Loading...
HomeMy WebLinkAboutSDP201700043 Review Comments Final Site Plan and Comps. 2017-10-03County of Albemarle Department of Community Development Memorandum To: Dustin Greene (dgreene@dominioneng.com) From: Megan Yaniglos, AICP- Principal Planner Division: Planning Services Date: August 10, 2017 Rev1: October 3, 2017 Subject: SDP-2017-043 Hollymead Town Center BI C6- Final Site Plan The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Requirements: 1. [32.5.2(b); COD] Provide sidewalk to the property line all the way along Meeting Street. It should be provided to the north of the proposed alley entrance. Rev1: Comment not addressed. 2. [32.7.9] Provide the number of required street trees and the number provided. Rev1: Comment not addressed. 3. [32.7.9] Street trees are required along Laurel Park Lane, a landscape easement may be needed for these trees. Rev1: Comment not addressed. 4. [32.5.2] [32.7.9] Any required street trees outside of the right of way will require a landscaping easement in the form of a plat and a deed stating the maintenance of those trees. Rev1: Comment not addressed. 5. A plat will need to be approved for all easements prior to final site plan approval. Additionally, remove the subdivision plan from the site plan set. A separate subdivision plat with an application and fee will be required for the subdivision of the lots and is not approved with the site plan. Rev1: Comment not addressed. 1 Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext. 3004 for further information.