deptforms.asp?department--cdengMo File: E1_vsmp_ review projectname.doc ENGINEERS SURVEYORS PLANNERS ASSOCIATES December 22,2014 Michelle Roberge, P.E. County of Albemarle Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902-4596 Re: WP0201400102—Stonefield Block G—VSMP Application WWA Project No. 213118.01 Dear Ms. Roberge: Enclosed please find four (4) copies of the revised Final Site Plan for the above- referenced project. We offer the following responses to your comments dated December 5, 2014 with regard to the Minor Amendment application: A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1)a PPP, (2)an ESCP, (3)a SWMP, and(4)any TMDL measures necessary. 1) Comment: Include the registration statement in the SWPP booklet. For future submissions,please use the Albemarle County SWPP template. It can be found in the followinglink: http://www.albemarle.org/deptforms.asp?department=cdengwpo Response: The registration statement is in the SWPPP book located in the site construction trailer. The SWPPP was prepared by Wetlands Studies and Solutions, Inc. and has been updated by Wetlands. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1) Comment: Include an 11"x 17"Pollution Prevention Plan map showing concrete washout,porta johns, fueling stations, and trash containers. This will be marked up by the contractor as construction of site progresses. Response: A Pollution Prevention Plan has been added to the SWPPP book in the field and has been submitted to Albemarle County under separate cover. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434) 978-1444 Charlottesville •Lynchburg C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. `/1) Comment: The title on the plans should state "VSMP". Response: "VSMP"has been added to the title on Drawing No. C-1. VComment: The LOD area noted on sheet C-20 is 4.6 acres. Please provide a note on the title sheet to clam that this area is covered under an existing general permit and state the registration number. Response: A note referencing the permit number and the registration number has been added to the cover sheet. /3) Comment: I compared sheet C-19 of Stonefield Block G to the approved sheet 29 of Stonefield Block F and G. There are stormsewer pipes on Block G that appear to be existing, but do not match what was proposed on the previous block F&G plans. The demo sheet clarifies some revisions to the pipe layout. Please clarify other pipes so it is clear what is already installed, what are revisions to the previous approved plan under Stonefield Block F&G, and what are new proposed pipes under this plan. Also, include new profiles for stormsewers if they changedfrom the previously approved WPO plans. Response: The plans reflect current field changes that have occurred. All tops have been noted on this set of plans. 4) Comment: On sheet C-14, under Stormwater Narrative, a note refers to WPO2010-23. However, another plan was approved under WP02013-69, where the North SWM Facility layout and vortechs stormfilter were revised WP02013-69 should be noted in the narrative as well. Also, it should be noted in this proposal that the vortechs location has been shifted slightly to a new location. Provide revisions to the stormsewer pipes and the vortechs profiles since it has changedfrom the previously approved plans. Response: Reference to WP02013-69 has been added to the narrative. The Stormfilter and Vortechs have not changed location in this plan. /5) Comment: Label existing str 160.1 on sheet C-11. Response: Structures 160.1 and 162 have been labeled on Drawing No. C-11. 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434) 978-1444 Charlottesville•Lynchburg Page 2 of 4 %owl 44.01 6) Comment: On sheet C-10, many existing structures'inverts in/out and top elevations do not appear to match what was approved in the previous WPO2013-69. It is labeled as existing on this plan, but it is unclear if these are as-built info or just revisions to the previous plan. Please clarify on the plan. Response: New top elevations have been added to the plan. Inverts were adjusted with the latest SWM plan review. 17) Comment: For str 178 (existing) match top elevation on sheet C-10 with sheet C-12. Response: The top elevation of structure 178 has been updated on Drawing No. C-12. 8) Comment: Is the pipe between existing STR 160-160.1 being proposed or is it already built?It is shown as a thicker lineweight, but it is not shown in the profiles. Please clarify. Response: Structure 161 has shifted with this plan. A new profile from structures 160.1 to 162 has been added to the plan on Drawing No. C-10. 9) Comment: For the north swm facility please update the tables labeled Albemarle Place Pre/Post Development Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle Place SWM Facilities Storage Volume. Please include with the proposed plans. This can be obtained from sheet C-25 WPO2010-23. Update calculations pertaining to the north SWM facilities. Response: Tables for the North Facility have been added to this plan on Drawing No. C-12. D. Erosion and Sediment Control Plan (ESCP) Virginia Code§62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. ..4) Comment: On sheet C-20 under sequence of construction, note no 2 refers to WPO-200900074. This should be coordinated with the approved WP02013- 69. Please state in note no 2. Response: A coordination note has been added to Drawing No. C-20. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434) 984-2700 •Fax(434)978-1444 ---------...------ Charlottesville •Lynchburg Page 3 of 4 We trust that the above responses and revised plans properly address the outstanding items. If you have any questions,please contact me. Sincerely, WW Associates, Inc. Robert C. Umberger Project Manager 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434) 984-2700 •Fax(434)978-1444 Charlottesville•Lynchburg Page 4 of 4 �pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review Stonefield- Block G WP0201400102 WW Associates, Inc Albemarle Place EAAP, LLC 5 Dec 2014 12 Dec 2014 Michelle Roberge County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1) Include the registration statement in the SWPP booklet. For future submissions, please use the Albemarle County SWPP template. It can be found in the following link: http: // www.albemarle.org /dgtforms.asp ?department= cdengnoo B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1) Include an 11 "x 17" Pollution Prevention Plan map showing concrete washout, porta johns, fueling stations, and trash containers. This will be marked up by the contractor as construction of site progresses. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1) The title on the plans should state "VSMP" Engineering Review Comments Page 2 of 3 2) The LOD area noted on sheet C -20 is 4.6 acres. Please provide a note on the title sheet to clarify that this area is covered under an existing general permit and state the registration number. 3) I compared sheet C -19 of Stonefield Block G to the approved sheet 29 of Stonefield Block F and G. There are stormsewer pipes on Block G that appear to be existing, but do not match what was proposed on the previous block F &G plans. The demo sheet clarifies some revisions to the pipe layout. Please clarify other pipes so it is clear what is already installed, what are revisions to the previous approved plan under Stonefield Block F & G, and what are new proposed pipes under this plan. Also, include new profiles for stormsewers if they changed from the previously approved WPO plans. 4) On sheet C -14, under Stormwater Narrative, a note refers to WPO2010 -23. However, another plan was approved under WPO2013 -69, where the North SWM Facility layout and vortechs stormfilter were revised. WPO2013 -69 should be noted in the narrative as well. Also, it should be noted in this proposal that the vortechs location has been shifted slightly to a new location. Provide revisions to the stormsewer pipes and the vortechs profiles since it has changed from the previously approved plans. 5) Label existing str 160.1 on sheet C -11. 6) On sheet C -10, many exisiting structures' inverts in/out and top elevations do not appear to match what was approved in the previous WPO2013 -69. It is labeled as existing on this plan, but it is unclear if these are as -built info or just revisions to the previous plan. Please clarify on the plan. 7) For str 178 (existing) match top elevation on sheet C -10 with sheet C -12. 8) Is the pipe between existing STR 160 -160.1 being proposed or is it already built? It is shown as a thicker lineweight, but it is not shown in the profiles. Please clarify. 9) For the north swm facility please update the tables labeled Albemarle Place Pre /Post Development Runoff Analysis, Albemarle Place BMP Computations Summary and Albemarle Place SWM Facilities Storage Volume. Please include with the proposed plans. This can be obtained from sheet C -25 WPO2010 -23. Update calculations pertaining to the north SWM facilities. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1) On sheet C -20 under sequence of construction, note no 2 refers to WPO- 200900074. This should be coordinated with the approved WPO2013 -69. Please state in note no 2. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 4 copies of the complete permit package with a completed application form. All revisions to calculations shall be resubmitted, signed, sealed and dated. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to Engineering Review Comments Page 3 of 3 discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforins.asp?department--cdengMTo File: E1 vsmp review projectname.doc